Professional Documents
Culture Documents
MOSQUE
PLOT LIMIT
BOUR H
OUSE
EXISTING U
NDER GRO
UND
WATER TA
NK
EXI : PARKIN
G
R HOUS
E
31150
EXISTING GAS
ROOM
EXISTING CHILLERS
PROPOSED G.W.T.
30900
WATER TREATMENT
EXISTING
COLD STORE
ION
DIESEL TANK
UNDER CONS. C
EXI : PARKIN
G
EXISTING FA
CTORY -1
G LABOU
45000
EXISTING FA
CTORY-2 (Ca
EXISTIN
PLOT LIMIT
pri-Sun)
EXISTIN
G LA
ION
EXI : PARKIN
G
convex mirror
Existing Interlock
LEVL+1816
LEVL+2060
UNDER CONS. S
LEVL+1835
EXISTING FACT
ORY-3
LEVL+2100
SLOPE
8250
LEVL+1769
1:7 (80 )
SLOPE
1:7 (8 0)
SLOPE
1:7 (8 0)
SLOPE
DISTRIBUTION C
ENTER-PHASE 1
1:7 (8 0)
SLOPE
1:7 (8 0)
EXISTING STOR
E
TORE
EXISTING FACT
ORY-4
HIGH SPEED LIN
E
PLOT LIMIT
45150
CHC-01
CHC-02
CH-02
EXISTING WAS
TE AREA
8250x4900
4900
10
UNDER GROUND
WASTE WATER TANK
4900
SLOPE
1:7 (8 0)
SLOPE
1:7 (8 0)
SLOPE
1:7 (8 0)
SLOPE
EXISTING F.G. S
1:7 (8 0)
SLOPE
1:7 (8 0)
11
CH-01
SEPTIC TANK
PLOT LIMIT
AL-AIN ROYAL
D.SH1
AL-AIN ROYAL
AL-AIN ROYAL
RESERVOIR B.O.S
4500
CDP-01
WATER TANK
CD-TANK
CWP-02
CWP-02
RESERVOIR B.O.S
4500
CWP-02
CWP-03
RESERVOIR B.O.S
4500
PHP-01
CDP-01
CWP-01
TWP-01
SC-01
AL-AIN ROYAL
PUMP ROOM FFL FLR.
0
RESERVOIR B.O.S
4500
RESERVOIR B.O.S
4500
AL-AIN ROYAL
DETAIL A
TANK
AL-AIN ROYAL
TYPICAL HORIZONTAL SPLIT
CASE PUMP DETAIL
TYPICAL HORIZONTAL SPLIT CASE PUMP DETAIL
AL-AIN ROYAL
FM-200 SYSTEM INSTALLATION
DETAIL ISOMETRIC DIAGRAM
AL-AIN ROYAL
D.SH1
AL-AIN ROYAL
AL-AIN ROYAL
D.SH1
AL-AIN ROYAL
AL-AIN ROYAL
D.SH1
AL-AIN ROYAL
SYSTEM DESCRIPTION
THE PLANT , CURRENTLY CONSUMES A TOTAL OF 2400 M3 / DAY OF
DOMESTIC WATER.
2-
34-
567891011-
SEQUENCE OF OPERATION
THE WATER SYSTEM SHALL BE OPERATIONAL YEAR-ROUND AND CLOSELY MONITORED BY SCADA
MONITORING AND CONTROL SYSTEM.
WATER SUPPLY FOR NEW AND EXISTING TANKS:EACH TANK WILL BE UNDER CONTROL OF :a.
b.
c.
MOTORIZED OS&Y STAINLESS STEEL GATE VALVES FCV. VALVE POSITION WILL
BE MONITORED BY PICV . VALVES WILL BE PLC CONTROLLED (OPEN AND
CLOSE) , BASED ON THE LIC/LIT READINGS AND LEVEL SETS DEFINED BY
OPERATOR.
d.
CIRCULATING WATER PUMPS (CWP 1,2,3):EACH TANK SHALL BE SERVED BY TWO DEDICATED HORIZONTAL SPLIT CASE CENTRIFUGAL
CIRCULATING . PUMPS OPERATION SHALL BE UNDER CONTROL OF :1. PLC CONTROL AS TO CONTROL ON/OFF IN LEAD LAG SELECTOR TO ALLOW ANY OF THE
CIRCULATING PUMPS TO ACT AS THE LEAD MACHINE. PUMP SHALL OPERATE IN
SCHEDULE AND DURATION SET BY THE OPERATOR AND MONITORED BY LEVEL
SWITCHES. THE CONTROLLER SHALL ALSO INCORPORATE CONTROL DEVICES FOR
MONITORING AND CONTROL :a.
b.
c.
d.
e.
f.
g.
h.
TRANSFER WATER PUMPS (TWP ):TRANSFER WATER PUMP SHALL BE SERVED BY TWO DEDICATED HORIZONTAL SPLIT CASE
CENTRIFUGAL CIRCULATING . PUMPS OPERATION SHALL BE UNDER CONTROL OF :1. PLC CONTROL, AS TO CONTROL ON/OFF IN LEAD LAG SELECTOR TO ALLOW ANY OF THE
TRANSFER WATER PUMPS TO ACT AS THE LEAD MACHINE. PUMPS ALTERATION OF
OPERATION SHALL BE IN SCHEDULES AND DURATIONS SET BY THE OPERATOR.
2. ULTRASONIC LEVEL SENSOR AND TRANSMITTER LIC/LIT OF THE EXISTING TANK. THE
SENSOR SHALL OPEN AND CLOSE THE MOTORIZED VALVE PCV , BASED ON OPERATOR
DEFINED LEVEL
3. UPON DETECTING ANY OF FEEDING VALVES PICV OPEN THE PUMP SHALL START,
4. UPON DETECTING ALL PICV CLOSED THE PUMP SHALL STOP
5. THE PUMP LOGIC CONTROLLER ALSO BE UNDER MONITOR AND CONTROL OF a.
b.
c.
d.
e.
f.
g.
h.
CLR/CLI
PHR/PHI
2-
3METER PUMP SHALL ALSO BE UNDER CONTROL OF CLHL AND PHL SENSORS. AS TO
STOP THE METERIN PUMP IN CASE OF EXCEED ALLOWABLE LEVELS.
AND
AL-AIN ROYAL
NaCOL
METERING UNIT
PH ACID
METERING UNIT
ABOVEGROUND
WATER TANK (3)
EXISTING GROUND
WATER TANK
EXISTING GROUND
WATER TANK
ABOVEGROUND
WATER TANK (3)
EXISTING GROUND
WATER TANK
EXISTING GROUND
WATER TANK
ABOVEGROUND
WATER TANK (3)
AL-AIN ROYAL
PUMPS SCHEDULE
PACK-01
MIXING SECTION
CONDENSER DATA
UNIT DIMENSIONS
COOLING COIL
COMPRESSOR
FILTERS
BED NO 1
BED NO 2
AL-AIN ROYAL
PENETRATION OF DUCTS
THROUGH ROOF SLAB
FLOOR CLEANOUT
DUCTS ISOLATION
DUCT INSTALLATION
ON ROOF
AL-AIN ROYAL
VOLUME DAMPER DETAIL
NTS
TYPICAL BRANCH TAKE-OFF FITTING
N.T.S.