Sl.

no Rapdrp
1 RAPDRP GIS CONNECTION SETUP
2 Kownledge Transfer on RAPDRP GIS
3 Requirment gathering from TCS
4 RAPDRP application tools study
5 RAPDRP application tools discussion
6 R-APDRP GIS tranning session conducted by TCS
7 Implementation of job and assiging job in Rapdrp gis application
8 Rapdrp studying the project
9 GIS MOBILE APP FEASIBILITY REPORT STUDY
10 CHECKING AVAILABILITY OF GIS JOBS IN MAPS.
11 Rapdrp - Verifying compliance of summary report with map data
comparison of summary report of LT connection with manual report of LT
12 connection
13 verification of intranet all module and preparing report
14 Preparing sheet of Rapdrp Estimate cost of project
15 Verification of each intranet module and preparing report
16 Updation of excel format of intranet Module
17 Verification of each intranet module and preparing report
18 CAT Module
Installing Drivers, Certificates and updating user's system to IE9 and Java 1.8 to
19 meet eOffice minimum requirements.
Collected Resource Allocation Forms for Net connection from eoffice users, who
20 didn't have Internet Connection in HRD,ACCOUNTS,DPE,O&CS wings.
21 Active Directory.Joining PC's to Domains in IT wing.
22 Working on gis rapdrp project document preparation
Working on gis rapdrp project document preparation completed and feature list
shared and discussion with esriindia for feability report for the moblie apps
23 developement
Working on gis rapdrp project document preparation completed and feature list
shared and discussion with esriindia for feability report for the moblie apps
24 developement
Working on collected data sample data from techsoft and interactive ersiindia
25 person
Coordinating with GM IT,ADE KISHOREand ersiindia person for WEBEX meeting
26 for moblie apps demo explaination
27 co-oridnating ersi india person for further requirment data for GIS moblie apps
28 verifying the collecter data moblie application
29 verifying the collecter data moblie application and e office
30 e office installation in sethammadhara divison office
31 verifying the collecter data moblie application on field
32 prepared report for updation of moblie gis apps
33 work on EPCCB_OH and SECTION TABLE for comparing of data

34 checking collector data mobile gis apps on desktop application

working on gis rapdrp project document preparation