TECHNICAL SPECIFICATIONS

PART 1 - GENERAL

1.1

RELATED DOCUMENTS

SCOPE OF WORK
Unless otherwise specified, the Contract or his subcontractor shall furnish all materials, tools,
equipment, apparatus, appliances, accessories, transportation, labor and supervision required for the
complete installation and testing of the Building Systems ready for use in accordance with the best
practice of the Building Trade as listed herein but not limited to the following:
1. The General Contractor is required to refer to all architectural, structural, mechanical, fire
protection and electrical plans and investigate all possible interference and conditions affecting
his work.
2. All work shall comply with the pertinent provision of the National Building Code of the Phils.
3. Furnish materials and equipment and perform labor required to complete the following:
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.

Sitework
Formworks
Steelworks
Concreting
Woodworks
Moisture Protection
Doors & Windows
Finishes
Specialties
Plumbing
Electrical

Preparation and submittal of two (2) sets of as built plans.

PART 2 -- PRODUCTS
A. UNIT MASONRY
B. WOOD
1. Kitchen and closets
2. Wood handrail

C. STEEL
1. Steel railing
D. MOISTURE PROTECTION
3. CONCRETE TILE ROOFS
4. WATERPROOFING

E. DOORS & WINDOWS


1. ALUMINUM WINDOWS
2. WOOD DOORS
3. FLUSH DOORS

E. FINISHES

2. FIBERCEMENT BOARD

3. LAMINATED WOOD FINISH


4. SOLID WOOD FLOOR

5. VITRIFIED TILE FINISH


6. PAINTS & COATINGS