You are on page 1of 3

Doosan Heavy Industries

Vietnam
Dung Quat Economic Zone,
Binh Thuan, Binh Son, Quang Ngai,
Vietnam
T +84 55 5618 900
F +84 553 618 950

20.Jan.2012

V.H.PHONG J.Y.JEONG

K.J.LIM

For Information

07.Dec.2011

V.H.PHONG J.Y.JEONG

K.J.LIM

For Information

Rev.

Date

Drawn

Checked

Approved

Details of Revision

Owner :

AES-VCM MONG DUONG


POWER COMPANY LIMITED

Owner's Engineer :

Contractor :

Project :

PC

MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT UAS :

Title :

T10206-QE01-P0ZEN__-040201
INSPECTION AND TEST PLAN FOR
ELECTRICAL CONDUIT INSTALLATION

T10206-QE01-P0ZEN__-040201

QE01

Unit :

P0

KKS :

ZEN

Reg. No. : 040201


Revision :

Drawing No. :

T10206

Page-No :

B
1 of 3

ITP for Electrical Conduit Installation

Doc. No.

T10206-QE01-P0ZEN__-040201

Rev. B

Contractor

DOOSAN

2 of 3

AES-VCM

This note is only applicable for AES-VCM Mong Duong

Detailed Legend

Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.

Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document


attesting to the satisfactory performance of the related test or inspection for review by
AES-VCM Mong Duong.

Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.

Hold Point / Downstream construction and other activities shall not proceed
without attendance or any written approval of AES-VCM Mong Duong.

NOTE : The Site ITP and all of the abovementioned reports will be kept available by
DOOSAN at anytime for control and or review by AES-VCM Mong Duong.

Page 2

Item Name

Oper. No.

KKS Description

Abbreviation :
Note :

Doc. No.

T10206-QE01-P0ZEN__-040201

Rev. B

Contractor

DOOSAN

Page 3

AES-VCM

ITP for Electrical conduit installation

Inspection & Test Activities


Applicable Code &
Subcontractor DOOSAN
AES-VCM
Standard Documentation
A
Sign
A
Sign
A
Sign

Inspection Process

Verification Document

1.0

Material Approval

Project Specification

2.0

Verify installed location

Construction Drawing

3.0

Steel conduit installation

Construction Drawing

Inspection Sheet

4.0

PVC installation for Duct Bank (before pouring concrete)

Construction Drawing

Inspection Sheet

S: Surveillance

R: Report Review

W: Witness Inspection

H: Hold Inspection

All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

page3

Quality Record

Remarks