You are on page 1of 8
105. 182.189/201208.27 1105 /0VORM pesctiesiaes Caety Mtoe Binh Thuan, Bia Sen, Quang Nash BEF economic zene, ‘F104 85 5618 900 #F to4.se3 618 059 2ajosri2 | Danny | HSOh | KulLim [Fortnfemation ate | orawn | checked | Approved Detals of Revision a Rew. Jowner : COMPANY LIMITED Ce AES-VCM MONG DUONG POWER Jowner's Engineer = (Contractor = (ifiiii-7- 0.4 Doosan Heavy Industries Vietnam Project lc: T10206 MONG DUONG II 2X S6OMW (NET) COAL FIRED POWER PROJECT |UAS : QEO1 lunit : PO litle T10206-QE01-POZEN__-040210 INSPECTION |xxs : zen AND TEST PLAN FOR eS OAODIO: ISOLATED PHASE BUSDUCT(IPB) cael INSTALLATION Revision + A Drawing No: Page-No 710206-QE01-POZEN-040210 ios Page 1 Copytign by Dosan Hear ndusiss Vietnam. Co.Lt. AU Rpts Rasered 105.182 158/ 201208270917) OvORM ZEEE pagina rrpsortre tovation — €Qazs-vew ‘roms cen- Pozen 1070 Detailed Legend NOTE: This note is only applicable for AES-VCM Mong Duong ‘Survetance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong ‘except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan. Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by ‘AES-VCM Mong Duong. ‘Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not. Hold Point / Downstream construction and other activities shall not proceed ‘without attendance or any written approval of AES-VCM Mong Duong. The Site ITP and all of the abovementioned reports will be kept available by DOOSAN at anytime for control and or review by AES-VCM Mong Duong. Page 2 Cope Coste HearyIndustes Via, Co,L. ALRs Reber. ‘SuoneapbedS Tose] ue uoTDadsuy as panaidde a Gyn Gouepsaane W/peULOned Oy WS UOTE oqgedsu OHH UoNDedSu| SsouNA MM —_ Mey HoHoy'y soURIHLMG's ConepUSUOSRT INCRE | ee pee Soansen uonemnsurse;Ayntonpuco seasng 38240 vin | poem pavenea ie mw] [ml [al cemingeeios porowos 9 sugep pUE YenP Ie esu3] OLA a "paqiea 5 anna we : ibaeemaeis - 7 a “voddns ansojous jonpsng awe ay] 99 a -sOumnesp Oy 300 3e Aud erate fre * ba = eve yea oy aseyd pue soseyd uaenyoq soueieaig| 88 rcopEpUSUTIADST ee etc se) ese) | ec eee ee] se patente pene oar -socoiurenmsaancepusy | jyo[ eq o44 jo endoyssounyBp ot ¥oet| od se Faoepuawnieoer uonejersuy Ssanpenve oof [a] fm) fa ‘emnsopus gal oto Guprm drayawareouo| 98 | ag aonepveunuese: ie natupatreeeage| =|) [ml |e volonpuco dl oun 0 Supram dr-y aul =uO] ga = BUATeS SOG PIRI his eee ee Mm “ 7 oy a1 spue eunsojoue yonpsnq ew ew ensus] YA ‘seme pause ‘SnO}o4 PUB JOXSEB 7800.0 04) Bulan ua eee st [sls -e1jo6oy proncn ove uonDes eunsopua enpsnal °8 paene “SFISOBG a bowie ee * * Wy ue soyonpUED geil 1480 303 yoyo) C8 aay ~ojsod pue saunas Ma ‘ paper oi ™ Me LW ‘Hoddns yanpsna jo jena] 1oau09 ay oeug| 8 cA toeonnazoa sree alee sy Suraed we eyoal ~bood-20z01408N) Supe “1000-9020 1.LSM Bupped | pue ‘sinu ‘sueqsng jo ojyPUOD jeoIsKyd ay yeUD| "pas WN 1s Burge ul fal fw vs Buyoeg 5138 Bupped » Oumesp syeinjeywew eueBe] Ly wauidinbo pojetoosse pue gal Avan Put ¥90U0 ac j Tse [es] ves Ty moe) vounca enwon [wosaY [wvso0G | vos] ss pn ow m0) een so Seay 1 9 wojeeduT | 9000 prow wena . ‘seqnsnpuy Assay uesoog er vom dpaceamiannee ce aad eee @ 1179 woRsodsuy bela 10.8102. 353/20120827 0.17 ovoR stots Cae Inspection Check List Fae TPB rtalaon Chet Rate Drawing Dae Syesife aan cueck mem eon © Agpov]——_Obseved Rest Ne Inspection cemens Ye [No | Nia Rema Motel Ree | __[ehes and veaty PB and assocntd equipment agabst manufactures crewing & packing its conect >| Check he pysieateondton of busbars, rus, an Bae 2 at packing iat TPB stllaon 7 [Eisai ore ivel of bust cuppa avucires an pasion. 2 [heck tor cantare of PS conductor and enclosure. > [tscet enclosure secon are coverd together using the proper gaskot and boone — [Enso tat the Gusev entnure endear Kol caveed ear couning. 3 __[thock te tun weting ofthe PB conductor 6 |eeck tne Mp woting ofthe IPS Enclosure. 7__[Ohesk he ighiness of he xe oint ots 7 [Serance been poses and paso fo oar arses per AFC drawings. | [eck tat te beac encionire 8 appar aac earths 10 [rau al ust and debi is removes eck by: (Sutconst)] DOOSAN Elica! Dep] DOOSAN QAIQC Dept. agswvem Nene iSigmuze _—_|Nane&'Siamwe | Nave@Sigmuve [Nano @ Signe Peion Psion Poston Poston Du Date Dac Dae mae Page 4 ‘cont Donen Haines Vieam. Co. Ale Rasen. Isolated Phase Lie) Dosen en stes c) AES-VCM Vielen Busduct (IPB) Electrical Inspection of IPB Certificate No. Systom Voltage: wv Drawing No, Rev: ‘Aroa/Unit No: te From To: 4 pusbar conductivity Test: Tester used! Tester SI. Not Gireut Designation Busbar conduciviy, ut ne From [70 i 2 B N E Notes: 1. Conductibility measurements shall be carried out between end to end. 2 ausbor Insulation Resistance Test: kV!__Mins) Testor used: Tester SI, No: L1-((2L3NE) Mohms 12 -(L1 L3 NE) Mohs L3-(L1 L2 NE) Mohms NE -(L1L2.N3) Mohms ‘3 Busbar High Voltage Test: Applied Voltage: ‘Tester used: Time Duration Tester SI. No Teakage Gurrent in| __GZiane Daan Gag aNE TSE uA 4 femer i Subcontractor DOOsAN AESVOM Name: Signature: ata: page 5) g.oted Ted raunyeusis| me wonsav nysooa sopenvosgns o 6 8 Z 8 | § + [es [= [oo Seam ESC MT oun to WSA-SAV @& (galsonpsng eseyg peyejos| BES givermome Igolated Phase Busduct(IPB) = AES-vcm Welding Visual Inspection we Oven suv [ ssn | see | moet | useno | wise | WOT [wren 1 2 a 5 ° ° ° © sebconctor 00s sven nrc: ov pase Doosan Heaw industries € ags.vem| PAGE: 8 OF 6 Vietnam L REBORTNO: TORQUE TEST REPORT LOCATION: [DRAWING NO > IKKS NO = MAKE = TORQUE TEST [Test equipment. [Serial no: ‘Calibration Due date: NO | BOLT LOCATION TORQUE SETTING BOLT SIZE RESULT | REMARK checked resut cade G Good NG: No good NA: Notappleabla caitey Tae Sas Date Fama sue IDHI hes

You might also like