You are on page 1of 9
1.5 18248 2012.08.28 088 EVER Geran terri ‘Binh Yous, Blab Sem, Qoang Noah, ‘T5238 $618 200 tna 689 616 950 & [dohfi2 | Darwy | sy Jeong | Ki.Lim |For tntrmaton Rev. | Date | Drawn | Checked | Approved Detals of Revision Owner : AES-VCM MONG DUONG POWER COMPANY LIMITED [Owners Engineer Contractor + be feyeEF-11'F Doosan Heavy industries % Vietnam project: pc: T1206 MONG DUONG Ii 2X 560MW (NET) COAL FIRED POWER PROJECT |UAS : QEOL Tle : T10206-QE01-POZEN__-040208 INSPECTION AND TEST PLAN FOR UPS & BATTERY.CHARGER INSTALLATION Revision : A Drawing We: Page No : a 710206-QE01-POZEN-040208 7 Lofs Page 1 ‘conan by Dosen Heat uses Vietnam, Co.Ltd. A Rpts Reserved 106.182:150/201208:2 14:28 0¥0RM Gey ITP for UPS & Battery ch Pree Dosti ndnis for ry charger - ven Installation fmeithci This note is only applicable for AES-VCM Mong Duong ‘Survellance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong ‘except for the first or last operation on the basis of each process. AES-VCM Mong Duong ‘could check the operation, if he is present at the site during the inspection by Doosan. Report Review Polnt / DOOSAN / Subcontractor Is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by ‘AES-VCM Mong Duong. \Witness Point / DOOSAN / Subcontractor shall submit request for Inspection to AES-VCM to decide whether they will attend such inspection or not. Hold Point / Downstream construction and other activities shall not proceed without attendance or any written approval of AES-VCM Mong Duong. NOTE: The Site TTP and all of the abovementioned reports will be kept available by DOOSAN at anytime for control and or review by AES-VCM Mong Duong. Page 2 \CopihtbyDooran Heavy tes Vom Co, ABFght Reserves ‘soogeaybadg Hsoigia 6] pu UnjoedSH alg parade ay yew eavepIcoGe uw puuejed oa fas UONPeGEA Ly aie) vorpadsu oH HH vanoedsu Sau mM MAREYOdaYy soURyBKNg'g :uonRAalAAy| WN vse peeve 03 M ™ 4 seeosoa1 woos ayeq a4 fo UoseyRUEA puE Bu “a vepemieaom soo sees 7 on wn cece ae ™ ™ 4 a pee dueo ove 4g pur oo! Jo Busou eines) 8 vn verve pape om M ” 4 oven ovguop| Aouico pus pape! se sjoge}»2040) 28 vn ry pm ms M ” 4 | semssieserneesuzoa | povosutose sos pueweuco oe Sunes ear Auer] 98 uot vn ™ M 4 ens oe! ce heyeisure are uoraeuuns pune wousdnbe pu joued 111809 jones me pojoadsu | vn sspeme poem ™ ™ 4 cvezooat YWouuEyp pus uopewove ovenuisan eta eu aunsua}] 78 vn verap pion ms M mM 4 | sears sa oeeea mua sterol evionoaje ayo] €a vin saree papa ae m m 4 | starssissansocouoa fomoas pue eves exe uojoouuocsewy seuenea eyo) za ao! 000 90 Hs “sGumeip Oay # vowonasu YIN} zocortwazodtooe soos a ¥ | coomnszosicoowntt |, grape os poques sme oy BuaHONaE] yg : a Tnaoou a poyRosee pun roy aa ten Sune u a 8 "sr upped exoyonu‘sougoe ‘sauea jo uonpuce eu yoeuo] | eueien'y vas |v [as [v | ats woureog ueagan Paina smog vopedsu cy nd0 | ue ny won a4 musta sousnpudacoyuesoce RA, semenazausen ei, 4, uoHoadsu : uorpodsu pH wopoedst IMIR wanaxy oda von] uonessaay| “suogndisip ew OG ou 66 Oak] 24840 s1009 zea pue uo. yum sajrgro pasoive| mppoWo pousene 0 4 19 ae a ™ betaehie ‘vouwwoo Uy payeSu 94} axe Waysks Ans 2v6| wudinbo s940-a6 yp Las}20}0 pub SIO\OAU OU RN | wedeu sex age 012951 ™ 4 nso Sejgeo joauod pus S9146°) org ‘suyo-efous 00 Jnog J0)9894,kunujuag pue aoUESIsay Lose] 3 vos ey ebuang a9 ™ 4 serie Suyueg pue regsng UIeR 10} 80 SOUEISISOY sis lunuguia ot abcess ‘gol seq Guy uo} swyorefou ogy | MSP omkeIs a8 * ‘ bitte ue zeqing UW 20}380) courrsisey uoneineyy) Y9 heyeisurg a ys. sad 0 1995 19031 ol see Sure pu sagsag WEY 40} 90), and, we in maecuyy) YORU Boa ™ 4 eerig9a ‘jolseq Sungeg pue seqsng UH Jo} 891 andio4| CLE vn sos peut 1.91 M H 99209 031 ‘Auedoid porsejoxd ote soxoq sesny Kionieg 399K0) ZL sjevorea vn varoax9 pager ot ™ 4 Sumy pu soyosu0d huesso0au nans| 1a pareInsuy uo pawunou 29 012 em ‘Pomuued jou oe uoypouu joo.0}4 PEPION vn ™ H | seoucei9 80 ooo2o wLom pareinsut Aang 2q pinoys uopoauu09 yaosoiut ays] 0-8 ig wis |v | 8s |v weunsog uoneowen — | wonsay | N¥S000_fepenvooans| « sso uooodsy, on 1800 | 9¥eN w= sa 9 oqe=d5H a ra paseo WOA-SHV e& soqnsnpur Aa vi wenmreczosimosen — | avs ee usta €@ AES-VCM Inspection Check List Project [UPS & Batter) Charger Checklist Tet Ne Drawing No Specific Location CHECK ITEM eiieaton & Approval Observed Result Inspection elements Yer [ Ne | NA "Remarks ‘Material Recspt [Check the condiion of Batlares, Raia, Invarors lend associated materials whle receiving \Gheck Satire, Recifer, veriere and associated \detae with respect tothe Batteries, Rectifiers, Inverters land associated technical particulars Bastres [Floor fnigh complete, Clean and Free Wom debris [Foor or wals Thing Installed [Racks assembled as per manufachrers nstuclons and [AFC drawing, Battery cel undamaged Battery placement and terminal oveniavon correc [Cableslinierooanealion are covecland secure HOUaNG ‘mechanical connections and grounding 2s per AFC drawings. [Room verdlaton are functioning, “Terminal and MSrCOnnECIOTS COVerEG with PrOTSEWVE [Eyewash and protecive clothing loperating propery. ‘avaiable and 0 [Ensure that proper lavel of elaolyie and specie gravity are correct and maintained, checked by: (Subcontract) DOOSAN Electrical Dept | DOOSAN QAIQC Dept ABSVCM, Position Date Name & Signatae Name & Signature | Name & Signanre Position Position Date Date Name & Signature Position Dae ages Soxenon hts €e AES-VCM. sees Inspection Check List Fret UPS & Bary Charger Checks Rel No Drawing No Date Specific Lacetion HECK ITEM eiicaion & Approval ‘Observed Result No Inspection elements 7 Yes [ No | WA ‘Remarks UPS , Bary Charger and State Transfer Switch 1 |Ensure base plate and fixing are correct 12 {Ensure no damaged to equipment ae instalation is ‘secured and alignment are verified and correc. 5 Merifed grounding re instal as per detain AFC léraning. 4 [Rooms, cabinets end enclosure shall be cean and secured 4 | Tghiness ofa cable connections and bus joni fs 28 loer manufactures recommendation. «¢ |The base ofthe swichgear panels sal be sealed wth Iroproct of closures to seal tho outgoing power cables. Checkat by: (Subcontractor) DOOSAN Ekstical Dept, DOOSAN QNQC Devt AES-VCM Name & Signature Name & Signature [Named Signature | Name & Signature Postion Poston Position Peston Due Date Dute Date Besa enti SWITCHGEAR TEST REPORT REPORT NO; PAGE: 7 OF 9 LOCATION: MAKE : KKS NO: BAR & EARTHING BUS MY SWGR. TORQUE TEST (MAIN BUS BAR) (Calibration Due date: [Serial no = BOLT SIZE Test equipment ‘TORQUE SETTING RESULT No BOLT LOCATION MAIN BUSBAR EARTAIN MAIN /EARTHING| G BUSBAR | BUSBAR | BUSBAR. REMARK |Chocked result code G: Good NG : No good NA: Not applicable Name Signature Date Remark [Certified by ‘SUB DEI AES S RECORD NO: Micra insets €@ acsvem SWITCHGEAR BUSBAR TEST REPORT [DRAWING NO : IKKS NO. MAKER. ‘TEST EQUIPMENT MAKE MODEL SERIAL NO. ‘CALIBRATION DUE DATE MV BUSBAR CONTACT RESISTANCE CHECK (ua) REFERENCE SOLID BUS Joint LOCATION BUSBAR BAR ut 2 L3 N G une [ N | 6 INSULATION RESISTANCE MEASUREMENT Phase to Phase Phase to Earth at ‘Test Voltage = L1-L2 12-13 |L3-L1| L1-E | 12-E | L3-E COMMENTS: [Certified by Name Signature Date Remark SUB OHI AES tay ai @ REPORT NO: Metron AES-VCM PAGE 9OF 9 CABLE TEST REPORT ‘tie Locmnonnnens LV CABLE CONTINUITY AND MEGGER TEST castexos |, DNEOGERTEST maa) ‘CONTINUITY PROVED | FROM 70 ees Gages Des [os ee TS NOTHING FOLLOWS Jere COMMENT: DOOSAN AESVCM Jsianarure: __ |srenarure: i wane: ante: Joare: loxre: See

You might also like