UMTS 900MHz Trials Outcomes

DR5 Milestone 08Wk15

Olivier CHARTON / Geraldine HENRY / Christelle FOUQIAU / Emilie


ROUSSEAU-TULMETS
LTE / WCDMA Technology Introduction
April, 2008

UMTS 900MHz Program

Milestone Summary: TI Team

Product: UMTS 900MHz (9311 BTS)


Milestone date: 08Wk13.4 (updated Wk15)

Recommendation:

Milestone: DR5
Date of review: March 27th, 2008

GO with Limitations(*)

Approvers: Director: C.S. Dubois

Release Leader: Mirna Plainfoss

Point still to be closed (Delivery planned Wk14)

WNE U900MHZ Deliverables (HLTP/ DTP / Handbook) - DONE

DR5 Limitations(*):

Perf & Stab Monitoring on 900MHz cluster with real end-users traffic not done (no FUT available during Trials)

=> Action Plan: Need to perform a soak period (Stab & Perf monitoring) when U900MHz will be deployed and commercially open with enough endusers traffic (around 1000 Calls per BTS per Days for both CS & PS services). New counters interBand Mobility to be tested also (Feat.28356)
=> Risk: SW issues or instabilities when load will increase could happen.

HSUPA Service in the 900MHz Band has no been validated due to no UE available in the trials timeframes

=> Action Plan: R&D to plan formal tests campaign to give Green Light for HSUPA services with U900MHz (some basic tests already done low risk)

Proven of U900 enhancements versus U2100 not achieve on the field (mainly for Tput and Coverage enhancements)

=> Action Plan: WNE to get results ASAP from Bytel ongoing trial in order to definitely conclude on those topics
=> Risk: Gap between theoretical study versus live measurement could lead to business issue (on recommended lower number of sites for example)

SW Dependencies:

Recommended Load Line-up is OAM5.2.3 / RNC-BTS 5.1.3 to take into account latest fix of issues found during trials.
Minimum Load Line-up (without major issue) is OAM5.1.3 / RNC-BTS 5.0.3 (but RNC build required see slides)

HW Dependencies:

DDSM Module (for antenna sharing) is out of this DR5 scope


AISG not supported on U900MHz DDM (Band E & P)
BTS 9332 rCompact (OD) is not supported with 900MHz Frequency Band

2 | Presentation Title | Month


2 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

UMTS 900MHz DR5 Milestone


Introduction
> UMTS 900MHz is designed to enhanced coverage for rural area (site count
reduction) and to improve indoor penetration in urban environment
> Real FOA customer has not been found but two Trials had taken place
between September07 and March08 with:
Orange customer in France (Testbed + Field trial in rural environment)
Indosat (Indonesia) Phase 1 & 2 (Testbed + Field trial in rural environment)
A 3rd Trial with Bytel is ongoing in Urban/Suburban environment
> Out of this DR5 scope:
RRH 900MHz
DDSM Module (for antenna sharing) but R&D validation now completed
without issue and Module + Kit are orderable (see MOPG).

3 | Presentation Title | Month


3 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

No HW Issue or Failure
has been found during
U900MHz Trials

UMTS 900MHz DR5 Milestone


HW Line-Up (see MOPG document)

HW STATUS

> U900MHz BTW HW Boards (for Macro 9311 Indoor & Outdoor)
xTRM:
NTBY17EA - MOD: xTRM BAND08 RoHS VERSION For 900 MHz (Band VIII)

DDM:
NTUM40JA - MOD: DDM BAND08_E For 900 MHz (Band VIII) - Lower frequency band (880-905
UL;925-950 DL). Do not mix with Band08_P in the same cabinet.
NTUM40JM - MOD: DDM BAND08_P For 900 MHz (Band VIII) - Upper frequency band (890-915
UL;935-960 DL). Do not mix with Band08_E in the same cabinet.

SCPA: (single carrier)


NTUM30GA PA: 55W SCPA BAND08 900 UMTS - ROHS VERSION For 900 MHz (Band VIII)

RF Cable (for Outdoor BTS only):


NTU779EA CABLE: RF DDM/BLKHD LP 850/900MHZ - Cable DDM/BLKHD for 850/900 MHZ

> Supported configurations: OTOR1, BTBR1, STSR1 & 1+1 (no 2nd carrier)
> Tx Splitter not supported
> Full cabinet is now orderable and ready to be delivered with U900MHz
modules fully cabled (no more loose boards only)
> AISG features are not supported by U900 DDM (E or P). No 900MHz TMA
currently available in ALU portfolio. Could be purchased directly to other
suppliers and to be used through RETA Line or Bias-T kits with CCU.
> BTS 9332 rCompact (OD) is not supported for 900MHz Frequency Band
> Combo GSM/UMTS BTS 18000 (ind & out) is no more supported
4 | Presentation Title | Month
4 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

UMTS 900MHz DR5 Milestone


SW Qualification Status

No GATING SW Issue has


been found during
U900MHz Trials

SW STATUS

> Software release dependency:


Minimum load line-up:

OAM5.1.2
UMTS Freq Band into 2 objects: Build necessary (see slide 7)
UA5.0.2
Restriction: HHO U2100U900 issue

First Recommended load line-up:

OAM5.1.3
Build still mandatory (see slide 7)
UA5.0.3
HHO fixed

Latest Recommended load line-up:


OAM5.2.3
UA5.1.0.3

> BTS U900MHz Installation (modules replacement) + Commissioning and Integration


into shared RNC and OAM successfully done:
One issue (RNC rebuild needed at U900 first integration): Fixed in OAM5.2.3 (see slide 7)

> Limitation: HSUPA has not been verified due to no Mobile availability in this timeframe.
UIIV/IOT plan not yet defined. Just a quick check done by IOT with good results on Tput
(UL=1.2Mbps / DL=5.8Mbps with QCT 7200A)
> Limitation: Perf & Stab Monitoring on 900MHz cluster with real end-users traffic not
done (no FUT available during Trials)
Risk: SW issues or instabilities when load will increase could happen.

> Mobiles availability: See dedicated slides in Back-up section

Issue seen on the field with NK pucini U900 UE has not be reproduced in CVN Testbed: AR
1-1783166 to be closed.

5 | Presentation Title | Month


5 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

POR STATUS

UMTS 900MHz DR5 Milestone


POR Qualification Status
> POR Features Listing:

GREEN LIGHT 32025: 900MHz NodeB


Out of Scope 33651: Antenna Sharing (DDSM new module)(Availability Q1/Q208 on track)
Only for sharing with Evolium 2G BTS and for two DRX maximum

> Related Features (driven by UA5.0 SW Extended team IPT):


GREEN LIGHT 33111: RNC support for Dual Band (900/2100)
GREEN LIGHT 33017: Mobility Handling in 3GPP R7 Frequency Bands
Issue seen with Nokia pucini not reproduced
Partially Tested 28356: Multi-band support (900/2100)

+ New counters screening in OAM5.2 **NOT TESTED**


GREEN LIGHT
32805: Multi Wireless Band OAM (and decorrelation STM1/OC3: Not Tested)
Two Issues Fixed
One issue (RNC rebuild needed at U900 first integration): Fixed in OAM5.2.3
One issue regarding PA900 info display at GUI: Fixed in OAM5.2.3

6 | Presentation Title | Month


6 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

UMTS 900MHz DR5 Milestone


Main known issue, fix plan & Workaround

Fixed in OAM5.2.3 planned 08Wk17


Fixed
AR
1-1742917

VO_OCV:TB:OAM5.2.1:CM:not possible to
add a frequency band in the parameter
OPERATOR.

P2

in
OAM
V5.2.3

7 | Presentation Title | Month


7 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

Workaround: Before fix availability, a RNC build is


mandatory to take into account new frequency list
addition at start-up in the two objects
Operator/nodeBCommonParam/dlFrequencyList
and ulFrequencyList . (RNC Maintenance Window
to be planned once). In addition, It is not
mandatory to change the object
Operator/frequencyBandList to add & activate a
new band (otherwise all the NE have to be deleted
& re-created).

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

DOC STATUS

UMTS 900MHz DR5 Milestone


Documentation Status

> Technical documentation: Installation Methods, NTP


No comments seen on-site

> Engg documentation at DR5:


Solcom deliverables (MOPG, eCAT, PFeBOM) : done (UMTS 900 and 850).
UMTS Outdoor RF design Guidelines : done (UMTS 900 and 850).
Eng'g Strategy & Rules & FMG for Mobility : done (UMTS 900 -will be applicable to
UMTS 850 when inter-band mobility will be introduced)
PEI BTS & RNC : done (UMTS 900 and 850).
HSxPA Engineering Guide : done (UMTS 900 and 850).
HSxPA Handbook (internal) : done (UMTS 900 and 850).
UPUG and CIQ : no specificity for UMTS 900 or 850 has been noted. So UA05.0
versions of these doc are applicable without modification for UMTS 850/900.
Templates : Current UA05.0 templates apply to UMTS 900/850 with minor change.
No need for dedicated template is expected.
Multirectifier dimensioning rule: done
UMTS900 Engineering Handbook (UMT/IRC/APP/024798 V01.01/EN)
UMTS900 Engineering Detailed Test Plan (UMT/IRC/APP/024797 V01.01/EN)
UMTS900 Engineering High Level Test Plan (UMT/IRC/APP/024796 V01.01/EN)

> See TIL Package for full picture)

8 | Presentation Title | Month


8 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

TOOLS STATUS

UMTS 900MHz DR5 Milestone


Tools Status

> Scanner 900MHz


Difficult to be found and to be funded
Compatibility with XCAL now OK
Couei 900MHz drivers successfully validated with Anritsu scanner ML8740 in Core
Eng'g Labs => GREEN Light WNE

> XCAL recommended SW load to support U900MHz


XCAP-W 4.90.40 (Currently Wk13: Beta version) available to fix:
Voice Call Statistics Issue
XCAP crashes with Qualcomm when performing 3G-2G HHO

9 | Presentation Title | Month


9 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

RADIO STATUS

UMTS 900MHz DR5 Milestone


U900 Improvement vs U2100 Status & Co-Existence
Not Proven
YELLOW
(frequency error)

> Coverage (U900 improvements vs U2100 and G900)


> Dead Zone tests for non co-localized scenario and co-localized scenario

Not Proven

> Better Throughput with U900 (HSxPA)

Not Proven

> Indoor Penetration Improvements

GREEN

> Mobility Status

GREEN

> Co-Existence with U2100

See specific U900 WNE


documents for more
details (Handbook, RF
design, HLTP/DTP)

No Specific recommendation
GREEN

> Co-Existence with G900


See U900 Handbook

Pass-Band
> Co-Existence with CDMA850
Filter needed
Proven of U900MHz enhancements versus U2100MHz not achieve on the field
(mainly for Tput and Coverage expected enhancements)
(Some gains had been shown but not possible to say how much)
=> Action Plan: WNE is committed to get results from Bytel ongoing trial (during Phase 2 from
Wk18) in order to definitely conclude on those topics
=> Risk: Gap between theoretical study versus live measurement could lead to business issue
on recommended expected lower number of sites or Tput values for examples

10 | Presentation Title |

10 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

UMTS 900MHz DR5 Milestone


Test Qualification Status (Lab & Live)

TESTS STATUS

> Installation (modules): OK


> Commissioning: OK(AR 1-742995 fixed in OAM5.2.3)
> Integration: OK

(AR 1-742917 fixed in OAM5.2.3)

> Basics Defense & Robustness TC: OK


> Basics OAM (CM / FM): OK
> Basic CALL-P (R99 CS & PS / HSDPA / Multi-service): OK
+ Endurance done by FT R&D: OK

> Basic Mobility scenario (SHO, HHO U900U2100, U900=>2G): OK


3G(U900)=>2G(GSM900) HHO Threshold to be tuned if needed
AR 1-1783166 (NK pucini issue) closed (not reproduced in lab)

> RF Test (3GPP TS25.141) + Co-Existence RF Test done by FT R&D with


various frequency spacing (2.8/2.6 etc): OK

11 | Presentation Title | Month


11 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

FOA-Like Exit Quality


Criteria have partially
fulfilled

UMTS 900MHz DR5 Milestone


FOA-Like Exit Criteria Status
Domain

Exit Criteria STATUS

Status

Target Criteria / Comments

Network KPI

GOOD VALUES
(as expected)
No Degradation Seen during Drive Test
(but U900 improvements versus U2100
not really proven due to hilly area and
tools issues)

KPI defined by PLM thru an external FRS. FOA is measuring only a subset of
criteria in live. Subset selection agreed with FOA Customer. Other KPI are
measured in lab by R&D.
Measured KPI during FOA: CSSR, CST, CDR for CS, PS R99 and HSDPA as
well as Throughout for R99 and HSDPA Mono & Multi-users.

Performance monitoring metrics

DONE WITHIN ORANGE FR LIVE


NETWORK.
GOOD OVERALL PERFORMANCES.
NO REGRESSION DUE TO U900 BTS
INTRODUCTION HAS BEEN OBSERVED.
But done in a no-traffic environment
for U900 band

Performance metrics selection monitored during FOA have been agreed


with FOA Customer.
One Site was bad performance but due cell planning issue. No trouble
found on the Micro BTS itself after quick KPI assessment.

Around 100 days on 6 BTS


Soak duration on
UA5 BTS product

600 Cumulative Days of soak period


(>1000+ for SCPA / DDM)
(no HW failure nor U900 Boards SW Traps
has been observed TBC)
But done in a no-traffic environment
for U900 band

(U900 Related) - Unfixed P1

0 STILL OPEN
(0 Fixed during the FOA)

(U900 Related) - Unfixed P2

0 STILL OPEN
(4 Future Deliverable All others to be
closed)

(U900 Related) - Unfixed P3

0 STILL OPEN
(1 To be closed)

% POR validated @DR5

12 | Presentation Title |

BC case linked to CR (product defect). Target is 0 case BC open / 0 P1


open
MJ case linked to CR (product defect). Target is No GATING Major Cases
open, all Open P2 CR should have agreed fix planned with FOA customer.
MN case linked to CR (product defect). Commitment is to fix remaining
minor cases with customer's agreement.

80%
32025, 33111, 33017, 28356, 32805

12 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

Minimum of 150 Cumulative Days of soak for UA5.

# features validated in Live @ DR5 / # of external features in POR

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

Orange 900MHz Trial


Summary & Outcomes

13 | Presentation Title |

13 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

Orange Trial STATUS

UMTS 900MHz DR5 Milestone


Orange Trial - Summary
> Start Date = 07Wk46
> End Date = 08Wk11

> Scope: Evaluate benefits of deploying UMTS at 900Mhz (including HSDPA)


including Antenna sharing coupling solution 2G/3G 900MHz (Orange solution)
o focus on coexistence of UMTS and GSM on same band (different carrier spacing)
o focus on coverage UMTS 900 versus UMTS 2100
o focus on functional tests (R99 & HSDPA)

> Key achievements:


First Live UMTS 900Mhz call on Orange network in 2007
Successfully demonstrated readiness of 900Mhz Alcatel-Lucent technology
Gain of 900Mhz versus 2100Mhz not really proven (area & tools issues)

> HW deployed:
6 * U900Mhz NodeBs (including 1 co-located 2100-900 site) with DDM-P
Type of coverage: Rural (in hilly environment) + One site for indoor penetration

> SW Load line-up:


Lab line-up UA5.0.3-TAP2/OAM5.1.2
Live line-up is UA5.0.3-TAP2/OAM5.2 (RNC50302073802s/BTS V05D1.1 E11.1)
OAM & RNC was U2100/U900 Shared Mode

14 | Presentation Title |

14 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

UMTS 900MHz DR5 Milestone


Orange Trial Issues Summary
AR Number

Loc.

Sev.

Field

P2

Field

P2

Field

P2

UMTS900:5.0.3:OTCell - no data in perf server:


1-1778607 OTCell Vau Germain OAM Activation well done but
no data reported

Field

P2

NO HSDPA traffic in case of multi-RAB CS or CSD:


1-1783166 Nokia Puccini (6121) & Multi service issue. No
HSDPA traffic in case of Multirab (CS or CSD)

Field

P3

1-1764394

Title
NBAP common RTWP Measurement wrong reporting
period in Call Trace.
Stability: Data recovered for December 13th,

1-1762226 January 3rd, 6th 15th RNC: AP SWERR and Reset on


December 13th at 12h21 (RNC).
1-1763083

HSDPA HHO (900/2100) not successful (HSDPA


Compress Mode activated):

Issue with handover from U900 to GSM 900 on UA5:


1-1796711 When the mobile is leaving the UMTS 900 coverage Field
the Inter Rat procedure is not triggered.
VO_OCV:TB:UA5.0.3:BTS:Display Frequency TIL
1-1744927
TB
command with wrong UARFCN Formula Offset
VO_OCV:TB:OAM5.1:DOC:Umtsfrequencybandlist is
a class 0 parameter. To integrate 1 UMTS900BTS
1-1759554 under a UMTS2100RNC we need to build the RNC.
The modification of this OAM parameter lead to a
RNC build.

P2
P2

TB

P3

1-1742995

VO_OCV:TB:OAM5.1:xTRM Card name set as


unknown in the equipment monitor.

TB

P2

1-1742917

VO_OCV:TB:OAM5.2.1:CM:not possible to add a


frequency band in the parameter OPERATOR.

TB

P2

15 | Presentation Title |

15 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

Status

Comments

INTERNAL. NBAP measurement for Call trace are not raised and
UL RSSI is raised every 20s instead of every 60s (depending on
closed parameter). Not reproducible by GPS.
CR DCT00016240 opened Small impact on RNC: 1/50 of service
FD UA loss. The issue (RAB assert) occurs during a call over IuR. 4 cases
V5.1.0.3 over 9 weeks of trial. Fixed in MNCL 5.1.0.3 load 08WK29. AR to
be closed. Not U900 Related.
parameter modification has been applied. Re-test successfully
CLOSED done Thursday, 24th and traces have shown that the HHO was
properly performed. AR to close. Parameters issue.
Wednesday, 16th. Data well reported & collected Thursday, 17th:
To be issue update: only Tx carrier power Not HSDPA measurement is
closed reported. Missing Rtwp (UL RSSI) and Tx carrier power: under
investigation
Test Multi-RAB CS/CSD + HSDPA successfully passed with
To be Qualcomm. Issue not reproduced in Cevennes lab with NOKIA
closed 6121C (01.01) / V04.09 / 210907 / RM-308 version (same version
live mobile).
To be

To be
closed

3G (U900) to 2G HHO successfully done in Lab. New parameters


updated. No more issue found.

FD UA

INTERNAL. Fix will be delivered. AR To close. Just a matter of TIL


V5.1.0.3 display (no service impact)
To be
closed

This AR track lack of documentation. Product Defect is FD


OAM5.2.3 (see AR 1-1742917). Explanations & Workaround
provided through NodeB 850MHz/NodeB 900MHz Introduction
charts package.

FD OAM AR tracked by CR Q01786082. fix is delivered in OAM V5.2.2.3. AR


to close. OAM5.2.2 is delivered W04 & OAM5.2.3 is planned W16
V5.2.3 (or 17) already delivered (last RFU Orange)
FD OAM Fixed in OAM5.2 release being the Live load to be used ==> No
impact on live deployment. OAM5.2.2 is delivered W04 already
V5.2.3 delivered (last RFU Orange). AR to close

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

Indosat 900MHz Trial


Summary & Outcomes
(phase 1 & 2)
16 | Presentation Title |

16 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

Indosat Trial STATUS

UMTS 900MHz DR5 Milestone


Indosat Trial - Summary

> Configuration: 2 BTS (3 sectors) with use of U900MHz Nod-B boards (per BTS):
1xTRM
3xSCPA-55W
3xDDM-P

> UE: Option datacards and QCT 900MHz


> Type of coverage: Rural
> Phase1:
Start Date = 07Wk45
End Date = 07Wk51
Scope:
Lab and Live I&C.
First calls (CS, PS, HSDPA)

Results:
All acceptance tests are successfully completed (including CS HO 3G to 2G)
Maximum possible throughput reached: HSDPA 3.2 Mbps with Cat8 mobile
(Limitation from NSN SGSN at 3,6Mbps)
Issue:
Coverage improvement between 2100 / 900 UMTS has never been really proved
during that trial. As well not proved due to Antenna connection issue UMTS900
coverage improvement versus GSM900 coverage
3G2G HHO Threshold to be clarified (voice quality degradation before HO if
Orange thresholds are applied (2100MHz values)

17 | Presentation Title |

17 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

Indosat Trial STATUS

UMTS 900MHz DR5 Milestone


Indosat Trial - Summary

> Phase2:
Start Date = January08
Duration = 2 weeks
Load line-up: UA5.0.2 / OAM5.1.2
Scope: Demonstrate U900MHz functionalities to VP from Indosat + Postel (regulatory)
Results:
Successfully passed (Voice and Video call, 3G2G HHO, PS R99 call, HSDPA Tput,
Mobility scenario)
With up to 3 UE in // = 1.5Mbps each with 10SF4 code max. at RNC level
Up to 3Mbps for one user (limited by PS CN)
Ping RTT OK
Mobility:
HSDPA 3G2G HHO, SHO
CS, CSD: SHO, SSHO
RF interferences measurements (with spectrum analyzer) with GSM900: No impact
with only 2.6MHz spacing
With CDMA850 done: Need to use a CDMA pass band filter to reduce CDMA
interferences on UMTS 900MHz spectrum
Issues:
3G2G HHO Threshold to be clarified (voice quality degradation before HO if Orange
thresholds are applied (2100MHz value)
U900 Coverage improvements versus G900 not really proven but roughly same
distance achieve despite GSM antenna installed 10 meter higher than UMTS ones
and with the same tilt.

18 | Presentation Title |

18 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

UMTS 900MHz DR5 Milestone


Indosat Trial Issues Summary
AR

Title

Loc.

Severity

Field

P2

No update for now from RNC TEC. Minor issue but still an issue
To be closed impacting IOT testing where ATMSPY is used as protocol
analyzer. No update from local support since 07Wk50.??

Field

P2

UE issue (no Mobile issue reproduce in lab. CR 00018171 on mobile 6280


Qualcomm: This a UE bug linked to "processing limitations"
fix plan)
with chipset hsdpa cat 8. For the moment, no fix planned.

1-1760817 ATMSPY 5.0 R7 hang on PS RANAP decoding

Field

P2

RANAP relocation required for HHO CS 3G/2G


1-1758318 is sent in loop even radio condition for HHO
are not met anymore

Field

P2

Field

P2

CLOSED

Unstable FTP transfer recovered only by RNC reset shelf after


more than 100 FTP files of 150Mbytes. PS Core network issue.

Field

P2

CLOSED

No more such issue found during January test execution


(should be a core network issue then).

TB

P2

Field

P2

CLOSED

Solution: Please enable isLocationReportUponChangeOfSai


Allowed in Location Services Managed Object

Field

P2

To be closed

Problem can not be reproduced on site with CS and PS service


being active at the same time (no more delay for PS core).

CLOSED

The problem for LUREJ was due to only ciphering+integrity


activated sent by CN CS and in RNC is set to
cipheringdisableignored+integrity. The changes made
through Object Editor to enable the ciphering not working
well, where OMC doesn't check for "kasumi". Changes need to
be done using WiPS.

Number
1-1760817

ATMSPY5.0 R7 and any other version do not


capture RANAP RESET messagesMultirab VT+HSDPA, the picture for Video call

1-1761832 will be stucked if the download throughput


more than3Mbps

1-1754637

HSDPA CAT 8 Tput degraded from 3Mbps


stable to 700Kbps

Video Call Problem (50% Success rate) from


1-1751744 Qualcomm 6280 (900MHz) to 2100Mz
commercial mobile
1-1751807

HSDPA Throughput Stability in Cable Mode


Configuration

1-1751898 RNC not support event change-of-service area


1-1750992

1-1745379

RANAP RESET for IuPS take too long to be


ACKNOWLEDGE by RNC

Location Update Rejected due to SECURITY


MODE REJECT

19 | Presentation Title |

19 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

Field

P1

Status

Comments

No update from RNC TEC but related to NSN Nokia-Siemens


SGSN IOT. Could not be found anymore on site after startup
trace files installed.
Could not be reproduced on site since MSC was answering
Not
positively or negatively but answering something (issue of no
Reproducible answer from MSC was related to SS7 routing issue). No update
from local support since 07Wk50.??
Duplicate

Diversity Antenna connection must be connected to get stable


To be closed HSDPA Tput. Could not get such stable Tput in live network
connection (maybe Antenna issue).

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

BYTEL 900MHz Trial


Ongoing

20 | Presentation Title |

20 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

BYTEL Trial STATUS

UMTS 900MHz DR5 Milestone


Bytel ongoing Trial Progress Status
> Start Date = 08Wk03
> End Date = 08Wk44
> Scope / Configuration:

Mainly done by Bytel with support and optimization services provided by ALU
Phase1:
6 sites 2100 MHz + 1 site 900 MHz
End of engineering optimization: W10, W12 (including report completion)
Successfully done

Bouygues Telecom's tests: W11 -> W14


Phase 2 (from Wk18)

W12 -> W18

LINE UP:

OAM 5.1.2 EP4


UA 5.0.2 EP2
BTS UNB05D110312

1 site U2100 + 6 sites 2100 swapped in U900


Phase 2 parameter proposal (ALU): W18 & W19
On-site activities: Pre-optim and optim (tilts + neighboring + parameters, ALU): W20 -> W23

Bouygues Telecom's tests: W24 -> W41


Phase 3:

900->2100 ALU (6 nodes B U900 from Phase 2) + removal of U900 site (ALU): W42 & W43
Phase 3 pre-optim + optim ALU (tilts + neighboring + parameters): W43&W44

> Configuration: DDM-E is used


> Type of coverage: Urban/Suburban
> Goal: RF Study to prove U900 enhancements versus U2100 as well as co-existence with
existing G900 layer
> In order to close open points regarding improvements with U900 versus U2100
(Mainly coverage gain) WNE will take part of Bytel trials Phase 2 measurements to
conclude of those topics.

21 | Presentation Title |

21 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

Back-Up

22 | Presentation Title |

22 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

UMTS 900MHz Device Status


Key points
> Lead Platform Suppliers today support 900MHz frequency band for UMTS technology
Nokia, Motorola, Qualcomm, EMP all have Base Band & Radio solutions ready
> First Devices delivered on the market in 2007
Nokia commercially launched the first 900MHz compliant terminal in July 2007
Option Wireless were the first device vendor to ship prototype HSDPA data cards to customers (Q3/07),
Prototype UPA data cards expected in March 2008
> Tri-band UMTS devices are becoming the minimum baseline for new 3G Devices
However most supported frequency bands shall remain Band 1, 2 and 5 (850/1900/2100 as per ITU)
> From 2008, 900MHz frequency will be generally available
Units to be available initially on dual band and tri-band products
Quad-band capable UMTS products will start to be shipped by Device vendors in 2008 (Most of these will
include 900MHz frequency band, especially in the non US markets)
Most Chipset vendors (QCT, EMP, Agere, NXP, Broadcom, etc.) are now focusing their efforts on multi
band solutions (more than 2 Bands)
7 to 9 frequency bands (as defined by ITU) are officially announced as included in Platforms
capabilities
3 to 4 bands as part of these can be easily implemented on a commercial devices from 2008
> Minor cost difference will allow general take-off of multi-band phones

Commercial Solutions can quickly be delivered to the Market upon Operators requests
UMTS 900MHz Frequency Band Support to Become Regular Feature by 2009

23 | Presentation Title |

23 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

Handset Support for UMTS 900 Technology


Summary / Conclusion

UMTS900 technology is currently available and most platform providers are commercializing it
Commercial device vendors are starting to commercialize UMTS900 capable devices but expect
operators to commit to the technology to ship large volumes
First units shipped in 2007 (Handset & data cards) - larger phone portfolio expected in 2008 ; market
take-off in 2009
First UPA data card available by mid 2008, mobiles expected 1-2 qtrs after

24 | Presentation Title |

24 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

www.alcatel-lucent.com

25 | Presentation Title |

25 | UMTS900MHz Trials Outcomes DR5 Milestone - 08Wk11

All Rights
Alcatel-Lucent
2006, #####
All Reserved
Rights Reserved
Alcatel-Lucent
2007

You might also like