SIEMENS Concrete Pre-placement Checklist Project: 380kV GIS Expansion,Safaniyah BSP Contract No. 440000518/00 General Informatic any Date Reference No. Location: Ref, Drawings Pout No. Mix Design Ref ‘Supplier Pouring Date & Time Est. Quantity sr | Not | Checked Ne. Ispeetion/Checkltems | Acceptable | acceptable | by | Date | Remarks | Reference drawings followed [Line and Grade Suib-grade Material ~| Melsture Barrier / Vapor Barrier | Form works Form works stability / strength checked for safety | Form coating applied Twooden | forms are thoroughly wet during Concrete Reinforcement Embedded Material Appropriate Spacers installed / ees | Working platform /area checked | or safety ile / Location is clean & clear for | | pounng aes See ae Bate ic Name | [NareiiSil ‘SM CE/ GAIGC Engineer ‘Sub-Contractor® Tiaseed Nea Rpatas ony cae sc momaco aed FRECO TRO Tn Sian Ud Sa ails vzaszo08 ‘abla Ente.