You are on page 1of 19

HOJA DE METRADOS

ENTIDAD

: GOBIERNO REGIONAL DE HUANCAVELICA

OBRA

: " REPRESAMIENTO DE LA LAGUNA UUNGA Y SISTEMA DE RIEGO MARAVILLAPAMPA - COLCABAMBA - SANTO DOMINGO - DEL DISTRITO

UBICACIN

: CHUPAMARCA - CASTROVIRREYNA - HUANCAVELICA

FORMULA

: METRADOS DE BOCATOMA- DESARENADOR - SIFON N 01

DE CHUPAMARCA - PROVINCIA DE CASTROVIRREYNA HUANCAVELICA "

Item

Descripcin

13.00

OBRAS DE CAPTACIN

13.01
13.01.01

OBRAS PELIMINARES

13.01.02

MOV. Y DESMOV. DE MAQ. Y EQS.

Elementos

13.02.03
13.03

Ancho

Altura

Parcial

Total

UND

1.00

GLB

2,020.00

m2

VER HOJA DE METRADOS DE EXPLANACIONES

3,559.57

m3

Considerando 20% de Esponjamiento de la Excavacin

4,271.48

m3

3.00

mes

1,499.81

m3

81.62

m3

1,718.15

m3

170.83

m3

352.20

m2

89,986.88

Kg

1,457.86

m2

634.40

m3

1.00

TRAZO Y REPLANTEO

1.00
13.02
13.02.01

Longitud

101.00

2,020.00

20.00

EXPLANACIONES
EXCAVACIN EN MATERIAL SUELTO C/EQUIPO
ELIMINACIN DE MATERIAL EXCEDENTE C/EQUIPO
BOCATOMA

13.03.01
13.03.01.01

TRABAJOS PRELIMINARES

13.03.02
13.03.02.01

MOVIMIENTO DE TIERRAS

CONTROL TOPOGRFICO EN OBRA

3.00

EXCAVACION PARA ESTRUCTURAS.


Muro Izq. Aguas arriba
Muro Izq. Central
Muro Izq. Aguas abajo
Muro derecho
Barraje Fijo

1.00
1.00

30.15
61.50
99.10
90.43
77.18

1.70
3.10

51.26
190.65

1.00
1.00
1.00

AREA=
AREA=
AREA=
AREA=
AREA=

2.90
1.60
10.70

287.39
144.69
825.83

1.20
1.20

AREA=
AREA=

61.37
15.77

0.80
1.20

58.92
22.71

RELLENO COMPACTADO MANUAL


Captacin (Eje 1-1) - Esponjamiento 20%
Canal de Limpia (Eje 2-2) - Esponjamiento 20%
ELIMINACIN DE MATERIAL EXCEDENTE C/EQUIPO

13.03.02.02

ENROCADO Dmin=40" (EXT. TRANSP. Y ACOMODO)


Enrocado aguas abajo

13.03.03
13.03.03.01

170.83

1.00
1.00
1.00
1.00
1.00

AREA=
AREA=
AREA=
AREA=
16.05

30.15
74.05
99.10
136.06
0.80

1.00

170.83

CONCRETO F'C = 100 KG/CM2 PARA SOLADO E=0.10CM


Muro Izq. Central
Muro Izq. Aguas abajo
Muro Derecho
Canal

13.03.03.02

AREA=

OBRAS DE CONCRETO SIMPLE


Muro Izq. Aguas arriba

13.03.04
13.03.04.01

1.00

30.15
74.05
99.10
136.06
12.84

OBRAS DE CONCRETO ARMADO


ACERO FY=4200KG/CM2

VER HOJA DE METRADOS DE ACERO-BOCATOMA

ENCOFRADO Y DESENCOFRADO
Muro Izquierdo Exterior
Aguas Arriba
Central
Aguas Abajo
Muro Izquierdo Interior (Captacin)

Muro Izquierdo Interior (Canal de Limpia)

Muro Derecho

2.00
2.00
2.00

5.37
AREA=
16.27

5.80
4.45

62.29
168.00
144.80

2.00
2.00

AREA=
21.80

57.90
5.60

115.80
244.16

2.00
2.00

AREA=
3.00

77.20
5.60

154.40
33.60

2.00

44.80

5.80

519.68

2.00
2.00

0.80
1.20

3.25
2.30

5.20
5.52

1.00
2.00

2.00
2.00

1.80
0.20

3.60
0.80

84.00

Muros Transversales
Captacin
Canal de Limpia
Losa de Mando
Base
Frizo

13.03.03.03

CONCRETO F'C = 210 KG/CM2


Base
Muro Izq. Aguas arriba
Muro Izq. Central
Muro Izq. Aguas abajo
Muro derecho

1.00
1.00
1.00
1.00

AREA=
AREA=
AREA=
AREA=

30.15
74.05
99.10
136.06

0.70
0.90
0.70
0.70

21.11
66.65
69.37
95.24

Muro Izquierdo Exterior

1.00
1.00
1.00

5.37
AREA=

0.60
84.00
0.60

5.80
0.60
4.45

18.69
50.40
43.44

16.27

Muro interior (captacion)

1.00
1.00

AREA=
21.80

57.90
0.40

0.40
5.60

23.16
48.83

Muro interior (canal de limpia)

1.00
1.00

AREA=
3.00

77.20
0.40

0.40
5.60

30.88
6.72

Muro Derecho

1.00

44.80

0.60

5.80

155.90

1.00
1.00

0.80
1.20

3.25
2.30

0.25
0.25

0.65
0.69

Losa de Mando

1.00

2.00

1.80

0.20

0.72

Losa Canal

1.00

16.30

0.80

0.15

1.96

Cuerpo Barraje fijo

1.00

10.70

AREA=

62.00

663.40

Losa de aproximacion

1.00

0.30

AREA=

71.55

21.47

Losa Captacin

1.00

0.80

AREA=

8.10

6.48

Losa Canal de Limpia

1.00

1.20

AREA=

23.70

28.44

Aguas Arriba
Central
Aguas Abajo

Muros Transversales
Captacin
Canal de Limpia

13.03.03.04

13.03.05
13.03.05.01

719.79

m3

68.80

68.80

1.00

und

1.00

und

1.00

Und

1.00

und

10.02

m2

VER HOJA DE METRADOS DE EXPLANACIONES

9.49

m3

Considerando 20% de Esponjamiento de la Excavacin

11.39

m3

9.19

m2

880.65

Kg

13.36

m2

3.38

m3

CONCRETO F'C = 175KG/CM2

JUNTAS
JUNTA WATER STOP DE 6"
Captacin
Muro
Losa

4.00
2.00

2.55
1.30

1.00
1.00
2.00
3.00
2.00

2.55

10.20
2.60
0.00
2.55
1.20
10.10
15.15
27.00

Canal de Limpia
Muro
Losa
Muro Izquierdo Exterior
Muro Derecho Exterior
Losa de Aproximacion

1.20
5.05
5.05
13.50

JUNTA ASFALTICA
Captacin
Muro
Losa

4.00
2.00

2.55
1.30

10.20
2.60
0.00

1.00
1.00
2.00
3.00
2.00

2.55

2.55
1.20
10.10
15.15
27.00

Canal de Limpia
Muro
Losa
Muro Izquierdo Exterior
Muro Derecho Exterior
Losa de Aproximacion

13.03.06
13.03.06.01

VARIOS
SUMINISTRO E INST. DE COMPUERTA 0.80mx0.60m
Bocatoma

13.03.06.02

1.00

1.00

1.00

1.00

1.00

1.00

SUMINISTRO E INST. DE ACCESORIOS (BOCATOMA)


Bocatoma

13.04

1.00

LINMIMETRO GRADUADO
Bocatoma

13.03.06.04

1.00

SUMINISTRO E INST. DE COMPUERTA 1.20mx2.40m


Bocatoma

13.03.06.03

1.20
5.05
5.05
13.50

CANAL DE ENTRADA (RECTANGULAR)


TRABAJO PRELIMINARES
TRAZO Y REPLANTEO
Canal

13.04.01
13.04.01.01

1.00

8.35

1.20

10.02

MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS.
ELIMINACIN DE MATERIAL EXCEDENTE MANUAL
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C = 100 KG/CM2 PARA SOLADO E=0.10CM
Solado

13.04.02

8.35

1.10

9.19

OBRAS DE CONCRETO ARMADO

13.04.02.01

ACERO ESTRUCTURAL FY=4200KG/CM2

13.04.02.02

ENCOFRADO Y DESENCOFRADO
Muro (izq. Y derecha)

13.04.02.03

1.00

CONCRETO F'C=210 KG/CM

VER HOJA DE METRADOS DE ACERO-CANAL ENTRADA

2.00

8.35

0.80

13.36

Muro (Izq. y Derecha)


Losa

13.05
13.05.01
13.05.01.01

13.05.02

8.35
8.35

0.15
1.10

1.00

12.00

3.50

13.05.03

2.00
1.38

TRABAJO PRELIMINARES

42.00

m2

VER HOJA DE METRADOS

23.06

m3

Considerando 20% de Esponjamiento de la Excavacin

27.67

m3

1.99

m2

0.48

m3

272.69

Kg

73.78

m2

7.37

m3

10.85

1.00

und

1.00

und

70.40

m2

TRAZO Y REPLANTEO

42.00

MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS.
ELIMINACIN DE MATERIAL EXCEDENTE MANUAL

13.05.03.01

0.80
0.15

DESARENADOR

Desarenador

13.05.02.01

2.00
1.00

OBRAS DE CONCRETO SIMPLE


CONCRETO F'C = 100 KG/CM2 PARA SOLADO E=0.10CM
Transicin de Entrada
Desarenador
Transicin de Salida

1.00
1.00
1.00

AREA=
9.55

1.00
1.00

AREA=
3.35

AREA=

1.90
1.70
1.72

0.10
0.10
0.10

0.19
1.62
0.17

2.50

0.15

0.38

AREA=

0.03

0.10

EMBOQUILLADO DE PIEDRA F'C=140 KG/CM +30% PG


Losa
Uas
13.05.04

OBRAS DE CONCRETO ARMADO

13.05.04.01

ACERO ESTRUCTURAL FY=4200KG/CM2

13.05.04.02

ENCOFRADO Y DESENCOFRADO

VER HOJA DE METRADOS DE ACERO-DESARENADOR

Transicin de Entrada
Muro

4.00

AREA=

1.10

4.40

4.00

AREA=

10.95

43.80

4.00

AREA=

0.77

3.08

4.00

2.56

0.50

5.12

4.00

4.82

0.80

15.42

2.00

0.70

1.40

1.96

Desarenador
Muro
Transicin de Salida
Muro
Canal de Limpia
Muro
Aliviadero
Muro
Vertedero
Muro
CONCRETO F'C=210 KG/CM

13.05.04.03

Transicin de Entrada
Muro
Losa

2.00
1.00

AREA=
AREA=

1.10
1.90

0.15
0.15

0.33
0.29

2.00
1.00

AREA=
AREA=

10.95
7.30

0.15
0.15

3.29
1.10

2.00
1.00

AREA=
AREA=

0.77
1.72

0.15
0.15

0.23
0.26

2.00
1.00

2.56
2.56

0.50
0.70

0.15
0.15

0.38
0.27

1.00
1.00

4.82
AREA=

0.80
3.37

0.15
0.15

0.58
0.51

1.00

0.70

1.40

0.15

0.15

Desarenador
Muro
Losa
Transicin de Salida
Muro
Losa
Canal de Limpia
Muro
Losa
Aliviadero
Muro
Losa
Vertedero
Muro

13.05.06
13.05.06.01

JUNTAS
JUNTA WATER STOP DE 4"
Transicin de Entrada
Muro
Losa

2.00
1.00

0.85
0.95

1.70
0.95

2.00
1.00

0.80
1.90

1.60
1.90

2.00
1.00

0.55
0.55

1.10
0.55

2.00
1.00

0.90
1.25

1.80
1.25

Transicin de Salida
Muro
Losa
Canal de Limpia
Muro
Losa
Aliviadero
Muro
Losa
VARIOS
SUMINISTRO E INST. DE COMPUERTA 0.50mx0.70m
Desarenador

1.00

1.00

1.00

1.00

SUMINISTRO E INST. DE ACCESORIOS (DESARENADOR)

13.06
13.06.01
13.06.01.01

CANAL DE SALIDA (TRAPEZOIDAL)


TRABAJO PRELIMINARES
TRAZO Y REPLANTEO
Canal

13.06.02

MOVIMIENTO DE TIERRAS

1.00

35.20

2.00

70.40

13.06.02.01

EXCAVACION PARA ESTRUCTURAS.


ELIMINACIN DE MATERIAL EXCEDENTE MANUAL

13.06.03

13.05.03.01

m3

Considerando 20% de Esponjamiento de la Excavacin

41.12

m3

3.60

m2

7.04

m3

28.80

180.00

m2

0.50

m3

ENCOFRADO Y DESENCOFRADO

12.00

AREA=

0.20

1.00

35.20

AREA=

12.00

2.40

1.00

60.00

3.00

1.00

5.00

AREA=

3.60

CONCRETO F'C=175 KG/CM


Muro Izq. y Derecha y Losa

13.06.04
13.06.04.01

34.27

OBRAS DE CONCRETO SIMPLE


Cerchas E=2"

13.06.03.02

VER HOJA DE METRADOS DE EXPLANACIONES

0.20

7.04

JUNTAS
JUNTA ASFALTICA
Canal

28.80

SIFN N 01
TRABAJO PRELIMINARES
TRAZO Y REPLANTEO
Sifn

180.00

DEMOLICIN DE CANAL EXISTENTE


Canal

0.10

0.50

MOVIMIENTO DE TIERRAS
EXCAVACIN EN MATERIAL SUELTO C/EQUIPO

VER HOJA DE METRADOS DE EXPLANACIONES

750.93

m3

EXCAVACION PARA ESTRUCTURAS

VER HOJA DE METRADOS DE EXPLANACIONES

24.13

m3

445.92

m3

484.15

m3

237.69

m3

48.29

m2

671.13

Kg

82.18

m2

9.10

m3

RELLENO COMPACTADO MANUAL


Relleno Tubera (Esponjamiento 20%)
Relleno Zanja (Esponjamiento 20%)
Descuento Tubera

1.20
1.20
1.00

34.20
34.20

AREA=
VOLUMEN=
AREA=

3.78
250.38
-0.28

155.13
300.46
-9.67

Considerando 20% de Esponjamiento de la Excavacin

ELIMINACIN DE MATERIAL EXCEDENTE C/EQUIPO


ENROCADO Dmin=40" (EXT. TRANSP. Y ACOMODO)
Enrocado de Proteccin

1.00

34.20

AREA=

1.00
1.00
1.00

42.65
8.85
4.50

0.60
1.70
1.70

6.95

237.69

OBRAS DE CONCRETO SIMPLE


CONCRETO F'C = 100 KG/CM2 PARA SOLADO E=0.10CM
Solado Tubera
Solado Camara de Carga
Solado Camara de Salida

25.59
15.05
7.65

OBRAS DE CONCRETO ARMADO


ACERO ESTRUCTURAL FY=4200KG/CM2

VER HOJA DE METRADOS DE ACERO DE SIFN

ENCOFRADO Y DESENCOFRADO
Transicin de Entrada
Muro

4.00

AREA=

0.65

2.60

2.00
2.00
2.00
2.00
1.00

AREA=
AREA=
0.60
AREA=
AREA=

11.55
13.70
1.00
0.60
3.38

23.10
27.40
1.20
1.20
3.38

2.00
2.00
2.00
2.00

AREA=
AREA=
0.60
AREA=

5.90
4.70
0.65
0.60

11.80
9.40
0.78
1.20

4.00

AREA=

0.68

2.72

Camara de Carga
Muro Izquierdo
Muro Derecho
Muro Lateral
Losa
Losa Techo
Camara de Salida
Muro Izquierdo
Muro Derecho
Muro Lateral
Losa
Transicin de Salida
Muro
CONCRETO F'C=210 KG/CM
Transicin de Entrada
Muro
Losa

2.00
1.00

AREA=
AREA=

0.65
0.81

0.15
0.15

0.20
0.12

1.00
1.00
1.00
1.00
1.00

AREA=
AREA=
0.60
AREA=
AREA=

11.55
13.70
1.00
11.75
2.45

0.15
0.15
0.15
0.15
0.15

1.73
2.06
0.09
1.76
0.37

1.00
1.00
1.00
1.00

AREA=
AREA=
0.60
AREA=

5.90
4.70
0.65
5.40

0.15
0.15
0.15
0.15

0.89
0.71
0.06
0.81

2.00

AREA=

0.68

0.15

0.20

Camara de Carga
Muro Izquierdo
Muro Derecho
Muro Lateral
Losa
Losa Techo
Camara de Salida
Muro Izquierdo
Muro Derecho
Muro Lateral
Losa
Transicin de Salida
Muro

Losa

1.00

AREA=

0.75

1.00
1.00

2.50
2.55

2.50
2.55

1.00

42.30

42.30

0.15

0.11

JUNTAS
JUNTA WATER STOP DE 4"
Transicin de Entrada
Transicin de Salida

5.05

42.30

1.00

und

SUMINISTRO E INSTALACIN DE TUBERA Y ACCESORIOS


MONTAJE E INSTALACIN DE TUBERA DE HIERRO DUCTIL K7JGS D=0.60 m
Tubera Sifn
SUMINISTRO E INST. DE ACCESORIOS (SIFN)
Sifn

1.00

1.00

METRADO DE ACERO
ENTIDAD

: GOBIERNO REGIONAL DE HUANCAVELICA

OBRA

: " REPRESAMIENTO DE LA LAGUNA UUNGA Y SISTEMA DE RIEGO MARAVILLAPAMPA - COLCABAMBA - SANTO DOMINGO - DEL DISTRITO

UBICACIN

: CHUPAMARCA - CASTROVIRREYNA - HUANCAVELICA

FORMULA

: METRADOS ACERO BOCATOMA

DE CHUPAMARCA - PROVINCIA DE CASTROVIRREYNA HUANCAVELICA "

BOCATOMA
ITEM

DISEO DE FIERRO

Transversal Inf. @

N VEC

N DE
ELEMEN.

LONG.
ELEMEN.

VARILLAS
1/4"

3/8"

1/2"

5/8"

3/4"

1"

0.25

0.56

1.02

1.6

2.26

3.97

0.20

5.85
4.90
BASE
Muro Izquierdo
Aguas arriba

Longitudinal inf. @

0.25

Transversal Sup. @

0.20

3/4"
1/2"

1.00
1.00

30
21

5.85
4.90

100.94

176.96

3/4"
1/2"

1.00
1.00

30
21

5.85
4.90

100.94

5/8"
1/2"

1.00
1.00

127
25

12.55
5.90

145.14

5/8"
1/2"

1.00
1.00

127
25

12.55
5.90

145.14

3/4"
1/2"

1.00
1.00

83
21

16.30
4.90

100.94

3/4"
1/2"

1.00
1.00

83
21

16.30
4.90

100.94

3/4"
1/2"

1.00
1.00

29
15

5.55
3.50

52.50

3/4"
1/2"

1.00
1.00

29
15

5.55
3.50

52.50

3/4"
1/2"

1.00
1.00

233
14

46.40
3.20

44.16

5.85
4.90

Longitudinal Sup. @

0.25

Transversal Inf. @

0.10

176.96

12.55
5.90
BASE
Muro Izquierdo
Central

Longitudinal inf. @

0.25

Transversal Sup. @

0.10

1587.58

12.55
5.90

Longitudinal Sup. @

0.25

Transversal Inf. @

0.20

1587.58

16.30
4.90
BASE
Muro Izquierdo
Aguas Abajo

Longitudinal inf. @

0.25

Transversal Sup. @

0.20

1344.75

16.30
4.90

Longitudinal Sup. @

0.25

Transversal Inf. @

0.20

1344.75

5.55
3.50
BASE
Muro Izquierdo
Aguas Abajo

Longitudinal inf. @

0.25

Transversal Sup. @

0.20

159.56

5.55
3.50

Longitudinal Sup. @

0.25

Transversal Inf. @

0.20

159.56

46.40
3.20

10811.20

PESO KG/M

BASE
Muro Derecho

Longitudinal inf. @

0.25

Transversal Sup. @

0.20

46.40
3.20

Longitudinal Sup. @

Vertical @

0.15

3/4"
1/2"

1.00
1.00

233
14

46.40
3.20

10811.20

3/4"
3/4"

1.00
1.00

40
40

6.80
6.80

1/2"
1/2"

1.00
1.00

66
27

5.85
5.85

1"
1"

1.00
1.00

85
85

8.20
8.20

5/8"
1/2"

1.00
1.00

41
33

12.55
12.55

3/4"
3/4"

1.00
1.00

110
110

5.45
5.45

1/2"
1/2"

1.00
1.00

53
35

16.30
16.30

5/8"
5/8"

1.00
1.00

110
110

5.95
5.95

1/2"
1/2"

1.00
1.00

15
15

43.40
43.40

5/8"
5/8"

1.00
1.00

310
310

6.80
6.80

1/2"
1/2"

1.00
1.00

66
27

46.40
46.40

3062.40
1252.80

1/2"

1.00

10.50

52.50

44.16

0.25

0.15
0.60
6.50

6.50

272.00
272.00

Muro Izquierdo
Aguas Arriba
Horizontal A@

0.10
5.85

Horizontal B@

Vertical @

386.10
157.95

0.25

0.15

0.15
0.60
7.90

7.90

694.27
694.27

Muro Izquierdo
Central
Horizontal A@

0.20
12.55

Horizontal B@

Vertical @

508.28
409.13

0.25

0.15

0.15
0.60
5.15

5.15

597.68
597.68

Muro Izquierdo
Aguas Abajo
Horizontal A@

0.10
16.30

Horizontal B@

Vertical @

855.75
575.93

0.15

0.40

0.40
0.40
5.75

5.75

651.53
651.53

Muro Izquierdo
Interior
Horizontal A@

0.40
43.40

Horizontal B@

Vertical @

667.28
667.28

0.40

0.15

0.15
0.60
6.50

6.50

2110.27
2110.27

Muro Derecho
Horizontal A@

0.10
46.40

Horizontal B@

0.25

Longitudinal a @

0.20
1.80
1.55

3.45
3.25
Muros
Transversales
Captacin

0.20

0.25
Transversal @

0.20

0.20

0.80

0.20

1/2"

1.00

51

1.20

61.50

0.20

1/2"

1.00

8.60

60.20

0.20

1/2"

1.00

42

1.60

66.80

0.80

Longitudinal a @

0.20
1.80
1.55

2.50
2.30
Muros
Transversales
Canal de Limpia
0.25
Transversal @
0.20

0.20
1.20
1.20

Longitud Total por en metros lineales


Numero de Varillas por
Total en Kilogramos por

0.00
0.00
0.00

0.00
0.00
0.00

9162.97
1019.00
9346.23

9207.01
1024.00
14731.21

26724.32
2970.00
60396.96

1388.53
155.00
5512.48

TOTAL Kg.
89,986.88

METRADO DE ACERO
ENTIDAD

: GOBIERNO REGIONAL DE HUANCAVELICA

OBRA

: " REPRESAMIENTO DE LA LAGUNA UUNGA Y SISTEMA DE RIEGO MARAVILLAPAMPA - COLCABAMBA - SANTO DOMINGO - DEL DISTRITO

UBICACIN

: CHUPAMARCA - CASTROVIRREYNA - HUANCAVELICA

FORMULA

: METRADOS ACERO DESARENADOR

DE CHUPAMARCA - PROVINCIA DE CASTROVIRREYNA HUANCAVELICA "

DESARENADOR
ITEM

DISEO DE FIERRO

Vertical @

N VEC

N DE
ELEMEN.

LONG.
ELEMEN.

1/4"

3/8"

0.25

0.56

VARILLAS
1/2"

5/8"

3/4"

1.02

1.6

2.26

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

PESO KG/M

0.2

0.7
0.70
0.30
Horizontal @
Muro Izquierdo
y Derecho

0.20

3/8"
3/8"

2.00
2.00

31
10

1.70
6.15

105.40
116.85

3/8"
3/8"

2.00
2.00

19
7

1.30
3.65

48.10
51.10

3/8"

1.00

49

0.70

33.95

3/8"

1.00

9.90

44.55

3/8"

1.00

0.85

6.80

3/8"

1.00

1.80

9.45

3/8"

1.00

0.75

4.13

3/8"

1.00

1.30

6.18

3/8"

1.00

14

0.55

7.56

3/8"

1.00

2.95

11.06

3/8"

1.00

14

0.85

12.11

3/8"

1.00

3.05

16.01

3/8"

1.00

0.70

5.60

3/8"

1.00

1.80

8.10

0.15

6
0.10

0.2

1.20

Horizontal @

0.2

0.15

3.5

Transversal
Losa

0.70

Longitudinal

Transversal
Transicin
de Entrada

Transversal

Transversal

Transversal

0.20
1.4

0.20

0.20

0.20
0.9

0.20

0.20

0.20
2.6

0.20

0.20

0.85

Longitudinal

Transversal
Vertedero

0.20

0.55

Longitudinal

Aliviadero

0.20

0.75

Longitudinal

Canal de Limpia

0.20
9.5

0.85

Longitudinal

Transicin
de Salida

0.20

0.20
2.7

0.20

0.20

0.70

Longitudinal

0.20
1.4

0.20

Longitud Total por en metros lineales


Numero de Varillas por
Total en Kilogramos por

0.00
0.00
0.00

486.95
55.00
272.69

TOTAL Kg.
272.69

METRADOS DE ACERO
ENTIDAD

: GOBIERNO REGIONAL DE HUANCAVELICA

OBRA

: " REPRESAMIENTO DE LA LAGUNA UUNGA Y SISTEMA DE RIEGO MARAVILLAPAMPA - COLCABAMBA - SANTO DOMINGO - DEL DISTRITO

UBICACIN

: CHUPAMARCA - CASTROVIRREYNA - HUANCAVELICA

FORMULA

: METRADOS ACERO CANAL DE ENTRADA

DE CHUPAMARCA - PROVINCIA DE CASTROVIRREYNA HUANCAVELICA "

CANAL DE ENTRADA (RECTANGULAR)


ITEM

DISEO DE FIERRO
Vertical @

LONG.
ELEMEN.

VARILLAS
1/4"

3/8"

1/2"

5/8"

3/4"

0.25

0.56

1.02

1.6

2.26

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

PESO KG/M

3/8"

2.00

43

0.90

76.95

3/8"

2.00

8.55

85.50

3/8"

1.00

43

0.80

34.20

0.80

Longitudinal@

0.20

0.10

8.4
Transversal @
Losa

N DE
ELEMEN.

0.20
0.10

Muro

N VEC

0.20

0.80

Longitudinal@

0.20
8.4

0.10
3/8"
1.00
5
8.55
Longitud Total por en metros lineales
Numero de Varillas por
Total en Kilogramos por

0.00
0.00
0.00

42.75
239.40
478.80
880.65

TOTAL Kg.
880.65

METRADOS DE ACERO
ENTIDAD

: GOBIERNO REGIONAL DE HUANCAVELICA

OBRA

: " REPRESAMIENTO DE LA LAGUNA UUNGA Y SISTEMA DE RIEGO MARAVILLAPAMPA - COLCABAMBA - SANTO DOMINGO - DEL DISTRITO

UBICACIN

: CHUPAMARCA - CASTROVIRREYNA - HUANCAVELICA

FORMULA

: METRADOS ACERO SIFN N 01

DE CHUPAMARCA - PROVINCIA DE CASTROVIRREYNA HUANCAVELICA "

SIFN N 01
ITEM

DISEO DE FIERRO

N VEC

N DE
ELEMEN.

LONG.
ELEMEN.

VARILLAS
1/4"

3/8"

1/2"

5/8"

3/4"

0.25

0.56

1.02

1.6

2.26

Transicin
Entrada

Longitudinal@

0.20

Muros

1/2"

2.00

1.10

12.65

1/2"

2.00

0.95

12.35

1/2"

1.00

5.20

5.20

1/2"

2.00

59.18

118.36

1/2"

2.00

55.85

111.70

1/2"
1/2"

1.00
1.00

46
8

1.40
8.95

64.05
71.60

1.10

Transversal @

0.20
0.95

Vertical @

0.20

Losa
1.2
0.40

0.5

0.95

1.40

0.75

Camara de
Carga Muro
Transversal @

Muro
Laterales

0.70
0.73
0.76
0.79
0.82
0.85
0.88
0.91
0.94
0.97
1.00
1.03
1.06
1.09
1.12
1.15
1.18
1.21
1.24
1.27
1.30
1.33

0.20
1.36
1.39
1.42
1.45
1.48
1.51
1.54
1.57
1.60
1.63
1.66
1.69
1.72
1.75
1.78
1.81
1.84
1.87
1.90
1.93
1.96
1.99

Longitudinal@
8.95
8.95
8.95
8.30
6.90
5.50
4.15
2.75
1.40

0.20

Transversal @

0.20

8.95
1.40

Losa Inferior

Longitudinal@

0.20

PESO KG/M

Transversal @

0.20

1.50
1.70

Losa Superior

Longitudinal@

0.20

Transversal @

0.20

Muro
Transversal

Transicin
Salida

1/2"
1/2"

1.00
1.00

9
10

1.70
1.50

14.45
14.25

1/2"

1.00

2.00

11.00

1/2"

1.00

11

0.90

9.90

1/2"

2.00

1.10

12.65

1/2"

2.00

0.95

12.35

1/2"

1.00

5.40

5.40

1/2"

2.00

26.28

52.56

1/2"

2.00

21.85

43.70

1/2"
1/2"

1.00
1.00

24
8

1.40
4.50

32.90
36.00

1/2"

1.00

1.60

8.80

1/2"

1.00

0.90

8.10

2.00

Longitudinal@
0.90

0.20

Longitudinal@

0.20

Muros

1.10

Transversal @

0.20
0.95

Vertical @

0.20

Losa
0.30

0.55

1.30
1.05
0.80

1.40

Camara de
Salida
Transversal @

Muro
Laterales

0.75
0.78
0.81
0.84
0.87
0.90
0.93
0.96
0.99
1.02
1.05
1.08

0.20
1.11
1.14
1.17
1.20
1.23
1.26
1.29
1.32
1.35
1.38
1.41
1.44

Longitudinal@
4.50
4.50
4.50
4.15
2.80
1.40

0.20

Transversal @

0.20

4.50
1.40

Losa Inferior

Muro
Transversal

Longitudinal@

0.20

Transversal @

0.20

1.60

Longitudinal@
0.90

0.20

Longitud Total por en metros lineales


Numero de Varillas por
Total en Kilogramos por

0.00
0.00
0.00

0.00
0.00
0.00

657.97
74.00
671.13

0.00
0.00
0.00

0.00
0.00
0.00

TOTAL Kg.
671.13

METRADO DE EXPLANACIONES
ENTIDAD

: GOBIERNO REGIONAL DE HUANCAVELICA

OBRA

: " REPRESAMIENTO DE LA LAGUNA UUNGA Y SISTEMA DE RIEGO MARAVILLAPAMPA - COLCABAMBA - SANTO DOMINGO - DEL DISTRITO

UBICACIN

: CHUPAMARCA - CASTROVIRREYNA - HUANCAVELICA

FORMULA

: METRADO DE EXPLANACIONES

DE CHUPAMARCA - PROVINCIA DE CASTROVIRREYNA HUANCAVELICA "

EXPLANACIONES
EXCAVACIN EN MATERIAL SUELTO C/EQUIPO

BOCATOMA
Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

0.00

0.00

Progresiva

91.92

0.00

0.00

0.00

Progresiva

92.13

0.00

92.02

0.00

92.02

0.00

Progresiva

91.89

0.00

92.01

0.00

184.03

0.00

Progresiva

90.36

0.00

91.12

0.00

275.15

0.00

Progresiva

87.91

0.00

89.13

0.00

364.28

0.00

Progresiva

85.62

0.00

86.76

0.00

451.04

0.00

Progresiva

83.49

0.00

84.55

0.00

535.59

0.00

Progresiva

81.50

0.00

82.50

0.00

618.09

0.00

Progresiva

79.62

0.00

80.56

0.00

698.65

0.00

10

Progresiva

78.07

0.00

78.85

0.00

777.50

0.00

11

Progresiva

10

76.95

0.00

77.51

0.00

855.01

0.00

12

Progresiva

11

74.96

0.00

75.96

0.00

930.97

0.00

13

Progresiva

12

72.54

0.00

73.75

0.00

1,004.72

0.00

14

Progresiva

13

70.31

0.00

71.42

0.00

1,076.14

0.00

15

Progresiva

14

68.31

0.00

69.31

0.00

1,145.45

0.00

16

Progresiva

15

66.53

0.00

67.42

0.00

1,212.87

0.00

17

Progresiva

16

64.96

0.00

65.74

0.00

1,278.61

0.00

18

Progresiva

17

63.60

0.00

64.28

0.00

1,342.89

0.00

19

Progresiva

18

62.03

0.00

62.81

0.00

1,405.70

0.00

20

Progresiva

19

59.69

0.00

60.86

0.00

1,466.56

0.00

21

Progresiva

20

57.31

0.00

58.50

0.00

1,525.06

0.00

22

Progresiva

21

54.85

0.00

56.08

0.00

1,581.14

0.00

23

Progresiva

22

71.21

0.00

63.03

0.00

1,644.17

0.00

24

Progresiva

23

68.45

0.00

69.83

0.00

1,714.00

0.00

25

Progresiva

24

65.73

0.00

67.09

0.00

1,781.09

0.00

26

Progresiva

25

64.30

0.00

65.01

0.00

1,846.10

0.00

27

Progresiva

26

61.96

0.00

63.13

0.00

1,909.23

0.00

28

Progresiva

27

60.31

0.00

61.14

0.00

1,970.37

0.00

29

Progresiva

28

60.35

0.00

60.33

0.00

2,030.70

0.00

30

Progresiva

29

60.82

0.00

60.58

0.00

2,091.28

0.00

31

Progresiva

30

60.94

0.00

60.88

0.00

2,152.16

0.00

32

Progresiva

31

58.72

0.00

59.83

0.00

2,211.99

0.00

33

Progresiva

32

54.49

0.00

56.60

0.00

2,268.59

0.00

34

Progresiva

33

48.98

0.00

51.74

0.00

2,320.33

0.00

35

Progresiva

34

42.64

0.00

45.81

0.00

2,366.14

0.00

36

Progresiva

35

36.48

0.00

39.56

0.00

2,405.70

0.00

37

Progresiva

36

31.58

0.00

34.03

0.00

2,439.73

0.00

38

Progresiva

37

30.34

0.00

30.96

0.00

2,470.69

0.00

39

Progresiva

38

29.25

0.00

29.80

0.00

2,500.49

0.00

40

Progresiva

39

28.31

0.00

28.78

0.00

2,529.27

0.00

41

Progresiva

40

27.51

0.00

27.91

0.00

2,557.18

0.00

42

Progresiva

41

26.88

0.00

27.19

0.00

2,584.37

0.00

43

Progresiva

42

26.39

0.00

26.63

0.00

2,611.00

0.00

44

Progresiva

43

26.06

0.00

26.22

0.00

2,637.22

0.00

45

Progresiva

44

26.69

0.00

26.38

0.00

2,663.60

0.00

46

Progresiva

45

27.66

0.00

27.18

0.00

2,690.78

0.00

47

Progresiva

46

28.50

0.00

28.08

0.00

2,718.86

0.00

48

Progresiva

47

19.65

0.00

24.08

0.00

2,742.94

0.00

49

Progresiva

48

19.31

0.00

19.48

0.00

2,762.42

0.00

50

Progresiva

49

18.81

0.00

19.06

0.00

2,781.48

0.00

51

Progresiva

50

18.43

0.00

18.62

0.00

2,800.10

0.00

52

Progresiva

51

18.19

0.00

18.31

0.00

2,818.41

0.00

53

Progresiva

52

17.93

0.00

18.06

0.00

2,836.47

0.00

54

Progresiva

53

17.52

0.00

17.73

0.00

2,854.20

0.00

55

Progresiva

54

16.93

0.00

17.23

0.00

2,871.43

0.00

56

Progresiva

55

16.18

0.00

16.56

0.00

2,887.99

0.00

57

Progresiva

56

15.24

0.00

15.71

0.00

2,903.70

0.00

58

Progresiva

57

14.17

0.00

14.71

0.00

2,918.41

0.00

59

Progresiva

58

13.29

0.00

13.73

0.00

2,932.14

0.00

60

Progresiva

59

12.74

0.00

13.02

0.00

2,945.16

0.00

61

Progresiva

60

12.38

0.00

12.56

0.00

2,957.72

0.00

Total
(m3)

62

Progresiva

61

12.16

0.00

12.27

0.00

2,969.99

0.00

63

Progresiva

62

6.93

0.00

9.55

0.00

2,979.54

0.00

2,979.54

0.00

100%

2,979.54

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

2,979.54

CANAL DE ENTRADA (RECTANGULAR)


Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

Progresiva

46.39

5.00

0.00

0.00

0.00

0.00

0.00

Progresiva

47

1.29

0.00

1.91

0.00

1.91

0.00

Progresiva

48

2.10

0.00

1.69

0.00

3.60

0.00

Progresiva

49

3.03

0.00

2.57

0.00

6.17

0.00

Progresiva

50

3.73

0.00

3.38

0.00

9.55

0.00

Progresiva

51

4.39

0.00

4.06

0.00

13.61

0.00

Progresiva

52

5.08

0.00

4.74

0.00

18.35

0.00

Progresiva

53

5.84

0.00

5.46

0.00

23.81

0.00

Progresiva

54.71

6.67

0.00

10.70

0.00

34.51

0.00

34.51

0.00

100%

34.51

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

Total
(m3)

34.51

DESARENADOR
Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

0.00

0.00

Progresiva

54.71

6.67

0.00

0.00

0.00

Progresiva

55

7.59

0.00

2.07

0.00

2.07

0.00

Progresiva

56

8.61

0.00

8.10

0.00

10.17

0.00

Progresiva

57

9.69

0.00

9.15

0.00

19.32

0.00

Progresiva

58

10.75

0.00

10.22

0.00

29.54

0.00

Progresiva

59

11.46

0.00

11.10

0.00

40.64

0.00

Progresiva

60

11.73

0.00

11.59

0.00

52.23

0.00

Progresiva

61

11.80

0.00

11.76

0.00

63.99

0.00

Progresiva

62

11.84

0.00

11.82

0.00

75.81

0.00

10

Progresiva

63

11.80

0.00

11.82

0.00

87.63

0.00

11

Progresiva

64

13.38

0.00

12.59

0.00

100.22

0.00

12

Progresiva

65

12.54

0.00

12.96

0.00

113.18

0.00

13

Progresiva

66.43

11.43

0.00

17.14

0.00

130.32

0.00

130.32

0.00

100%

130.32

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

Total
(m3)

130.32

CANAL DE SALIDA (TRAPEZOIDAL)


Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

11.43

0.00

0.00

0.00

0.00

0.00

Progresiva

66.43

Progresiva

67

11.43

0.00

6.52

0.00

6.52

0.00

Progresiva

68

10.12

0.00

10.77

0.00

17.29

0.00

Progresiva

69

9.09

0.00

9.60

0.00

26.89

0.00

Progresiva

70

8.58

0.00

8.84

0.00

35.73

0.00

Progresiva

71

9.37

0.00

8.97

0.00

44.70

0.00

Progresiva

72

10.65

0.00

10.01

0.00

54.71

0.00

Progresiva

73

12.01

0.00

11.33

0.00

66.04

0.00

Progresiva

74

13.41

0.00

12.71

0.00

78.75

0.00

10

Progresiva

75

14.84

0.00

14.12

0.00

92.87

0.00

11

Progresiva

76

15.97

0.00

15.40

0.00

108.27

0.00

12

Progresiva

77

16.59

0.00

16.28

0.00

124.55

0.00

13

Progresiva

78

16.71

0.00

16.65

0.00

141.20

0.00

14

Progresiva

79

16.32

0.00

16.52

0.00

157.72

0.00

15

Progresiva

80

15.68

0.00

16.00

0.00

173.72

0.00

16

Progresiva

81

15.05

0.00

15.36

0.00

189.08

0.00

17

Progresiva

82

14.42

0.00

14.73

0.00

203.81

0.00

18

Progresiva

83

13.81

0.00

14.12

0.00

217.93

0.00

19

Progresiva

84

13.29

0.00

13.55

0.00

231.48

0.00

Total
(m3)

20

Progresiva

85

12.80

0.00

13.05

0.00

244.53

0.00

21

Progresiva

86

12.32

0.00

12.56

0.00

257.09

0.00

22

Progresiva

87

11.83

0.00

12.08

0.00

269.17

0.00

23

Progresiva

88

11.36

0.00

11.60

0.00

280.77

0.00

24

Progresiva

89

10.88

0.00

11.12

0.00

291.89

0.00

25

Progresiva

90

10.42

0.00

10.65

0.00

302.54

0.00

26

Progresiva

91

10.01

0.00

10.21

0.00

312.75

0.00

27

Progresiva

92

9.88

0.00

9.94

0.00

322.69

0.00

28

Progresiva

93

9.82

0.00

9.85

0.00

332.54

0.00

29

Progresiva

94

9.77

0.00

9.80

0.00

342.34

0.00

30

Progresiva

95

9.72

0.00

9.75

0.00

352.09

0.00

31

Progresiva

96

9.67

0.00

9.69

0.00

361.78

0.00

32

Progresiva

97

9.62

0.00

9.64

0.00

371.42

0.00

33

Progresiva

98

9.56

0.00

9.59

0.00

381.01

0.00

34

Progresiva

99

9.51

0.00

9.54

0.00

390.55

0.00

35

Progresiva

100

9.46

0.00

9.49

0.00

400.04

0.00

36

Progresiva

101

9.41

0.00

9.44

0.00

409.48

0.00

37

Progresiva

101.61

9.32

0.00

5.72

0.00

415.20

0.00

415.20

0.00

100%

415.20

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

415.20
CANAL DE ENTRADA (RECTANGULAR)
MOVIMIENTO DE TIERRAS

EXCAVACION PARA ESTRUCTURAS


Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

1.06

0.00

0.00

0.00

0.00

0.00

Progresiva

46.39

Progresiva

47

1.06

0.00

0.64

0.00

0.64

0.00

Progresiva

48

1.135

0.00

1.10

0.00

1.74

0.00

Progresiva

49

1.153

0.00

1.14

0.00

2.88

0.00

Progresiva

50

1.155

0.00

1.15

0.00

4.03

0.00

Progresiva

51

1.155

0.00

1.16

0.00

5.19

0.00

Progresiva

52

1.155

0.00

1.16

0.00

6.35

0.00

Progresiva

53

1.155

0.00

1.16

0.00

7.51

0.00

Progresiva

54.71

1.155

0.00

1.98

0.00

9.49

0.00

9.49

0.00

100%

9.49

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

Total
(m3)

9.49
DESARENADOR
MOVIMIENTO DE TIERRAS

EXCAVACION PARA ESTRUCTURAS.


Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

Progresiva

54.71

1.155

0.00

0.00

0.00

0.00

0.00

Progresiva

55

1.17

0.00

0.34

0.00

0.34

0.00

Progresiva

56

1.19

0.00

1.18

0.00

1.52

0.00

Progresiva

57

1.48

0.00

1.33

0.00

2.85

0.00

Progresiva

58

1.65

0.00

1.56

0.00

4.41

0.00

Progresiva

59

1.79

0.00

1.72

0.00

6.13

0.00

Progresiva

60

1.93

0.00

1.86

0.00

7.99

0.00

Progresiva

61

2.08

0.00

2.01

0.00

10.00

0.00

Progresiva

62

2.16

0.00

2.12

0.00

12.12

0.00

11

Progresiva

63

2.47

0.00

2.31

0.00

14.43

0.00

12

Progresiva

64

2.47

0.00

2.47

0.00

16.90

0.00

13

Progresiva

65

2.47

0.00

2.47

0.00

19.37

0.00

14

Progresiva

66.43

2.70

0.00

3.69

0.00

23.06

0.00

23.06

0.00

100%

23.06

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

Total
(m3)

23.06
CANAL DE SALIDA (TRAPEZOIDAL)
MOVIMIENTO DE TIERRAS

EXCAVACION PARA ESTRUCTURAS.

Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

Progresiva

66.43

2.70

0.00

0.00

0.00

0.00

0.00

Progresiva

67

0.96

0.00

1.04

0.00

1.04

0.00

Progresiva

68

0.96

0.00

0.96

0.00

2.00

0.00

Progresiva

69

0.96

0.00

0.96

0.00

2.96

0.00

Progresiva

70

0.96

0.00

0.96

0.00

3.92

0.00

Progresiva

71

0.96

0.00

0.96

0.00

4.88

0.00

Progresiva

72

0.96

0.00

0.96

0.00

5.84

0.00

Progresiva

73

0.96

0.00

0.96

0.00

6.80

0.00

Progresiva

74

0.96

0.00

0.96

0.00

7.76

0.00

10

Progresiva

75

0.96

0.00

0.96

0.00

8.72

0.00

11

Progresiva

76

0.96

0.00

0.96

0.00

9.68

0.00

12

Progresiva

77

0.96

0.00

0.96

0.00

10.64

0.00

13

Progresiva

78

0.96

0.00

0.96

0.00

11.60

0.00

14

Progresiva

79

0.96

0.00

0.96

0.00

12.56

0.00

15

Progresiva

80

0.96

0.00

0.96

0.00

13.52

0.00

16

Progresiva

81

0.96

0.00

0.96

0.00

14.48

0.00

17

Progresiva

82

0.96

0.00

0.96

0.00

15.44

0.00

18

Progresiva

83

0.96

0.00

0.96

0.00

16.40

0.00

19

Progresiva

84

0.96

0.00

0.96

0.00

17.36

0.00

20

Progresiva

85

0.96

0.00

0.96

0.00

18.32

0.00

21

Progresiva

86

0.96

0.00

0.96

0.00

19.28

0.00

22

Progresiva

87

0.96

0.00

0.96

0.00

20.24

0.00

23

Progresiva

88

0.96

0.00

0.96

0.00

21.20

0.00

24

Progresiva

89

0.96

0.00

0.96

0.00

22.16

0.00

25

Progresiva

90

0.96

0.00

0.96

0.00

23.12

0.00

26

Progresiva

91

0.96

0.00

0.96

0.00

24.08

0.00

27

Progresiva

92

0.96

0.00

0.96

0.00

25.04

0.00

28

Progresiva

93

0.96

0.00

0.96

0.00

26.00

0.00

29

Progresiva

94

0.96

0.00

0.96

0.00

26.96

0.00

30

Progresiva

95

0.96

0.00

0.96

0.00

27.92

0.00

31

Progresiva

96

0.96

0.00

0.96

0.00

28.88

0.00

32

Progresiva

97

0.96

0.00

0.96

0.00

29.84

0.00

33

Progresiva

98

0.96

0.00

0.96

0.00

30.80

0.00

34

Progresiva

99

0.96

0.00

0.96

0.00

31.76

0.00

35

Progresiva

100

0.96

0.00

0.96

0.00

32.72

0.00

36

Progresiva

101

0.96

0.00

0.96

0.00

33.68

0.00

37

Progresiva

101.61

0.96

0.00

0.59

0.00

34.27

0.00

34.27

0.00

100%

34.27

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

Total
(m3)

34.27
SIFN N 01
MOVIMIENTO DE TIERRAS

EXCAVACIN EN MATERIAL SUELTO C/EQUIPO


Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

0.00

0.00

Progresiva

101.61

9.32

0.00

0.00

0.00

Progresiva

102

9.32

0.00

3.63

0.00

3.63

0.00

Progresiva

103

9.35

0.00

9.34

0.00

12.97

0.00

Progresiva

104

9.29

0.00

9.32

0.00

22.29

0.00

Progresiva

105

9.23

0.00

9.26

0.00

31.55

0.00

Progresiva

106

9.16

0.00

9.19

0.00

40.74

0.00

Progresiva

107

9.00

0.00

9.08

0.00

49.82

0.00

Progresiva

108

8.73

0.00

8.86

0.00

58.68

0.00

Progresiva

109

8.19

0.00

8.46

0.00

67.14

0.00

10

Progresiva

110

7.24

0.00

7.72

0.00

74.86

0.00

11

Progresiva

111

6.24

0.00

6.74

0.00

81.60

0.00

12

Progresiva

112

5.23

0.00

5.73

0.00

87.33

0.00

13

Progresiva

113

8.87

0.00

7.05

0.00

94.38

0.00

14

Progresiva

114

8.94

0.00

8.90

0.00

103.28

0.00

15

Progresiva

115

8.93

0.00

8.93

0.00

112.21

0.00

16

Progresiva

116

8.91

0.00

8.92

0.00

121.13

0.00

17

Progresiva

117

8.88

0.00

8.89

0.00

130.02

0.00

18

Progresiva

118

8.84

0.00

8.86

0.00

138.88

0.00

19

Progresiva

119

8.79

0.00

8.81

0.00

147.69

0.00

20

Progresiva

120

17.43

0.00

13.11

0.00

160.80

0.00

21

Progresiva

121

17.39

0.00

17.41

0.00

178.21

0.00

22

Progresiva

122

17.34

0.00

17.36

0.00

195.57

0.00

23

Progresiva

123

17.28

0.00

17.31

0.00

212.88

0.00

24

Progresiva

124

17.21

0.00

17.24

0.00

230.12

0.00

25

Progresiva

125

17.12

0.00

17.16

0.00

247.28

0.00

Total
(m3)

26

Progresiva

126

17.03

0.00

17.08

0.00

264.36

0.00

27

Progresiva

127

16.94

0.00

16.98

0.00

281.34

0.00

28

Progresiva

128

16.85

0.00

16.89

0.00

298.23

0.00

29

Progresiva

129

16.78

0.00

16.81

0.00

315.04

0.00

30

Progresiva

130

16.71

0.00

16.74

0.00

331.78

0.00

31

Progresiva

131

16.65

0.00

16.68

0.00

348.46

0.00

32

Progresiva

132

16.60

0.00

16.62

0.00

365.08

0.00

33

Progresiva

133

16.56

0.00

16.58

0.00

381.66

0.00

34

Progresiva

134

16.53

0.00

16.54

0.00

398.20

0.00

35

Progresiva

135

16.50

0.00

16.52

0.00

414.72

0.00

36

Progresiva

136

16.49

0.00

16.50

0.00

431.22

0.00

37

Progresiva

137

16.50

0.00

16.49

0.00

447.71

0.00

38

Progresiva

138

16.83

0.00

16.67

0.00

464.38

0.00

39

Progresiva

139

16.93

0.00

16.88

0.00

481.26

0.00

40

Progresiva

140

16.73

0.00

16.83

0.00

498.09

0.00

41

Progresiva

141

17.02

0.00

16.87

0.00

514.96

0.00

42

Progresiva

142

17.64

0.00

17.33

0.00

532.29

0.00

43

Progresiva

143

18.42

0.00

18.03

0.00

550.32

0.00

44

Progresiva

144

19.42

0.00

18.92

0.00

569.24

0.00

45

Progresiva

145

20.45

0.00

19.94

0.00

589.18

0.00

46

Progresiva

146

21.49

0.00

20.97

0.00

610.15

0.00

47

Progresiva

147

20.40

0.00

20.95

0.00

631.10

0.00

48

Progresiva

148

18.48

0.00

19.44

0.00

650.54

0.00

49

Progresiva

149

16.58

0.00

17.53

0.00

668.07

0.00

50

Progresiva

150

14.70

0.00

15.64

0.00

683.71

0.00

51

Progresiva

151

12.83

0.00

13.77

0.00

697.48

0.00

52

Progresiva

152

10.84

0.00

11.84

0.00

709.32

0.00

53

Progresiva

153

8.15

0.00

9.50

0.00

718.82

0.00

54

Progresiva

154

5.64

0.00

6.90

0.00

725.72

0.00

55

Progresiva

155

5.25

0.00

5.45

0.00

731.17

0.00

56

Progresiva

156

6.88

0.00

6.06

0.00

737.23

0.00

57

Progresiva

157

7.20

0.00

7.04

0.00

744.27

0.00

58

Progresiva

158

6.13

0.00

6.66

0.00

750.93

0.00

750.93

0.00

100%

750.93

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

750.93
EXCAVACION PARA ESTRUCTURAS.

SIFN N 01
Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

Progresiva

101.61

0.96

0.00

0.00

0.00

0.00

0.00

Progresiva

102

0.96

0.00

0.37

0.00

0.37

0.00

Progresiva

103

1.40

0.00

1.18

0.00

1.55

0.00

Progresiva

104

1.83

0.00

1.61

0.00

3.16

0.00

Progresiva

105

2.11

0.00

1.97

0.00

5.13

0.00

Progresiva

106

2.38

0.00

2.24

0.00

7.37

0.00

Progresiva

107

2.66

0.00

2.52

0.00

9.89

0.00

Progresiva

108

2.93

0.00

2.79

0.00

12.68

0.00

Progresiva

109

3.20

0.00

3.07

0.00

15.75

0.00

10

Progresiva

110

3.48

0.00

3.34

0.00

19.09

0.00

11

Progresiva

111

3.75

0.00

3.62

0.00

22.71

0.00

12

Progresiva

111.61

0.90

0.00

1.42

0.00

24.13

0.00

24.13

0.00

100%

24.13

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

Total
(m3)

24.13
RELLENO COMPACTADO MANUAL

SIFN N 01
Nmero

Area

Descripcin

Volumen

(m2)

(m3)

Volumen Parcial (m3)

Corte

Relleno

Corte

Relleno

Corte

Relleno

0.00

0.00

Progresiva

113

8.59

0.00

0.00

0.00

Progresiva

114

6.50

0.00

7.55

0.00

7.55

0.00

Progresiva

115

6.49

0.00

6.50

0.00

14.05

0.00

Progresiva

116

6.48

0.00

6.48

0.00

20.53

0.00

Progresiva

117

6.45

0.00

6.46

0.00

26.99

0.00

Progresiva

118

6.41

0.00

6.43

0.00

33.42

0.00

Progresiva

119

6.36

0.00

6.38

0.00

39.80

0.00

Total
(m3)

Progresiva

120

6.70

0.00

6.53

0.00

46.33

0.00

Progresiva

121

6.66

0.00

6.68

0.00

53.01

0.00

10

Progresiva

122

6.61

0.00

6.63

0.00

59.64

0.00

11

Progresiva

123

6.55

0.00

6.58

0.00

66.22

0.00

12

Progresiva

124

6.48

0.00

6.51

0.00

72.73

0.00

13

Progresiva

125

6.39

0.00

6.43

0.00

79.16

0.00

14

Progresiva

126

6.30

0.00

6.35

0.00

85.51

0.00

15

Progresiva

127

6.21

0.00

6.25

0.00

91.76

0.00

16

Progresiva

128

6.12

0.00

6.16

0.00

97.92

0.00

17

Progresiva

129

6.05

0.00

6.08

0.00

104.00

0.00

18

Progresiva

130

5.98

0.00

6.01

0.00

110.01

0.00

19

Progresiva

131

5.92

0.00

5.95

0.00

115.96

0.00

20

Progresiva

132

5.87

0.00

5.89

0.00

121.85

0.00

21

Progresiva

133

5.83

0.00

5.85

0.00

127.70

0.00

22

Progresiva

134

5.80

0.00

5.81

0.00

133.51

0.00

23

Progresiva

135

5.77

0.00

5.79

0.00

139.30

0.00

24

Progresiva

136

5.76

0.00

5.77

0.00

145.07

0.00

25

Progresiva

137

5.77

0.00

5.76

0.00

150.83

0.00

26

Progresiva

138

6.10

0.00

5.94

0.00

156.77

0.00

27

Progresiva

139

6.20

0.00

6.15

0.00

162.92

0.00

28

Progresiva

140

6.00

0.00

6.10

0.00

169.02

0.00

29

Progresiva

141

6.29

0.00

6.14

0.00

175.16

0.00

30

Progresiva

142

6.91

0.00

6.60

0.00

181.76

0.00

31

Progresiva

143

7.69

0.00

7.30

0.00

189.06

0.00

32

Progresiva

144

8.69

0.00

8.19

0.00

197.25

0.00

33

Progresiva

145

9.72

0.00

9.21

0.00

206.46

0.00

34

Progresiva

146

10.76

0.00

10.24

0.00

216.70

0.00

35

Progresiva

147

9.67

0.00

10.22

0.00

226.92

0.00

36

Progresiva

148

7.75

0.00

8.71

0.00

235.63

0.00

37

Progresiva

149

5.85

0.00

6.80

0.00

242.43

0.00

38

Progresiva

150

3.97

0.00

4.91

0.00

247.34

0.00

39

Progresiva

151

2.10

0.00

3.04

0.00

250.38

0.00

250.38

0.00

100%

250.38

0.00

EXCAVACION EN ROCA SUELTA

0%

0.00

0.00

EXCAVACION EN ROCA FIJA

0%

0.00

0.00

VOLUMEN TOTAL DE EXCAVACION


EXCAVACION EN MATERIAL SUELTO

250.38

You might also like