PT JAYA SATRIA
Beyond Construction
Jl. Jababeka V Blok U No. 17 18, Cikarang, Bekasi,
Jawa Barat 17432
Telp. (021) 8768546 Fax. (021) 765345
E-mail : jayasatria@yahoo.com
SATUA
N
Panjang
Tinggi
Luas kotor
= 0.85 m
= 0.9 m
= ( Panjang x Tinggi )
= ( 0.85 x 0.9 ) = 0.7650 m2
Keliling Pondasi Total = 8 + 2 + 7 + 7 + 7 + 2 + 8 + 2 + 4 + 2 +
3+6+7+6+2+2+4+8+2+2+
2+8+6+2+2+7+9+2+ 3+2+
3 + 6 + 3 + 5 + 3.1 + 3 + 6 + 4 + 4 + 7
+ 2 + 11 + 4 + 2 + 2 + 6 + 21 + 6 + 2 +
4 + 1 + 3 + 3.1 + 0.9 + 2 + 2 + 2.245 +
3+3
= 277.525 m
Volume Galian
= 277.525 x 0.7650
= 212.3 m
Galian Pondasi Kolom Tipe F2
Volume Galian Pondasi = 27.04 m x 28
Per Kolom
= 757.12 m
Volume Titik 34
= 16 m x 20
= 320 m
VOLUM
E
0.7650
m2
277.525
212.3
757.12
320
[Type text]
PT JAYA SATRIA
Beyond Construction
Jl. Jababeka V Blok U No. 17 18, Cikarang, Bekasi,
Jawa Barat 17432
Telp. (021) 8768546 Fax. (021) 765345
E-mail : jayasatria@yahoo.com
= 3.696 m
12
Volume Total
6.802
m
m
m
m
m
m
m
m
3.756
118.77
532.58
= 1.134 m
= 2.016 m
2
m
m
= 0.504 m
= 0.264 m
= 3.756 m
= 757.12 ( 6.802 x 28 )
= 566.664 m
= 320 ( 3.756 x 20 )
= 244.88 m
= 811.77 + 118.77 + 532.58
= 1462.894 m
15.7
x 47.47 x 1.9
2
Volume Total
= 708.01505 m
= 2170.999 m
= 2171
m
566.664
m
m
244.88
m
1462.894
708.015
2171
[Type text]
PT JAYA SATRIA
Beyond Construction
Jl. Jababeka V Blok U No. 17 18, Cikarang, Bekasi,
Jawa Barat 17432
Telp. (021) 8768546 Fax. (021) 765345
E-mail : jayasatria@yahoo.com
( P1 = P2 = P3 = P4 )
= 2.135 ( 8.5 x 1.2132 x 1.56 x 34.7 )
= 121.67 m
0.4+1
P5 =
x 4.05 = 2.835 m x 15.7
2
= 44.51 m
P6 =
0.4+1
2
x 3.4 = 2.38 m x 21
= 49.98 m
Urukan
P7 = 0.3 x 1.05 = 0.45 x 43.17 = 19.427 m
P8 = 0.3 x 1
= 0.3 x 1.6
= 4.8
m
P9 = 0.3 x 1.6 = 0.32 x 36.7 = 11.74 m
Total
= 252.33 m
Urukan Pasir Untuk Pondasi
Pondasi Menerus
0.9 x 0,05 x 277.525 = 12.489 m
252.33
0.07 x 2 x 2 x 20
0.07 x 2.6 x 2.6 x 28
Total
Pada Lantai
1.1 x 37 x 24 = 88.8 m
Volume Rapat Beton
0.05 x 37 x 24 = 44.4 m
= 5.6 m
( F34 )
= 13.25 m ( F12 )
= 18.95 m
18.95
88.8
44.4