You are on page 1of 18

Pressure, Temperature and Spinner

COMPANY :
WELL :

BANGKO 067 # O-W1-22

FIELD :

BANGKO

COUNTY :
COUNTRY :

LOGGED ON
LOGGED BY
PROCESSED BY
PROGRAM NO

:
:
:
:

CHEVRON PACIFIC INDONESIA

RIAU
INDONESIA

22 APRIL 2016
HOT HOLE INSTRUMENTS
HOT HOLE INSTRUMENTS
BNKO0006720150819LOG05

2016

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Client
Field
Well/Type
Date
Witness
Engineer
Analyst
Data Processing

PT. Chevron Pacific Indonesia


BANGKO
BO - 067 (O-W1-22)
22 April 2016
Zenitra
Seno Pratomo
Hot Hole Instruments Processing Data Team
Sugeng Triyono
Pressure, Temperature and Spinner
PATS Tool
No.7
Impeller Type
3P- Blade Type
1. Body OD
: 1 7/8
Tool Dimension
2. Spinner OD : 2 1/8
3. Length
: 12.375
Start Depth
0'
Stop Depth
448'
PBTD
1265'
TD
1900'
F/L
N/A'
Max. Temp
171 DegF
WHP
102 Psi
Total Cost
$3,060 USD
QC
Adiyon
Remarks
1. Casing valve close

Page 1 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

1.687

Figure 1: PATS TOOL

Page 2 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Comments
- Main objectives of the survey:
To determine water disposal profile and also to determine the percentage of each zone
-

Casing Valve was in completely close position

Survey Depth interval: @0ft 448ft at speed 250 ft/m (Logging down up)

Sensor Type : Speed (fpm), Pressure (psi), Temperature (degF)

-Survey Finding
-

Pick Up Tension @448 ft

Temp Reading started reached geothermal gradient at n/a indicated static fluid below that
depth than water

Gasrate measurement with DP meter was not available.

Page 3 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Pick Up Tension @448 ft

PBTD @1265ft
TD @1900 ft

Figure 1: Merge Pressure and Temperature log while survey was conducted at log. Depth 0-448
Speed of 250 ft/m

Page 4 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Table 1. Spinner, Temperature and Pressure Data List at 4480-5050


DEPTH (Ft)

LSPD (Sc)

TEMP(DegF)

PRESS(Psi)

SPIN(Hz)

DEPTH (Ft)

LSPD (Sc)

TEMP(DegF)

PRESS(Psi)

SPIN(Hz)

5.00

0.00

157.96

98.31

0.00

190.00

248.09

160.53

99.30

-16.71

10.00

63.20

157.69

98.30

0.00

195.00

248.09

160.99

101.25

-27.02

15.00

91.17

157.45

98.63

0.00

200.00

246.71

161.63

102.42

-23.03

20.00

106.06

157.28

98.83

0.00

205.00

246.08

161.96

103.28

-27.24

25.00

111.48

157.18

98.86

0.00

210.00

247.08

162.07

104.03

-20.61

30.00

121.10

157.10

98.85

0.00

215.00

247.58

162.14

104.42

-21.85

35.00

123.06

157.04

98.94

0.00

220.00

247.67

162.25

104.82

-18.91

40.00

123.80

156.98

99.06

0.00

225.00

247.66

162.38

105.27

-20.88

45.00

124.05

156.96

99.03

0.00

230.00

247.54

162.52

105.38

-21.67

50.00

15.72

156.95

98.95

0.00

235.00

247.30

162.65

105.60

-18.61

55.00

116.23

156.94

99.09

0.00

240.00

247.49

162.78

105.89

-19.37

60.00

191.76

156.94

99.07

0.00

245.00

247.55

162.91

106.04

-12.05

65.00

255.53

156.95

99.09

0.00

250.00

247.70

163.12

106.62

-32.10

70.00

256.93

156.97

99.13

0.00

255.00

246.77

163.48

107.24

-20.75

75.00

255.07

157.00

99.10

0.00

260.00

246.72

163.64

107.49

-22.25

80.00

253.66

157.04

99.13

0.00

265.00

247.14

163.71

107.76

-18.95

85.00

253.19

157.09

99.12

0.00

270.00

247.44

163.81

107.95

-20.10

90.00

252.83

157.14

99.01

0.00

275.00

247.57

163.92

108.03

-19.26

95.00

252.27

157.19

98.97

0.00

280.00

247.38

164.03

107.99

-9.24

100.00

252.12

157.25

98.92

0.00

285.00

247.31

164.05

107.95

-12.81

105.00

251.98

157.33

98.90

0.00

290.00

247.56

164.12

107.15

-16.06

110.00

251.42

157.39

98.81

0.00

295.00

247.65

164.18

108.57

-32.34

115.00

251.06

157.47

98.78

0.00

300.00

246.36

164.82

111.37

-25.83

120.00

250.99

157.56

98.77

0.00

305.00

244.75

165.42

111.64

-26.20

125.00

250.74

157.69

98.82

0.00

310.00

244.65

165.70

112.93

-14.56

130.00

250.48

157.80

98.79

0.00

315.00

246.05

165.76

113.89

-33.09

135.00

250.24

157.94

98.80

0.00

320.00

245.59

166.15

113.48

-15.85

140.00

249.99

158.10

98.79

0.00

325.00

245.93

166.12

114.88

-29.38

145.00

250.02

158.28

98.83

0.00

330.00

246.37

166.33

114.89

-13.49

150.00

249.93

158.45

98.90

0.00

335.00

246.39

166.35

115.03

-15.71

155.00

249.63

158.61

98.97

0.00

340.00

246.72

166.36

114.93

-17.97

160.00

249.32

158.76

98.98

0.00

345.00

246.90

166.33

114.82

-16.29

165.00

249.32

158.90

98.92

0.00

350.00

246.81

166.33

114.76

-15.44

170.00

249.17

159.03

98.80

0.00

355.00

246.71

166.32

114.62

-14.85

175.00

249.11

159.75

98.76

-3.49

360.00

246.53

166.31

113.91

-18.36

180.00

248.83

160.08

98.87

-14.77

365.00

246.65

166.74

116.44

-28.82

185.00

248.31

160.32

98.99

-19.10

370.00

245.15

167.64

117.27

-17.47

Page 5 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

DEPTH (Ft)

LSPD (Sc)

TEMP(DegF)

PRESS(Psi)

SPIN(Hz)

375.00

244.44

167.93

117.16

-9.58

380.00

245.72

167.82

117.51

-11.93

385.00

243.97

168.19

117.74

-22.20

390.00

241.21

168.43

118.08

-17.91

395.00

241.52

168.60

118.36

-19.37

400.00

241.43

168.79

118.69

-18.46

405.00

241.16

169.05

119.49

-25.55

410.00

241.06

169.36

119.34

-19.41

415.00

227.62

169.71

120.21

-11.91

420.00

175.73

170.30

122.73

-13.35

425.00

140.27

170.88

122.73

-13.34

430.00

133.29

170.88

122.69

-11.67

435.00

137.13

170.87

121.95

-6.51

440.00

139.52

170.84

123.85

-4.90

445.00

127.42

171.65

123.73

-10.21

450.00

64.08

171.54

123.73

-4.41

448.00

78.79

171.55

123.73

-6.47

DEPTH (Ft)

LSPD (Sc)

TEMP(DegF)

PRESS(Psi)

SPIN(Hz)

Page 6 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Figure 2. Stop Check at 200ft


Table 2. Spinner, Temperature and Pressure Data List at 200ft
Time (m)

Rps

T (F)

P (Psia)

Time (m)

Rps

T (F)

P (Psia)

0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00

162.03
162.32
162.09
161.95
162.00
162.08
161.88
162.09
162.36
162.47
162.27
162.22
162.02
161.89
162.27
162.13
162.02
162.28
162.43
162.12

107.99
107.05
107.94
107.02
106.19
107.58
106.92
107.40
108.38
109.35
108.44
108.00
106.87
105.92
107.77
106.75
105.72
106.71
107.18
106.20

5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
7.25
7.50
7.75
8.00
8.25
8.50
8.75
9.00
9.25
9.50
9.75
10.00

162.66
162.38
162.24
162.61
162.46
162.74
162.98
162.58
162.45
162.82
162.44
162.69
162.51
162.36
162.20
162.58
162.50
162.90
162.96
162.76

107.85
107.56
106.52
108.79
107.99
107.81
109.23
108.26
107.56
107.20
107.32
106.13
107.70
106.48
105.73
107.89
106.94
107.79
108.84
107.32

Page 7 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Figure 3. Stop Check at 250ft


Table 3. Spinner, Temperature and Pressure Data List at 250ft
Time (m)

Rps

T (F)

P (Psia)

Time (m)

Rps

T (F)

P (Psia)

0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00

163.40
163.32
163.65
163.51
163.55
163.40
163.56
163.63
163.93
163.73
163.77
163.94
163.90
163.78
163.75
163.63
164.01
164.22
164.23
163.96

109.71
110.01
110.87
110.25
110.59
109.18
109.32
109.83
109.36
110.41
110.44
111.44
110.41
110.02
109.42
108.30
110.84
111.78
111.41
110.18

5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
7.25
7.50
7.75
8.00
8.25
8.50
8.75
9.00
9.25
9.50
9.75
10.00

163.88
163.93
164.00
164.31
164.08
163.85
164.22
164.00
163.90
163.62
164.31
164.20
164.08
164.32
164.19
164.04
163.99
164.25
164.24
164.09

109.51
109.72
110.21
111.28
110.50
109.49
111.83
110.47
109.54
108.14
110.21
110.59
110.15
111.82
110.77
109.97
109.84
109.17
111.21
110.35

Page 8 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Figure 4. Stop Check at 300ft


Table 4. Spinner, Temperature and Pressure Data List at 300ft
Time (m)

Rps

T (F)

P (Psia)

Time (m)

Rps

T (F)

P (Psia)

0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00

164.92
164.92
165.30
165.27
165.14
165.66
165.23
165.76
165.30
165.04
165.23
165.57
165.54
165.26
165.63
165.63
165.89
165.57
166.03
165.49

112.56
112.54
113.14
113.00
112.21
113.67
112.81
112.90
113.11
111.99
112.43
111.68
113.02
111.81
112.85
113.54
114.53
113.30
113.75
112.54

5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
7.25
7.50
7.75
8.00
8.25
8.50
8.75
9.00
9.25
9.50
9.75
10.00

165.35
165.82
165.65
165.44
165.42
165.84
165.77
165.56
165.58
166.13
165.73
166.12
165.93
165.80
165.63
165.88
165.64
165.62
165.76
165.74

111.54
113.55
112.78
111.76
111.98
113.08
113.11
111.97
112.17
111.79
112.71
112.74
114.89
113.61
112.29
113.97
112.20
112.46
112.83
112.64

Page 9 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Figure 5. Stop Check at 350ft


Table 5. Spinner, Temperature and Pressure Data List at 350ft
Time (m)

Rps

T (F)

P (Psia)

Time (m)

Rps

T (F)

P (Psia)

0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00

166.51
166.75
167.01
167.36
167.28
167.09
167.09
167.48
167.04
167.05
167.54
167.27
167.54
167.65
167.32
167.20
167.06
167.63
167.30
167.47

114.50
115.10
116.27
116.71
116.37
116.15
115.62
116.28
115.38
115.28
116.42
116.06
115.63
115.87
115.80
114.91
114.55
116.45
115.45
116.36

5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
7.25
7.50
7.75
8.00
8.25
8.50
8.75
9.00
9.25
9.50
9.75
10.00

167.33
167.45
167.39
167.27
167.19
167.42
167.70
167.54
167.31
167.43
167.53
167.47
167.51
167.63
167.81
167.37
167.66
167.47
167.36
167.43

115.43
116.04
115.94
114.96
114.87
115.91
117.48
116.38
115.16
115.79
116.11
116.13
116.03
116.58
116.23
114.96
116.31
115.32
114.71
115.39

Page 10 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Figure 6. Stop Check at 400ft


Table 6. Spinner, Temperature and Pressure Data List at 400ft
Time (m)

Rps

T (F)

P (Psia)

Time (m)

Rps

T (F)

P (Psia)

0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00

169.44
169.39
169.39
169.31
169.69
169.57
169.72
169.60
169.46
170.13
169.61
169.84
169.63
169.65
169.86
169.75
169.57
169.67
169.73
169.84

118.44
118.91
118.92
118.76
118.88
120.04
120.22
119.47
119.28
120.09
119.68
120.62
119.72
119.17
119.04
119.77
118.37
118.86
119.89
120.53

5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
7.25
7.50
7.75
8.00
8.25
8.50
8.75
9.00
9.25
9.50
9.75
10.00

169.77
169.84
169.66
169.52
169.89
169.77
169.92
170.11
169.71
169.84
169.82
169.69
169.68
170.04
169.89
170.07
169.89
169.98
169.86
169.90

119.76
119.21
119.32
118.23
120.14
119.65
120.23
120.56
119.56
119.44
119.71
118.35
118.24
119.90
119.73
120.21
119.34
119.51
119.30
119.50

Page 11 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

Figure 7. Stop Check at 448ft


Table 7. Spinner, Temperature and Pressure Data List at 448ft
Time (m)

Rps

T (F)

P (Psia)

Time (m)

Rps

T (F)

P (Psia)

0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00

171.50
171.45
171.53
171.53
171.59
171.74
171.69
171.76
171.76
171.89
171.78
171.86
171.85
171.95
171.84
171.97
171.92
171.95
172.00
172.00

122.84
121.74
121.90
121.74
121.62
121.36
121.46
121.59
121.56
121.97
121.62
121.50
121.54
121.87
121.31
121.40
121.53
121.63
121.46
121.71

5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
7.25
7.50
7.75
8.00
8.25
8.50
8.75
9.00
9.25
9.50
9.75
10.00

172.01
172.02
172.09
172.09
172.13
172.17
172.15
172.17
172.21
172.15
172.20
172.21
172.22
172.20
172.28
172.31
172.25
172.29
172.30
172.34

121.47
121.70
121.47
121.38
121.56
121.55
121.63
121.65
121.50
121.65
121.54
121.58
121.52
121.65
121.55
121.76
121.81
121.59
121.90
121.99

Page 12 of 14

Client
Field
Date
Time (m)

10.25
10.50
10.75
11.00
11.25
11.50
11.75
12.00
12.25
12.50
12.75
13.00
13.25
13.50
13.75
14.00
14.25
14.50
14.75
15.00
15.25
15.50
15.75
16.00
16.25
16.50
16.75
17.00
17.25
17.50
17.75
18.00
18.25
18.50
18.75
19.00
19.25
19.50
19.75
20.00

Rps

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

T (F)

P (Psia)

Time (m)

172.35
172.34
172.34
172.24
172.33
172.33
172.38
172.41
172.26
172.27
172.25
172.29
172.28
172.35
172.34
172.34
172.40
172.41
172.42
172.40
172.47
172.30
172.47
172.41
172.51
172.26
172.41
172.32
172.40
172.39
172.41
172.34
172.34
172.34
172.34
172.37
172.33
172.33
172.43
172.40

121.57
121.83
122.86
121.75
122.20
121.41
122.01
122.51
122.01
123.04
121.91
121.93
122.68
122.01
121.97
121.89
122.39
122.27
121.29
123.11
122.74
122.64
121.68
123.32
123.47
122.21
121.87
122.92
122.53
122.48
123.15
122.63
122.14
122.50
123.17
122.88
123.22
122.46
122.62
123.46

20.25
20.50
20.75
21.00
21.25
21.50
21.75
22.00
22.25
22.50
22.75
23.00
23.25
23.50
23.75
24.00
24.25
24.50
24.75
25.00
25.25
25.50
25.75
26.00
26.25
26.50
26.75
27.00
27.25
27.50
27.75
28.00
28.25
28.50
28.75
29.00
29.25
29.50
29.75
30.00

Rps

T (F)

P (Psia)

172.32
172.35
172.48
172.33
172.34
172.34
172.42
172.42
172.29
172.35
172.59
172.35
172.38
172.44
172.37
172.32
172.37
172.35
172.44
172.37
172.37
172.32
172.30
172.45
172.44
172.36
172.28
172.40
172.35
172.31
172.49
172.30
172.48
172.47
172.49
172.30
172.34
172.49
172.30
172.39

122.42
122.68
123.43
122.03
122.86
122.39
121.88
122.61
122.05
122.91
122.01
122.78
121.46
123.56
122.96
121.74
122.97
121.81
123.25
122.90
123.25
122.13
121.98
121.54
121.62
122.65
121.87
121.85
121.87
122.07
123.58
122.44
123.34
123.36
123.42
121.82
122.15
121.34
121.99
121.72

Page 13 of 14

Client
Field
Date
Time (m)

30.25
30.50
30.75
31.00
31.25
31.50
31.75
32.00
32.25
32.50
32.75
33.00
33.25
33.50
33.75
34.00
34.25
34.50
34.75
35.00
35.25
35.50
35.75
36.00
36.25
36.50
36.75
37.00
37.25
37.50
37.75
38.00
38.25
38.50
38.75
39.00
39.25
39.50
39.75
40.00

Rps

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

T (F)

P (Psia)

Time (m)

172.33
172.43
172.31
172.28
172.44
172.35
172.32
172.37
172.43
172.40
172.25
172.46
172.29
172.46
172.29
172.27
172.27
172.33
172.27
172.26
172.34
172.27
172.47
172.27
172.22
172.36
172.47
172.29
172.23
172.24
172.59
172.42
172.28
172.32
172.31
172.19
172.33
172.36
172.29
172.23

122.04
123.57
121.91
122.33
122.01
122.06
122.79
122.83
123.15
123.08
121.74
123.08
122.38
123.43
122.31
122.23
122.78
122.04
122.51
122.65
122.96
122.20
121.73
122.71
122.09
122.96
122.17
122.77
122.31
121.83
122.43
123.60
122.08
121.92
122.90
121.89
122.60
122.45
121.91
121.95

40.25
40.50
40.75
41.00
41.25
41.50
41.75
42.00
42.25
42.50
42.75
43.00
43.25
43.50
43.75
44.00
44.25
44.50
44.75
45.00
45.25
45.50
45.75
46.00
46.25
46.50
46.75
47.00
47.25
47.50
47.75
48.00
48.25
48.50
48.75
49.00
49.25
49.50
49.75
50.00

Rps

T (F)

P (Psia)

172.26
172.41
172.27
172.29
172.48
172.48
172.27
172.31
172.33
172.26
172.33
172.24
172.42
172.26
172.25
172.23
172.39
172.48
172.41
172.29
172.47
172.27
172.21
172.40
172.24
172.37
172.21
172.39
172.33
172.36
172.36
172.22
172.60
172.32
172.53
172.23
172.27
172.16
172.27
172.21

121.88
122.99
122.31
121.57
121.40
123.83
122.46
121.90
122.14
122.39
121.56
122.30
123.23
122.13
122.56
121.89
122.39
121.91
121.30
122.34
122.31
122.64
122.12
122.46
122.30
121.74
121.97
122.91
122.43
123.37
123.01
121.88
123.72
122.50
121.48
122.50
122.47
121.61
122.63
121.66

Page 14 of 14

Client
Field
Date
Time (m)

50.25
50.50
50.75
51.00
51.25
51.50
51.75
52.00
52.25
52.50
52.75
53.00
53.25
53.50
53.75
54.00
54.25
54.50
54.75
55.00
55.25
55.50
55.75
56.00
56.25
56.50
56.75
57.00
57.25
57.50
57.75
58.00
58.25
58.50
58.75
59.00
59.25
59.50
59.75
60.00

Rps

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

T (F)

P (Psia)

172.27
172.16
172.42
172.24
172.15
172.23
172.17
172.24
172.13
172.38
172.26
172.15
172.18
172.22
172.18
172.28
172.29
172.27
172.34
172.40
172.16
172.18
172.21
172.23
172.29
172.12
172.57
172.16
172.34
172.24
172.11
172.33
172.21
172.28
172.21
172.34
172.11
172.37
172.27
172.39

122.46
122.16
123.26
121.74
121.95
122.33
121.84
122.54
121.59
122.73
121.59
121.60
121.76
122.04
122.14
121.46
121.52
122.32
122.17
122.89
121.67
121.93
122.45
122.00
122.69
121.82
122.74
122.31
123.15
122.74
121.85
122.99
122.43
121.99
122.03
123.02
122.17
122.25
122.89
123.14

Time (m)

Rps

T (F)

P (Psia)

Page 15 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

ATTACHMENT
Completion Diagram

Page 16 of 14

Client
Field
Date

:
:
:

CHEVRON PASIFIC INDONESIA


BANGKO Well : BO 067 # O-W1-22
22 APRIL 2016

End of Report

Page 17 of 14

You might also like