The Contractor shall make a record to be agreed with the Engineer on the condition of the
Site immediately before entering for the purpose of constructing the Works.

Prior to commencing Work in roads the Contractor shall complete, and submit to the
Engineer, the necessary inventory forms (Road Safety Division Site Inventory form, the
Street Name Inventory etc). The Contractor shall be responsible for rectifying any
damage to the above signs in the absence of an approved inventory prior to construction.

Where work is required on the Owners plant the Contractor shall comply with the
Owners permit procedure prior to commencement of work.

4.0.

PROTECTION

4.1.

GENERAL

4.1.1.

Scope
1

This Part specifies the requirements associated with the protection of the Works and
other works, watching and lighting and for Site hoarding.

4.2.

PROTECTION OF THE WORKS

4.2.1.

General Protection

4.2.2.

SPECIFICATION
09056

The Contractor shall take full responsibility for the care and protection of the Works and
temporary works against damage of any kind for the duration of the Contract.

In the event of any damage to the Works or temporary works, the Contractor shall
undertake all necessary repairs at his own cost.

Protection of Finishes, Equipment and Surfaces


1

The Contractor shall take full responsibility for the protection of finishes, equipment and
surfaces that form part of the Works Protective coatings and wrappings shall be left on
items for as long as possible and practicable.

In the event of any damage to finishes, equipment or surfaces, the Contractor shall
undertake all necessary repairs at his own cost.

4.3.

PROTECTION OF OTHER WORKS

4.3.1.

Protection against Damage


1

The Contractor shall take all necessary precautions to avoid causing any unwarranted
damage to roads, land, properties, trees and other features and, during the currency of
the Contract shall deal promptly with any complaints by owners or occupiers.

Where any portion of the Works is close to, across, or under any existing apparatus, the
Contractor shall temporarily support and work round, under or adjacent to the apparatus
in a manner designed to avoid damage, leakage or danger, and to ensure uninterrupted
operation of the apparatus.

Should any leakages or damage be discovered, the Contractor shall at once notify the
Engineer and the owner concerned, as appropriate and the Contractor shall afford every
facility for the repair or replacement of the apparatus affected.

The Contractor shall be held responsible for any damage caused by him, his work
people,sub-contractors or suppliers to public or private roads, paved areas, paths,
verges, trees, shrubs, fences, boundary walls, gates, signs, drains, ducts and services
during the execution of the Contract and shall bear the cost of making good any damage
to the entire satisfaction of the local and other authorities and owners. The Contractor
shall keep all private roads and paths clean and free from dirt and debris and any
obstruction associated with the works,which would prejudice the safe and unimpeded
normal use of the said roads and paths.