n NOTES & LEGEND

D3

TYPE

INDEX FILE NO.

1500

D4

1800

900

D5

3100

900

2100

1500
2100

2100

2050
2400

NOTE:

CONSTRUCTION:
FINISH:

CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY


CONTRACTOR ON GA DRAWINGS

NOTE:

DOUBLE SWING DOOR TO MANUFACTURER'S DETAILS


EPOXY POWDER COATED ALUMINIUM

CONSTRUCTION:
FINISH:
CONSTRUCTION:
FINISH:

CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY


CONTRACTOR ON GA DRAWINGS

NOTE:

MACHINE CARVED RED HARDWOOD PANELED SWING DOOR FRAME.


1 COAT UNDER COAT PRIMER
2 COATS CLEAR VANISH
DOUBLE SWING DOOR TO MANUFACTURER'S DETAILS
2 COATS CLEAR VANISH

Door No.04

CONSTRUCTION:

230mm MASONRY CONSTRUCTION

CONSTRUCTION:
FINISH:
CONSTRUCTION:
FINISH:

CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY


CONTRACTOR ON GA DRAWINGS

NOTE:

HINGES:

HINGES:

HINGES:

PULL HANDLES:

PULL HANDLES:

PULL HANDLES:

PULL HANDLES:

LOCK SET:
DOOR STOP:

LOCK SET:
DOOR STOP:

IRONMONGERY

HINGES:

LOCK SET:
DOOR STOP:

QUANTITY REQUIRED: 01

LOCATION

DOOR NUMBER:

SINGLE ALUNIMIUM &


GLASS DOOR

WALL

230mm MASONRY CONSTRUCTION

DOUBLE TIMBER &


GLASS DOOR

SUPERVISER OFFICE

ALUMINIUM AND GLASS FOLDING DOOR FRAME.

FRAME

CONSTRUCTION:

QUANTITY REQUIRED: 01

LOCATION

Door No.03

WALL

LOCATION

EPOXY POWDER COATED ALUMINIUM


6mm THICK CLEAR SAFETY GLASS

DOOR NUMBER:

LOCATION:

FFL

EPOXY POWDER COATED ALUMINIUM


6mm THICK CLEAR SAFETY GLASS
SINGLE SWING DOOR TO MANUFACTURER'S DETAILS

DOOR

FINISH:

ALUMINIUM AND GLASS FOLDING DOOR FRAME.

CONFERENCE ROOM

FRAME

WALL
FRAME

EPOXY POWDER COATED ALUMINIUM

230mm MASONRY CONSTRUCTION

DOUBLE ALUMINIUM & GLASS


DOOR

LOCATION:

FFL

EPOXY POWDER COATED ALUMINIUM

OFFICES, BATHROOMS

LOCATION:

DOOR NUMBER:

Door No.05

CONSTRUCTION:

150mm MASONRY CONSTRUCTION

CONSTRUCTION:

813x2032X40 "LOTUS AMORETTI" OR EQUAL APPROVED MERANTI RRV DOUBLE


SIDED DOOR

CONSTRUCTION:

2 COATS POLYURETHANE - FINISH SUEDE


CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY
CONTRACTOR ON GA DRAWINGS

NOTE:
HINGES:

1 PAIR, FACTORY FITTED, 100mm M/S BUTT HINGES WITH WASHERS

LOCK SET:
DOOR STOP:

SINGLE DOOR

1 COAT UNDER COAT PRIMER

FINISH:

CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY


CONTRACTOR ON GA DRAWINGS

QUANTITY REQUIRED: 09

GALVANISED STEEL SINGLE DOOR FRAME.

FINISH:

IRONMONGERY

FINISH:

FOLDING DOOR TO MANUFACTURER'S DETAILS

CONSTRUCTION:

QUANTITY REQUIRED: 01

IRONMONGERY

DOOR

CONSTRUCTION:

EPOXY POWDER COATED ALUMINIUM


6mm THICK CLEAR SAFETY GLASS

Door No.02

CONSTRUCTION:

DOOR

FRAME

FINISH:

ALUMINIUM AND GLASS FOLDING DOOR FRAME.

DOOR NUMBER:

WALL

230mm MASONRY CONSTRUCTION

DOUBLE ALUMINIUM & GLASS


DOOR WITH DOUBLE SIDE LIGHTS

FRAME

CONSTRUCTION:

QUANTITY REQUIRED: 01

RECEPTION

DOOR

Door No.01

LOCATION:

LOCATION

DOOR NUMBER:

CONSTRUCTION:

IRONMONGERY

MAIN ENTRANCE

IRONMONGERY

WALL

LOCATION

LOCATION:

FFL

FFL

DOOR

FFL

600

825

150

2050
2400

1075

350

650

TYPE

D2

TYPE

3000
1700

650

350
350

TYPE

D1

TYPE

DOOR SCHEDULE

1 PAIR, FACTORY FITTED, 100mm M/S BUTT HINGES WITH WASHERS

PULL HANDLES:
LOCK SET:
DOOR STOP:

FLUSH BOLTS:

FLUSH BOLTS:

FLUSH BOLTS:

FLUSH BOLTS:

FLUSH BOLTS:

DOOR CLOSER:

DOOR CLOSER:

DOOR CLOSER:

DOOR CLOSER:

DOOR CLOSER:

DOOR SPRINGS:

DOOR SPRINGS:

DOOR SPRINGS:

DOOR SPRINGS:

DOOR SPRINGS:

All installation procedures to


comply with
good building
practice
and deemed to
satisfy the Architect's requirements.
This drawing to be read in
conjunction
with GA-layouts and
all dimensions
to
be checked
on site.
Refer any discrepancies to
the Architect in writing.

TYPE

D7

1000

WINDOW SCHEDULE

DOOR SPRINGS:

DOOR SPRINGS:

06

REQUIRED

W2

WINDOW NUMBER:

01

WINDOW NUMBER:

W3

TYPE

949

300

GARAGE
REQUIRED

06

LOUNGE - MASTER BEDROOM & BEDROOM 2 - DRESSING ROOM

WINDOW NUMBER:

REQUIRED 14

W4

W5

WINDOW NUMBER:

REQUIRED

CONSTRUCTION:

ALUMINIUM WINDOW FRAMES

CONSTRUCTION:

ALUMINIUM WINDOW FRAMES

CONSTRUCTION:

ALUMINIUM WINDOW FRAMES

CONSTRUCTION:

ALUMINIUM WINDOW FRAMES

CONSTRUCTION:

ALUMINIUM WINDOW FRAMES

FINISH:

EPOXY PODER COATED ALUMINIUM


BRONZE FINISH

FINISH:

EPOXY PODER COATED ALUMINIUM


BRONZE FINISH

FINISH:

EPOXY PODER COATED ALUMINIUM


BRONZE FINISH

FINISH:

EPOXY PODER COATED ALUMINIUM


BRONZE FINISH

FINISH:

EPOXY PODER COATED ALUMINIUM


BRONZE FINISH

6mm SAFETY SOLAR SHIELD S10 BRONZE


TRANSLUSCENT

TYPE

DOOR CLOSER:

REQUIRED

W1

WINDOW NUMBER:

SCULLERY/LAUNDRY - BATHROOM - ENSUITE

W6

6mm SAFETY SOLAR SHIELD S10 BRONZE


TRANSLUSCENT

6mm SAFETY SOLAR SHIELD S10 BRONZE


TRANSLUSCENT

W7

15160

FRAME

DOOR STOP:

DOOR CLOSER:

REVISION DETAILS

FFL

1 PAIR, FACTORY FITTED, 100mm M/S BUTT HINGES WITH WASHERS

LOCK SET:

FLUSH BOLTS:

KITCHEN

FFL

LOCATION

CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY


CONTRACTOR ON GA DRAWINGS

PULL HANDLES:

FLUSH BOLTS:

TYPE

KITCHEN

2 COATS GLOSS ENAMEL PAINT

FFL

GLAZING

DOOR STOP:

FFL

6mm SAFETY SOLAR SHIELD S10 BRONZE


TRANSLUSCENT

TYPE

HINGES:

1 PAIR, FACTORY FITTED, 100mm M/S BUTT HINGES WITH WASHERS

FFL

LOCATION

NOTE:

INITIAL

STEEL "SHAWL" DOOR

FRAME

CONSTRUCTION:

DATE

NCT1S

1 COAT UNDER COAT PRIMER

GLAZING

FINISH:

CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE CHECKED AND CONFIRMED BY


CONTRACTOR ON GA DRAWINGS

LOCK SET:

NO.

W5

2000
600

GALVANISED STEEL SINGLE DOOR FRAME.

600

1500

WALL
FRAME

CONSTRUCTION:

FINISH:

IRONMONGERY

IRONMONGERY

230mm MASONRY CONSTRUCTION

2 COATS POLYURETHANE - FINISH SUEDE


6mm THICK TOUGHENED GLASS - FROSTED

PULL HANDLES:

W4

533

STEEL DOOR

LOCATION

HINGES:

CONSTRUCTION:

QUANTITY REQUIRED: 01

FRAME

NOTE:

W3

GLAZING

FINISH:

813x2032X40 "LOTUS AMORETTI" OR EQUAL APPROVED MERANTI RRV DOUBLE


SIDED DOOR

Door No.07

LOCATION

CONSTRUCTION:

1 COAT UNDER COAT PRIMER

2400

1800

GALVANISED STEEL SINGLE DOOR FRAME.

W2

TYPE

TYPE
CONSTRUCTION:

REVISIONS

2000
DOOR NUMBER:

LOCATION

115mm MASONRY CONSTRUCTION

SINGLE TIMBER DOOR

W1

GENERATOR ROOM

FRAME

CONSTRUCTION:

QUANTITY REQUIRED: 03

LOCATION:

GLAZING

Door No.06

LOCATION

DOOR NUMBER:

FINISH:

DOOR

TOILETS

DOOR

FRAME

WALL

LOCATION

LOCATION:

NOTE: CORRECT HANDING OF ALL WINDOWS AND DOORS TO BE


CHECKED AND CONFIRMED BY CONTRACTOR ON GA DRAWINGS

TYPE

FFL

FFL

TYPE

2100

2100

850

FRAME

D6

GLAZING

TYPE

GENERAL NOTES

CONSTRUCTION NOTES (All work to be in accordance with SABS 0400)


ROOF TRUSS
Roof pitch 3
Prefabricated pitched steel roof trusses at maximum 1000mm centres
designed and executed by an approved specialist fabricator and including
bracing and detail shop drawings. Roof plan to be used as a guide only.
ROOF FINISH
0.6mm KlipLok 700 steel roof sheeting klipped to 75x150mm C-chanel
steel purlins at 1.1m c/c on D10 Bubble foil sasilaltion insulation on
straining wires at 1m c/c nailed to steel trusses/rafters at 1.1m c/c
secured to wall by anchor bolts (to suite). Provision made for Pink Aerolite
blanket insulation in-between purlins.
FLAT ROOF
R.c. slab (to Eng's det) with DERBIGUM (Duram 195) waterproofing on
25mm min. screed to fall discharging to 110mm down pipes with Fulbore
heads
ROOF FLASHING
Approved durable GSI or other flashing and counter-flashing where roof
abuts against wall and around any projection through the roof covering.
WALLS
Well burnt clay bricks of minimum 10Mpa nominal unit strength and class
2 mortar and comply with the national building regulations and 230mm
thick concrete blockwork. For effective lateral support brickforce above
and below window openings and at wallplate level and at every 3 courses.
All external walls to be plastered blockwork and vanished brickwork.
WATERPROOFING
375 Micron gunplas brickgrip dampproof coursing extending over the full
thickness of the wall to be installed at all window cills and at the level of
the top of the surface bed at least 170mm above the adjoining ground.
Vertical waterproofing membrane to be installed where any wall of a
room is in contract with the ground
NATURAL LIGHT AND VENTILATION
All habitable rooms, bathrooms and toiletsare to be provided with
windows for the purposes of natural light and ventilation the total area of
any such window is to be not less than 10% of the floor area of the room
served by it (with a min of 0.2sqm) For natural light , and such window will
be provided with opeing for natural ventilation. The total area of which
will be not less than 5% of the floor area of the room.
WINDOWS
Windows to be standard as manufactured by or similiar approved
GLAZING
Glazing to comply with clause NN2,1 of the NBR All sliding doors to be
fitted with safety glass
SURFACE BED
200mm 20Mpa concrete on 150m layers of well compacted approved
suitable material.
WORK BELOW GROUND
All work below ground including foundations to engineers detail,
foundation sizes and depths to be finalised on site to the satisfaction of
the local authority and the structural engineer and as part of the NBR but
in any case to be not less than 700 x 250
DRAINAGE
(in accordance with PART P of SABS 0400)
75mm deep seal traps used with all waste fittings. All i.e's to be marked
at the surface and sealed. WC's to have "S" or "P" traps with side access
cleaning eyes. All WHB"s to have 32mm waste pipes and 40mm. waste
pipes. No drainage bends or junctions in or under building. Reseal traps to
all waste fittings.
Pipes Sizes:
wc: 100mm, whb: 40mm, bath: 40mm, shw: 50mm,
bt: 50mm, sink: 40mm, uri: 40mm, jac: 50mm.
Wc soil pipes having a greater drop than 1:20 must be antisyphoned
100mm pvc drain pipes laid to fall 1:40 min. Drains under buildings to
be protected against load by being encased in concrete.

6mm SAFETY SOLAR SHIELD S10 BRONZE


TRANSLUSCENT

06

ARCHITECTURAL
DESIGN OFFICE
GOVERNMENT OF SWAZILAND
MINISTRY OF PUBLIC WORKS & TRANSPORT
PO BOX 58, MBABANE.
PHONE: 2409 9000
FAX:
2404 2321

PROJECT

PROPOSED NEW NATIONAL


DISASTER EARLY WARNING
CENTRE AT MBABANEGOVERNMENT COMPLEX

W8

10000

4580

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

FFL

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

LOUVRE

01

WINDOW NUMBER:

W7

REQUIRED

01

WINDOW NUMBER:

W8

CONSTRUCTION:

ALUMINIUM WINDOW FRAMES

CONSTRUCTION:

ALUMINIUM WINDOW FRAMES

FINISH:

EPOXY PODER COATED ALUMINIUM


BRONZE FINISH

FINISH:

EPOXY PODER COATED ALUMINIUM


BRONZE FINISH

FINISH:

EPOXY PODER COATED ALUMINIUM


BRONZE FINISH

GLAZING

6mm SAFETY SOLAR SHIELD S10 BRONZE


TRANSLUSCENT

FRAME

ALUMINIUM WINDOW FRAMES

FRAME

LOUVRE

LOUVRE

DOOR & WINDOW SCHEDULES


DESIGN GROUP

CONSTRUCTION:

6mm SAFETY SOLAR SHIELD S10 BRONZE


TRANSLUSCENT

LOUVRE

HIGHRISE WINDOW
LOCATION

REQUIRED

LOCATION

W6

LOUVRE

FFL

HIGHRISE WINDOW

GLAZING

LOCATION
FRAME
GLAZING

LOUVRE

FFL

HIGHRISE WINDOW
WINDOW NUMBER:

LOUVRE

1000

LOUVRE

1000

LOUVRE

1000

TITLE

REQUIRED

6mm SAFETY SOLAR SHIELD S10 BRONZE


TRANSLUSCENT

01

DESIGNATION

NAME

SR. ARCHITECT

T. Qwabe

PROJECT ARCH.

N. Buthelezi

DESIGNED

P.S. Dlamini

DRAWN

P.S. Dlamini

SIGNATURE

DATE

ENGINEER
SCALE:

NTS

DATE:

Febuary 2014

DRAWING NO.

WT/53/14/004

CONTRACT NO.

CHKD

REV.