Professional Documents
Culture Documents
1. Please write carefully your Name, Student membership number, Subject name
on the each Subject Assignment.
2.
3.
The fees for Internal Assignment will be Rs.100/- per subject. This is to be paid
through Demand Draft drawn in favour of Indian Institution of Industrial
Engineering, payable at Mumbai and sent alongwith Assignment. Write your name
and membership number on the back side of the Demand Draft.
4.
Solve all the questions and all the sub questions (do not leave any questions or sub
questions). Detailed answers are expected
5.
The paper should be written neat and clean. Leave left margin, top margin and
bottom margin. Write up should be legible.
6.
The expected length of answer shall depend upon the nature of the question.
7.
Answers shall include the definition, Diagrams, Tables, examples, etc. depending on
the nature of question.
8.
IE005 Engineering drawing & Computer Graphics assignment, student may use
drawing sheet.
9. Content that has been directly copied from the Internet will NOT be accepted.
10. Assignments that have been copied and shared among student(s) will be
automatically rejected and such students are liable for disqualification.
11. Ensure that your answers are according to the marks allocated. Students are
advised to check their Assignments thoroughly before submitting the same.
12. Front cover of Internal Assignment shall be attached with Each Assignment.
13. Late submissions upto 15th July 2016 will be accepted with Rs. 100/- as late fees.
14. Beyond 15th July 2016 Internal Assignment will not be accepted.
Controller of Examinations
Student Name
: __________________________
:___________________________
:_________________________
E-mail ID
:_________________________
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q1.
Q2.
a)
(10)
b)
(10)
a)
The cost of Equipment is Rs.65000 and its scrap value is Rs.3,500. The
life of equipment is 9 Years. The maintenance cost for each year is given
in following table:
(10)
Year
Maintenance
Cost
1
1500
2
2000
3
3500
4
5000
5
8000
6
10000
7
12000
8
16000
9
24000
Q3.
Q4.
(10)
Suggest and Justify the material handling equipment for handling following
materials:
(20)
a)
b)
c)
d)
e)
a)
(10)
b)
(10)
Q5.
Q6.
Q7.
a)
(10)
b)
(10)
(20)
a)
Capacity Estimation
b)
b)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q1.
Q2.
Q3.
Q4.
Q5.
Q6.
(10)
a)
b)
a)
(10)
b)
(10)
a)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
SCM starts with the customer and ends with the customer". Explain in
detail.
(10)
b)
(10)
(10)
(10)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------a)
Define Sequencing? Explain the steps of processing 'n' jobs through three
machines?
(10)
b)
(10)
Q2.
Define Demand forecasting? What are the different sources of data for
forecasting? Describe any four methods of it with suitable examples?
(20)
Q3.
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
Q1.
Q4
Q5.
Q6.
(20)
Q7.
a)
Define Management Information System? Explain the role of MIS in a
typical business organization?
(10)
b)
(10)
Q8.
(20)
a)
b)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
a)
(10)
Q.2.
Q.3.
Q.4.
Q.5.
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
example.
Q.6.
Q.7.
a)
Bring out the significant difference between Quality Control and Quality
Assurance.
(10)
b)
(10)
(20)
a)
b)
Vendor appraisal
c)
d)
Quality of conformance.
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q1.
a)
(10)
Q2.
b)
List and explain the various reasons for unnecessary cost in product
development.
a)
b)
(10)
(10)
(10)
Q3.
What are the various incentives that can be considered for motivating the
individuals to be innovative? How do innovative individuals contribute to the
innovation culture in the organisation?
(20)
Q4.
a)
(20)
Q5.
(ii)
(iii)
Travel agencies
(iv)
a)
(10)
b)
(10)
Q7.
a)
(10)
b)
What do you mean by intellectual property? What are the procedures for
registering patents in India and developed countries?
(10)
Write one Basic and one Secondary functions of each of the following:
a)
Computer
b)
Window
c)
Newspaper
d)
OHP
e)
Business
f)
Television set
g)
Microwave oven
h)
Door
i)
ISO system
j)
Cell phone
(20)
Internal Assignment
Section-B
----------------------------------------------------------------------------------------------------------------------------Q.1.
Explain the Need to design right Corporate objectives, goals and policies also
explain the Process of Corporate planning ? Give Examples
(20)
Q.2.
What is Swot Analysis ? And prepare a swot for a business you want to start in
online fashion retail segment ?
(20)
Q.3.
a)
Explain the strategic parameters to look for if you need to expand your
business in Global Market ?
(10)
b)
(10)
Q.4.
(20)
Q.5.
(20)
Q.6.
(20)
Q.7.
(20)
a) Gap Analysis
b) Investment Evaluation
c) Information System
d) Computer Modelling
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
The objective function for an optimization problem is taken as the total income,
which involves an income of five units on item A and seven units on item B. The
former requires 2.5 hours of cutting and 1.5 hours of polishing, whereas item B
requires 4 hours of cutting and 1 hour of polishing. If the total labor hours
available for cutting are 4000 and for polishing 2000, formulate the optimization
problem and solve it by the simplex method to obtain the optimum.
(20)
Q.2.
(20)
Q.3.
Q.4.
a)
Goal Programming
b)
Simulations in optimization
b)
Solve the transportation problem for which the cost, origin availabilities and
destination requirement are given in Table below. Further also check the
optimality.
D1
D2
D3
D4
D5
a1
O1
20
O2
20
O3
30
O4
40
bj
10
10
20
30
30
(20)
(20)
(20)
Q.5.
Consider the convective heat transfer from a spherical reactor of diameter D and
temperature Ts to a fluid at temperature Ta, with a convective heat transfer
coefficient h. Denoting (Ts - Ta) as , h is given by h = 2 + 0.55 0.27 D-1.2
Also, a constraint arises from strength considerations and is given by D = 75. It is
desired to minimize the heat transfer from the sphere. Further the heat content is
given as Q = hA, where A is the area of sphere. Set up the objective function in
terms of D and and with one constraint. Employing Lagrange multipliers for this
optimization, evaluate the optimal values of D and .
Q.6.
Use dynamic programming to identify the path for minimum cost of transportation
from point A to B in Figure 1 below while passing through one of the three
stations of locations C, D, and E. Employ the costs given in the Figure 1 and the
following costs for going between the other locations:
1-1
1-2
1-3
2-1
2-2
2-3
3-1
3-2
3-3
10
14
20
14
15
16
20
16
15
(20)
Q.7.
a)
b)
to, tm, tp
Activity
to, tm, tp
10-20
4, 8, 12
50-70
3, 6, 9
20-30
1, 4, 7
50-80
4, 6, 8
20-40
8, 12, 16
60-100
4, 6, 8
30-50
3, 5, 7
70-90
4, 8, 12
40-50
0, 0, 0
80-90
2. 5, 8
40-60
3, 6, 9
90-100
4, 10, 16
(15)
(05)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q.2.
Q.3.
Q.4.
Q.5.
Q.6.
Q.7.
a)
(10)
b)
(10)
a)
b)
(10)
a)
(10)
b)
(10)
a)
Explain KM repository.
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
What is the meant by data warehouse? What role it plays in knowledge (10)
management?
(10)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q1.
a)
(10)
(10)
Q2.
Q3.
Q4.
Q5.
Q6.
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
Explain Load towing and walking beam conveyor with neat sketch
(10)
a)
(10)
b)
Write about different roller conveyors and oscillating conveyors with neat
sketch in material handling.
(10)
a)
(10)
b)
State the detail procedure for lifting, handling and erecting a typical heavy
machine.
(10)
Q7.
a)
(20)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q1.
Q2.
Q3.
Q4.
a)
FLR Circuit
(ii)
(iii)
(10)
a)
Draw a hydraulic circuit to achieve rapid advance, feed and rapid return a
double acting cylinder using meter in control. Write the specifications of
the elements used.
b)
a)
Notches are to be punched out of plastic parts. The plastic parts can be
inserted from two sides. Two pneumatic sensors test whether the plastic
parts have been inserted. The punching operation is triggered, when the
value of the output signal from at least one of the two sensors is 1.
Simplify the Boolean equation and design a pneumatic circuit.
b)
(10)
a)
(10)
b)
(10)
(10)
(10)
(10)
Q5.
Q6.
Q7.
a)
(10)
b)
Draw the symbols and briefly explain the following elements: (i) linear and
rotary actuators (ii) hydraulic accumulators.
(10)
[10 2 = 20]
a)
NC System component
b)
a)
(10)
(10)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
(20)
Q.2.
(20)
Q.3.
(10)
(10)
Q.4.
(20)
Q.5.
(20)
Q.6.
(20)
a)
b)
c)
d)
Q.7.
Discuss surveying the plant for locations and hazards. Also discuss education
and training in safety.
(20)
Q.8.
(20)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q2.
a)
(10)
b)
(10)
a)
(10)
b)
(10)
Q.3.
Q4.
Q.5.
a)
(10)
b)
(10)
a)
Comment on the statement "Insurance may meet your medical bill, but
the pain has to be borne by you". Link this statement with maintenance
problems and professionalization of maintenance.
(10)
b)
"The stock out cost is always higher than cost of spares so hoard the
spare part.'' Discuss in details.
(10)
a)
(10)
b)
There are five maintenance jobs and five maintenance persons. The
matrix below gives the time in hours of repairing machine i by person j.
How should one machine be assigned to one person so that the total
hours required are minimum?
(10)
Persons
P1
P2
P3
P4
P5
J1
11
17
16
20
J2
12
15
J3
13
16
15
12
16
J4
21
24
17
28
26
J5
14
10
12
11
13
Job 4
Q.6.
Q7.
a)
(10)
b)
(10)
(20)
a)
b)
c)
Group replacements
d)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q.2.
Q.3.
Q.4.
a)
(10)
b)
(10)
a)
If the interest rate is 12 %, what are the doubling period as per the rule of
72 and the rule of 69 respectively.
(10)
b)
(10)
(20)
b)
c)
d)
Debt-Equity Ratios.
a)
What are the effects of indirect expanses while estimating cash flow ?
(10)
b)
(10)
Project
Initial investment
(Rs. Crores)
NPV
(Rs Crore)
PI
3.00
0.60
1.20
2.00
0.50
1.25
2.50
1.50
1.60
6.00
1.80
1.30
Q.5.
(20)
a)
b)
Costs of Debts.
c)
d)
Q.6.
(20)
Q.7.
a)
(10)
b)
(10)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q.2.
Q.3.
Q.4.
Q.5.
Q.6.
Q.7.
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
(20)
b)
b)
(20)
Internal Assignment
Section-B
Q.2.
a)
(10)
b)
Explain Monte Carlo method of simulation .How would you use method of
simulation to (i) Exact probability distribution (ii) Empirical probability
distribution.
(10)
(20)
Daily Sale
22
23
24
25
26
27
28
Probability
0.05
0.10
0.20
0.30
0.16
0.14
0.05
The production cost and selling price of each ton is Rs. 35,000/- and Rs. 60,000/respectively. Any unsold ton of product is disposed off at a loss of Rs.5,000/- per
ton. There is penalty of not meeting Rs.2,000/- per ton for not meeting the
demand. Determine the total profit or loss based on simulation run for 10 days
using the following random numbers: Random numbers: 14, 23, 05, 91, 87, 59,
37, 49, 63, 75.
Q.3.
Q.4.
Q.5.
a)
(08)
b)
(12)
a)
b)
(10)
a)
(10)
(10)
Q.6.
A firm has a single service station with following arrival and service time
probability distributions:
Inter-arrival time
(minutes)
Probability
Service time
(minutes)
Probability
10
0.10
0.08
15
0.25
10
0.14
20
0.30
15
0.18
25
0.25
20
0.24
30
0.10
25
0.22
30
0.14
(20)
The customer arrival at the service station is a random phenomenon and the time
between arrivals varies from 10 minutes to 30 minutes. The service time varies
from 05 minutes to 30 minutes. The queuing process begins at 9 AM and
proceeds for nearly 8 hours. An arrival goes to the service facility immediately, if
it is free. Otherwise it has to wait in a queue. Determine the (i) Average queue
length (ii) Average waiting time of a customer before service (iii) Average service
time based on simulation study using the following random numbers.
Random numbers for inter-arrival time: 20, 73, 30, 99, 66, 83, 32, 75, 04, 15
Random numbers for service time : 26, 43, 98, 87, 58, 90, 84, 60, 08, 50
Q.7.
A company trading in motor vehicle spares wishes to determine the level of stock
it should maintain for the item in its range. Demand is variable and there is fixed
lead time for the replenishment of stock. For one item -roller bearing, the
following information is available.
Demand (Units /day)
10
11
12
13
14
Probability
0.1
0.2
0.3 0.3
0.1
(20)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q.2.
a)
Explain the typical procedure for starting the new industrial unit with the
help of suitable example?
(10)
b)
(10)
a)
(10)
b)
(10)
Q.3.
(20)
Q4.
(20)
Q.5.
(20)
Q.6.
(20)
a)
Technology Transfer
b)
Economic Ratios
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q.2.
a)
(10)
b)
(10)
a)
(10)
b)
Last 6 months sales of a product of PQR company in the year 2014 are
as under:
(10)
Month
May
June
July
Aug.
Sept.
Oct.
Actual sales
315
260
440
530
620
570
(i)
(ii) If the actual sales during the month of November has been
500 nos, what shall be the forecast for the month of
December?
Q.3.
a)
(10)
b)
(10)
Q.4.
Q.5.
Q.6.
Q.7.
a)
(10)
b)
(10)
a)
(10)
b)
What are the different vendor rating plans? What are there merits and
demerits.
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q.2.
Write notes on
(10)
a)
Environmental Protection
b)
(10)
a)
(10)
b)
(10)
Q3.
Define pollution? What are the different types of pollution? Explain the same.
Q4.
a)
b)
Q.5.
Q.6.
Q.7.
(20)
(10)
(10)
Write notes on
a)
(10)
b)
(10)
(10)
b)
Bio-degradable waste
(10)
a)
b)
What is Green
manufacturing.
manufacturing?
And
explain
drivers
for
green
(10)
(10)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
(20)
Q2.
(20)
Q3.
Define Motivation? Explain different theories of motivation? What are the normal
practices adopted by successful organizations to motivate their employees?
(20)
Q4.
(20)
Q5.
Define performance appraisal? What are its objectives? Explain the process of
performance appraisal? Also explain the concept of succession planning?
(20)
Q6.
Write notes on
(20)
a)
Evolution of HR
b)
Job Evaluation
c)
System Modelling
d)
Compensation Management
e)
Leadership
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q.2.
Fixed Costs
b)
Variable Costs
c)
d)
(20)
Explain with example Payback period and Net Present value (NPV). Which one
between Payback & NPV is a superior method of evaluating a project?
(20)
OR
The cash flow for two projects are given below:
Year
Project A
Project B
-3,00,000
-3,00.000
60,000
1,30,000
1,00,000
1,00,000
1,20,000
80,000
1,50,000
60,000
Compute the Net present Value of both the projects at discount rates of 12 % &
14%. Which project you will select for investment at 12% & 14% discount rate.
Q.3.
What are the advantages of conducting performance review? What problems are
encountered in performance review and how can they be overcome?
(20)
(20)
Q.4.
b)
c)
d)
e)
Econometric Method
(20)
Q.6.
Q.7.
a)
b)
c)
Procurement Planning
b)
c)
d)
Selection of Contractors
A project consists of 6 activities and their time estimates are given below:
Activity time
Optimistic time
Pessimistic
to
tm
tp
1-2-
18
24
42
1-3
12
24
36
2-4
10
3-4
17
20
2-5
20
28
48
4-5
a)
b)
c)
d)
e)
(20)
Internal Assignment
Section-B
-----------------------------------------------------------------------------------------------------------------------------Q.1.
Q2.
Q.3.
Q.4.
Q.5.
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
(10)
b)
(10)
a)
Explain working of multidisc plate clutch with neat sketch. Prepare trouble
shooting chart for it.
(10)
b)
(10)
a)
(10)
State the criteria and basics followed while designing chassis and frames
of vehicle.
(10)
Q.6.
Q.7.
(20)
a)
Dynamo
b)
c)
Alternator
d)
Sensors in automobiles
e)
Classification of automobiles
(20)
a)
b)
c)
d)
Brakes in automobiles
e)