You are on page 1of 30

Page 1 of 2

Neil Gillespie
From:
To:
Sent:
Subject:

<homeownercare@homeadvisor.com>
<neilgillespie@mfi.net>
Friday, June 03, 2016 5:17 AM
Thank you for your Solar Panel For Electric System Installation Service Request

Thanks for using HomeAdvisor, Neil!


Here are the pros we matched to your project.
Need to finance your project? Learn More
Install Solar Panels For Electric System
in Ocala, FL
Home Energy Conservation, LLC
(407) 402-7470 Email this pro

4.75
2 Verified Reviews

View Profile

All American Solar, LLC


(321) 297-2127 Email this pro

4.83
35 Verified Reviews

View Profile

Power Production Management, Inc.


(866) 828-3337 Email this pro
References Available

View Profile

See more info and full profiles in your Project Profile >

Get pros for another home project

6/8/2016

Page 2 of 2

See All Categories

Ready to hire? Read these helpful tips for hiring service pros >
Thank you for choosing HomeAdvisor!
We are always here to help.

(877) 800-3177

HomeAdvisor, Inc.
14023 Denver West Pkwy, Golden, CO 80401
Terms & Conditions | Privacy Policy
Please don't go...Unsubscribe

6/8/2016

Page 1 of 2

Neil Gillespie
From:
To:
Sent:
Subject:

"Wes McDonald" <wesmcdonald@allamericansolarllc.com>


"Neil Gillespie" <neilgillespie@mfi.net>
Wednesday, June 08, 2016 11:30 AM
Re: Fw: This will confirm our appointment at 1:00 PM today

Thanks Neil for the info, we are licensed to install pv systems for connection to all utility providers in
the state. See you soon
Wes
On Jun 8, 2016 8:50 AM, "Neil Gillespie" <neilgillespie@mfi.net> wrote:
All American Solar, LLC
Wes McDonald
Allamericansolarllc.com
Dear Wes,
I forgot to mention, my home shares a common wall with the home next door. Oak Run has an
architectural review board, although I do not know if approval is required for a Solar-Photovoltaic
system. Thanks.
Neil J Gillespie
----- Original Message ----From: Neil Gillespie
To: Wes McDonald
Sent: Wednesday, June 08, 2016 8:36 AM
Subject: This will confirm our appointment at 1:00 PM today

All American Solar, LLC


Wes McDonald
Allamericansolarllc.com
Dear Wes,
Thank you for your email. This will confirm our appointment at 1:00 PM today.
Please be advised I currently get electric from Sumterville Electric Cooperative, Inc. d.b.a. SECO
Energy.
To facilitate the estimate process to install a Solar-Photovoltaic system at my home, please find
attached the following documents in PDF, and a photograph of my home
z
z
z
z
z

Solar-Photovoltaic-Information-for-Sumter-Electric-Members-2015
Interconnection-Checklist-Renewable-1-1000kW-2016
Interconnection-Agreement-Renewable-1-1000kW-1.6.2016
Oak Run - Nantucket Model Home Floor Plan (PDF)
Photograph of my home at 8092 SW 115th Loop, Ocala, Florida 34481

6/8/2016

Page 2 of 2

Also, the asphalt shingle roof on my home is worn due to age. Our family built this home new in
1993. The home was a new purchase then from DECCA/Oak Run. The current roof is the original
roof. The roof as not been replaced.
Sincerely,
Neil J. Gillespie
8092 SW 115th Loop
Ocala, FL 34481
(352) 854-7807
Email: neilgillespie@mfi.net
----- Original Message ----From: Wes McDonald
To: neilgillespie@mfi.net
Sent: Tuesday, June 07, 2016 12:31 PM
Subject: Web address

Allamericansolarllc.com
That is our web page address I'll see you tomorrow.
Thanks,
Wes McDonald

6/8/2016

Page 1 of 4

Neil Gillespie
From:
To:
Sent:
Attach:
Subject:

"Neil Gillespie" <neilgillespie@mfi.net>


"Michael Collins" <mike@ppmsolar.com>
Wednesday, June 08, 2016 8:43 AM
Oak Run - Nantucket Model Home Floor Plan (PDF).pdf; Solar-Photovoltaic-Information-for-SumterElectric-Members-2015.pdf; Interconnection-Checklist-Renewable-1-1000kW-2016.pdf;
Interconnection-Agreement-Renewable-1-1000kW-1.6.2016.pdf; 8092 SW 115th Loop, Ocala, FL.jpg
Re: Follow up to your solar inquiry

Michael Collins
Power Production Management, Inc.
http://www.powerproductionmanagement.com/
Dear Michael,
Thank you for your email. Sorry I missed your phone call. I tend to communicate by email.
Please be advised I currently get electric from Sumterville Electric Cooperative, Inc. d.b.a. SECO
Energy.
To facilitate the estimate process to install a Solar-Photovoltaic system at my home, please find attached
the following documents in PDF, and a photograph of my home.
z
z
z
z
z

Solar-Photovoltaic-Information-for-Sumter-Electric-Members-2015
Interconnection-Checklist-Renewable-1-1000kW-2016
Interconnection-Agreement-Renewable-1-1000kW-1.6.2016
Oak Run - Nantucket Model Home Floor Plan (PDF)
Photograph of my home at 8092 SW 115th Loop, Ocala, Florida 34481

My home shares a common wall with the home next door.


Also, the asphalt shingle roof on my home is worn due to age. Our family built this home new in 1993.
The home was a new purchase then from DECCA/Oak Run. The current roof is the original roof. The
roof as not been replaced.
Sincerely,
Neil J. Gillespie
8092 SW 115th Loop
Ocala, FL 34481
(352) 854-7807
Email: neilgillespie@mfi.net
----- Original Message ----From: Michael Collins
To: neilgillespie@mfi.net
Sent: Monday, June 06, 2016 3:13 PM
Subject: Follow up to your solar inquiry
Hi Neil,

6/26/2016

Page 4 of 4

6/26/2016

BEDROOM #2

MASTER
BEDROOM

11' 8" x 10' 0"

14' 0" x 12' 6"

LIVING ROOM

18' 4" x 14' 0"

DINING
10' 4" X 11' 4"

COURTYARD
II

II

I'

II
II

II

,I

II

, I

GARAGE

20' 3" x 19'


9"
II
II
I,

II
II
ONE CAR

:I
I

II

NANTUCKET
Two Bedrooms/Two Baths

living area
Lanai
Entry

Garage
Total Area
Under Roof

1,245 sq. ft.


113 sq. ft.
57 sq. ft.
287 sq. ft.
1,702 sq. ft.

Solar Photovoltaic Information for Sumter Electric Members

The US federal government and the State of Florida are encouraging home owners to help
supply our future electricity demand. The following information should help you start your
research if you want to pursue generating electricity at your home or business:

Certified Solar Photovoltaic Systems:


In Florida, these systems are subject to the requirement that solar systems manufactured
or sold in the state be certified by the Florida Solar Energy Center.
In accordance with Florida Law (377.705, F.S.) [35KB, Adobe Acrobat PDF], the Florida
Solar Energy Center is charged to develop and promulgate standards for solar energy
systems manufactured or sold in the state based on the best currently available information.
. . and "establish criteria for testing performance of solar energy systems. . .".
The following link will take you to Florida Solar Energy Centers list of companies that provide
photovoltaic systems that have already been certified and qualify for State of Florida rebates:
http://www.fsec.ucf.edu/EN/certification-testing/index.htm
The following link will take you to a list of Solar Contractors http://www.homeadvisor.com

Solar Photovoltaic tax credits and rebates:


State of Florida Rebate
For up-to-date information visit: http://www.freshfromflorida.com/Divisions-Offices/Energy
See http://www.fsec.ucf.edu/en/ for more information regarding Florida Rebates.
U.S. Federal Tax Rebate (Residential Solar and Fuel Cell Tax Credit)
For up-to-date information visit: http://www.energy.gov/

Rev.11.2015

Customer-owned Renewable Generation Systems (RGS)


Interconnection Checklist
(11,000 kW)

Customer Name: _____________________________________________________



Account Number: ____________________________________________________

Documents required

Complete Interconnection Agreement for Customerowned RGS (original


signatures required)

Complete Application Form for Interconnection of Customerowned RGS;
including copy of approved County, State or City electric permit

Provide proof of insurance in accordance with Interconnection Agreement for
CustomerOwned RGS page 3, Article 8 (not applicable if 10kW or less)

Enclose (1) copy of your oneline diagram
Other requirements

Lockable, nonfused alternating current disconnect; clearly labeled, within five


feet of meter can, mounted separately from meter socket and inverter

Member is responsible for entire energy consumption including situations
where metering configurations are incorrectly installed
Prepared By: __________________________________________

(Member Signature)

Date: ___________________________

Please return all information to:


Sumter Electric Cooperative, Inc.
Attention: Engineering Services RGS
P.O. Box 301
Sumterville, Florida 335850301

(Office use only)


Approved By:_________________________________________

Not Approved By:____________________________________

If not approved describe reasons below:

Date:___________________________

Date:___________________________

_______________________________________________________________________________________________________________________________
Substation: __________________________________________________ Feeder: ____________________________
REV. 11.2015

Interconnection Agreement
For Customer-owned Renewable Generation Systems
(11,000 kW)
This Interconnection Agreement for CustomerOwned Renewable Generation Systems
("Interconnection Agreement") is made this ____________ day of ___________________ 20___, by and
between Sumter Electric Cooperative, Inc. ("Cooperative") and __________________________________
("the Customer") located at __________________________________________, Florida, referred to herein
individually as a Party and collectively as the Parties.
RECITALS
Whereas, a Renewable Generation System (RGS) is an electric generating system that uses
one or more of the following fuels or energy sources: hydrogen, biomass, solar energy,
geothermal energy, wind energy, ocean energy, waste heat, or hydroelectric power as
defined in Section 377.803, Florida Statutes, rated at no more than 1,000 kilowatts (kW)
alternating current (AC) power output and is primarily intended to offset part or all of a
Customer's current electricity requirements.
Whereas, the Customer has requested to interconnect its Renewable Generation System of
______ kW to the Cooperative's electrical service grid at the Customer's presently metered
location; and
Whereas, the Cooperative and Seminole Electric Cooperative, Inc. ("Seminole") have
entered into that certain Wholesale Power Contract ("WPC"), effective as of July 30, 1975,
which, as amended, provides, among other things, that the Cooperative may allow net
metering for renewable energy resources which are located on a customer's premises; and
Whereas, the Cooperative and Seminole have entered into that certain Net Metering
Agreement, which provides the standard interconnection requirements for a customer's RGS
installation.
Whereas, the Customer acknowledges the complexity and integrated nature of the
Cooperative's electric system, to which the Customer desires interconnection and with
which Customer desires parallel operation, and
Whereas, the Customer acknowledges the important safety issues and financial
consequences on the Cooperative's electric system that could result from any deviation by
the Customer from the requirements of this Agreement.
Now, Therefore, in consideration of the mutual covenants and agreements herein set forth,
the Parties do hereby agree as follows:
1)

In order to commence the process for interconnection, the Customer shall provide
the Cooperative a completed Application Form, attached hereto as Attachment 1

Rev. 7.2015

Page 1 of 6

2)


3)


4)


5)


6)

and incorporated herein.



The Customer agrees to provide the Cooperative with written certification that the
RGS installation has been inspected by the local code official who has certified that
the installation was permitted and has been approved and has met all electrical and
mechanical requirements. Such certification shall be delivered to Cooperative prior
to the operation of the RGS.
The Customer shall, prior to operation of the RGS, provide equipment specifications
to the Cooperative identifying and certifying in writing that the RGS, inverters and
associated equipment design, and installation and operation adhere to IEEE1547
Standards, UL1741 Standards, the National Electric Code, and, if applicable, has been
approved by the Florida Solar Energy Center (FSEC Std 20310).
The Customer is responsible for the inspection, maintenance, and testing in
accordance with the manufacturer's instructions and applicable codes, standards,
and regulations to insure that the RGS and associated equipment are operated
correctly and safely.
The Customer agrees to permit the Cooperative and/or Seminole, if it should so
choose, to inspect the RGS and its component equipment and the documents
necessary to ensure compliance with various sections of this Interconnection
Agreement both before and after the RGS goes into service and to witness the initial
testing of the RGS equipment and protective apparatus. The Cooperative shall
provide the Customer with as much notice as reasonably practicable, either in
writing, email, facsimile or by phone, as to when the Cooperative may conduct
inspection or document review, and the Customer shall provide the Cooperative with
as much notice as reasonably practicable regarding the testing of the RSG equipment
and protective apparatus. Upon reasonable notice, or at any time without notice in
the event of an emergency or hazardous condition, Customer agrees to provide the
Cooperative access to the Customer's premises for any reasonable purpose in
connection with the performance of the obligations imposed by this Interconnection
Agreement. The Customer shall notify the Cooperative at least ten (10) days prior to
the inservice date of the RGS to provide sufficient notice for the Cooperative to be
able to be present, if it so chooses, when the RGS is placed in service. Seminole shall
have the same rights and duties of inspection as the Cooperative; however, nothing
herein obligates the Cooperative or Seminole to inspect, and the failure of the
Cooperative and/or Seminole to inspect or, upon inspection, to detect a problem or
deficiency shall not transfer responsibility to Cooperative or Seminole nor relieve
Customer of its duties hereunder.
The Customer is responsible for protecting the RGS, inverters, protection devices, and
other system components from the normal and abnormal conditions and operations
that occur on the Cooperative's electrical system in delivering and restoring system
power. The Customer certifies that the RGS equipment includes a utilityinteractive
inverter or interconnection system equipment that ceases to interconnect with the
utility upon a loss of utility power. The inverter shall be considered certified for
interconnected operation if it has been submitted by a manufacturer to a nationally

Rev. 7.2015

Page 2 of 6

recognized testing laboratory (NRTL) to comply with UL 1741. The NRTL shall be
approved by the Occupational Safety & Health Administration (OSHA).

7)

8)


9)


10)


11)


12)

The Customer shall not energize the Cooperative's system when the Cooperative's
system is deenergized. There shall be no intentional islanding, as described in IEEE
1547, between the Customer's and the Cooperative's systems.
For an RGS with a capability of ten (10) kW or less, the Customer shall not be
required to maintain General Liability Insurance for Personal and Property Damage,
and for an RGS with a capability of greater than ten (10) kW, the Customer shall
provide and maintain not less than one million dollars ($1,000,000) of General
Liability Insurance for Personal and Property Damage. Proof of said insurance, if
applicable, shall be provided by the Customer and attached to this Interconnection
Agreement, and all policy renewals shall be provided to the Cooperative.
The Customer shall, at the Customer's expense, install and maintain a manual
disconnect switch to provide a separation point between the AC power output of the
RGS and any Customer facilities connected to the Cooperative's electrical system.
The manual disconnect switch shall be mounted separately from the meter socket
and shall be readily accessible at all times to the Cooperative and shall be capable of
being locked in the open position by the Cooperative. The Cooperative may open and
lock the switch, isolating the RGS from the Cooperative's electrical service grid
without prior notice to the Customer. To the extent practical, the Cooperative will
attempt to notify the Customer of its intent to disconnect the RGS from the
Cooperative's electrical service grid, but shall have no liability for failure to do so.
"Gross power rating" (GPR) means the manufacturer's AC nameplate generating
capacity of the RGS that will be interconnected to and operate in parallel with the
Cooperatives distribution facilities. For inverterbased systems, the GPR shall be
calculated by multiplying the total installed DC nameplate generating capacity by .85
in order to account for losses during the conversion from DC to AC. It is the
Customer's responsibility to notify the Cooperative of any change to the GPR of the
RGS by submitting a new application for interconnection specifying the modifications
at least thirty (30) days prior to making the modifications. If such modifications are
approved by the Cooperative, an amendment to this Interconnection Agreement shall
be executed by the Parties and the Customer recognizes and agrees that an increase
in GPR to greater than ten (10) kW may impose additional requirements on the
Customer.
The RGS must have a GPR that does not exceed ninety percent (90%) of the
Customer's utility distribution service rating at the Customer's location. If the GPR
does exceed that ninety percent (90%) limit, the Customer shall be responsible to pay
the cost of upgrades for that distribution service to accommodate the GPR capacity
and to ensure the ninety percent (90%) threshold is not breached.
The Cooperative will furnish, install, own and maintain metering equipment to
measure kilowatthours (kWh) of energy and, if applicable, the kW of demand and
time of use of said energy and demand. The Customer's service associated with the

Rev. 7.2015

Page 3 of 6


13)


14)


15)

RGS will be metered at a single metering point, and the metering equipment shall be
capable of measuring the net energy delivered by the Cooperative to the Customer
and the net energy delivered by the Customer to the Cooperative on a monthly basis.
The Customer agrees to provide safe and reasonable access to the premises for
installation of this equipment and its future maintenance or removal.
Once the Cooperative has received the Customer's written documentation that the
requirements of this Interconnection Agreement have been met and the correct
operation of the manual switch has been demonstrated to Cooperative, the
Cooperative will, within ten (10) business days, notify that parallel operation of the
RGS may commence.
The Customer shall indemnify, hold harmless and defend the Cooperative and
Seminole from and against any and all liability, proceedings, suits, cost or expense for
loss, damage or injury to persons or property in any way directly or indirectly
connected with, or growing out of operation of the RGS, except in those cases where
loss occurs due to the grossly negligent actions of the Cooperative.
The Cooperative has the right, at the Customer's expense, to disconnect the RGS at
any time. This may result from but is not limited to :
a)

b)

c)

d)

e)


16)


17)

Cooperative and/or Seminole's system maintenance, operation and


emergency operations;
Hazardous conditions existing on the Cooperative's and/or transmission
provider's system due to the operation of the RGS generating or protective
equipment as determined by the Cooperative or Seminole;
Adverse electrical effects on the electrical equipment of the Cooperative's
other electric customers as determined by the Cooperative;
Failure by the Customer to adhere to the terms of this Interconnection
Agreement ; and,
Failure by Customer to pay sums due to the Cooperative for electric service or
any other reason.

On the termination of this Interconnection Agreement, the Cooperative, at the


Customer's expense, shall open and padlock the manual disconnect switch and
remove any additional Cooperative equipment associated with the provision of net
metering service. At the Customer's expense, the Customer agrees to permanently
isolate the RGS and associated equipment from the Cooperative's electric service
grid. The Customer shall notify the Cooperative within ten (10) working days that
the disconnect procedure has been completed.
The Parties agree that the sole and proper jurisdiction and venue for any legal action
brought to enforce this Interconnection Agreement or to address the rights and
obligations of this Interconnection Agreement shall be the State Court of the proper

Rev. 7.2015

Page 4 of 6


18)


19)













21)


22)

jurisdiction located within the State of Florida.


In the event of any dispute hereunder for any action to interpret or enforce this
Interconnection Agreement, the prevailing Party shall be entitled to recover its
reasonable costs, fees and expenses, including, but not limited to, witness fees, expert
fees, consultant fees, attorney, paralegal and legal assistant fees, costs and expenses
and other professional fees, costs and expenses whether suit be brought or not, and
whether in settlement, in any declaratory action, at trial or on appeal.
Any written notice required or appropriate hereunder shall be deemed properly
made, given to, or served on the Party to which it is directed, when sent by United
States certified mail, Return Receipt Requested, addressed as follows:



If to Customer:
___________________________________
___________________________________
___________________________________

If to Cooperative:
Sumter Electric Cooperative, Inc.
Attn: Engineering Department RGS
P.O. Box 301
Sumterville, Florida 335850301
Notice of any change in any of the above addresses shall be deemed in the
manner specified in this section.

Other Special Provisions:



The Parties acknowledge that this Interconnection Agreement is subject to the RGS
Agreement and the Wholesale Power Contract, each entered into between Cooperative
and Seminole Electric Cooperative, Inc. This Interconnection Agreement is intended to
be consistent with the RGS Agreement and the Wholesale Power Contract, but in the
event that any of the provisions of this Interconnection Agreement shall be held or
otherwise determined to be in conflict with either the RGS Agreement or the Wholesale
Power Contract, the parties agree that the RGS Agreement or Wholesale Power
Contract, respectively, shall prevail.
This Interconnection Agreement, along with the Application Form, when duly
executed, constitutes the entire agreement between the Parties with respect to
matters herein contained.
(THE SIGNATURE PAGE FOLLOWS)

Rev. 7.2015

Page 5 of 6


In Witness Whereof, the Parties hereto have caused this Interconnection Agreement to be
duly executed in triplicate the day and year first above written.


_____________________________________________
Sumter Electric Cooperative, Inc.
Customer: Print Name or Organization

By: ____________________________________________
By: _____________________________
Signature: Authorized Representative
Signature

_________________________________________

__James P. Duncan, CEO__
(Print Name and Title)

Rev. 7.2015

Page 6 of 6

Attachment 1
Page 1 of 2

Application Form
Parts A & B to be Completed upon Initial Application

A. Applicant Information
Cooperative
Account No:

Name:
Mailing Address:
City:

Zip Code:

Street Address (if different)


Daytime Phone:

Fax:

Email:

B. System Information
System Information (please check):

Wind

Solar

System Name/Model:

Other (please state type)


System Capacity:

kVA

List Manufacturer/Model for:


Generator/modules:
Inverter:
Batteries (if applicable)
System Location:
Permission to monitor?

Inverter Location:
Yes

No

Parts C through G to be Completed upon Final Acceptance

C. Applicant Information
Contractor
License No:

Installation Contractor:
Address:
City:
Daytime Phone:

Zip Code:
Fax:

Email:
Installation Date:

D. Hardware and Installation Compliance


The system hardware is in compliance with Underwriters Laboratories (UL) 1741, and IEEE 1547 standards for utility
interconnected inverters.
Signed (Contractor):
Name (Print):

Date:
Company:

Attachment 1
Page 2 of 2
E. Owner Acknowledgment
The system has been installed to my satisfaction and I have been given system warranty information, and an operation
manual. Also, I have been thoroughly instructed in the operation and maintenance of the system.
Signed (Owner):

Date:

F. City/County Electrical Code Inspection (or attach copy of completed inspection form)
Satisfies Code Requirements
Name of City or County
Represented
Inspector Name (Print):
Inspector Signature:

Date:

G. Seminole Electric Cooperative, Inc. Approval (SECI) - Required for Generator Systems
with Capacity Ratings of 250 kVA or greater
Satisfies SECI Interconnection Requirements
SECI Representative Name (Print):
SECI Representative Signature:

Phone:
Date:

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

72476

KWH USED

71824

RATE SCHEDULE

652

USAGE PERIOD

04/13/2016 TO 05/13/2016

RES

DAYS
SERVICE

CONSTANT

30

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.016000

=== SPECIAL MESSAGE ===


NEXT READING DATE: 06/14/16
CURRENT DUE DATE: 06/01/16
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Hurricane season begins


June 1. SECO is Storm
Ready - are you?
Visit www.secoenergy.com
to report a power outage
and find the Emergency
Preparation Checklist.
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
22
SAME MTH LAST YEAR
23

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
89.31== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

92.11
10.435.95
0.36
2.09

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$90.08

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5253 1 AV 0.376
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

05/17/2016

06/01/2016

ACCOUNT NUMBER

AMOUNT DUE

7010005303

90.08

08305

LIJLJIIL
LDIBNPDJ
LLFALCHJ
LNABFIKD
PIDAGDIL
KDPMGACL
OEFBCFBJ
LDDHLLDL

4 5253
C-21 P-32

FA.TA.AA.DF.AD.FF.DF.TD.AA.DT.TD.DD.DD.FD.FT.DF.FD.FF.DF.FD.TF.AF.TD.FT.TT.FT.FT.FA.AA.DF.DA.TT.D

08070100053030000009008000000000005

To assure proper credit, please return this section with your payment.

The SECO Telephone system enables automated reporting of power outages and routine billing inquiries around the clock through
the phone numbers shown below. Automated outage reporting allows us to handle your calls faster so that our personnel can work
toward rapid restoration of service. To report an outage call 800-SECO141 (800-732-6141).

For Your Convenience

P.O. Box 301 ] Sumterville, FL 33585-0301 ] www.secoenergy.com


(Business Hours are 8 A.M. to 5 P.M. Monday - Friday)
Customer Service Centers

Call Center Phone Numbers

Citrus County...................................................................... (352) 726-3944


Hernando County............................................................... (352) 521-5788
Lake County ..................................................................... (352) 357-5600
(352) 429-2195
Levy County ..................................................................... (352) 528-3644
Marion County ................................................................... (352) 237-4107
(352) 489-4390
Pasco County ..................................................................... (352) 521-5788
Sumter County .................................................................. (352) 793-3801
..
The Villages (exchanges 205, 259, 430, 750, 751,753) (352) 357-5600

293 South U.S. Highway 301


Sumterville, FL 33585-0301
50 West Ardice Avenue
Eustis, FL 32726
850 North Howey Road
Groveland, FL 34736-2234
610 South U.S. Highway 41
Inverness, FL 34450-6030
4872 S. W. 60th Avenue
Ocala, FL 34474-4316

Pay your bill online at www.secoenergy.com Or call at (877) 371-9382 (Max payment of $600).
CALL BEFORE YOU DIG: (800) 432-4770

ITEMIZED STATEMENT OF SERVICES


* Special Message - This area is designed to report important

information. You will also know the next scheduled meter


reading date. Please assist us in obtaining an actual reading
each month by tying up the dog and/or providing access to
our meter.
* Energy Information - In this area you will find information

about your energy consumption. We offer free Energy


Audits that will provide you with specific conservation
measures.
* General Information

Office = The office serving this location


Account Number = Ten digit number for SECO to access
any information for this account.
Meter Number = Eight digits located on the face of the meter.
Map Number = Used to identify your premises on a grid
mapping system.

KWH Used = A 100 watt bulb will consume 100 watts per
hour. In 10 hours, will use 1000 Watts or 1 KWH
Estimated Reading = This appears on the bill if the meter
reading was estimated.
Days of Service = The number of days of service for the usage
period of this bill.
Due date = Current Bill Only Must Be Received By - To avoid
late payment fee, payment must be received by the date
appearing below this statement. If you are paying on the day
this payment is due, Do Not mail. Bring payment to one of our
offices. This date does not extend the date that any previous
balance is due and payable.
Rate = Rate Schedule used to calculate bill. Electric power
purchased for residential household use is exempt from sales
tax. If Rate is RES and power is not for residential use you must
check RATE CHANGE block below.

RATE CHANGE: IF SERVICE SHOULD BE CHANGED FROM OR TO RESIDENTIAL CHECK HERE:


ADDRESS CHANGE:

NAME:

ADDRESS:

CITY:

ST:

ZIP:

PHONE NBR:

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

71824

KWH USED

71180

RATE SCHEDULE

644

USAGE PERIOD

03/14/2016 TO 04/13/2016

RES

DAYS
SERVICE

CONSTANT

30

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.016000

=== SPECIAL MESSAGE ===


NEXT READING DATE: 05/13/16
CURRENT DUE DATE: 04/30/16
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Time to change your


HVAC or refrigerator
filter? Buy discounted
filters with free shipping
at www.filterchange.coop
Proceeds benefit Pennies
from Heaven.
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
21
SAME MTH LAST YEAR
23

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
101.14== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

91.23
10.305.95
0.36
2.07

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$89.31

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5147 1 AV 0.376
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

04/15/2016

04/30/2016

ACCOUNT NUMBER

AMOUNT DUE

7010005303

89.31

08305

LIKILKIL
LBIJBALL
LLFALNFJ
LJIBOFKD
LIDFFDFL
KDFFAOOB
OJLMNCLJ
LDHDLLDL

4 5147
C-21 P-32

TD.FD.TD.AT.DT.TT.FD.FA.DD.FF.FA.FA.AA.DA.TF.AD.AA.TT.AT.TA.FT.AT.FA.TA.FF.TF.AF.FD.DD.FT.TD.DF.A

08070100053030000008931600000000008

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

71180

KWH USED

70409

RATE SCHEDULE

771

USAGE PERIOD

02/11/2016 TO 03/14/2016

RES

DAYS
SERVICE

CONSTANT

32

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.016000

=== SPECIAL MESSAGE ===


NEXT READING DATE: 04/13/16
CURRENT DUE DATE: 03/31/16
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Our 2016 Annual Meeting


is on Saturday, March 19,
in Sumterville. Enjoy
prizes, entertainment,
coffee, cookies, &
doughnuts. Come join the
fun - breakfast is on us!
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
24
SAME MTH LAST YEAR
26

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
111.74== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

105.27
12.345.50
0.33
2.38

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$101.14

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
4974 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

03/16/2016

03/31/2016

ACCOUNT NUMBER

AMOUNT DUE

7010005303

101.14

08305

LIKJKKIL
KDIBIKNL
LLFALBDB
OHIBBDKD
LADHGHCJ
KDBFIKML
OGDDPPHB
LPLHPPLL

4 4974
C-19 P-33

DA.AT.FA.TA.AD.FT.DD.AD.TA.TD.DD.DA.FD.FF.TT.DF.DF.AD.AF.FF.AA.TA.AT.FD.FD.DD.DT.AA.TD.TF.AA.DT.D

08070100053030000010114700000000002

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

70409

KWH USED

69538

RATE SCHEDULE

871

USAGE PERIOD

01/13/2016 TO 02/11/2016

RES

DAYS
SERVICE

CONSTANT

29

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.015000

=== SPECIAL MESSAGE ===


NEXT READING DATE: 03/14/16
CURRENT DUE DATE: 03/01/16
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Check out our NEW


mobile-friendly website
at secoenergy.com.
Open a SmartHub
account to update
your phone number
before storm season.
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
30
SAME MTH LAST YEAR
31

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
108.01== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

116.33
13.075.50
0.33
2.65

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$111.74

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
4934 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

02/15/2016

03/01/2016

ACCOUNT NUMBER

AMOUNT DUE

7010005303

111.74

08305

LJLJIIIL
KCIJNMOL
LLFALMFB
KFIBNBKD
LADJEAPL
KDNNNFFJ
OAJIGMDJ
LHDDLLLL

4 4934
C-19 P-33

TD.TA.DA.FT.FA.DA.TF.FT.FD.DF.AF.AD.FA.AF.AF.DT.TF.DF.TT.TT.FD.TF.AA.DF.TA.DT.AF.DA.FD.AD.TT.AD.T

08070100053030000011174400000000009

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

69538

KWH USED

68705

RATE SCHEDULE

833

USAGE PERIOD

12/11/2015 TO 01/13/2016

RES

DAYS
SERVICE

CONSTANT

33

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.015000

=== SPECIAL MESSAGE ===


NEXT READING DATE: 02/11/16
CURRENT DUE DATE: 01/30/16
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Set your thermostat


at 68 degrees or lower
in winter. Each degree
higher increases heating
costs 3-5 percent per
degree. Order new HVAC
filters on SecoEnergy.com.
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
25
SAME MTH LAST YEAR
28

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
87.92== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

112.13
12.505.50
0.33
2.55

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$108.01

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5316 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

01/15/2016

01/30/2016

ACCOUNT NUMBER

AMOUNT DUE

7010005303

108.01

08305

LKKJLIIL
PAINBIEL
KLFALNDJ
LNIBGPCD
PADDGEFJ
KDOFIEAD
OAFFDOPB
LLHLPHDL

4 5316
C-20 P-34

TD.AT.TF.AA.AT.DD.AT.FT.TD.TF.FA.FT.FT.TD.TF.DD.DA.TD.AA.TA.FT.FA.FT.DF.FF.DF.DF.DT.DT.TD.TD.FT.T

08070100053030000010801800000000008

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

68705

KWH USED

68077

RATE SCHEDULE

628

USAGE PERIOD

11/11/2015 TO 12/11/2015

RES

DAYS
SERVICE

CONSTANT

30

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.015000

=== SPECIAL MESSAGE ===


NEXT READING DATE: 01/13/16
CURRENT DUE DATE: 12/30/15
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Replace air filters for


energy efficiency and
$ savings. Order discount
filters at secoenergy.com
or call 888 939 9788.
Free shipping!
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
21
SAME MTH LAST YEAR
26

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
110.99== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

89.46
9.425.50
0.33
2.05

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$87.92

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5461 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

12/15/2015

12/30/2015

ACCOUNT NUMBER

AMOUNT DUE

7010005303

87.92

08305

LKIIIIIL
OCIFENOL
KLHALLFJ
LDABIGCD
PIDADJHL
KDMNNCAL
OKJLJPNB
LHHDLPLL

4 5461
C-20 P-31

TA.AF.TT.TT.DT.AT.TF.FD.DT.AF.TT.FT.AF.DA.TD.FA.TF.TA.TT.AF.AD.FT.AT.TD.AT.TD.TD.DF.TT.FD.AA.FF.T

08070100053030000008792200000000006

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

68077

KWH USED

67219

RATE SCHEDULE

858

USAGE PERIOD

10/12/2015 TO 11/11/2015

RES

DAYS
SERVICE

CONSTANT

30

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.014400

=== SPECIAL MESSAGE ===


NEXT READING DATE: 12/11/15
CURRENT DUE DATE: 11/28/15
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Capital Credit Retirement


has been applied to most
electric accounts in Nov.
In most cases if you have
more than one account
your credit has been
combined and applied to
your master account.
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
29
SAME MTH LAST YEAR
20

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
98.27== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

114.89
12.365.50
0.33
2.63

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$110.99

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5253 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

11/13/2015

11/28/2015

ACCOUNT NUMBER

AMOUNT DUE

7010005303

110.99

08305

LLIJLIIL
OBIJMDMJ
KLFALEPJ
LNABDGID
PICBBEBL
KDOOIIFJ
OJJFAABB
LLLPPDLL

4 5253
C-20 P-34

AT.DA.FA.DF.FD.FF.TF.TA.FA.TT.AT.DF.DF.FD.FA.DA.AD.FD.DD.FT.TF.FF.AD.FA.TD.FT.AT.TA.AA.AA.DA.TD.F

08070100053030000011099800000000000

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

67219

KWH USED

66490

RATE SCHEDULE

729

USAGE PERIOD

09/14/2015 TO 10/12/2015

RES

DAYS
SERVICE

CONSTANT

28

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.014400

=== SPECIAL MESSAGE ===


NEXT READING DATE: 11/11/15
CURRENT DUE DATE: 10/30/15
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Read about yet


another HOT BUCKS
decrease in Oct's
SECO NEWS.
9% decrease in
your bill over
last 24 months!
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
26
SAME MTH LAST YEAR
22

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
115.87== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

100.63
10.505.50
0.33
2.31

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$98.27

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5567 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

10/15/2015

10/30/2015

ACCOUNT NUMBER

AMOUNT DUE

7010005303

98.27

08305

LLIILKIL
LPINJNAL
KLHALBFB
OBIBFMID
LICEHLKJ
KDNNJNBJ
OKNLMJHJ
LLDDLDLL

4 5567
C-22 P-32

TT.DT.DF.DA.AA.FF.AT.FT.AT.DF.FT.FF.FD.FD.AF.DA.FA.DF.AF.AT.AT.AF.FT.DA.DT.DA.FD.FT.AD.DD.TF.TT.T

08070100053030000009827600000000004

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

66490

KWH USED

65592

RATE SCHEDULE

898

USAGE PERIOD

08/13/2015 TO 09/14/2015

RES

DAYS
SERVICE

CONSTANT

32

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.013400

=== SPECIAL MESSAGE ===


NEXT READING DATE: 10/13/15
CURRENT DUE DATE: 10/01/15
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
108.08== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

119.32
12.035.50
0.33
2.75

Visit SECO on Facebook


for outage information
company news, incentives,
trivia contests, storm prep,
safety advice and
energy-efficiency tips.
Facebook.com/secoenergy
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
28 KWH/DAY
SAME MTH LAST YEAR
27 KWH/DAY
ELECTRIC CHG = CUST CHG + ENERGY
CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$115.87

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5538 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

09/16/2015

10/01/2015

ACCOUNT NUMBER

AMOUNT DUE

7010005303

115.87

08305

LKLJJIIL
LOIBANHL
KLHALMHJ
KDIBDHID
LACLDDCL
KDJNJOMD
OKPBHCLJ
LHDLPHLL

4 5538
C-22 P-30

TF.FD.AA.AT.TF.DD.DT.AD.DF.DD.TF.TA.AT.AF.TT.AT.FF.AD.AF.DF.FA.TT.AA.FT.FF.TD.AA.AF.DT.FA.AT.FT.D

08070100053030000011587400000000003

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

65592

KWH USED

64772

RATE SCHEDULE

820

USAGE PERIOD

07/14/2015 TO 08/13/2015

RES

DAYS
SERVICE

CONSTANT

30

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.013400

=== SPECIAL MESSAGE ===


NEXT READING DATE: 09/14/15
CURRENT DUE DATE: 09/01/15
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

J.D. Power ranks


SECO Energy customer
satisfaction the highest
in midsize south
segment. Details in
SECO News. Thank
you, members!
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
27
SAME MTH LAST YEAR
30

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
124.03== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

110.69
10.995.50
0.33
2.55

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$108.08

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5511 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

08/17/2015

09/01/2015

ACCOUNT NUMBER

AMOUNT DUE

7010005303

108.08

08305

LLJJJIIL
LMIBJDCL
KLHALBNB
KDIBNGAD
LICBBLDJ
KDAOJBPJ
OODNMKPB
LDPPLLLL

4 5511
C-22 P-29

TD.FT.FD.AT.TF.TD.FD.AA.DF.FD.AF.TT.FT.AT.TA.TD.FA.AA.AF.DA.FA.AA.DT.AF.FA.DF.AA.FT.DT.FF.AD.DA.D

08070100053030000010808200000000005

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

64772

KWH USED

63802

RATE SCHEDULE

970

USAGE PERIOD

06/12/2015 TO 07/14/2015

RES

DAYS
SERVICE

CONSTANT

32

1.0

POWER COST ADJUSTMENT


(PER KWH)

-.012400

=== SPECIAL MESSAGE ===


NEXT READING DATE: 08/13/15
CURRENT DUE DATE: 07/31/15
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

Read SECO News


and learn how to
win a $500 bill
credit, a WiFi
programmable
thermostat or a
year of HVAC filters.
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
30
SAME MTH LAST YEAR
31

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
106.71== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

127.28
12.035.50
0.33
2.95

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$124.03

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5361 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

07/16/2015

07/31/2015

ACCOUNT NUMBER

AMOUNT DUE

7010005303

124.03

08305

LLLLJIIL
KPIJAGKL
KLFALENJ
LPIBBKCD
PICBIBOL
KDOFEIPL
OBDAPHJJ
LDDDLLDL

4 5361
C-21 P-27

DD.DF.AA.FT.DF.DF.TA.AA.AD.TD.FA.DD.AA.TD.AA.FD.TF.FD.TA.DT.FF.TD.TT.FA.TA.TT.FA.AF.FD.DA.TT.AD.F

08070100053030000012403500000000009

To assure proper credit, please return this section with your payment.

Bills are due and payable by the due date shown on the
bill. Bills not paid by the due date are subject to a late
payment fee of 1.5% of the amount due, with a minimum
fee of $5.00

7010005303

Sumter Electric Cooperative, Inc.


PO Box 301
Sumterville FL 33585-0301


 "
" $%#!v
$%#!v

08305

ITEMIZED STATEMENT OF SERVICES


NEIL J GILLESPIE
8092 SW 115 LOOP
OCALA FL 34481-3567

ACCOUNT NUMBER

METER NUMBER

MAP NUMBER

7010005303

37709247

2855 A4 74965 16213

OFFICE

METER READING
CURRENT
PRIOR

63802

KWH USED

63004

RATE SCHEDULE

798

USAGE PERIOD

05/13/2015 TO 06/12/2015

RES

DAYS
SERVICE

CONSTANT

30

1.0

POWER COST ADJUSTMENT


(PER KWH)

.012400

=== SPECIAL MESSAGE ===


NEXT READING DATE: 07/14/15
CURRENT DUE DATE: 07/01/15
FOR IMPORTANT BILL INFORMATION AND
PHONE NUMBERS SEE REVERSE SIDE.

HOTBUCKS are even


hotter! As of June 1, the
cost of 1,000 kWh was
reduced AGAIN to
$118.20 - a 7.5%
decrease since 1/2014.
Details in SECO News.
=== ENERGY INFORMATION ===
DAILY AVG ELEC USE
27
SAME MTH LAST YEAR
26

TRUSTEE DISTRICT 4

PAYMENT RECEIVED
95.95== CURRENT CHARGES ==
ELECTRIC CHARGE
*HOT BUCKS - PCA*
SURGE LEASE
STATE TAX
2.5625% GROSS RCT TA

108.26
9.905.50
0.33
2.52

KWH/DAY
KWH/DAY

ELECTRIC CHG = CUST CHG + ENERGY


CHGCUSTOMER CHG $
20.00 PER
MONTHENERGY CHG 0.110600 PER KWH USED

PLEASE PAY AMOUNT DUE

$106.71

RETAIN THIS STATEMENT FOR YOUR RECORDS

PLEASE MAKE CHECKS PAYABLE TO:


SUMTER ELECTRIC COOPERATIVE, INC.
P.O. BOX 31634
TAMPA, FLORIDA 33631-3634
FOR ADDRESS / RATE CHANGE CHECK HERE
See reverse side


 "
" $%#!v
$%#!v
5351 1 AV 0.391
NEIL J GILLESPIE
8092 SW 115TH LOOP
OCALA FL 34481-3567

This date does not extend the date that any previous
balance is due and payable.
BILLING DATE

DUE DATE-CURRENT BILL ONLY MUST BE RECEIVED BY

06/16/2015

07/01/2015

ACCOUNT NUMBER

AMOUNT DUE

7010005303

106.71

08305

LLJILKIL
KNIJBMBJ
KLFALNFJ
LNIBHLCD
LICFMEAL
KDGIBCKL
OABAJLPJ
LHPLLDDL

4 5351
C-21 P-27

DD.DT.TD.FT.TA.TF.AT.FA.FD.FF.AA.AF.FT.AT.AF.DT.FA.DT.AD.TT.FT.TF.DT.TA.DA.DA.TF.TT.FD.AD.TD.AA.A

08070100053030000010671900000000007

To assure proper credit, please return this section with your payment.

You might also like