INTRODUCTION TO COST
2
PLANNING PROCESS
CP as a process is difficult to define concisely as it
involves a variety of procedures and techniques
used concurrently by the QS or building economics.
Traditional CP will usually follow the conventional
outline design, detailed process.
In practical sense, the CP starts with the
development of a figure (or cost) to allow client to
decide whether the project is feasible.
The feasibility estimate is usually calculated on a
unit cost method, refine using the elemental
method, component elements and sub-elements.
The elemental method is a system of cost planning
and control that enables the cost of a scheme to be
monitored during the various stages of design
development.
INTRODUCTION (CONT’D)
3
COST PLANNING
SCEME DESIGN
INFORMATION
PRODUCTION
COMPLETION
TERMINOLOGY
OPERATIONS
FEASIBILITY
MANAGEMENT
QUANTITIES
PROPOSALS
FEED BACK
INCEPTION
PLANNING
HANDBOOK
BILLS OF
OUTLINE
PROJECT
TENDER
ACTION
DESIGN
DETAIL
R.I.B.A.
SITE
M
G
K
A
D
B
L
F
TERMINOLOGY
BRIEFIN SKETCH WORKING
USUAL
SITE OPERATIONS
G PLAN DRAWINGS
DETAIL
OUTLINE DESIGN
DRAWINGS
CONTRACT RECORD
DESIGN PILOT DRAWINGS DRAWING
PLANS DETAILS S
CONFIRMATION SCHEME PRODUCTION
13 OF COST LIMIT DESIGN INFORMATIO QS TASKS IN COST PLANNING PROCESS
PLANS N DRAWINGS
STAGES IN RIBA
14
Stage A – Inception
A stage where client expresses his intention to build a
building and appoints an architect and other consultant.
Cost also discussed, but not fixed as it might be change
to client’s need.
Stage B – Feasibility
The architect and consultant will study the client’s needs.
The client’s financial will be observed in determining the
feasibility / profitability of a project. Can be done in 2
method :
a. Client provides cost estimates and consultant’s
confirm the estimate.
STAGES IN RIBA (CONT’D)
15
Stage L – Completion
Handed over to client.
Stage M – Feed Back
Analysis on the overall management, construction and
the performance of the project will be done. Used for
the future project.
SUMMARY OF COST
19
PLANNING
DESIGN METHOD
PROCESS DUTY
SEQUENCE USED
Elemental Breakdown
8 Tender Action “ Cost Analysis
of Tender