Overview

Operation Guide

Appendix

RBT Ring Back Tone Service

Acceptance Manual

V5.0Da06SP02

Huawei Website: Email:


http://support.huawei.com support@huawei.com
Technologies Co.,
Telephone: Fax:
Ltd.
80083021180755-28560000 0755-28560111
All Rights Address: Postal Code:
Administration Building, Huawei Technologies Co., Ltd., 518129
Reserved
Bantian, Longgang District, Shenzhen, P. R. China
Version:
02 (2007-06-29)

Huawei Technologies Proprietary


Acceptance Manual Part I Overview
RBT Ring Back Tone Service

Part I Overview

1Groundings for Acceptance


This manual is based on ITU-T Recommendation, IETF standards, and the
characteristics of the Ring Back Tone (RBT) service developed by Huawei.
On finishing equipment installation and debugging, an acceptance group, which
consists of the customer and installation staff, shall carry out acceptance tests to the
equipment, ensuring that it has reached the required indexes of the customer.

2Architectural Description
The manual applies to RBT V5.0Da06SP02
This manual consists of three parts:
(1) Part I Overview introduces the groundings for acceptance, content of
the manual, numbering specifications for acceptance items, and other matters
needing attention.
(2) Part II Operation Guide details the testing procedures of all items,
and serves as a reference for technical support engineers in acceptance.
 Part III Appendix the cover for signing.

3Numbering Specifications for Acceptance Items

. IFour-digit numeration

TXX-XX
Meaning:

TXX-XX

Acceptance sub-item

Acceptance category

. IISix-digit numeration

TXX-XXXX
Meaning

Huawei Technologies Proprietary


Acceptance Manual Part I Overview
RBT Ring Back Tone Service

TXX-XXXX
Acceptance sub-item

Acceptance item

Acceptance category

4Notes
()1
Before acceptance test starts, please ensure that the system is properly installed,
the software and hardware debugging is passed, and the system can run
normally.
()2
The acceptance items should be validated by representatives of Huawei and the
customer.
()3
In actual acceptance as well as in the preliminary tests, representatives of both
parties should observe relevant testing criteria. As some indices are already
tested before delivery, if the testing conditions are limited, sampling, or even
exemption from testing can be introduced.

 Note:
In actual acceptance, please stick to the contract and stipulation agreed by both
parties. This manual serves as a reference only.