Operation Guide
Appendix
Acceptance Manual
V5.0Da06SP02
Part I Overview
2Architectural Description
The manual applies to RBT V5.0Da06SP02
This manual consists of three parts:
(1) Part I Overview introduces the groundings for acceptance, content of
the manual, numbering specifications for acceptance items, and other matters
needing attention.
(2) Part II Operation Guide details the testing procedures of all items,
and serves as a reference for technical support engineers in acceptance.
Part III Appendix the cover for signing.
. IFour-digit numeration
TXX-XX
Meaning:
TXX-XX
Acceptance sub-item
Acceptance category
. IISix-digit numeration
TXX-XXXX
Meaning
TXX-XXXX
Acceptance sub-item
Acceptance item
Acceptance category
4Notes
()1
Before acceptance test starts, please ensure that the system is properly installed,
the software and hardware debugging is passed, and the system can run
normally.
()2
The acceptance items should be validated by representatives of Huawei and the
customer.
()3
In actual acceptance as well as in the preliminary tests, representatives of both
parties should observe relevant testing criteria. As some indices are already
tested before delivery, if the testing conditions are limited, sampling, or even
exemption from testing can be introduced.
Note:
In actual acceptance, please stick to the contract and stipulation agreed by both
parties. This manual serves as a reference only.