You are on page 1of 2

Table A.

2 Surface and Hoisting Equipment


Note: DS-1 Category 3 is equal to API RP-7G
Equipment Category Intermediate Major Relevant Standards
Inspection Inspection
frequency Frequency
Drilling Mast & (Raising 1 year 4 years API 9A (Wire) / RB 9B (Care) /
Lines) * see note below API RP 4G / 4F
ASTM E165 ASTM E709
Manufacturers Recommendations
Substructure 1 year 4 years API RP4G, App A
ASTM E165 ASTM E709
Stabbing Board, including 6 months 1year ASTM E165
Monkey board.
Crown Block 1 year 3 years API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Travelling Block 1 year 3 years API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Drilling Hook 6 months 3 years API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Links Elevator 6 months API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Elevators 6 months 2 years API 8C / RP 8B
ASTM E165 ASTM E709
Manufacturers Recommendations
Rotary Table 1 year 4 years API 7K / RP 7L
ASTM E165
Manufacturers Recommendations
Kelly D. Bushing 6 months 1 year API 7K / RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Master Bushing 6 months 1 year API 7K / RP 7L
ASTM E165
Manufacturers Recommendations
Slips 6 months 6 months API 7K / RP 7L
ASTM E709
Manufacturers Recommendations
Spiders 6 months 6 months API RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Safety Clamp 6 months 6 months API RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Tongs 6 months 6 months API RP 7L
ASTM E165 ASTM E709
Manufacturers Recommendations
Kelly Spinner 6 months 1 year ASTM E165 ASTM E709
Manufacturers Recommendations

PDF created with FinePrint pdfFactory trial version www.pdffactory.com


Equipment Category Intermediate Major Relevant Standards
Inspection Inspection
frequency Frequency
Brake Bands & Linkages 6 months or 1 year after API RP 7L
when Blocks last inspection ASTM E165 ASTM E709
changed which Manufacturers Recommendations
ever comes
first
Dead Line Anchor 6 months 2 years ASTM E165 ASTM E709
Manufacturers Recommendations
Lifting Plugs 6 months ASTM E165 ASTM E709 E709
PDO ERD 80-01
Manufacturers Recommendations
Air Winches 1 year 1 year ASTM E165 ASTM E709
PDO ERD 80-01
Manufacturers Recommendations
Swivels 6 months 2 years API 8C / RP 8B
IADC Chpt H Sect 4
ASTM E165 ASTM E709
Manufacturers Recommendations
Spelters 6 months ASTM E165 ASTM E709
PDO ERD 80-01
Trailer King Pings 6 months ASTM E165 ASTM E709
Slings & Shackles 6 months 6 months API RP 9B (Care) / / RP 8B
ASTM E165 ASTM E709
PDO ERD 80-01
Personnel Basket 6 months 4 years ASTM E165 ASTM E709
Cranes (Hook Inspection) 6 months 1 year ASTM E165 ASTM E709
PDO ERD 80-01
Manufacturers Recommendations
Forklifts (Fork & Forks 6 months 1 year ASTM E165 ASTM E709
Support) PDO ERD 80-01
Manufacturers Recommendations
* Note: Raising Lines can be separated from mast inspection. Medium rigs change out as per manufacture
recommendations. Heavy rigs should inspect raising lines after each move.

PDF created with FinePrint pdfFactory trial version www.pdffactory.com

You might also like