WORKPLAN

Program Title : Establishment of Regional Metrology Laboratory (DOST 02)

Duration: (in months) 14 Planned Start : Month Oct Year 2010 Planned End : Month Dec Year 2011

Objectives Expected Activities of Workplan Y1 (2010) Y2 (2011) Y3 (2012)


Output* (to include training needs)
Q1 Q2 Q Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
3
1. Purchase/acquisition of equipment
1. To acquire basic Basic mass and (mass comparator, working/reference X X
equipment for mass and volume calibration standards, proving tanks, etc)
volume calibration equipment 1. X X
2. 2. Installation of equipment
acquired and
installed. 3. 3. Trial testing X X
4.
5. 4. Construction of Driveway and X
6. Completion of Facility Requirements

5. Final site inspection of volumetric X


Calibration Building and Facilities
X
6. Launching of Regional
Metrology Center
1. Selection/Hiring of RMC staff
2. To acquire RMC staff X
2. On -site training on volumetric
basic competent in calibration (gas tankers) X X
competencies in mass and 3. Training on calibration of buckets
mass and volume volumetric 4. Training on calibration of digital balances X
calibration calibrations 5. Training on calibration of gas pumps X
6. Training on calibration of gas pumps X
7. Legal Metrology X
8. Training on Calibration of Bascula X
9. Training on Calibration of Truck Scales X
Objectives
3. To promote the Expected
Regional Metrology Activities of Workplan Y1 (2010) Y2 (2011) Y3 (2012)
DOST 02 Regional Output*
C enter services (to
1. include training
Production needs)and
of brochures X X X X X X
Calibration Center promoted thru tri- flyers, promotion in TV and
services media radio X X X X X X
2. Conduct of technology fora to
Technology Fora LGUs, NGAs and Consumers
conducted
4. To maintain Mass Working and 1. Calibration of reference/working X X
and Volumetric reference standards standards to national standards
calibration equipment regularly calibrated (ITDI)

Prepared by : SYLVIA T. LACAMBRA Checked by: SANCHO A. MABBORANG


AMANCIA B. MAGUSIB
PD-Quirino & RMC Focal Person ARD, Field Operations ARD,
Technical Operations

Noted: URDUJAH A. TEJADA


Regional Director