Welding Control

Before welding

1. WPS approved
2. Welder qualification
3. Fit-up inspection
4. Root gap check shall be as per requirements
5. Hi low if any
6. Joint configuration
7. Joint no
8. check electrodes size and type
9. Preheat if required

During Welding

1. Check heat in put used ( current / parameter)


2. Interpass temperature shall be as approved WPS
3. Cleaning interpass
4. Root penetration if assessable

After welding

1. Post of Cleaning
2. Visual inspection on surface defect
(Under cut, weld profile, surface porosity, under fill, spatters, and other).
3. NDT (RT, MPI, DPT, UT)
4. NDT result as review ACCEPTED/Rejected
5. PWHT any required

Traceability

1. Inspection records as
- Visual records,
- Material records
- NDT records & PWHT records if any.
- Any NCR
- Final Inspection Release records

Key in Data system ( PIC)

1. Material traceability
2. Welding Traceability
3. Iso Drawing no & line no
4. NDT records & PWHT if any
5. WPS no & welders
WELDING PROCESSES CONTROL CHART

Material ID check
Material Received
MRIR Physical check

Cutting plan
Qualification Marking & cutting
Drawing approved

Fit-up inspection Fit-up report


Fit-up
check root gap
joint configuration Inspection before welding
check no hi low check approved WPS/welder qualification
joint no electrodes size and types
pre heat if required

Welding process
Inspection during Welding
Check heat in put used
Interpass temperature
Cleaning interpass
Electrodes size & type
Root penetration

Not ok Inspection Insp Inspection after welding


Visual Inspection
Rpt Cleaning,weld profile
Visual inspection on surface defect
OK

NDT Not ok NDT (RT, MPI, DPT, UT)


NDT result as review
PWHT If required
OK

Data entry
system Key in Data system

1. Material traceability
2. Welding Traceability
3. Iso Drawing no & line no
4. NDT records & PWHT record
5. WPS no