You are on page 1of 2

ASTELIT - Project Date of issue: 13-Jul-05

P
E
Region: MW - Call-Off Send to NOKIA:
✘ New Link Change Expansion Cancelled Order No:
TRS - Planner: Omur Yalcin
Radio Equipment Flexi 23GHz 4x2 Polarisation Vertical Telephone: +380504459304
Link Capacity 4x2Mb/s Link Distance (km) 13.23 SA - Contact:
Link Channel M28 Telephone:

Link Number: LU0019-LU9000


SITE “A” SITE “B”
Site No. LU0019 LU9000
S
A Name:
/
Address:
T
R Site Access
S
Longitude 039°10'36.37"E Latitude 48°33'11.80"N Longitude 039°01'27.00"E Latitude 48°29'27.09"N

Appendices: Road map FlexBus Data 2M CrossCon CW Drawing Q1-Bus Assignment

Freq. [GHz] 23.20850 22.20050


Link end ✘ HIGH LOW HIGH ✘ LOW
Azimuth 233 53

T Dish height [m] 102.00 55.00


R Dish size [m] 0.60 1.20
S
Install details Pole no: # of MW on site: Pole no: # of MW on site:
Feeder type RG-223 RG-223
Feeder length Fill in during PISM! Fill in during PISM!
Waveguide ✘ NO Yes/length: ✘ NO Yes/length:

IU-Inst.-details: BTS 3rd Party Rack BBU (EmPower/NUSS) BTS 3rd Party Rack BBU (EmPower/NUSS)
Site-Type: Model Site Type (1-9): # … Model Site Type (1-9): # …

Tx Power 18.00 dBm 18.00 dBm


Tx Atten. 0.00 dB 0.00 dB
Rx Level -40.9330 dBm -40.9330 dBm

T Flat Fade M. 45.0670 dB 45.0670 dB


R Com. Fade M. 33.7145 dB 33.7145 dB
S
Interleave val. 4 4
Total Ann Rel. [%] 99.9954492 99.9944747

Comments

Unit Capacity ✘4x2 8x2 16 x 2 STM_1 ✘4x2 8x2 16 x 2 STM_1


Unit Type NEW FXCRRI FXC E1/T1 FIU 19’ FIU 1+1 FXCRRI FXC E1/T1 FIU 19’ FIU 1+1
Unit Type EXIST. ✘ FXCRRI FXC E1/T1 FIU 19’ FIU 1+1 ✘ FXCRRI FXC E1/T1 FIU 19’ FIU 1+1
FXC RRI FB1 ✘ FB2 ✘ FB1 FB2
FXC E1/T1 Port 1 Port 2 Port 3 Port 4 Port 1 Port 2 Port 3 Port 4
T FXC CARD SLOT 3 1
R FIU19 PIU(4x2) 4x2 8x2 12 x 2 4x2 8x2 12 x 2
S
FlexB. (Active)FIU1 FB1 FB2 FB1 FB2
FlexB. (Protect)FIU2 FB1 FB2 FB1 FB2
FIU19 FB plug-in
4x2 8x2 16 x 2 No use 4x2 8x2 16 x 2 No use
FB 3 active cap.
FIU19 FB plug-in
4x2 8x2 16 x 2 No use 4x2 8x2 16 x 2 No use
FB 4 active cap.

Date: SA_Agent: TI-Company:


Date: 11-Nov-04 TRS_Engineer: Dejan Vukas Estimated delivery date:
Date: 13-Jul-05 TRS_Engineer: Omur Yalcin DOP details:
Date: Project Mgr.:

Distribution NOKIA: Distribution NOKIA: Distribution ASTELIT: Page: 1of 1


1x Logistics Co-ordinator 1x Cost & Progress Management 1x Procurement

You might also like