INSTRUMENT TEST RECORD COMMISSIONING PROCEDURE

PROJECT SITE MCC Ref.


MCC Title Inst. Title TAG No.
Compartment Aux. Supply Output

COMPLETION CHECKS
Supply Details Instrument Details Remarks
Voltage V Manufacturer
Load Watts Model No.
Supply fuse/MCB rating Amps Range
Signal fuse Amps Type: Indicator/Transmitter/Switch/
(Delete as appropriate) Element/Recorder/Controller
Certification IS Ex SAFE Serial No.
INSTALLATION CHECKS
TAG No. in place
Isolation valves checked
Fixing bolts etc. checked
Condition satisfactory
Sensor stability checked
MCC Instrument Cable test
Cabling
Terminated Cable No. Earth tag Terminated Cable No. Earth tag sheet ref.

Power
CPC Cable core / Armour

Control
Analogue
Flying lead N/A N/A N/A N/A

FUNCTIONAL CHECKS AND TESTS:


Local isolator Type Operation
Instrument indicator Range Scale
Panel/SCADA indicator Range Scale

Calibration (Ref.) INPUT


OUTPUT or READING Error %
1–5v 4 – 20 mA % span Actual
1 4 0
2 8 25
3 12 50
4 16 75
5 20 100

Integrator Type Scale Operation


Alarm settings Low Low Low High High High
Fail-safe setting Fail High Fail Low Default/Last known
Cubicle heater Volts Thermostat operation (if fitted
(if fitted) Watts

Design Engr Test Engr Client Engr Commissioning Activity


Date Date Date Report No.