You are on page 1of 2

Customer Contract #

Location Project
Contractor Job #
Site test record LV SWITCHGEAR Doc. Ref.

BATTERY CHARGER & BATTERY BANK TEST.......................................................................................................2

Test performed by Test witnessed by Test witnessed by Date of test

Name

Signature 1 OF 2
Customer Contract #
Location Project
Contractor Job #
Site test record LV SWITCHGEAR Doc. Ref.

BATTERY CHARGER & BATTERY BANK TEST


1. GENERAL DATA AND INFORMATION:
Circuit ref. Sr. No.
Manufacturer Model No.
AH Rating Voltage Rating
No. of Cells

2. FUNCTIONAL TEST:

SL.NO. DESCRIPTION CHECKED

1. Panel must be properly earthed.

2. Verify the component / wiring as per drawing.

3. Check the Battery bank connection healthiness

4. Verify application of petroleum jelly on Battery bank terminals

5. Permanent AC supply available for battery charger

6. Float / Boost charging OK

7. Protection checks of Charger (as recommended in O&M manual)

8. Alarms generation in Battery charger OK

3. LOAD TEST :
CHARGER INPUT CHARGER BATTERY CHARGING LOAD CURRENT
VOLTAGE (AC) OUTPUT VOLTAGE VOLTAGE (DC) CURRENT (A) (A)
(DC)

REMARKS :

Test performed by Test witnessed by Test witnessed by Date of test

Name

Signature 2 OF 2