You are on page 1of 10

QUERY SHEET

PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.


DATE:CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:CONTRACTORS REF: -

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

FOR ABUHATIM CO LLC

M/s NATIONAL ENGINEERING OFFICE

QUERY SHEET
PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.
DATE:- 19.05.2011 CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:CONTRACTORS REF: - 1

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

Electrical room outer wall along transformer yard has been shown as common wall between transformer yard and electrical room. Please clarify.

FOR ABUHATIM CO LLC

M/s NATIONAL ENGINEERING OFFICE

QUERY SHEET
PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.
DATE:- 30.05.2011 CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:CONTRACTORS REF: - 2

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

Reinforcement details for Cutout openings in drop panel (Drg ST 2003 grid line M 20 and M1) are not provided in structural drawing. Please provide.

FOR ABUHATIM CO LLC

M/s NATIONAL ENGINEERING OFFICE

QUERY SHEET
PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.
DATE:- 30.05.2011 CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:CONTRACTORS REF: - 3

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

Two sides of Lift 4 outer walls are RCC walls and other two sides are Block work. Please clarify.

FOR ABUHATIM CO LLC

M/s NATIONAL ENGINEERING OFFICE

QUERY SHEET
PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.
DATE:- 30.05.12 CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:CONTRACTORS REF: -4

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

Distance from DD grid for Column C3 at the intersection of grid YY and DD is 1787mm in Drg ref ST 2201 R.C layout at raft level, but it is 1752mm in ST 2001 Column axis plan. please clarify.

FOR ABUHATIM CO LLC

M/s NATIONAL ENGINEERING OFFICE

QUERY SHEET
PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.
DATE:- 30.05.2011 CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:CONTRACTORS REF: - 5

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

For Staircase-2 & 3 Distance between grid MM and core wall (CW1) is not mentioned in Drg ref. ST 2001 column axis plan. Please provide

FOR ABUHATIM CO LLC

M/s NATIONAL ENGINEERING OFFICE

QUERY SHEET
PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.
DATE:- 02.06.2011 CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:CONTRACTORS REF: - 6

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

Transformer yard finished floor level is shown as 16.98 in revised transformer yard location drawing Drg ref. A1001 R2 isuued on 01.06 2011 vide ref. 2011/NEO-MCT/8021-S/2366. But existing road level in front of proposed gate is 15.08. Please clarify.

FOR ABUHATIM CO LLC

M/s NATIONAL ENGINEERING OFFICE

QUERY SHEET
PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.
DATE:- 04.06.2011 CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:CONTRACTORS REF: - 7

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

1) Column size of C1 has been reduced from ground floor level in dwg ref, ST 2401 R0 from 650x650 to 600x600. But column layout for Ground floor is not provided. Please provide. 2) Beam schedule for TRB 40 along Grid line MM between Grid 4 and 5 at Terrace level in Drg ref ST 2008 R0 is not provided. Please provide.

FOR ABUHATIM CO LLC

M/s NATIONAL ENGINEERING OFFICE

QUERY SHEET
PROJECT: - CONSTRUCTION OF TELECOMMUNICATIONS REGULATORY AUTHORITY BUILDING AT SEEB.
DATE:- 04.06.2011 CLIENT: -TELECOMMUNICATIONS REGULATORY AUTHORITY. CONTRACTOR: - ABU HATIM CO LLC. CONSULTANTS REF:- 8 CONTRACTORS REF: -

KIND ATTN: M / S NATIONAL ENGINEERING OFFICE

Please furnish us the following information:


QUERY REPLY

1) For Lift duct 1,2,3 and Service three sides are shown as RC walls and remaining side no beam details are provided in dwg ref ST 2003 R0, ST 2004 R0, ST 2005 R0, ST 2006 R0. But beam details for the same is provided in ST 2007 R0, ST 2008 R0. Please Clarify. 2) Top reinforcement detail T2/T3 for GB11 in Schedule of ground floor level beams in dwg ref. ST 2405 R0 is shown as 3Y30. Please clarify.