You are on page 1of 11

ELECTRIFICATION OF BUILDINGS AT COLLEGE OF ENGINEERING ARANMULA

Main Building
Part-4 Schedule for Internal Electrification & Allied Cabling
Item Particulars of Job No. Qty Unit Supply Rate of materials Supply Amount of materials Labour Rate Labour Amount Remarks

Supplying materials (G.I switch box, PVC conduits and accessories, wires, Jn. boxes, ceiling roses etc ) and making wiring points as described in specification for lights, fans and 6A 3 Pin sw:sockets - Sockets in independent 1054 location , Giving connection from D.B, termination of wires , testing and commissioning etc. complete, (wire size see D.B load schedule ) same as above, but lights with 2 way switch control. Wiring as above for switched power sockets, connecting to D.B etc complete do for 6A switch sockets in independent boxes and circuits 9 50 60

points

350

368,900.00

150

158,100.00

Switches and plates are not to be included

2 3.1 3.2

points points points

400 1050 450

3,600.00 52,500.00 27,000.00

150 150 150

1,350.00 7,500.00 9,000.00

Providing materials and making 3 phase outlet 4.1 points marked M1, M2 in labs, fixing 4P MCB metal box, fully concealed Supplying materials and making sw:socket outlet points ( sw: plate not to be included ) in independent locations totally recessed with 4.2 PVC conduits G.I switch boxes and Copper PVC wires for UPS - (supply for computers) terminations, testing and commissioning.

10

points

2113

21,130.00

300

3,000.00

points

270

1,890.00

100

700.00

Page 1 of 11

Item Particulars of Job No. Supplying materials and including wiring for telephone outlets (independent), totally recessed in floor or walls, providing 2 pair 5.1 0.5mm dia tinned Copper conductor telephone cable, terminations , testing , commissioning etc complete. 5.2 do empty conduits with G.I. fishwire for PA system points - 20mm conduit concealed

Qty

Unit

Supply Rate of materials

Supply Amount of materials

Labour Rate

Labour Amount

Remarks

12

points

575

6,900.00

125

1,500.00

162 510

M M

23 9.5

3,726.00 4,845.00

5 1

810.00 510.00

5.3 Pulling 1 sqmm wire inside for bells Providing 25mm conduiting and wiring for UPS 5.4 D.B's (Concealed 250mm pipe & 2x16+1x10 sq.mm Cu: PVC wires. 6 do for data socket outlets in independent boxes, using PVC conduits & GI boxes, empty race way with G.I. Fish wire Supplying and fixing 50x50mm UPVC trunking on wall Supplying and fixing 38x38mm UPVC trunking for computer lab. -do- 38x25mm Supplying and fixing end covers for 10 (i) 50x50 trunking. (i) 38x38 trunking. (i) 38x25 trunking.

Nos

3735

11,205.00

150

450.00

Nos

180

900.00

100

500.00 Office area

7 8 9

15 18 18

M M M

134 99 70

2,010.00 1,782.00 1,260.00

25 13 9

375.00 234.00 162.00

4 2 2

Nos Nos Nos

20 15 15

80.00 30.00 30.00

3 3 3

12.00 6.00 6.00

Page 2 of 11

Item Particulars of Job No. Supplying and fixing the following size of UPVC boxes with lids 11 (a) 145x 85x 32mm (b) 85x 85x 32mm (c) Supplying and fixing 10A , 6 way PVC/Cu. terminal strip in each box. Supplying and laying wiring inside the trunking originating from UPS D.B's for safe A.C power supply to computer tables in computer lab , using 2x1.5sq.mm +1.0E sq.mm for each circuit terminating in terminal strips in the boxes. a) 1.5sq.mm wire b) 1 sq.mm wire 13 Supplying and installing, 3 core 1.sq.mm PVC/PVC flex cable , terminate inside jn. box, provide looping between table mounted power strip etc complete. Supplying and fixing 6A , 3pin , 3 socket type power strip with disconnector switch & spike protection. a) Supplying and fixing RJ 45 computer jack below each table in 85 x85x32 mm surface box 15 b) Supplying and fixing 4mm thick plain hylam sheet below each computer table on suitable metal support (hylam sheet 60x10cm size.)

Qty

Unit

Supply Rate of materials

Supply Amount of materials

Labour Rate

Labour Amount

Remarks

12 76 84

Nos Nos Nos

60 40 6

720.00 3,040.00 504.00

10 10 2

120.00 760.00 168.00

Precision POS B2 Precision POS B1

12

700 350 120

M M M

14 10 36

9,800.00 3,500.00 4,320.00

2 1.5 5

1,400.00 525.00 600.00

14

72

Nos

280

20,160.00

20

1,440.00

- By others

72

Sets

100

7,200.00

30

2,160.00

Metal frame shall be enamel painted

Page 3 of 11

Item Particulars of Job No. c)Supplying and fixing 25mm dia PVC conduits with fish wire for data cables & for other purpose related to computers. 16.1 a) b) Supply and fix D.B's of following details excluding breakers-IP42/43 4way (8+12) double door TPN -do- vertical with 3 phase outgoing

Qty

Unit

Supply Rate of materials 30

Supply Amount of materials 480.00

Labour Rate

Labour Amount 160.00

Remarks

16

10

6 1 12 5 3

Nos No Nos " "

1800 4042 2267 5167 932

10,800.00 4,042.00 27,204.00 25,835.00 2,796.00

350 350 450 650 200

2,100.00 350.00 5,400.00 3,250.00 600.00 UPS Room

16.2 6way (8+18) D.D - TPN 16.3 8 way TPN vertical D.D 16.4 8 way SPN D.D 17 Supply and fix M.C.B.'s as detailed below

17.1 SP 'B' Series (6 to 32A) 17.2 do 'C' Series (6 to 32A) A7.3 do 'C' Series 16A TP 17.4 "B series 4P (6 to 32A) 17.5 C' Series -do17.6 17.7 17.8 17.9 17.1 17.11 -do- 63A 4P 4P, 100mA RCCB up to 40A -do- 63A -do- D.P 100mA , 32A -do- 40A D.P isolator MCB 40A

15 233 10 2 2 2 18 6 1 1 2 3 Nos " " " " " " No " Nos "

136 150 696 910 1035 1440 2107 2368 1708 1708 292 366

2,040.00 34,950.00 6,960.00 1,820.00 2,070.00 2,880.00 37,926.00 14,208.00 1,708.00 1,708.00 584.00 1,098.00

15 15 25 25 25 25 25 25 25 25 25 25

225.00 3,495.00 250.00 50.00 50.00 50.00 450.00 150.00 25.00 25.00 50.00 75.00

17.12 -do- 63A

Page 4 of 11

Item Particulars of Job No. 17.13 do- 4P 63A 17.14 do-4P 40A 17.15 Blanking Plates

Qty 5 18 60

Unit " " "

Supply Rate of materials 678 616 12

Supply Amount of Labour Rate materials 3,390.00 25 11,088.00 25 720.00 1

Labour Amount 125.00 450.00 60.00

Remarks

Supplying and fixing grid switches of the 18.1 following categories. Give connection , test and commission (a) 6A 1way (1M size) 1022 (b) 16A 1way 50 (b) -do- 2way (1M size) 9 (c) -do- Bell push. 2 (d) 6A 3 pin Socket (3M size) 221 (e) 16A 3 pin Socket (3M size) 50 Supply and fix (flush mounting) outlets for Air (f) 1 conditionaires- MCB protected-25A 18.2 Switch plate Assemblies Supplying and fixing the following modular plate assemblies for the switches in item I (a) 1 Module (b) 2 Module (c) 3 Module (d) 4 Module (e) 6 Module (f) 8 Module (g) 10 Module (h) 12 Module (i) 18 Module 18.3 4M maroon colour plate for com.jacks

Nos Nos " " " " "

53 60 54 57 67 67 550

54,166.00 3,000.00 486.00 114.00 14,807.00 3,350.00 550.00

15 15 20 15 20 20 65

15,330.00 750.00 180.00 30.00 4,420.00 1,000.00 65.00 Havells DBOXX range or equivalent

30 45 162 14 30 18 4 108 4 7

Nos " " " " " " " " "

52 53 61 69 92 127 151 166 215 69

1,560.00 2,385.00 9,882.00 966.00 2,760.00 2,286.00 604.00 17,928.00 860.00 483.00

15 15 15 18 18 20 20 25 35 18

450.00 675.00 2,430.00 252.00 540.00 360.00 80.00 2,700.00 140.00 126.00

Page 5 of 11

Item Particulars of Job No. 18.4a) Tele. Jack (RJ 11) / (M-type) b) -do- twin (1M) c) Blank Plates Cable Trenches (a) Excavating trenches for power cables as per given dimensions, in gravel filled ground, 19 backfill and compact the soil after laying of cables. (b) Supplying & spreading clean river sand 75mm below & 75mm above of the power cables OR good quality manufactured sand. (c) Supplying and laying pre-cast concrete PCC slab 4 cm thick made in 1:2:4 ratio in convenient to handle size (say 75cmx25cm) trenches with multipole cables (d) Supplying and laying solid concrete blocks 23x11x7 cm size for smaller trenches. Ducts for cables. (a) Supplying and laying UPVC ducts 75mm dia & 4Kg/cm rating including excavation required 20 (b) -do - 90mm dia & 4Kg/cm rating as required.(The ends of ducts to be closed and applied with mastic sealant like Silicon paste as directed after passing cable- only 1 cable allowed in 1 duct)

Qty 12 1 60

Unit " " "

Supply Rate of materials 73 81 17

Supply Amount of Labour Rate materials 876.00 15 81.00 18 1,020.00 1

Labour Amount 180.00 18.00 60.00

Remarks

Cu.M

350

1,750.00

5 5

Cu.M Sq.M

1925 330

9,625.00 1,650.00

100 50

500.00 250.00

500

Nos

4,000.00

500.00

315

72

22,680.00

20

6,300.00

50

84

4,200.00

20

1,000.00

Page 6 of 11

Item Particulars of Job No. 20 (c) Supplying & fixing smooth bend for 75mm Pipe (d) do for 90mm pipe 21 Cable trays Supplying and fixing G.I (hot dip galvanised) perforated cable trays made of 1.5, mm thick sheet ,75mm wide, folded flange type with required accessories and G.I ,1mm thick sheet, rectangular heat sheild as directed. Providing fan hooks in concrete with 8mm dia SS rods

Qty 52 2

Unit Nos Nos

Supply Rate of materials 45 64

Supply Amount of materials 2,340.00 128.00

Labour Rate 10 12

Labour Amount 520.00 24.00

Remarks

(a)

20

125

2,500.00

30

600.00

22.1

400

Nos

27

10,800.00

15

6,000.00

Fabrication, supply of down roads (pipes) of same diameter as of original rods supplied with ceiling fans, but of minimum wall thickness 22.2 1.5mm , machine fabricated and neatly painted with required no : of burr free slots & slits in length 75 cm. 22.3 Supply & fix G.I. round boxes and ball sockets for down rods of lights Supply of 1200 mm sweep ceiling fans of approved make

432

Nos

40

17,280.00

40

17,280.00 for ceiling fans

286

Sets

65

18,590.00

35

10,010.00

22.4

432

Nos

1550

669,600.00

Page 7 of 11

Item Particulars of Job No.

Qty

Unit

Supply Rate of materials

Supply Amount of materials

Labour Rate

Labour Amount

Remarks

Unpacking assembling & fixing 1200 mm ceiling fans using down rods, giving connections with 432 22.5 3core 0.75 sq.mm PVC/PVC flex cable , testing and commissioning etc complete including wire Supplying and fixing electronic step regulators (2M size) for the above fans & connect Supplying 200 mm sweep Ex. Fan PVC body with automatic shutter.(for toilets) do- metallic body, front grill 300mm sweep , reversible type (for other areas) Luminaires ( Prices include lamps also) Supplying and fixing, connecting, testing and commissioning of Fabrication & supply of downrods neatly 23.1 painted of same dimensions as in the case of ceiling fans Type A - 1x36 W flu: fitting with electronic choke, suspended from ceiling using down rods 23.2 2 nos 75 cm long including metal round blocks, ball sockets (down rods already priced as separate item) 23.3 Type A - 1x36 W FTL on wall 23.4 Type B 23.5 Type C

Nos

140

60,480.00

22.6 22.7 22.8 23

432 35 11

Nos Nos Nos

342 1144 1400

147,744.00 40,040.00 15,400.00

20 50 75

8,640.00 1,750.00 825.00 Labs

432

Nos

36

15,552.00

30

12,960.00

235

Nos

560

131,600.00

120

28,200.00

72 24 22

Nos Nos Nos

560 698 790

40,320.00 16,752.00 17,380.00

50 40 50

3,600.00 960.00 1,100.00

Page 8 of 11

Item Particulars of Job No. 23.6 23.7 23.8 23.9 23.10 23.11 23.12 23.13 24.1 a b c d e Type AO Type BA Type M - mirror light Type m - do PI P2 & P3 Type W Type R Supplying & laying/fixing the following sizes of armoured 1.1 KV grade power cables. 4c 6 sqmm Al 4c 10 sqmm Al 4c 16 sqmm Al 4c 35 sqmm Al 4c 25 sqmm Al

Qty 8 36 8 23 1 2 4 102

Unit Nos Nos Nos Nos Nos Nos Nos Nos

Supply Rate of materials 815 900 525 430 8000 3000 780 780

Supply Amount of Labour Rate materials 6,520.00 120 32,400.00 50 4,200.00 50 9,890.00 50 8,000.00 300 6,000.00 250 3,120.00 50 79,560.00 75

Labour Amount 960.00 1,800.00 400.00 1,150.00 300.00 500.00 200.00 7,650.00

Remarks

80 450 100 250 75

M M M M M

119 123 155 248 200

9,520.00 55,350.00 15,500.00 62,000.00 15,000.00

30 30 35 35 35

2,400.00 13,500.00 3,500.00 8,750.00 2,625.00

Supply and fixing the Copper earth conductor of assorted sizes 2 each with each U.G cable , 200 24.2 tied to cable with stainless steel cable ties at 1M interval, terminating with crimped Copper lugs, testing and commissioning etc complete. Supplying and fixing glands and terminating the 24.3 following sizes of cables, providing PVC shrouds etc complete. a b 4c 6 sqmm Al 4c 10 sqmm Al 4 26

Kg

550

110,000.00

10

2,000.00

Nos Nos

42 56

168.00 1,456.00

30 30

120.00 780.00

Page 9 of 11

Item Particulars of Job No. c d e 4c 16 sqmm Al 4c 35 sqmm Al 4c 25 sqmm Al

Qty 12 12 4

Unit Nos Nos Nos

Supply Rate of materials 84 131 101

Supply Amount of materials 1,008.00 1,572.00 404.00

Labour Rate 35 40 35

Labour Amount 420.00 480.00 140.00

Remarks

Supplying and fixing programmable Electronic timer with min. 150 hrs battery backup, inside a non metallic box, together with a 16A D.P 25.1 Contactor & a toggle type bypass switch, giving connections, testing and commissioning including wiring from D.B in concealed/ surface conduit as directed. Supply and fix 225mm dia gong electric bell (240 V a.c) Supply & Fixing identification labels/tags for DB's, Panels, Cables etc as per specifications (for entire Contract)

No

4250

4,250.00

550

550.00

For College Bell

25.2

No

1000

6,000.00

50

300.00

26

LS

3000

3,000.00

Page 10 of 11

Item Particulars of Job No. Prepare and submit O & M manual (for entire Contract) properly documented, Spiral bound folio, incorporating catelogues, fully dimensioned as built drawing, details of preventive & break down maintenance proceedures, list of spares to be maintained etc complete. (O & M manuals to be approved by Consultants)

Qty

Unit

Supply Rate of materials

Supply Amount of materials

Labour Rate

Labour Amount

Remarks

27

Nos

1000

3,000.00

Total Amount

2,495,602.00

450,338.00

Quantities only approximate. Actuals to be measured from site. Installation shall conform to K.S.E.B. and Electrical Inspectorate regulations. I / We agree to undertake and execute the works as per specs. & the rates above

Amount in figures 29,45,940.00/Total Amount in figures - Total Amount in words - Twentynine Lakhs fourtyfive thousand Nine hundred and Fourty only.
Signature of the tenderer with date Issuing Authority

Name & Address

Signature with date

Page 11 of 11

You might also like