Professional Documents
Culture Documents
SKY WAY
SKY BOGIES
SKY COACHES
SKY STATIONS
SKY WAY
SKYBOGIES IN
THE MIDDLE OF
ROAD WAY PILE
FOUNTATIONS
SUPPORT 1M DIA
COLUMN
APPROXIMATELY
8M HIGH AND
SPACE AT 15M ALL
ALONG THE
ROADWAY.
SKY BOGIE
UNLIKECONVENTIONAL MASS
TRANSIT SYSTEMS,SKY BUS NEEDS
SMALLER STATIONS.
SERVICE IS EVERY 2 MINUTES.
TOTALLY AUTOMATED WITHOUT
DRIVERS OR GUARDS.
STATION ACTS AS ONLY FACILITY.
BENEFITS OF SKY BUS
FAST TRANSPORTATION.
NO LAND ACQUISITION PROBLEM.
NO DEMOLITION OF STRUCTURE OR
GARDENS.
NO ENVIRONMENTAL HAZARDS.
FLYOVERS.
NO POLLUTION.
NO WAITING.
METRO VS SKYBUS
CAPITAL COST IS.400 CAPITAL COST IS.50
CRORE PER KM CRORE PER KM.
TIME TO CONSTRUCT IS TWO YEAR FOR EVERY
5-6 YEAR FOR EVERY 20-30 KM ROUTE.
PHASE. SPEED OF TRAVEL IS
SPEED OF TRAVEL IS 40-50 KM/HR.
30-50 KM/HR. FREQUENCY OF METRO
FREQUENCY OF METRO TRAIN IS EVERY TWO
TRAIN IS EVERY THREE MINUTES.
MINUTES.
COST FARE IN METRO COST FARE IN METRO
RS.6(MINIMUM CHARGE) RS.50(MINIMUM CHARGE)
PICTURE-1
PICTURE-2