You are on page 1of 2

Name: NGUYEN SY HOANG KHIEM Title:

Student Number: 1091345

Code: A8

Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process


Authors: Ling Wang, Jian Chu, Jun Wu Journal: Int. J. Production Economics 107 (2007) 151163
Keywords: Maintenance strategies; Multiple criteria decision-making; Fuzzy analytic hierarchy process; Prioritization method; Power plant Abstract This paper aims to evaluate different maintenance strategies for different equipment. To deal with the uncertain judgment of decision makers, a fuzzy modification of the analytic hierarchy process (AHP) method is applied as an evaluation tool for uncertain of decision makers This method is used for solving problems with non-linear constraints. It is beneficial for managers to define the optimum maintenance strategy for each piece of equipment. The rest of the paper is organized as 6 sections: 1) Introduction Manufacturing firms face pressure to reduce their production costs continuously. On the other hand, maintenance plays an important role in keeping availability and reliability levels, product quality, and safety requirements. Unfortunately, maintenance received little attention in the past. In this section, it will show clearly about the importance of maintenance. 2) Alternative maintenance strategies: Section 2 describes the possible alternative maintenance strategies in this study. There are 4 main strategies : corrective maintenance, Time-based preventive maintenance, Condition-based maintenance and Predictive maintenance. 3) Comparing criteria :
When different maintenance strategies are evaluated for different machines, the manufacturing firms must set maintenance goals taken as comparing criteria these goals can be divided into four aspects analyzed as follows: safety, cost, added-value and feasibility

4) Fuzzy AHP The AHP was developed first by Satty. It is a popular tool for MCDM by structuring a complicated decision problem hierarchically at several different levels. Its main steps include: - organizing problem hierarchically - development of judgment matrices by comparisons - calculating local priorities from judgment matrices - alternatives ranking 5) Fuzzy prioritization method In this section, it describes some calculations that help for understanding about the fuzzy prioritization method more clearly. 6) Case study In this section, it describes the application of the proposed evaluation method for the selection of maintenance strategies in a thermal power plant. 7) Conclusion In this paper, the selection of maintenance strategies in manufacturing firms is studied. The case study shows that the revised fuzzy AHP method is applicable as an evaluation technique for maintenance strategies, and is useful for other similar MCDM problems.

TN : NGUYN S HONG KHIM Tiu :

MSSV: 1091345

M S : A8

La chn cc chin lc bo tr ti u da trn mt qu trnh phn tch h thng phn cp m


Tc gi: Wang Ling, Jian Chu, Jun Wu Tp ch: Int. J. Sn xut Kinh t 107 (2007) 151-163 T kha: Bo tr chin lc; cc tiu chun ra quyt nh; qu trnh phn tch h thng phn cp s m, phng php u tin, nh my in. Tm tt: Bi vit ny nhm mc ch nh gi cc chin lc bo tr khc nhau cho cc thit b khc nhau. i ph vi s khng chc chn ca cc nh sn xut quyt nh, sa i s m ca qu trnh phng php phn tch h thng cp bc (AHP) c p dng nh mt cng c nh gi cho cc nh ra quyt nh bo tr. Phng php ny c s dng gii quyt vn vi cc rng buc phi tuyn tnh. l mang li li ch cho cc nh qun l xc nh chin lc bo tr ti u cho mi phn ca thit b. Phn cn li ca bi bo c t chc l 6 phn: 1) Gii thiu Cc cng ty sn xut phi i mt vi p lc gim chi ph sn xut ca h lin tc. Mt khc, bo dng ng mt vai tr quan trng trong vic gi mc sn sng v tin cy, cht lng sn phm, v cc yu cu an ton. Tuy vy, bo tr t c ch trong qu kh. Trong phn ny, n s ch r v tm quan trng ca bo tr. 2) Cc chin lc bo tr thay th: Phn 2 m t cc chin lc bo tr c th thay th trong nghin cu ny. C 4 chin lc chnh: sa cha bo tr, bo dng phng nga da trn thi gian, iu kin bo tr v bo dng on trc. 3) So snh cc tiu ch: Khi cc chin lc bo tr khc nhau c nh gi cho cc my khc nhau, cc cng ty sn xut phi t ra cc mc tiu bo tr c thc hin nh cc tiu ch so snh. Cc mc tiu ny c th c chia thnh bn kha cnh phn tch nh sau: an ton, chi ph, gia tng gi tr v tnh kh thi 4) Fuzzy AHP AHP c pht trin u tin bi Satty. N l mt cng c ph bin cho MCDM bi cu trc phc tp ca mt vn quyt nh phn cp nhiu cp khc nhau. Bc chnh ca n bao gm: - T chc vn phn cp - Pht trin ca cc ma trn n bng cch so snh - Tnh u tin t cc ma trn n - La chn thay th xp hng 5) Phng php u tin s m: Trong phn ny, n m t mt s tnh ton c th tr gip cho s hiu bit v phng php u tin s m mt cch r rng hn. 6) Nghin cu trng hp: Trong phn ny, n m t vic p dng phng php nh gi xut cho vic la chn cc chin lc bo tr trong mt nh my nhit in. 7) Kt lun: Trong bi bo ny, vic la chn chin lc duy tr trong cc cng ty sn xut c nghin cu. Cc trng hp nghin cu cho thy rng phng php AHP sa i c p dng nh l mt k thut nh gi cho cc chin lc bo tr, v rt hu ch cho cc vn MCDM khc tng t.

You might also like