You are on page 1of 8

ISSUED DOCUMENT MASTER LIST

Project
NVT/TTL BRIDGE
Name:
Job
VN11153
Number:

Update: 1-Dec-11

Client: CIENCO 1

Doc number.
Job no
VN11153

Type
CC

Scope Doc
no.
SC
001

Old no.

Discription

Vietnamese name

SSI 2000: proposal for anti-busting


rebar

Remarks
Calculation

Revision and issued date

17/11/11

Status

Submit
date

Approve date

19/10/11

21/10/11

Submitted to Cienco 1
Combined with
Geometric control of
pylon construction
VN11153/MS/PY/001,
submitted to C1
Submitted to Cienco 1

VN11153

PP

MW

001

Proposal for supply, installation of


the monitoring system for
construction

VN11153

MU

CF

001

Use and maintenance manual

Manual

10/11/11

VN11153

MS

PY

001

Method
statements

8/6/11

VN11153

CC

GP

002

Geometric control of pylon


construction
Guide pipe support frame on
abutment S1

Calculation

1/11/11

Submitted to Cienco 1

VN11153

CC

GP

001

Guide pipe calculation report

Calculation

3/11/11

Submitted to Cienco 1

3/11/11

VN11153

CC

SC

002

Damper solution calculation note

Calculation

Submitted to Cienco 1

4/11/11

VN11153

MS

BR

001

S5 bearing installation

Method
statements

15/8/11

Approved

15/8/11

VN11153

CC

TS

001

VN11153

QP

BR

001

Quality Plan

12/7/11

Approved

15/8/11

VN11153

CD

SC

Drawing

1/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1001

VN11153-GE-SI-1001

Drawing

29/10/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1002

VN11153-GE-SI-1002

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1003

VN11153-GE-SI-1003

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1004

VN11153-GE-SI-1004

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1005

VN11153-GE-SI-1005

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1006

VN11153-GE-SI-1006

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1007

VN11153-GE-SI-1007

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1008

VN11153-GE-SI-1008

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1009

VN11153-GE-SI-1009

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1010

VN11153-GE-SI-1010

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1011

VN11153-GE-SI-1011

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

VN11153

CD

SC

1012

VN11153-GE-SI-1012

Drawing

29/10/11

Submitted to Cienco 1

24/11/11

Calculation report of Temporary stay


anchorage (deck-backspan)
S5 bearing Quality Plan + Inspection
and maintenance

Proposal

18/8/11

2/10/11

28/10/11

3/11/11

26/7/11

29/9/11

19/10/11

26/8/11

7/11/11

approved

5/11/11
5/11/11

Calculation

SSI 2000 (deviator)


GENERAL STAYED CABLE
ARRANGEMENT
ANCHOR STRAND PATTERN
(1/10)
ANCHOR STRAND PATTERN
(2/10)
ANCHOR STRAND PATTERN
(3/10)
ANCHOR STRAND PATTERN
(4/10)
ANCHOR STRAND PATTERN
(5/10)
ANCHOR STRAND PATTERN
(6/10)
ANCHOR STRAND PATTERN
(7/10)
ANCHOR STRAND PATTERN
(8/10)
ANCHOR STRAND PATTERN
(9/10)
ANCHOR STRAND PATTERN
(10/10)

B TR CHUNG H CP DY
VNG
H U NEO CP DY VNG
(1/10)
H U NEO CP DY VNG
(2/10)
H U NEO CP DY VNG
(3/10)
H U NEO CP DY VNG
(4/10)
H U NEO CP DY VNG
(5/10)
H U NEO CP DY VNG
(6/10)
H U NEO CP DY VNG
(7/10)
H U NEO CP DY VNG
(8/10)
H U NEO CP DY VNG
(9/10)
H U NEO CP DY VNG
(10/10)

STAY PIPE

NG DY VNG

Page 1 of 8

ISSUED DOCUMENT MASTER LIST


Project
NVT/TTL BRIDGE
Name:
Job
VN11153
Number:

Update: 1-Dec-11

Client: CIENCO 1

Doc number.
Job no

Type

Scope Doc
no.
SC
1013

Old no.

Discription

GENERAL ARRANGEMENT OF
BACK SPAN STAY CABLE (1/2)
GENERAL ARRANGEMENT OF
1014 VN11153-GE-SI-1014
BACK SPAN STAY CABLE (2/2)
GENERAL ARRANGEMENT OF
1014a VN11153-GE-SI-1014a
BACK SPAN STAY CABLE (3/3)
GENERAL ARRANGEMENT OF
1015 VN11153-GE-SI-1015
MAIN SPAN STAY CABLE (1/4)
GENERAL ARRANGEMENT OF
1015a VN11153-GE-SI-1015a
MAIN SPAN STAY CABLE (2/4)
GENERAL ARRANGEMENT OF
1016 VN11153-GE-SI-1016
MAIN SPAN STAY CABLE (3/4)
GENERAL ARRANGEMENT OF
1016a VN11153-GE-SI-1016a
MAIN SPAN STAY CABLE (4/4)
DS ANCHORAGE DIMENSION
1017 VN11153-GE-SI-1017
AND DETAILS
DR ANCHORAGE DIMENSION
1018 VN11153-GE-SI-1018
AND DETAILS
DECK ANCHORAGE - ANTI
1019 VN11153-GE-SI-1019
VANDALISM PIPE
DECK ANCHORAGE - DECK
1020 VN11153-GE-SI-1020
CONNECTOR

VN11153-GE-SI-1013

Vietnamese name
CU TO CP DY VNG NHP
BIN (1/3)
CU TO CP DY VNG NHP
BIN (2/3)
CU TO CP DY VNG NHP
BIN (3/3)
CU TO CP DY VNG NHP
CHNH (1/4)
CU TO CP DY VNG NHP
CHNH (2/4)
CU TO CP DY VNG NHP
CHNH (3/4)
CU TO CP DY VNG NHP
CHNH (4/4)
CHI TIT V KCH THC U
NEO DS
CHI TIT V KCH THC U
NEO DR
NEO TRN MT CU - NG CN
BO V

VN11153

CD

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

1021

VN11153-GE-SI-1021

DECK ANCHORAGE - SEALS

VN11153

CD

SC

1022

VN11153-GE-SI-1022

DECK ANCHORAGE - BEARING


PLATE AND GUIDE PIPE

NEO TRN MT CU - CHI TIT


VNG M
NEO TRN MT CU - BN
NEO V NG DN HNG

VN11153

CD

SC

1023

VN11153-GE-SI-1023

GUIDE PIPE ON ABUTMENT

NG DN HNG TRN M

VN11153

CD

SC

1024

VN11153-GE-SI-1024

GUIDE PIPE ON DECK

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

VN11153

CD

SC

DECK ANCHORAGE - GUIDE


DEVIATOR
PYLON ANCHORAGE 1026 VN11153-GE-SI-1026
EXPANSION SLEEVE
PYLON ANCHORAGE - HDPE
1027 VN11153-GE-SI-1027
SHIM
PYLON ANCHORAGE - STEEL
1027a VN11153-GE-SI-1027a
DISK
PYLON ANCHORAGE - TENSION
1028 VN11153-GE-SI-1028
RING
PYLON ANCHORAGE - BEARING
1029 VN11153-GE-SI-1029
PLATE AND GUIDE PIPE
BACK SPAN ANCHORAGE ON
1030 VN11153-GE-SI-1030
PYLON
MAIN SPAN ANCHORAGE ON
1031 VN11153-GE-SI-1031
PYLON
PYLON ANCHORAGE - GUIDE
1032 VN11153-GE-SI-1032
DEVIATOR
PYLON ANCHORAGE 1033 VN11153-GE-SI-1033
CENTRALIZER
1025

VN11153-GE-SI-1025

NEO TRN MT CU - NG NI

NG DN HNG TRN MT
CU
NEO TRN MT CU - CU TO
B CHUYN HNG
NEO TRN THP - NG BC
NGOI
NEO TRN THP - VNG M
NG HDPE
NEO TRN THP - VNG CHN
THP
NEO TRN THP - VNG CHU
LC
NEO TRN THP - BN V
NG DN HNG
U NEO NHP BIN TRN THP
U NEO NHP CHNH TRN
THP
NEO TRN THP - CU TO B
CHUYN HNG
NEO TRN THP - CU TO B
NH TM

Page 2 of 8

Remarks

Revision and issued date

Status

Submit
date

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

Submitted to Cienco 1

24/11/11

Drawing

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

29/10/11

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

22/11/11

Submitted to Cienco 1

24/11/11

Drawing

22/11/11

Submitted to Cienco 1

24/11/11

Approve date

ISSUED DOCUMENT MASTER LIST


Project
NVT/TTL BRIDGE
Name:
Job
VN11153
Number:

Update: 1-Dec-11

Client: CIENCO 1

Doc number.
Job no

Type

Scope Doc
no.
SC
1034

Old no.

VN11153-GE-SI-1034

Discription
ANTI-BUSTING DETAIL

Vietnamese name
THP GIA CNG U NEO

Remarks

VN11153

CD

VN11153

QP

GP

VN11153

MS

BR

VN11153

MS

BR

1001

KE250-2-VN-500167a

TECHNICAL DESIGN FOR S5


BEARING - KE250

THIT K K THUT GI CU KE250

Drawing

VN11153

MS

BR

1002

KA43-1-VN-500167a

TECHNICAL DESIGN FOR S5


BEARING - KE 43

THIT K K THUT GI CU KA43

VN11153

MS

BR

1003

VN11153-MS-BE-1003

GENERAL LAYOUT OF S5
BEARING

VN11153

MS

BR

1004

VN11153-MS-BE-1004

VN11153

MS

BR

1005

VN11153

MS

BR

VN11153

MS

VN11153

Revision and issued date

Status

Submit
date

Approve date

Drawing

22/11/11

Submitted to Cienco 1

24/11/11

QC doc

24/10/11

Submitted to Cienco 1

20/10/11

7/11/11

Approved by DCCD

15/10/11

31/10/11

15/10/11

Approved by DCCD

15/10/11

31/10/11

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

B TR GI CU TRN TR S5

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

GENERAL COORDINATE OF S5
BEARING

B TR CHUNG TA GI CU

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

VN11153-MS-BE-1005

DETAIL COORDINATE OF S5
BEARING KE250 (B2)

TA V V TR GI CU
KE250 (B2)

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

1006

VN11153-MS-BE-1006

DETAIL COORDINATE OF S5
BEARING KE250 (B3)

TA V V TR GI CU
KE250 (B3)

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

BR

1007

VN11153-MS-BE-1007

DETAIL COORDINATE OF S5
BEARING KA43 (B1 & B4)

TA V V TR GI CU KA43
(B1 & B4)

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

MS

BR

1008

VN11153-MS-BE-1008

INSTALLATION METHOD OF S5
BEARING - 01

BIN PHP LP T GI CU 01

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

VN11153

MS

BR

1009

VN11153-MS-BE-1009

INSTALLATION METHOD OF S5
BEARING - 02

BIN PHP LP T GI CU 02

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

VN11153

MS

BR

1010

VN11153-MS-BE-1010

INSTALLATION METHOD OF S5
BEARING - 03

BIN PHP LP T GI CU 03

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

VN11153

MS

BR

1011

VN11153-MS-BE-1011

INSTALLATION METHOD OF S5
BEARING - 04

BIN PHP LP T GI CU 04

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

VN11153

MS

BR

1012

VN11153-MS-BE-1012

INSTALLATION METHOD OF S5
BEARING - 05

BIN PHP LP T GI CU 05

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

VN11153

MS

BR

1013

VN11153-MS-BE-1013

INSTALLATION METHOD OF S5
BEARING - 06

BIN PHP LP T GI CU 06

Drawing

15/10/11

Approved by DCCD

15/10/11

31/10/11

VN11153

MS

BR

1014

VN11153-MS-BE-1014 PRESETTING OF S5 BEARING

DCH CHUYN TRC LP


T GI TR S5

Drawing

24/10/11

Approved by DCCD

25/10/11

31/10/11

VN11153

MS

BR

1015

VN11153-MS-BE-1015

BO V GI TRONG QU TRNH
TH TI

Drawing

24/10/11

Approved by DCCD

25/10/11

31/10/11

VN11153

PP

SC

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2001 VN11153-GE-SI-1001

GENERAL STAYED CABLE


ARRANGEMENT

B TR CHUNG H CP DY
VNG

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2002 VN11153-GE-SI-1002

ANCHOR STRAND PATTERN (1/10)

H U NEO CP DY VNG
(1/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

Quality control Record of Guide


pipes

APP01

Construction method of S5 Bearing

PROTECTION FOR BEARING


DURING STATIC LOAD TEST

Drawing

SSI 2000 (damper) - proposal

Drawing

Page 3 of 8

ISSUED DOCUMENT MASTER LIST


Project
NVT/TTL BRIDGE
Name:
Job
VN11153
Number:

Update: 1-Dec-11

Client: CIENCO 1

Doc number.
Job no

Type

Old no.
Scope Doc
no.
SC
2003 VN11153-GE-SI-1003

Discription

Vietnamese name

Remarks

ANCHOR STRAND PATTERN (2/10)

H U NEO CP DY VNG
(2/10)

Drawing

Revision and issued date

Status

Submit
date

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

VN11153

PP

SC

2004 VN11153-GE-SI-1004

ANCHOR STRAND PATTERN (3/10)

H U NEO CP DY VNG
(3/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2005 VN11153-GE-SI-1005

ANCHOR STRAND PATTERN (4/10)

H U NEO CP DY VNG
(4/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2006 VN11153-GE-SI-1006

ANCHOR STRAND PATTERN (5/10)

H U NEO CP DY VNG
(5/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2007 VN11153-GE-SI-1007

ANCHOR STRAND PATTERN (6/10)

H U NEO CP DY VNG
(6/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2008 VN11153-GE-SI-1008

ANCHOR STRAND PATTERN (7/10)

H U NEO CP DY VNG
(7/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2009 VN11153-GE-SI-1009

ANCHOR STRAND PATTERN (8/10)

H U NEO CP DY VNG
(8/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2010 VN11153-GE-SI-1010

ANCHOR STRAND PATTERN (9/10)

H U NEO CP DY VNG
(9/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2011 VN11153-GE-SI-1011

ANCHOR STRAND PATTERN


(10/10)

H U NEO CP DY VNG
(10/10)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2012 VN11153-GE-SI-1012

STAY PIPE

NG DY VNG

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2013 VN11153-GE-SI-1013

GENERAL ARRANGEMENT OF
BACK SPAN STAY CABLE (1/3)

CU TO CP DY VNG NHP
BIN (1/3)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2014 VN11153-GE-SI-1014

GENERAL ARRANGEMENT OF
BACK SPAN STAY CABLE (2/3)

CU TO CP DY VNG NHP
BIN (2/3)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2014a VN11153-GE-SI-1014a

GENERAL ARRANGEMENT OF
BACK SPAN STAY CABLE (3/3)

CU TO CP DY VNG NHP
BIN (3/3)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2015 VN11153-GE-SI-1015

GENERAL ARRANGEMENT OF
MAIN SPAN STAY CABLE (1/3)

CU TO CP DY VNG NHP
CHNH (1/3)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2016 VN11153-GE-SI-1016

GENERAL ARRANGEMENT OF
MAIN SPAN STAY CABLE (2/3)

CU TO CP DY VNG NHP
CHNH (2/3)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

1016a VN11153-GE-SI-1016a

GENERAL ARRANGEMENT OF
MAIN SPAN STAY CABLE (3/3)

CU TO CP DY VNG NHP
CHNH (3/3)

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2017 VN11153-GE-SI-1017

DS ANCHORAGE DIMENSION AND CHI TIT V KCH THC U


DETAILS
NEO DS

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2018 VN11153-GE-SI-1018

DR ANCHORAGE DIMENSION AND CHI TIT V KCH THC U


DETAILS
NEO DR

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2019 VN11153-GE-SI-1019

DECK ANCHORAGE - ANTI


VANDALISM PIPE

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

NEO TRN MT CU - NG CN
BO V

Page 4 of 8

Approve date

ISSUED DOCUMENT MASTER LIST


Project
NVT/TTL BRIDGE
Name:
Job
VN11153
Number:

Update: 1-Dec-11

Client: CIENCO 1

Doc number.
Job no

Type

Old no.
Scope Doc
no.
SC
2020 VN11153-GE-SI-1020

Discription

Vietnamese name

Remarks

Revision and issued date

Status

Submit
date

Approve date

DECK ANCHORAGE - DECK


CONNECTOR

NEO TRN MT CU - NG NI

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

2021 VN11153-GE-SI-1021

DECK ANCHORAGE - SEALS

NEO TRN MT CU - CHI TIT


VNG M

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

SC

2022 VN11153-GE-SI-1022

DECK ANCHORAGE - BEARING


PLATE AND GUIDE PIPE

NEO TRN MT CU - BN
NEO V NG DN HNG

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

PP

SC

2023 VN11153-GE-SI-1023

GUIDE PIPE ON ABUTMENT

NG DN HNG TRN M

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2024 VN11153-GE-SI-1024

GUIDE PIPE ON DECK

NG DN HNG TRN MT CU

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2025 VN11153-GE-SI-1025

DECK ANCHORAGE - GUIDE


DEVIATOR

NEO TRN MT CU - CU TO
B CHUYN HNG

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2026 VN11153-GE-SI-1026

PYLON ANCHORAGE EXPANSION SLEEVE

NEO TRN THP - NG BC


NGOI

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2027 VN11153-GE-SI-1027

PYLON ANCHORAGE - HDPE SHIM

NEO TRN THP - VNG M


NG HDPE

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2028 VN11153-GE-SI-1028

PYLON ANCHORAGE - TENSION


RING

NEO TRN THP - VNG CHU


LC

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2029 VN11153-GE-SI-1029

PYLON ANCHORAGE - BEARING


PLATE AND GUIDE PIPE

NEO TRN THP - BN V


NG DN HNG

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2030 VN11153-GE-SI-1030

BACK SPAN ANCHORAGE ON


PYLON

U NEO NHP BIN TRN THP

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

PP

SC

2031 VN11153-GE-SI-1031

MAIN SPAN ANCHORAGE ON


PYLON

U NEO NHP CHNH TRN THP

Drawing

1/11/11

Submitted to Cienco 1

4/11/11

VN11153

CD

GP

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

CD

GP

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

CD

GP

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

CD

GP

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

CD

GP

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

CD

GP

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

CD

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

Drawing

31/10/11

Approved

1/11/11

5/11/11

VN11153

PP

VN11153

PP

SC

VN11153

PP

VN11153

Guide pipe installation method of S1 abutment


GENERAL STAYED CABLE
ARRANGEMENT
GENERAL ARRANGEMENT OF
1002 VN11153-GE-SI-1013
BACK SPAN STAYED CABLE
GENERAL ARRANGEMENT OF
1003 VN11153-GE-SI-1014
BACK SPAN STAYED CABLE
GENERAL ARRANGEMENT OF
1004 VN11153-GE-SI-1014a
BACK SPAN STAYED CABLE
DECK ANCHORAGE - BEARING
1005 VN11153-GE-SI-1022
PLATE AND GUIDE PIPE

B TR CHUNG H CP DY
VNG
CU TO CP DY VNG NHP
BIN
CU TO CP DY VNG NHP
BIN
CU TO CP DY VNG NHP
BIN
NEO TRN MT CU - BN
NEO V NG DN HNG

GP

1006 VN11153-GE-SI-1023

NG DN HNG TRN M

CD

GP

1007 VN11153-CD-GP-1001

CD

GP

1001 VN11153-GE-SI-1001

GUIDE PIPE ON ABUTMENT

GUIDE PIPES INSTALLATION IN


S1 ABUTMENT
GUIDE PIPES INSTALLATION IN
1008 VN11153-CD-GP-1002
S1 ABUTMENT

LP T NG DN HNG TI
M S1
LP T NG DN HNG TI
M S1

Page 5 of 8

ISSUED DOCUMENT MASTER LIST


Project
NVT/TTL BRIDGE
Name:
Job
VN11153
Number:

Update: 1-Dec-11

Client: CIENCO 1

Doc number.
Job no

Type

Old no.
Discription
Scope Doc
no.
GUIDE PIPES INSTALLATION IN
GP
1009 VN11153-CD-GP-1003
S1 ABUTMENT
CO-ORDINATE OF GP
GP
1010 VN11153-CD-GP-1004
REFERENCE POINT
CO-ORDINATE OF GP
GP
1011 VN11153-CD-GP-1005
REFERENCE POINT

VN11153

CD

VN11153

CD

VN11153

CD

VN11153

CD

GP

1012 VN11153-CD-GP-1006 GUIDE PIPE LEGS DETAILS

VN11153

CD

GP

1013 VN11153-CD-GP-1007 GUIDE PIPE LEGS DETAILS

VN11153

CD

GP

1014 VN11153-CD-GP-1008

VN11153

CD

GP

1015 VN11153-CD-GP-1009

VN11153

CD

GP

1016 VN11153-CD-GP-1010

VN11153

CD

GP

1017 VN11153-CD-GP-1011

VN11153

CD

GP

1018 VN11153-CD-GP-1012

VN11153

CD

GP

1019 VN11153-CD-GP-1013

VN11152

CD

PY

VN11153

CD

PY

1001 VN11153-CD-PY-1001

VN11153

CD

PY

1002 VN11153-CD-PY-1002 Kicker formwork

VN11153

CD

PY

1003 VN11153-CD-HO-1013

VN11153

CD

PY

1004 VN11153-CD-CF-1001 concrete block for climb form

VN11153

CD

CF

Climb form system

VN11153

CD

CF

VN11153

CD

CF

VN11153

CD

CF

1003 VN11153-CD-CF-1003 PANELS ASSMBLY

VN11153

CD

CF

1004 VN11153-CD-CF-1004

VN11153

CD

CF

VN11153

CD

CF

GUIDE PIPES SUPPORT FRAME


NO.01 OF S1 ABUTMENT
GUIDE PIPES SUPPORT FRAME
NO.02 OF S1 ABUTMENT
GUIDE PIPES INSTALLATION IN
S1 ABUTMENT
GUIDE PIE SUPPORT FRAME
NO.1A
GUIDE PIE SUPPORT FRAME
NO.2A
GUIDE PIE SUPPORT FRAME
NO.3A

Vietnamese name

hoist's footing location and


coordinate

U BAR AND ANCHOR BAR OF


CLIMB FORM LOCATIONS ON
ANCHOR FIXING DETAIL - BACK
1002 VN11153-CD-CF-1002
WALL
1001 VN11153-CD-CF-1001

CLIMB FORM ASSEMBLING


PHASE 1 (1/2)
CLIMB FORM ASSEMBLING
1005 VN11153-CD-CF-1005
PHASE 1 (2/2)
FULLY ASSEMBLIBNG OF CLIMB
1006 VN11153-CD-CF-1006
FORM (1/2)

Revision and issued date

Status

Submit
date

Approve date

LP T NG DN HNG TI
M S2

Drawing

31/10/11

Approved

1/11/11

5/11/11

TA CC iM THAM CHIU

Drawing

31/10/11

Approved

1/11/11

5/11/11

TA CC iM THAM CHIU

Drawing

31/10/11

Approved

1/11/11

5/11/11

Drawing

31/10/11

Approved

1/11/11

5/11/11

Drawing

31/10/11

Approved

1/11/11

5/11/11

Drawing

31/10/11

Approved

1/11/11

5/11/11

Drawing

31/10/11

Approved

1/11/11

5/11/11

Drawing

31/10/11

Approved

1/11/11

5/11/11

CU TO KHUNG S 1A

Drawing

31/10/11

Approved

1/11/11

5/11/11

CU TO KHUNG S 2A

Drawing

31/10/11

Approved

1/11/11

5/11/11

CU TO KHUNG S 3A

Drawing

31/10/11

Approved

1/11/11

5/11/11

Submitted to Cienco 1

28/11/11

CU TO CHN NG DN
HNG
CU TO CHN NG DN
HNG
CU TO KHUNG ng DN
HNG S 01 M S1
CU TO KHUNG ng DN
HNG S 021 M S2
CU TO KHUNG ng DN
HNG S 03 M S3

Pylon construction
Co-oordinate of the first pylon
serment with preset design detail

Remarks

Drawing
Ta phn on thp th nht
cng vi dch chuyn thit k

Drawing

Vn khun chn thp

Drawing

v tr v ta vn chn thng vn
thng

Drawing

26/11/11

b tr b tng chn vn khun leo

Drawing

28/11/11

Drawing
V TR NEO V THANH U CHO
VN KHUN LEO TRN THP
CHI TIT NEO CHN C NH
TRONG B TNG - MT SAU
T HP CC TM VN KHUN
LEO
LP DNG VN KHUN LEO
PHN ON 1 (1/2)
LP DNG VN KHUN LEO
PHN ON 1 (2/2)
BN V LP DNG TON B
VN KHUN LEO (1/2)

Page 6 of 8

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

ISSUED DOCUMENT MASTER LIST


Project
NVT/TTL BRIDGE
Name:
Job
VN11153
Number:

Update: 1-Dec-11

Client: CIENCO 1

Doc number.
Job no

Type

Old no.
Discription
Scope Doc
no.
FULLY ASSEMBLIBNG OF CLIMB
CF
1007 VN11153-CD-CF-1007
FORM (2/2)

Vietnamese name

Remarks

Revision and issued date

Status

Submit
date

BN V LP DNG TON B
VN KHUN LEO (2/2)

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

THANH CHT NGANG

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

1009 VN11153-CD-CF-1009 CLIMBING RAIL - PHASE 1, 2, 3

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

CF

1010 VN11153-CD-CF-1010

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

CD

CF

1011 VN11153-CD-CF-1011

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1012 VN11153-CD-CF-1012

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1013 VN11153-CD-CF-1013

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1014 VN11153-CD-CF-1014

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1015 VN11153-CD-CF-1015

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1016 VN11153-CD-CF-1016

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1017 VN11153-CD-CF-1017

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1018 VN11153-CD-CF-1018

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1019 VN11153-CD-CF-1019

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1020 VN11153-CD-CF-1020

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1021 VN11153-CD-CF-1021

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1022 VN11153-CD-CF-1022

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1023 VN11153-CD-CF-1023

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1024 VN11153-CD-CF-1024

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

1025 VN11153-CD-CF-1025 HYDRAULIC PLANT

Drawing

23/11/11

Submitted to Cienco 1

28/11/11

VN11153

CD

CF

Drawing

18/10/11

Submitted to Cienco 1

18/10/11

VN11153

CD

CF

Drawing

18/10/11

Submitted to Cienco 1

18/10/11

VN11153

CD

CF

Drawing

18/10/11

Submitted to Cienco 1

18/10/11

VN11153

CD

CF

Drawing

18/10/11

Submitted to Cienco 1

18/10/11

VN11153

CD

VN11153

CD

CF

1008 VN11153-CD-CF-1008 DOWEL BARS

VN11153

CD

CF

VN11153

CD

VN11153

THANH RAY TRT - PHN


ON 1, 2, 3
BN V LP DNG CHUNG T
SLIDING UNIT G.A. (1/3)
HP H TRT (1/3)
BN V LP DNG CHUNG T
SLIDING UNIT G.A. (2/3)
HP H TRT (2/3)
BN V LP DNG CHUNG T
SLIDING UNIT G.A. (3/3)
HP H TRT (3/3)
HORIZONTAL BEAMS & BRACES BN V LP DNG DM NGANG
G.A. (1/2)
V H GING CA VN KHUN
HORIZONTAL BEAMS & BRACES BN V LP DNG DM NGANG
G.A. (2/2)
V H GING CA VN KHUN
HORIZONTAL FRAME G.A. LEVEL - BN V LP DNG KHUNG
4
SN THAO TC V TR -4
BN V LP DNG H THANH
ROD BRACES G.A.
GING
BN V LP DNG SN THAO
PLATFORM G.A. +0
TC +0
BN V LP DNG SN THAO
PLATFORM G.A. -4
TC -4
BN V LP DNG CP TREO
WIRE ROPES G.A
SN THAO TC
BN V LP DNG RAY TRT
CLIMBING RAIL G.A. TYPE A
LOI A
BN V LP DNG RAY TRT
CLIMBING RAIL G.A. TYPE B
LOI B
PLATFORM G.A. +0 (UPPER
BN V LP DNG SN THAO
PYLON)
TC +0 (ON TRN THP)
PLATFORM G.A. -4 (UPPER
BN V LP DNG SN THAO
PYLON)
TC -4 (ON TRN THP)
HORIZONTAL BEAM G.A. +0
BN V LP DNG DM NGANG
(UPPER PYLON)
+0 (ON TRN THP)
B TR THIT B THY LC

Climb form system of pylon construction


Climbing form system of pylon
construction (1/3)
Climbing form system of pylon
2002 VN11153-CD-CF-1002
construction (2/3)
Climbing form system of pylon
2003 VN11153-CD-CF-1003
construction (3/3)
2001 VN11153-CD-CF-1001

H thng vn khun leo thi cng


thp cu (1/3)
H thng vn khun leo thi cng
thp cu (2/3)
H thng vn khun leo thi cng
thp cu (3/3)

Page 7 of 8

Approve date

ISSUED DOCUMENT MASTER LIST


Project
NVT/TTL BRIDGE
Name:
Job
VN11153
Number:

Update: 1-Dec-11

Client: CIENCO 1

Doc number.
Job no

Type

Old no.
Discription
Vietnamese name
Scope Doc
no.
General layout of climbing form work B tr h vn khun leo trong m
CF
2004 VN11153-CD-CF-1004
system in 3D view
hnh 3D

VN11153

CD

VN11153

CD

TS

VN11153

CD

TS

VN11153

CD

TS

VN11153

CD

TS

VN11153

CD

TS

Temporary stay cable


TEMPORARY STEEL BRACKET
BACK SPAN (BACK SPAN)
BARS & EMBEDDED PLATE
1021 VN11153-CD-TS-1021
SETTING OUT (BACK SPAN)
PYLON - CONNECTION PIECE (61033 VN11153-CD-TS-1033
12)
DECK - CONNECTION PIECE (61035 VN11153-CD-TS-1035
12)
1014 VN11153-CD-TS-1014

Revision and issued date

Status

Submit
date

18/10/11

Submitted to Cienco 1

18/10/11

Drawing

21/10/11

Submitted to Cienco 1

21/10/11

Drawing

21/10/11

Submitted to Cienco 1

21/10/11

Drawing

21/10/11

Submitted to Cienco 1

21/10/11

Drawing

21/10/11

Submitted to Cienco 1

21/10/11

Remarks
Drawing

Drawing
NEO DY VNG TM TRN
DM (NHP BIN)
CU TO TM CHN SN V
THANH CNG CAO (NHP
CHI TiT LIN KT TRN THP (612)
CHI TiT LIN KT TRN DM (612)

Page 8 of 8

Approve date

You might also like