You are on page 1of 119
City of Cleveland, OH Division of Water Review of Proposed City of Westlake Water System Separation from CWD December 12, 2011 \magine the result BEE 2 acanis Said Certtied Project Manager eft Wsde.SZ. WichaelL, MoGinchy, PE. Principal Consultant Review of Proposed City of, Westlake Water System Separation from CWD rete (ty of Glveland, OF Division of Water Prey: ARCADIS US, Ine 1100 Superior Avenue Suite 1250, evelana Ohio 44114 Tei216 781 617 Fax216 781 6243 (©1000084.890 Deoombor 12,2014 This document i tended only forthe use ofthe incvical or entity for which twas prepared and may contain information that 's privileged, confidential and exempt from cfisclosure under appicabie law. Any dissemination, astbuton or copying af this document is stictly prohisted BE 2 arcanis Section 1 - Executive Summary Section 2 - Background Purpose CW Water System Proposed Separated Westlake Water System Water Service Agreement Section 3- Hydraulic Considerations General Regulatory Ground Storage Tank Concems Pumped Storage System Single Pressure Regulator/Transient Analysis ‘Water Distribution System Pressure Wostiake Low Service Zone Fire Flows: Section 4 - Operations Startup Requirements Managemenv/Administrative - Accounting, Customer Service, Bling, Meter Reading, IT Distribution Operations and Maintenance agulatory Compliance - Sampling, Testing and Reporting Field services ~ Troubleshooting, Water Quality, OUPS, Inspection Engineering — Hydraulic Modeling, Backllow Program, Asset Records, Asset Management, CIP, Studies Personnel Equipment Fasilitos Noone 10 12 1“ 6 18 20 20 21 22 22 23 23 24 24 Table of Contents

You might also like