You are on page 1of 43

Project Report Online Shopping Cart

201 1

DEPARTMENT OF COMPUTER SCIENCE & ENGINEERING Regional College for Education Research and Technology,Jaipur A project Report On

Online Shopping Cart


Sukhveer Singh Sourabh Singh Vikash Sharma Yadhunandan Nagar Submitted in partial fulfillment for the Award of Degree of Bachelor of Technology

Session: 2011-12

Submitted To:
Mr. Kailash Sharma (Head Of Department)

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

CERTIFICATE OF ORGANISATION
This is certify that the project entitled Online Shopping Cart has been carried out by Sukhveer Singh,Sourabh Singh,Vikash gupta,Yadhunandan nagar under our guidance in partial fulfillment of the degree of Bachelor of Technology in computer science of Rajasthan Technical University,Kota During the acadmic Year 2011-2012.

To the best of knowledge and belief this work has not been submitted Elsewhere for the award of any other degree.

Project Guide:

Examiner:

Head of Department:

Miss. Ruchika

Mr. Kailash Sharma

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

PREFACE
This project report is according to the format provided by the Computer Science and IT department and submitted in order to fulfill the partial requirement for B.Tech degree. The report contains various DFDs SWDLC and screenshots of the Online Shopping Cart designed during the summer training session. The software requirement specification (SRS) is also included in the report in order to provide complete information. The code is written in ASP.NET and C#. The site basically consists of three modules- admin, member and guest. Admin can make changes in the information database, block an user, add new data where as a member can only add new data. On the other side a guest can only view the home page of the site. Throughout the project the complete focus is given on the reliability of the data which is provided on the site. The process to get the information is easy and user friendly and the site can be a great source to get information.

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

ACKNOWLEDGEMENT
We acknowledge Mr. Kailash Sharma (HOD CS Department) who provided us Proper resources and faculty members to comlete our project. We are grearful to him for his proper guidelines and motivation that make us to complete our project on time. We also sincerely acknowledge all faculty members of CS department RCERT Jaipur, who directed us to complete project within specified period. Our extremely grateful to them for there kind consent, cooperation and encouragement. We are greatly motivated by their never ending enthusiasm and motivation. We learnt a lot while attending their sessions of project. We also acknowledge Miss. Ruchika Sharma, Who help and guided us throughout in the completion of this project. She helped us to understand how to implement a project and also provided continues supervisor of project. This project has been benefited from many suggestions and comments given by our friends. Besides it there are some books and online helps we have taken. We also like to thanks our faculty members from CS department.

Team Members:Name no. Sign


Sukhveer Singh
Dept. of CS

Roll

08ERCCS114 RCERT,Jaipur

Project Report Online Shopping Cart

201 1
08ERCCS113 08ERCCS125 08ERCCS131

Sourabh Singh Vikash Gupta Yadhunandan nagar

ABSTRACT
The Project Entitled Online Shopping Cart developed to automate the Shopping process of the different Shopping category. On-Line Shopping is becoming quite popular today. The Online Shopping cart System offering Easy to use, access for 24 hours a day. Online shopping is the process whereby consumers directly buy goods or services from a seller in realtime, without an intermediary service, over the Internet. It is a form of electronic commerce. An online shop, e-shop, e-store, internet shop, web shop, online store, or virtual store evokes the physical analogy of buying products or services at a bricks-and-mortar retailer or in a shopping centre. The process is called Business-to-Consumer (B2C) online shopping. Online shopping is rising day by day in India. Because India is the country where computer users are increasing day by day so as the online shopping trends are also increasing. This project covers the online selling of cosmetics, fashion accessories, watches etc. The project shows the product category and then product details. From the product details, the product can be added to cart and can be bought.

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Table of Contents
S.N Name of Topic Page no

1. INTRODUCTION...........................................................................................8 1.1 1.2 Project Overview .........................................................................8 Scope............................................................................................8

2. COMPANY PROFILE ..9-11 2.1 2.2 2.3 2.4 Introduction.9 Policy Quality..10 Service Description...11 Contact Us..11

3. SOFTWARE DEVELOPMENT LIFE CYCLE ............................................12-18 3.1 3.2 3.3 3.4 3.5 3.6 3.7
Dept. of CS

Requirement analysis.12 Feasibility Study..13 Analysis....14 Preliminary Design.14 System Design.......................................................................15 Implementation...16 Acceptance Test Generation....17 RCERT,Jaipur

Project Report Online Shopping Cart

201 1

3.8 3.9 3.10

Quality Assurance..17 Database Conversion....17 Installation....18

4. ADVANTAGES OF THE PROPOSED SYSTEM.......................................19 5. ASP.NET ..................................................................................................20-22 6. SOFTWARE/HARDWARE DETAILS .......................................................23 6.1 6.2 Hardware Specification.............................................................23 Software Specification..............................................................24

7. SYSTEM ANALYSIS & DESIGN 25-31 7.1 Use Cases..26 7.1.1 Context Level Diagram..26 7.1.2 First Level DFD Diagram...27 7.1.3 Second level DFD Diagram..28 7.1.4 Login Activity Diagram...29 7.1.5 Implementation View..30 7.2 E-R Diagram...31

8. CONCLUSION.32 9. REFERENCES.32 10. APPENDICES..33-37 10.1 10.2 10.3 10.4 10.5 10.6 10.7
Dept. of CS

Home Page33 Registration Page.34 Show Products Page...34 Products detail Page....35 Login Page.35 Your Cart Page..36 Checkout Page..36 RCERT,Jaipur

Project Report Online Shopping Cart

201 1

10.8

Confirmation Page.37

10.10 About Us Page...37 11. SYSTEM INTERFACES.38 12. IMPLEMENTATION OF MECHNISMS....39

INTRODUCTION
Online shopping is the process whereby consumers directly buy goods or services from a seller in real-time, without an intermediary service, over the Internet. It is a form of electronic commerce. An online shop, eshop, e-store, internet shop, web shop, online store, or virtual store evokes the physical analogy of buying products or services at a bricks-and-mortar retailer or in a shopping centre. The process is called Business-to-Consumer (B2C) online shopping.

Project Overview: The shopping cart project needs to create the shopping cart system to organize the products record and the other information about the customers. How customers can buy products from website can be recognized from their username and password. Scope: Online shopping is rising day by day in India. Because India is the country where computer user's are increasing day by day so as the online shopping trends are
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

also increasing. This project covers the online selling of cosmetics, fashion accessories, watches etc. The project shows the product category and then product details. From the product details, the product can be added to cart and can be bought.

COMPANY PROFILE
2.1 Introduction Shaperz india is an IT services company focusing on software development, IT consulting and provides offshore outsourcing solutions to enterprises all over India. At Shaperz india we believe that in order to benefit from offshore outsourcing, it is imperative that you continue to control the system. Our partnership led service approach, addresses the critical components which ensure a long term successful offshore IT Outsourcing strategy for our clients. In the race for technological leadership there are no victories, only incremental milestones. Technology leaders are looking for partners who share their business vision, risk and can actually deliver consistent performance. With Orbit tech., you can be assured of visible benefits with guaranteed success, because we deliver a successful offshore IT outsourcing model without fail.

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

2.2 Quality policy PSI has a documented quality management system conforming to ISO 9001:2008 quality system standards. The quality system is followed & implemented as per the guidelines of ISO 9001:2008 standard. Our Quality policy is defined as under: ISO 9001:2008: As an organization we are focused on developing overall procedural standards for every business function of the company wherein involving all our people and customers to provide effective and quality software development services. Guided under ISO quality system our comprehensive evaluation & monitoring system addresses several important issues and helps our customers in the following ways:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

To develop international quality management and quality assurance standards. Documentation of quality management systems software development process and methodologies. Effective delivery and exchange of IT services with focus on total customer satisfaction. Monitoring and analysis of project management activities to prompt any bugs and delays. Analysis and monitoring of IT services so that they are designed delivered and maintained in accordance with customer specific requirements.

2.3 Service Description We possess an excellent team of 20 software engineers, experienced in 1) Java and Internet technologies 2) Web Applications development JavaScript, CGI, PERL, PHP, VB script, ActiveX 3) Dot Net Studio (VB.Net, Asp.Net, C#) 4) Web site design. 5) PHP, My SQL, Web Databases 6) Oracle and Visual Basic 6.0 7) SQL Server, Oracle 8) Access, ASP & VB Applications Our Developers love challenging assignments and are ready to sacrifice their sleep in exchange for challenging work!

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

2.4 Contact Us Contact Address Tel. Number Website Email : : : : : Mr Ankit Tiwari A-44 A,Sector-16,Tonk Road Noida 201301 +91-120-2511331 www.shaperzindia.com info@sheperzindia.com

3.Software Development Life Cycle


SDLC:
Software Development Life Cycle (SDLC) is a structured sequence of phases for implementing an information system. A System/Software development life cycle (SDLC) is a logical process by which Systems analysts, software engineers, programmers and end-users build information systems and computer application to solve business problems and needs. The System/Software development life cycle (SDLC) is a conceptual model used in project management that describes the stages involved in an information system development project, from an initial feasibility study through maintenance of the completed application.

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

In the software development process we focus on the activities directly related to the production of the software, for example, design, coding, and testing. A development process is a sequence of steps. Each step performs a well-defined activity leading towards the satisfaction of the project goals, with the output of one step forming the input of the next one. We have followed the concept of SDLC in the following way:

Requirement analysis Feasibility Study Analysis Preliminary Design System Design Implementation Acceptance Test Generation Quality Assurance Database Conversion Installation

3.1 Requirement Analysis:


Requirement Analysis is the first phase of the SDLC. First, we need to figure out what the problem is (analysis)? We must know exactly what we want to do before we can begin to do it. A clear understanding of exactly what is needed is necessary for creating a solution. In this phase Business Analysts (BA), find out what is the problem and what are requirements and so on. It begins with a request from the user for a new system. It involves the following: Identify the requirement for the system. Clarify deficiencies in the current system. Identify deficiencies in the current system.
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Establish goals and objectives for the new system. Determine the feasibility for the new system. Prepare a project charter that will be used to guide the reminder of the project.

3.2 Feasibility Study:


Feasibility Study is basically the test of the proposed system in the light of its workability, meeting users requirements, effective use of resources and of course, the cost effectiveness. It is a set of manual & computerized components for gathering, storing & processing business data for an organization. It also converts such data useful decision oriented information. The main goal of feasibility study is not to solve the problem but to achieve the scope. In the process of feasibility study, the cost and benefits are estimated with greater accuracy. It has three types:

Operational Feasibility Technical Feasibility Economic Feasibility


Through Feasibility Study, we can specify User Requirement Specification (URS) and Software Requirement Specification (SRS). Depending on the results of the initial investigation, the survey is expanded to a more detailed feasibility study. Formation of a project form and appointment of a project leader. Preparation of System Flow Charts. Enumerate proposed candidate system. Describe the characteristics of that candidate system. Determine and evaluate the performance of that candidate system. Weight system performance and cost data.
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Selection of the best candidate system.

3.3 ANALYSIS:
Analysis is a detailed study of the various operations performed by a system and their relationships within and outside of the system. This activity is also used to study the system in details. The objective of this step is to develop structured system specifications for the proposed system. The structured system specification will be called the Essential Model. It involves: Detailed study of the system. Understand the procedure of the system. Determine the scope of the system. Define the goals of the proposed system.

3.3 PRELIMINARY DESIGN:


The most creative and challenging phase of the system life cycle is System Design. The term design describes the final system and the process by which it is developed. This activity deals with certain design issues that are to be finalized in consultation with the user. The two most important issues of relevance to the user are the automation boundary & the human machine interface. The output of this activity is the user implementation model. This model, in addition to the essential model defines the following for the system: Automation Boundary Report Layout Workable plan for implementing the candidate system. Screen layouts for the data entry forms Menus
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Information on personnel, money, hardware, facilities, and their estimated cost must also be available.

3.4 DESIGN:
System Design involves the transformation of the user implementation model into software design. The first step is to determine how the output is to be produced and in what format. Second, input data and master files (database) have to be designed to meet the requirements of the proposed output. The design specification of the proposed system consists of the following: Database schema Pseudo code for all the modules.

3.5 Coding:
After designing the new system/software, the whole system/software is required to be converted into computer language. Coding the new system/software into computer programming language does this. It is an important stage where the defined procedures are transformed into control specifications by the help of a computer language. This is also called the Programming Phase in which the programmer converts the program specifications into computer instructions, which we refer as programs. The programs coordinate the data movement as and control the entire process in a system/software.

Testing:
Before actually implementing the new system/software into operations, a test run of the system/software is done removing all the bugs, if any. It is an important phase of a successful system. After codifying the whole programs of the system, a test plan should be developed and run on a given set of test data.

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

In the system/software testing stage, we check the overall behaviour of the system/software against the functional and the performance requirements. There are two type of testing: White-Box: Internal part (code) of the project is testing. Black-Box: System behaviour (input/output) is checked.

3.6 Implementation:
After having the user acceptance of the new system/software developed, the Implementation phase begins. Implementation is the stage of a project during which theory is turned into practice. In this phase, user can know how to execute the package, how to enter data and so on. The implementation phase is less creative then system design. This activity includes programming, testing & integration of modules into progressively more complete system. It is primarily concerned with user training, site preparation, and file conversion. During the final testing user acceptance is tested, followed by user training. System testing checks the readiness and accuracy of the system to access, update, and retrieve data from new files. The output of this activity is the complete integrated system. Major sub activities Coding Integration Testing Debugging
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Inputs Project character Design specification Outputs Integrated Systems

3.7 Maintenance:
When the implementation report is submitted, an Maintenance should be made to determine whether the system/software meets the objectives stated in the general design report. In this phase, users may be able to suggest the easy-to-implement improvements.

3.8 ACCEPTANCE TEST GENERATION:


This activity generated a set of test data that can be used to test the new system before accepting it. If successful, the program(s) is then run with live data. Otherwise a diagnostic procedure is used to locate and correct errors in the program. Input Project Character Output Quality Assurance test set

3.9 DATABASE CONVERSION:


This activity involves conversion of data from the existing system (if any) to the new system.
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

PROCEDURE DESCRIPTION:
The objective of this step is to produce a manual, which may be used as a guide for operating the system. Inputs Project Character User implementation model Outputs User manual (guide for end user)

3.10 INSTALLATION:
This is another activity of the System Development Life Cycle. The change over from the current system to the new system is done. Inputs Project Character User manual Outputs Installed system

This project involves all the activities of the System Development Life Cycle except for the database conversion and installation.

4. Advantages of the proposed System


Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

NEED FOR NEW SYSTEM


Identification of need is basic step in software developments. Before starting to develop software, it is must to know the need of that software. Projects are initiated for different reasons. The reasons behind need of development of onLine citysearch.com are:

Capability:
Multilevel transmission of information and activities are influenced by process transactions quickly and efficiently.

Improved processing speed:


Multilevel Information activity required improved processing speed of action.

Faster Information Retrieval:


Locating and retrieving information from storage.

Control:
The citysearch.com provides Greater accuracy and consistency in saving and fetching information.

Reduced Costs:
The citysearch.com Perform Publishing related transaction easily The

citysearch.com reduces manpower requirement so ultimately affect is cost reduction.

Competitiveness:
In this system performance of any group or individual can be published which make competitiveness.

Sharing of Information:
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

The onlineshopping.com promotes the sharing of information.

5. ASP.NET
ASP.net is the latest version of Microsofts Active Server pages Technology (ASP). ASP.NET is a unified Web development model that includes the services necessary for you to build enterprise class web application with a minimum of coding. ASP.net is part of .net framework, and when coding ASP.net you have access to classes in the .net framework. You can code your applications in any language compatible with the common language runtime (CLR), including Microsoft Visual Basic, C#, and Jscript, .Net and J #. These languages enable you to develop ASP.Net applications that benefit from the common language runtime, type safety and inheritance and so on.

ASP.NET Includes
A page and control framework. The ASP.NET compiler. Security Infrastructure. State-management facilities. Application configuration. Health monitoring and performance features. Debugging support. An XML web service framework. Extensible hosting environment and application life cycle management. An extensible designer environment. ASP is a server side scripting technology that enables scripts (embedded in web pages) to be executed by an Internet Server.
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

ASP is a Microsoft technology. ASP stands for Active Server Pages. ASP is a program that runs inside IIS. IIS stands for Internet Information Services. IIS comes a free component with Windows 2000. IIS is also a part of the Windows NT 4.0 Option pack. PWS is a smaller but fully functional version of IIS. PWS can be found on your windows 95/98 CD.

ASP file
An ASP file is just the same as an HTML file. An ASP file can contain text, HTML, XML and scripts. Scripts in an ASP file are executed on the server. An ASP file has the file extension .asp.

ABOUT ASP.NET
ASP 3.0 is the latest version of ASP, but there will never be an ASP 4.0 version. ASP.NET is the next generation ASP, but its not an upgraded version of ASP.ASP.NET Framework. Microsoft spent three years rewriting ASP.NET from the ground up, and ASP.NET is not fully backward compatible with ASP 3.0.

.NET FRAMEWORK
The .NET framework is the infrastructure for the Microsoft .NET platform. The .NET Framework is an environment for building, deploying and running web applications and the .NET framework contains a common language runtime and common class libraries like ADO.NET, ASP.NET and Windows Forms to RCERT,Jaipur

Dept. of CS

Project Report Online Shopping Cart

201 1

provide advanced standard services that can be integrated into a variety of computer systems. The.NET framework provides a feature-rich application environment, simplified development and easy integration between a numbers of different development languages. The .NET framework is language neutral. Currently it supports C++, C#, Visual Basic and Jscript. Microsoft Visual Studio .Net is a common development for the .net framework.

Differences between ASP and ASP.NET


ASP .NET has a better language support, a large set of new controls and XML based components and better user authentication. ASP.NET provides increased performance by running ASP.NET is not fully backward compatible with ASP. compiled code.

New in ASP.NET
Better language support Programmable controls. Event Driven programming. XML-Based components. User authentication, with accounts and roles. Higher scalability. Increased performance compiled code. Easier configuration and deployment. Not fully ASP compatible.

Language Support
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

ASP.NET uses the new ADO.NET. ASP.NET supports full Visual Basic, not VB script. ASP.NET supports C# and C++. ASP.NET supports Jscript as before.

ASP.NET Controls
ASP.NET contains a large set of HTML controls. Almost all HTML controls on a page can be defined as ASP.NET control objects that can be controlled by scripts .ASP.NET also contains a new set of object oriented input controls , like programmable list boxes and validation controls. A new data grid control supports sorting, data paging and everything you expect from a dataset control.

2.2.5 Software/Hardware Details


HARDWARE SPECIFICATIONS
PC Processor RAM HDD PC Processor RAM HDD Internet Connection Hardware Environment (Deployment Server) PC (Windows) Intel Pentium Processor 4, 2.4GHz or equivalent. 512 MB RAM 40 GB Hardware Environment (End users PC) PC (Windows) Intel Pentium Processor, 233 MHz or equivalent. 128 MB RD RAM 10 MB of free HDD space for Internet Cache 56 K Model Connection

SOFTWARE SPECIFICATIONS
Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Software Environment (Deployment Server) Operating System MS Windows Server 2003 or higher Other software SQL Server 2005 or higher, Enterprise Edition (TBD), Internet Information Server services (IIS 6.0 or higher), .Net Framework 4.0 Microsoft IIS 6.0 IE 6.0 or IE 7.0 Software Environment (End User) Operating System Win 2000 / Win XP or higher Browser Microsoft Internet Explorer 6.0 or higher Web Server Browser

TECHNOLOGIES TO BE USED
ASP.NET 4.0 is being used for developing the web pages. C#. NET is being used for logic development for the project. ADO .NET Entity Framework Ajax

DATABASE USED
SQL SERVER 2005 is being used for managing the database at server

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

7. SYSTEM ANALYSIS AND DESIGN


DATA FLOW DIAGRAM:
Graphical description of a systems data and how the processes transform the data is known as Data Flow Diagram (DFD). A DFD shows the flow of data through a system. It views a system as a function that transforms the inputs into desired outputs. Any complex system will not perform this transformation in a Single Stop, and the data will typically undergo a series of transformations before it becomes the output. The DFD aims to capture the transformations that take place within a system to the input data so that eventually the output data is produces. The agent that performs the transformation of data form one state to another is called processes. So the DFD show the movement of data through the different transformations of processes in the system. Control information such as record counts, passwords and validation requirements is not pertinent to a data flow diagram. Meaning full names for data flows, processes and data stores must be chosen. To construct the data flow diagrams, we use

Arrows: An arrow identifies the data flow- data in motion. It is a pipeline


through which information flows. All data flow are identified by unique names. These names are chosen so that they convey some meaning about what the data is.

Circles: Circles stands for processes that convert data into information.
RCERT,Jaipur

Dept. of CS

Project Report Online Shopping Cart

201 1

Open ended boxes: An open-ended box represents a data store or a


temporary repository of data.

Squares: A square defines a source (originator) or destination of system data.

ANALYSIS AND DESIGN


7.1 Use Cases 7.1.1Context Level Diagram:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

7.1.2 First Level DFD Diagram:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

7.1.3 Second level DFD Diagram:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

7.1.4 Login Activity Diagram:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

7.1.5 Implementation View:

ONLINE SHOPPING CART

Request

C#

Asp.Net
Data Base

Response

.Net Framework

Browser

Operating System

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

7.2 E-R Diagram:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

8. CONCLUSION
The development of the software includes so many people like user system developer, user of the system and the management, It is important to identify the system requirements by properly collecting required data to interact with the system. Proper design builds upon this foundation give a blue print, which is actually implemented by the developers. On realizing the importance of the systematic documentation all the processes are implemented using a software engineering approach. Working in a live environment enables one to appreciate the intricacies involved in the System Development Life Cycle (SDLC)). We have gained a lot of practical knowledge from this project, which we think, shall make us stand in a good state in the future.

9. REFERENCES

www.w3schools.com www.webdevelopernotes.com www.dotnetfunda.com

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

10. APPENDICES

i. Home page:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

ii. Registration page:

iii. Show Products page:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

iv. Products detail page:

v. Login page:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

vi. Your Cart page:

vii. Checkout page:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

viii. Confirmation page:

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

ix. About us page:

11.SYSTEM INTERFACES Interface:


The software provides good graphical interface for the front end of the database and a gootd informative interface for the rear end.

Hardware Interface:The system should have these hardware requirements The processor should be at least Pentium 3 or above The processor speed should be greater than 400 MHz

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Ram should be or greater than 512 MB

Software Interfaces:The software requires the support of the following softwares for the database and other requirements ASP.NET for web interface Mysql for database SqlServer 2005

12.Implementation of security mechanisms:


Security is critical in system development. The amount of protection depends on the sensitivity of the data, the reliability of the user, and the complexity of the system. The motives behind security are to keep the organization running, protect data as asset, and seek management support for more installations. There are three categories of controls in data security Physical Security (protection from fire, flood, etc.) Database Integrity Control Measures (Passwords, Encryption).

Dept. of CS

RCERT,Jaipur

Project Report Online Shopping Cart

201 1

Potential threats to system security include errors and omissions, disgruntled and dishonest employees, fire and natural disasters. Errors and omissions cause the most damage. Personal computers have been adding security problem disasters pinpoint unacceptable exposures and adopt preventive measures as part of a security plan. The goal is to identify the threat that results in the greatest monetary losses and provide protection to the appropriate degree. After system security risks have been evaluated the next step is to select security measures. These measures are classified as follows: Identification it is a scheme for identifying persons to the system based on

Something you know such as password or a picture badge Something you are such as fingerprint or voice print or something you have such as credit card, key of special terminal.

Dept. of CS

RCERT,Jaipur

You might also like