Professional Documents
Culture Documents
Warning: T-Con PWB under shield. Be sure to reinsert screws before operating set with shield removed. TO TFT MODULE J3 TO TFT MODULE J4
T-CON Board
To Back lights U4 1) 0V 2) 1.8V 3) 3.3V U16 16Mhz UC1
T2
15.7V D1
BALLAST PWB
L3
CN5
To Back lights
LVDS
T2
To Back lights
T2
14
P206 N/C
P204
P201
Power Supply
CN1 24V To Back lights T2 P203 N/C P202 Note: STBY 5V (P201 pin 8) and AC Det (ADC) (P201 pin 1) must be present at all times. Check both ends of the the cable. If AC Det missing, check ohms to see if shorted. If yes, replace responsible board. If not, jump STBY 5V to ADC. If Main board responds correctly, SMPS at fault. If not, Main board at fault.
Diode Check 1.8V 1.6V 1.6V Gnd Open Open Open Open Gnd Open Open Gnd 1.1V
IC1104
IC1104 1 (1.1V) 2 (2.6V) 3 (GND) 4 (3.2V) 5 (3.2V) IC1114 1 (2.6V) 2 (5.0V) 3 (GND) 4 (3.3V) 5 (1.2V)
IC1000
T2
To Back lights
LD200
P1204
To Back lights
T2
P201
1 2 3 4 5 6 7 8 9 10 11 12 13
9 Disconnect P1100 and P1101 on Main PWB. Jump pin 2 to pin 3 thru a 10K Ohm resistor. As seen in 10 100 ohm the image to the left. This should force the SMPS to the Watt on state. All Voltages should be produced. (6V, 19V, 12V)
SMPS TEST 2: To force the ballast on short pin 5 to pin 8 thru a 100 Ohm resistor.
J3
16