Professional Documents
Culture Documents
Group 1 (13/09/06)
Approved By (Date)
1. Hazard Identification
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
2. Risk Evaluation
Existing Risk Control Severity Likelihood Risk Level
3. Risk Control
Additional Risk Control Measure Action Officer Follow-up Date)
Reference
Document for Reference
Fatal
-VSCC -Staging / Scaffold -Use body harness and anchor at hard point -Isolate power supply with lock out / tag out --VSCC
Monitor workers to be equipped with proper PPE (body harness) -Counter check by multi-meter
-Live wire
Falling hazard
Bodily injury
-Qualified Signaler/Rigger -Valid inspection tag for lifting appliances -Barricade affected area
Lifting Supervisor
Supervisor
Page 1 of 2
1. Hazard Identification No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer (Follow-up Date)
Live wire
-Permit to work system and -Authorized person to conduct test -VSCC meeting
Page 2 of 2
Company Task
Group 2
Arasu, Joleen, Yen, Sheng, Thein, Manir Ram, Aye Min, Kelvin and Ramkumar
Approved By (Date)
13/09/2006
12/09/2009
1. Hazard Identification No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer Follow-up Date)
-Slip & fall due to slippery surface or -Trip & fall due to wires and cables on floor -Minor injury
-Keep the area clear / dry -Use cable hanger to hang cable -Use of PPE
Nil
Supervisor
-Ensure only trained & licensed forklift driver operates -Ensure the path of forklift is free from obstruction -Ensure not to overload -Secure the load -Ensure using of hand gloves -Ensure area is barricaded -Ensure lifting belt is certified and fit for use -Ensure trained signalmen is present
Supervisor
-Cut injury while pulling cable (minor injury) -Cable falling while lifting (minor injury)
Nil
Supervisor
Live voltage
-Highlight in VSCC meeting -Ensure skilled electrician is used -Lock out / Tag out at main switch board
Supervisor
Page 1 of 2
1. Hazard Identification No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer (Follow-up Date)
-Electric shock -Electrocution (fatal) -Cut injury during connection (minor injury) -Electric shock -Electrocution (fatal)
-Ensure that line test is carried out -Ensure using of hand gloves
Supervisor
Live voltage
-Ensure the switchboard & load bank are properly barricade -Ensure that physical check on the cable -Ensure load bank is shut off -Ensure generator is switched off & stopped -Ensure the main switch board is isolated
Supervisor
Live voltage
Supervisor
Page 2 of 2
Company Task
RISK ASSESSMENT FORM Conducted By (Date) ABC Group 3 Remove Alternator from Vessel and Overhaul in WS
Approved By (Date)
13/09/09
1. Hazard Identification No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer Follow-up Date)
- Unknown condition
-Entry permit for confine space -Gas check -Forced ventilation &general lighting -Housekeeping -Adequate PPE
-VSCC Meeting -Isolate the circuit breaker -Lock out & Tag Out -Use correct tool
Supervisor
-Spark or molten generated from gas cutting, may cause flame -Bodily injury/ fatal -Hit by falling object -Bodily injury / fatal
Supervisor
Falling object
-Trained rigger / signalmen -Check SWL & condition of wire sling or lifting belt -Use bucket container to lift from onboard to shore
Supervisor
Page 1 of 2
1. Hazard Identification No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer (Follow-up Date)
Moving vehicle
-Ensure proper lashing -Use low bed trailer for over site alternator -Keep road clear of obstruction
Supervisor
-PPE -Proper tools -Correct WPs -Avoid/minimize hand contact and over extension
Supervisor
Chemical cleaning
-Burn -Allergic
Supervisor
8 9
Baking Testing
Train personnel using the hot / oven room -Trained personnel -Test protocol
2 5
2 1
Supervisor Supervisor
Page 2 of 2
Company Task
Group 4
Group 4
Approved By (Date)
1. Hazard Identification No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer Follow-up Date)
-Highlight in VSCC -PPE (eye protection, hand gloves) -Continuous ventilation -Temporary light and ventilation -Display warning sign
MSDS
Electric hazard
Finger injury
-PPE (hand gloves) -Calibrated and tested equipment -Skilled electrician -Rubber Mat
Electric hazard
Finger injury
Page 1 of 2
1. Hazard Identification No. Task Step Hazard Possible Accident/ Ill Health & Personsat-risk
3. Risk Control Additional Risk Control Measure Action Officer (Follow-up Date)
(Steps before this step) -Sign boards -Barricade -Insulation mat -Standby FFA -PPE -Skilled electrician -SWP checklist -Skilled electrician
Short circuit
Page 2 of 2
Company Task
Group 5
Approved By (Date)
1. Hazard Identification No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer Follow-up Date)
-Lack of O2
-Asphyxiation
-Entry permit -Force ventilation -General lighting -Lifeline rope -Body harness/ safety belt
Supervisor
-Falling hazards
-Body injury
Electric Shock
Electrocution Fatality
-Workers briefed during Take 5 -Work highlighted in VSCC -Isolate power supply -LOTO
Hotwork
Burns Fatality
Work at height
Falling hazard
Fractures Fatality
-Workers briefed -Work highlighted in VSCC -Permit to work -Proper PPE -Proper tool -Fire watchman -Workers briefed -Work highlighted in VSCC -Permit to work -Safety harness
Page 1 of 1
Company Task
Group 6
Group 6 (13/09/2006)
Approved By (Date)
13/09/2006
13/09/2009
1. Hazard Identification No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer Follow-up Date)
Identify the location of the whole loop according to the one-line diagram and P&ID layout drawing
-Electrical shock
-Tag-Out and Lock-Out all the equipments relate to this loop -PPE, -Check the staging OK -Tag and use harness -Apply entry permit and use ventfan -Tag-Out and Lock-Out power supply unit for the panel -PPE -Use proper tool
Supervisor Officer
Visual check the grounding cable and cleaning for the panel
Electrical shock
Supervisor Officer
Disconnect all the cables to do the continuous check and merger test
Electrical shock
-PPE -Tag-Out and Lock-Out power supply unit for the panel -Make sure use proper tools and the tools all in good condition -Line check by skilled electrician
Supervisor Officer
Page 1 of 2
1. Hazard Identification No. Task Step Hazard Possible Accident/ Ill Health & Personsat-risk
3. Risk Control Additional Risk Control Measure Action Officer (Follow-up Date)
Connect back all the cables and make sure its exactly following the connection diagram
Electrical shock
-PPE -Tag-Out and Lock-Out power supply unit for the panel - Ensure all termination must be tightened. -Out-going must be secured -Line check by skilled electrician
Supervisor Officer
Power On
Electrical shock
-Put warning symbol of energized -First quickly ON-OFF one or two times
Supervisor Officer
Page 2 of 2
Company Task
Group 7
Group 7 (13/09/06)
Approved By (Date)
13/09/09
1. Hazard Identification No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer Follow-up Date)
Cleaning of switchboard
-Respirator
Supervisor
MSDS
-HSE Manual -Electrocution 5 1 M -Temporary earthing of Bus Bar Barricade & display warning sign Supervisor
Live terminal
Electrocution
-Isolate external source -LOTO external source --Use proper tool/ measuring device -Rudder mat -Deploy skilled electrician --Deploy skilled electrician -Do it at night (silent hour) --Use proper tool/ measuring device -Rubber Mat -LOTO
Electrocution
Supervisor
Electrocution
Supervisor
Power up
Electrocution
-VSCC meeting -Permit to work -Isolate all outgoing breaker -LOTO at breaker
Supervisor
Page 1 of 1
Company Task
Group 8
13/09/06
Approved By (Date)
12/09/09
1. Hazard Identification No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer Follow-up Date)
-Greasy/Oily floor
-Housekeeping
Isolation of power
-Electrocution
Supervisor
Ergonomics
Supervisor
-Height -Ergonomics
-Harness to wear and anchor at strong point -Ladder/Staging to be provided with OK tags
Termination
Supervisor
Page 1 of 1
Company Task
Approved By (Date)
11/09/09
No.
Task Step
3. Risk Control Additional Risk Action Officer Control Measure Follow-up Date)
Severity
Likelihood
Risk Level
Live wire
-VSCC & Production meeting -Isolate power -LOTO system -Supply of temp lighting -Ensure only skill electrician operate at MSB -Warning sign boards -Rubber mat -PPE esp; hand gloves -Dust Mask -Proper tools
Supervisor
Cleaning breaker and tightening bolt and nut (air blow and hand cleaning)
Supervisor
Check breakers
Supervisor
Live conductors
Electric shock
-Gloves -Ensure megger discharge to earth -Use proper tool -Rubber mat -Deploy Skilled electrician
Supervisor
Page 1 of 2
No.
Task Step
3. Risk Control Additional Risk Action Officer Control Measure (Follow-up Date)
Severity
Likelihood
Risk Level
Live wire
Electric shock
-Ensure main cable properly terminated -Make sure all the tolls remove from MSB -Isolate all outgoing breaker -LOTO breaker
Supervisor
Page 2 of 2
Company Task
Group 10
Group 10
Replacement of Batteries in Emergency Generator Room 13/09/06 by Group 10 Next Review Date 15/09/9
Approved By (Date)
1. Hazard Identification No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
3. Risk Control Additional Risk Control Measure Action Officer Follow-up Date)
Access the location of the emergency generator room (Location Identification) Switch off the battery charger and check the cable
Falling / Tripping
Bodily injury
Torchlight
Supervisor
-PPE -Rubber glove -Correct tools -VSCC Meeting -Deploy skilled electrician -Prevent tool from falling onto the battery -Cover the battery with wooden plank -PPE -Insulation of the tools -Face mask -Proper tools
Supervisor
Bodily injury
Disconnect the link and cable with a correct size spanner (Correct tools) Take out the battery from the battery box manually and clean the box
Improper tools
Hand injury
Supervisor
Manual lifting
-Require two persons to lift -Correct posture -PPE -Manual lifting procedure
Supervisor
Page 1 of 2
1. Hazard Identification No. Task Step Hazard Possible Accident/ Ill Health & Personsat-risk
3. Risk Control Additional Risk Control Measure Action Officer (Follow-up Date)
Manual lifting
Back injury
- Require two persons to lift -Correct posture -PPE -Manual lifting procedure
Supervisor
Live terminal
-Electric shock
Supervisor
Page 2 of 2