Common Queries pertaining to MSEDCL INFRA II scheme. While scrutinizing Infra II schemes certain common observation is found: 1.

Annexure-I:Existing Transformation Capacity and Lines/cables at various voltage levels Existing values in Annexure XIII-A-R should match with these quantities. 2. Annexure-II: Statement showing Maximum demand, Connected Load kVA, Voltage Regulation in Existing System 1. Remarks for % VR greater than -9% to + 6% are to be mentioned in the last column. 2. Conductor Type and no of runs in case of UG feeder is to be mention and corresponding Thermal rating in Amps is to be checked 3. For calculating % VR of existing system, separate calculation sheet is to be attached and values from separate sheet is to be linked in this sheet, % VR at horizon is to be calculated considering the load growth factor.( Refer Alibaug Dn DPR) 3. Annexure-IV Existing Distribution Transformer Analysis (As on 31/03/2010) 1.In case of DTC transformer overloaded (75 % above) what will be line of action, same is to be bring out under DPR, weather same is incorporate under New Infra or any other scheme. 4. Annexure-V:Details of equipements required for replacement/renovation & addition in the substation 1. Consolidated Details of equipments required for replacement / renovation & addition in the substation including total MVA added for Power and Distribution transformers are to be filled up from Annexure XIII_A_R. 2. Maintain the accuracy of quantities while filling up this annexure. 5. Annexure-VII(b):Table Of Transmission Capacities Existing And Proposed After Modification In The Scheme 1. In the Load reshuffling column, if load is bifurcated from the existing feeder then, load in KVA(Col. O) is to be tak en as (-ve) and the feeder on which this load is diverted, load in KVA(Col. O) is to be considered as (+ve)..and mention under which is Scheme is propose ( New Infra or Any other scheme) 2. Total of Connected load under col. O should be Zero. (Same is to be verified for all DPR) 3. VR is to be calculated on the base of Load reshuffling ;( Refer Alibaug DPR) 6.Annexure-VII(b):Table Of Transmission Capacities Existing And Proposed After Modification In The Scheme 1. In the remark column proposed substation capacity (MVA) is to be mentioned for overloaded sub stations.( Which is not observed in many DPR , same to be mention) 7. Annexure-VIII(a)-(b): Sub-Transmission / Primary Distribution Feeder Analysis- Energy Losses ( T & D ) 1. Under no investment & With Investment option, energy losses are to be calculated from the following formula: Avg. Energy loss in feeder in (Mus) = (0.105*L*R*P^2*LLF) (2*LDF*DF^2*10^6) Note: Under No Investment LLF as taken 0.408 and Under Investment LLF taken as 0.208 (Ideally LLF should be same under no investment & With Investment option)..Same is need to be justify. 2. Under Investment, KVA projection is to be checked considering the diversion of load

8. Annexure-IX(A)(B) :Energy Losses In Transformers 1. No of power transformer under no investment & with Investment option is to be checked (Addition / deletion is not proper) 2. No of Dist. transformer under no investment & with Investment option is to be checked (Addition / deletion is not proper) 9.Annexure-X(A)(B):Summary Statement Of Total Energy Losses (MUs) 1.LT Line loss of Div is to entered as per actual. . 2.Non Technical loss is to be checked 10.Annexure-XI :Sub-Transmission / Primary Distribution Feeder AnalysisAdditional Units available for sale. 1.Additional Energy sale with Investment option for year 2012-13 to 14-15 is to be worked out according to the load growth. 2. Load Growth of existing where no Investment is proposed, is to be calculate and value shall be same for under no investment & With Investment option, 3.In case of load reshuffle: Addl sale under No Investment shall be as per Without Modification Demand in KVA and corresponding projected growth , however Addl sale under Investment shall be as per With Modification Demand in KVA (as per diverted KVA projection)..Same is to be verify for all DPRs 11. Annexure-XII :Statement of Additional Sales & Reduction in Losses with Proposed Scheme 1. Some of DPR have ve Addl Sale and some of DPR have ve Comm. Loss, same is to be verify. 12. IRR Sheet 1. Sr No II B: In some DPR tech Loss is multiply by 10 of value of value obtain under Annexure XII, same is to be justify 13 Annexure-XIII AR 1. Proposed qty of DTC, Power transformer is to be match with Annexure V and Annexure IX AB 2. Ensure that civil cost is added in the cost of the project. Same is not verify under Annexure XIII AR and Annexure XIIIAR Addl Sheet 3.No of proposed meter is high where as no of proposed DTCs are low 4.Proposed HT LT Lines seems to be substantial compare to qty of proposed DTC 5,Civil Cost found different w.r.to additional sheet of Annexure XIII AR 14. Annexure-XII-B INVESTMENT OUTLAY RELATED TO BENEFITS GAINED 1. Ensure that Grand total (A&B) matches to Annexure XII-A-R grand total. 15. Annexure-XIV:Benefits Achived in Infra Plan -I and Projected Benefits due to Infra Plan-II 1.Link the values of Commercial / Technical losses and Sales from Annexure B and DTC failure rate from Annexure D is to be verify and should be match with Chapter Sheets. 2. SAIFI, SAIDI and CAIDI values for year forecast for the horizon year is found deteriorated (same is to verify) 16. Format A 1. Check the Additional Load Capacity planned

17. Format B 1 Energy Sale is to be checked as per load growth, as well as Technical loss and commercial loss is to be verify and same is to be mention as under DPR calculation 18. Format C 1. All the parameter is to be match with summary sheet of Chapters 19.CBA Analysis 1.Ensure the project cost and Sale energy Common Chapter Points 1.Summary sheet is to be verify same is to be as per enclosed Annexure I to XIV

You might also like