CHECK LIST FOR STRUCTURES AT NELLORE WATER SUPPLY IMPROVEMENT SCHEME

SL.NO TYPE OF STRUCTURES CONTRACTOR NAME DETAILS OF BALANCE WORK


Rolling Shutter Painting Finishing (patch) work for Monorail (fixed) 1 Pump House at NTS Glass fixing in one pannel of one window Area Leveling outside of Pump House Cover Slab to be placed over Chamber Handing Over to Client All Works are completed Handing Over to Client Area Leveling outside of Pump House Handing Over to Client Partition wall to be constructed upto Roof slab Partition wall Plastering Entrance Doors to be fixed (1.2 X 2.1 Mtrs) Inside Doors to be fixed Type - 1 (0.9 X 2.1 Mtrs) Inside Doors to be fixed Type - 2 (0.75 X 2.1 Mtrs) Windows to be fixed (1.2 X 1.5 Mtrs) Ventilator to be fixed (0.6 X 0.45 Mtrs) Toilet Arrangement Sanitary fixing (Water Closet) Wash Basin Soak pit & Septic Tank Electrical fitting arrangement Outside Painting with Water Proof Cement Paint Inside painting OBD Cealing painting with Destemper Soil filling & Area Leveling Handing Over to Client Completed Handing Over to Client Flooring Works to be done Entrance Doors to be fixed (1.2 X 2.1 Mtrs) Inside Doors to be fixed Type - 1 (0.9 X 2.1 Mtrs) Inside Doors to be fixed Type - 2 (0.75 X 2.1 Mtrs) Windows to be fixed (1.2 X 1.5 Mtrs) Ventilator to be fixed (0.6 X 0.45 Mtrs) Steps to be provided Toilet Arrangement Sanitary fixing (Water Closet) Wash Basin Soak pit & Septic Tank Electrical fitting arrangement Outside Painting with Water Proof Cement Paint Inside painting OBD Cealing painting with Destemper Soil filling & Area Leveling Parapet Wall - Brick Work Parapet Wall - Plastering Handing Over to Client Plastering Works to be done Flooring Works to be done Entrance Doors to be fixed (1.2 X 2.1 Mtrs) Inside Doors to be fixed Type - 1 (0.9 X 2.1 Mtrs) Inside Doors to be fixed Type - 2 (0.75 X 2.1 Mtrs) Windows to be fixed (1.2 X 1.5 Mtrs) Ventilator to be fixed (0.6 X 0.45 Mtrs) Steps to be provided Extra Reinforcement Rods to be Cutting at roof slab Toilet Arrangement Sanitary fixing (Water Closet) Wash Basin Electrical fitting arrangement Outside Painting with Water Proof Cement Paint Inside painting OBD Cealing painting with Destemper Soil filling & Area Leveling Handing Over to Client

UNIT
Nos Job Nos Cum Nos Job Job Cum Job Sqm Sqm Nos Nos Nos Nos Nos Nos Nos Nos Job Sqm Sqm Sqm Cum Job Job Sqm Nos Nos Nos Nos Nos Job Nos Nos Nos Job Sqm Sqm Sqm Cum Sqm Sqm Job Sqm Sqm Nos Nos Nos Nos Nos Job Job Nos Nos Job Sqm Sqm Sqm Job

QTY
1 1 1 108 3 1 1 174.27 1 11.7 23.4 2 4 2 10 2 2 2 1 1 221 232 112 75.6 1 1 43.63 2 4 2 10 2 1 2 2 1 1 221 232 112 75.6 25.2 50.4 1 252 43.63 2 4 2 10 2 1 1 2 2 1 221 232 112 75.6 1

TARGET DATE

2 3

Intake Structure at NTS Raw Water Sump at NTS

NTS - Staff Quarters (Twin Type)

Intake cum Pump House at SS Tank

21.02.2012

Murali Murali

01.03.2012 01.03.2012

WTP - Staff Quarters - 1 (Twin Type)

Local Painter Local Painter Local Painter

28.02.2012 28.02.2012 28.02.2012 28.02.2012 28.02.2012 14.02.2012 17.02.2012

Local Mason Local Mason

Murali Murali 7 WTP - Staff Quarters - 2 (Twin Type)

01.03.2012 01.03.2012 28.02.2012

02.03.2012 02.03.2012 02.03.2012

SL.NO

TYPE OF STRUCTURES

CONTRACTOR NAME
Murali Murali

DETAILS OF BALANCE WORK


Rolling Shutter Cover to be Provided Aluminium Grill fixing for window (1.2 X 1.2 Mtrs) MS Pipe Mesh Plastering (WTP to Clear Water Sump) Ventilators to be fixed (0.5 X 0.5 Mtr) Electrical Panal Rubber Matts Name Boards Repainting Names Rewriting Open type Shed Arrangement for Chlorine Cylinder 600mm dia NP3 Pipes Laying from Sludge Chamber to low level canel Handing Over to Client Cover for pumps to be provided Bridge Re painting Handing Over to Client Glass fixing in door Pannel at Ground floor & 1st floor Ventilators to be fixed (0.5 X 0.5 Mtr) Grouting nozzles to be removed from bottom of wash water tank at 1st floor Parapet Wall - Brick Work Parapet Wall - Plastering Parapet Wall - Painting Level Markings to Filter beds Leakages in Valves & Gauge arrangements V Notch & Indicator providing to Aerator Name Boards Repainting Names Rewriting Handing Over to Client Electrical Switch Board Plug point to be replaced (2 Nos)

UNIT
Nos Nos Sqm Nos Nos Job Job Job Rmt Job Nos Job Job Nos Nos Nos Sqm Sqm Sqm Job Job Nos Nos Nos Job Nos Nos Nos Nos Nos Cum Job Cum Job Job Job Job Sqm Job Job Sqm Job Job

QTY
2 3 20.72 8 2 1 1 1 250 1 1 1 1 3 12 1 45 90 90 1 1 4 1 1 1 1 5 13 1 1 19300 1 112 1 1 1 1 265 1 1 265 1 1

TARGET DATE
08.02.2012

1 8

Pump House at NTS WTP - Clear Water Sump Cum Pump House

Murali Local Painter Local Painter

12.02.2012 08.20.2012 08.20.2012

WTP - CLF Murali Murali

16.02.2012

Local Mason Local Mason 10 WTP - Filter House

Local Painter Local Painter

09.02.2012 09.02.2012

11

WTP - Chemical House

Murali Narayanan Local Painter Local Painter

Ventilators to be fixed (0.5 X 0.5 Mtr) Precast slab to be placed (from Areator to Flash mixer) Name Boards Repainting Names Rewriting All WTP Structures Soil filling & Area Leveling (Chemical House, Filter House & Clear Water Sump cum Pump House) Handing Over to Client

18.02.2012 05.02.2012 08.20.2012 09.02.2012

12 13 14 15 16 17 18 19

OHBR at Podalakur Road - 1000 KL ELSR at MG Nagar - 750 KL ELSR at Military Colony - 1000 KL ELSR at Magunta Layout - 1000 KL ELSR at Swatantra Park - 750 KL ELSR at Ranganayagula Peta - 750 KL ELSR at Krishna Avenue - 750 KL ELSR at Padarpalli - 1000 KL

Indra Construction Soil filling & Area Leveling Handing Over to Client Handing Over to Client Handing Over to Client Handing Over to Client Sree Con Construction Side Wall Secound Paint Painting Handing Over to Client Handing Over to Client Sree Con Construction Side Wall Secound Paint Painting Handing Over to Client Handing Over to Client

STRUCTURES YET TO BE STARTED AT NELLORE WATER SUPPLY IMPROVEMENT SCHEME


SL.NO
1 2 Improvement to Existing NTS Channel at Kondlapudi Providing Compound wall to alround the WTP

STRUCTURES

UNIT
Nos Rmt

QTY
1 890

TARGET DATE

Geo-membarine Works

Rmt

600

URES AT NELLORE WATER SUPPLY IMPROVEMENT SCHEME


SPECIFIC REMARKS
Monorail Projection Outside the wall to be cut

Precast Slab Casted Completed

Completed

In Progress

SPECIFIC REMARKS
Completed

In Progress Completed Completed

Completed Completed

Completed Completed Completed

ARTED AT NELLORE WATER SUPPLY IMPROVEMENT SCHEME


REMARKS
Yet to Start Water Occupaied at WTP Area. Compound Wall Yet to be start 100 Mtrs material Procurred. Balance 500 Mtrs material MRN Raised