You are on page 1of 11

PROJECT: TITLE: Doc No.

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT DISTRIBUTION PANEL LLB-EI-PS-003 FOR ELECTRICAL POWER

TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL

Note: New issue shall supersedes all previous, which shall be cancelled immediately. Prepared by Rev. Reason for issue Date A Issue for quotation 21 Nov 11 Name LT. Long Date 21 Nov 11 Name NX Truong Date Name Checked by Approved by

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

TABLE OF CONTENTS APPENDIX 1: LIST OF CIRCUIT BREAKER FOR ELECTRICAL POWER DISTRIBUTION PANEL . 3 1. INTRODUCTION ..................................................................................................................................... 5 2. SCOPE OF SUPPLY ................................................................................................................................. 5 3. APPLICABLE CODES AND STANDARD ............................................................................................ 6 4. ELECTRICAL REQUIREMENTS ........................................................................................................... 6 5. MATERIAL AND PAINTING ................................................................................................................. 7 6. SPARE PARTS ......................................................................................................................................... 7 7. DELIVERY ............................................................................................................................................... 8 8. PACKING, MARKING AND TRANSPORTATIONS ............................................................................ 8 9. INSPECTION AND TESTING................................................................................................................. 8 10. INSTALLATION SUPERVISION AND COMMISSIONING ................................................................ 8 11. WARRANTY ............................................................................................................................................ 9 12. DOCUMENTS AND CERTIFICATES .................................................................................................... 9 If Any ............................................................................................................................................................. 10 If Any ............................................................................................................................................................. 11 If Any ............................................................................................................................................................. 11

Page 2 of 11

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

APPENDIX 1: LIST OF CIRCUIT BREAKER FOR ELECTRICAL POWER DISTRIBUTION PANEL

Item I 1 2 3 4 II 1 2 3 4 III 1 2 3 4 IV 1 2 3 V 1 2 VI 1 2 3 4 5 6 7 8 VII 1 2 3 4

Description 440VAC Machinery Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP 440VAC Laundry & Workshop Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP 440VAC Galley Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP 440VAC Electrical Workshop Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP 440VAC Vent. Fan Power DP Outgoing feeder for 440VAC Power DP Outgoing feeder for 440VAC Power DP 220 VAC Main Switchboard Outgoing feeder for 220VAC Main SWBD Outgoing feeder for 220VAC Main SWBD Outgoing feeder for 220VAC Main SWBD Outgoing feeder for 220VAC Main SWBD Outgoing feeder for 220VAC Main SWBD Outgoing feeder for 220VAC Main SWBD Outgoing feeder for 220VAC Main SWBD Outgoing feeder for 220VAC Main SWBD 220 VAC Emergency Switchboard Change over contact (Automatic) Outgoing feeder for 220VAC Emergency SWBD Outgoing feeder for 220VAC Emergency SWBD Outgoing feeder for 220VAC Emergency SWBD

Circuit Breaker MCCB 100AF/15A MCCB 100AF/20A MCCB 100AF/30A MCCB 100AF/16A MCCB 100AF/40A MCCB 100AF/30A MCCB 100AF/15A MCCB 100AF/20A MCCB 100AF/50A MCCB 100AF/40A MCCB 100AF/15A MCCB 100AF/20A MCCB 63AF/40A MCCB 63AF/16A MCCB 63AF/20A MCCB 63AF/16A MCCB 100AF/15A MCB 63AF/20A MCB 63AF/32A MCB 63AF/16A MCB 63AF/40A MCB 63AF/50A DS 400AF MCCB 125AF/125A MCCB 63AF/63A TBA MCCB 63AF/10A MCCB 63AF/20A MCCB 63AF/32A

Quantit y 7 3 1 1 4 5 2 1 2 2 3 2 3 3 1 1 8 3 3 2 1 2 2 1 5 1 7 4 1

Remar k

Page 3 of 11

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

5 VIII 1 2 3 IX 1 2 X 1 2 XI 1 2 XII 1 2 3 4 5 6 7 XIII

Outgoing feeder for 220VAC Emergency SWBD 220VAC Lighting DP (LP-1) Outgoing feeder for 220VAC LP Outgoing feeder for 220VAC LP Outgoing feeder for 220VAC LP 220VAC Lighting DP (LP-2) Outgoing feeder for 220VAC LP Outgoing feeder for 220VAC LP 220VAC Lighting DP (LP-3) Outgoing feeder for 220VAC LP Outgoing feeder for 220VAC LP 220VAC Distribution Panel (DP-5) Outgoing feeder for 220VAC DP-5 Outgoing feeder for 220VAC DP-5 220VAC Distribution Panel (DP-6) Outgoing feeder for 220VAC DP-6 Outgoing feeder for 220VAC DP-6 Outgoing feeder for 220VAC DP-6 Outgoing feeder for 220VAC DP-6 Outgoing feeder for 220VAC DP-6 Outgoing feeder for 220VAC DP-6 Outgoing feeder for 220VAC DP-6 220VAC Distribution Panel (DP-7) Outgoing feeder for 220VAC DP-7 Outgoing feeder for 220VAC DP-7 Outgoing feeder for 220VAC DP-7 220VAC Emergency Lighting Panel (ELP-1) Outgoing feeder for 220VAC ELP 220VAC Emergency Lighting Panel (ELP-2) Outgoing feeder for 220VAC ELP 220VAC Nautical aids DP (N-1) Outgoing feeder for 220VAC DP N-1 Outgoing feeder for 220VAC DP N-1 Outgoing feeder for 220VAC DP N-1 220VAC Radio power DP (R-1) Outgoing feeder for 220VAC DP R-1 Outgoing feeder for 220VAC DP R-1

MCCB 63AF/16A MCB 50AF/10A MCB 50AF/15A MCB 50AF/20A MCB 50AF/10A MCB 50AF/20A MCB 50AF/10A MCB 50AF/20A MCB 63AF/10A MCB 63AF/20A MCB 63AF/10A MCB 63AF/20A MCB 63AF/32A MCB 63AF/16A MCB 63AF/40A MCB 50AF/10A MCB 50AF/20A MCB 63AF/10A MCB 63AF/20A MCB 63AF/32A MCB 50AF/10A MCB 50AF/10A MCB 63AF/10A MCB 63AF/16A MCB 63AF/20A MCB 63AF/10A MCB 63AF/32A

2 9 4 4 17 4 11 2 5 3 8 9 3 1 1 2 2 1 3 5 8 6 14 5 1 6 1

1 2 3
XIV 1 XV 1 XVI 1 2 3 XVII 1 2

Page 4 of 11

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

1. INTRODUCTION This document describes the minimum requirement that are call for manufacture to supply Electrical Power Distribution Panels which are to be installed on the JACK-UP VESSEL (LIFTBOAT) being built by Petrovietnam Marine Shipyard JSC (hereinafter referred to as COMPANY) at Vungtau, Vietnam. CONTRACTOR is responsible to propose and supply necessary components and equipment for optimal solution. Definition PVMS : PETROVIETNAM MARINE SHIPYARD JOINT-STOCK COMPANY MCCB : Molded Case Circuit Breaker MCB P.E : Miniature Circuit Breaker : Protective Earth

SWBD : Switchboard

2. SCOPE OF SUPPLY The CONTRACTOR shall supply the following items below, but not limited to the extent specified in the relevant specification and this document:
SN 1 2 3 4 5 6 7 8 9 10 Items 440VAC Machinery power DP 440VAC Laundry & Workshop power DP 440VAC Electrical workshop power DP 440VAC Galley power DP 440VAC Vent. Fan power DP 220 VAC Main switchboard 220 VAC Emergency switchboard 220VAC lighting DP (LP-1) 220VAC lighting DP (LP-2) 220VAC lighting DP (LP-3) Description 440VAC, 3phase, 60Hz, 3 bus bar, rated 125AF/100A 440VAC, 3phase, 60Hz, 3 bus bar, rated160AF/160A 440VAC, 3phase, 60Hz, 3 bus bar, rated 125AF/100A 440VAC, 3phase, 60Hz, 3 bus bar, rated 160AF/160A 440VAC, 3phase, 60Hz, 3 bus bar, rated 125AF/20A 220VAC, 3phase, 60Hz, 3 bus bar, rated 400AF 220VAC, 3phase, 60Hz, 3 bus bar, c/w change over contactor (automatic) rated 400AF 220VAC, 3phase, 60Hz, 3 bus bar, rated 63AF/50A 220VAC, 3phase, 60Hz, 3 bus bar, rated 63AF/50A 220VAC, 3phase, 60Hz, 3 bus bar, rated Qty 1 1 1 1 1 1 1 1 1 1

Page 5 of 11

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

SN 11 12 13

Items 220VAC Distribution panel (DP-5) 220VAC Distribution panel (DP-6) 220VAC Distribution panel (DP-7)

Description 63AF/32A 220VAC, 3phase, 60Hz, 3 bus bar, rated 63AF/40A 220VAC, 3phase, 60Hz, 3 bus bar, rated 125AF/125A 220VAC, 3phase, 60Hz, 3 bus bar, rated 63AF/63A

Qty 1 1 1

Commissioning Spare parts Delivery Packing, making and transportation Supply Inspection and testing Supply Warranty Supply the Documents and Certificates

3. APPLICABLE CODES AND STANDARD - ABS: American Bureau of Shipping - Rules for Steel Vessels and Rules for Mobile Offshore Drilling Units. Latest Edition. - IEC standards for other products - IMO MODU Code 1989 (A.6499 (6)). - NEC Standard USA Products - IEEE 45 Recommended practices USA products - API RP500 (Hazardous Area) - NFPA 496 for Hazardous Area Pressurization CONTRACTOR shall follow the latest edition of the standards listed. In case of conflict between various codes or between codes and this specification, CONTRACTOR shall highlight to the purchaser for decision & approval. 4. ELECTRICAL REQUIREMENTS Distribution panels are to incorporate the following design considerations:

Page 6 of 11

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

Panel boards are to be dead front, circuit breaker type. Doors for panels are to be provided with combination catch and lock. Circuit breakers are to be selected and arranged to isolate any fault in the system vital operation of the vessel, with the smallest possible interruption of the system. Each circuit breaker is to have sufficient interrupting capacity to safely interrupt the maximum fault current obtainable at its point of application. Circuit breakers used in panels are to be commercial marine molded case type, quick-make, quick-break, with inverse tripping characteristics on overloads and instantaneous trip device for short circuit. All distribution boards should be of the bus bar connection type so as to facilitate future add-ons. All shall be supplied with a main isolation switch, allowing for safe local isolation for maintenance purposes. Builder shall supply and install suitable quantities 220VAC feeder panels for lighting, socket outlets, small galley equipment and other small devices. The Builder shall be responsible for the small power and lighting layout in all areas, including the accommodation. The exact model and style shall be approved by Owner. Distribution panels shall be 3 phase, 3 wire, 440VAC and 220VAC with ground bar kits, all circuits to have balanced loads, wherever possible. Circuits shall be grouped with lighting and receptacle outlets. 5. MATERIAL AND PAINTING All electrical equipment shall be designed and constructed of at least flame retardant materials. Unless otherwise specified materials used for distribution board shall be manufactures standard. 6. The distribution board and accessories material shall be suitable for the offshore environment.

SPARE PARTS CONTRACTOR shall supply spare part list for first two (02) years operation.

Page 7 of 11

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

7.

DELIVERY TBA

8.

PACKING, MARKING AND TRANSPORTATIONS TBA

9. -

INSPECTION AND TESTING An Inspection and Test Plan (ITP) shall be provided by the CONTRACTOR for review & approval by the COMPANY or COMPANYs Authorized Representative. Inspection and witness of tests by the CONTRACTOR / THIRD PARTY shall be in accordance with the approved ITP. The COMPANY shall have the right to check the CONTRACTORs workshop/factory during all stages of manufacturing, inspection, testing, preservation and packing. The CONTRACTOR shall provide sufficient advance notice (minimum 30 days) to the COMPANY prior to each inspection or test. Testing of the equipments shall be performed at the CONTRACTORs Factory and at the COMPANYs fabrication yard. The COMPANY will require a Factory Acceptance Test (FAT) which will be attended by COMPANY and COMPANYs Authorized Representative and also by the third party Certify Authority. INSTALLATION SUPERVISION AND COMMISSIONING The CONTRACTOR shall be responsible to support for installation and commissioning of the equipment including but not limited to: To do the interface, connections between the well control equipments and other systems (such as structural foundations, electrical system, switchboard, alarm system and etc). CONTRACTOR shall provide installation and commissioning procedures for Company approval at least six (6) weeks before installation and commissioning starting. CONTRACTOR shall provide accessories (such as shims, bolts, nuts, washers etc) to do these works. CONTRACTOR shall provide certify engineers/technicians at least five (5) years experience in installation and commissioning to support the COMPANY to install and do commissioning. The duration time for installation and commissioning shall Page 8 of 11

10.

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

be estimated 15 man days following the installation and commissioning procedures which are approved by Company. The commissioning for all transformers should be estimated finished on October 2011. If there is any changing in the schedule, the COMPANY will notify to the CONTRACTOR at least one (1) month before the schedule day.

The COMPANY shall supply manpower, means of transportation and hoisting equipment at COMPANYs yard to do the installation and commissioning works under instruction and supervision by engineers of the CONTRACTOR. 11. WARRANTY Eighteen (18) Month Warranty shall be provided by CONTRACTOR from the date of finished commissioning and ready for operation. The Warranty as a minimum shall cover all defects in and/or from: engineering, design, manufacturing, materials, corrosion protection application/ performance and preparation for shipment and packing. 12. DOCUMENTS AND CERTIFICATES CONTRACTOR shall submit the following documents and certificates to COMPANY as below, all documents and certificates thats to be submitted shall be written in English.
For Review & Comment (Note 1) Final Issue (Note 3)

Dat Description Code A CONTROL DOCUMENTS Bidders Technical A01 Proposal Technical specification A02 summary A03 Equipment Catalogue A04 Reference List A05 List of Document A06 List of MTO List of Drawings & A07 Schedule to release B - DRAWINGS

With Quotation

For Approval (Note 2)

Remarks

1(E) 1(E) 1(E)

Page 9 of 11

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

B01 Specification Data Sheet Arrangement Drawing for B02 VFD and LER rooms Dimension Outline B03 Drawing B04 Foundation Drawing B05 Layout Drawing Electrical interconnect B06 Drawing B07 Instrumental Drawing Electrical and B08 Instrumental One Line Diagram B09 Part Assembly Drawing Name Plate Detail and B10 List Engineering Analysis and B11 Design Document Short Circuit Calculation B12 and discrimination study Coordination protection B13 study B14 Ground fault calculation B15 Motor starting study B16 Heat dissipation report

1(E)

C HANDLING, PACKAGING AND PRESERVATION Packing and Preservation C01 Procedures C02 Handling Procedures Special Protection C03 Procedures D MANUFACTURING PROCEDURES Testing and Inspection D01 Procedures Inspection and Testing D02 Plan (ITP) D03 Painting Procedures D04 Manufacturing Schedule

If Any

If Any

Page 10 of 11

PROJECT: TITLE: Doc No.:

JACK-UP VESSEL (LIFTBOAT) TECHNICAL REQUIREMENT FOR ELECTRICAL POWER DISTRIBUTION PANEL LLB-EI-PS-003 Rev. A

E INSTALLATION, COMMISSIONING, OPERATION, MAINTENANCE, SPARE,TRAINING Installation and E01 Commissioning Procedures Installation & Operating E02 and Maintenance Manual Part List & Spare Part list E03 (First 2 years operation) E04 Warranty Documents E05 Special Tools List F QA / QC DOCUMENTATIONS F01 F02 F03 F04 F05 F06 F07 Mill Test Certificates Certificates of Origin Certificates of Quality All Class Certificates FAT report (Factory Acceptance Test) Material Certificates Calibration Certificates If Any If Any If Any

Notes: 1. Note 1: CONTRACTOR shall submit the documents and certificates for COMPANY Reviews and comments within 01 weeks after the day contract signing. 2. Note 2: CONTRACTOR shall submit the documents and certificates for COMPANY Approval within 06 weeks after the day contract signing. 3. Note 3: CONTRACTOR shall submit the Final documents and certificates to COMPANY within 02 weeks before shipment. 4. O: Original Print Copy with stamps, authorize signatures 5. D: Duplicates from the Original
6. E: CD-ROM Copy 7. H: Hard Document. The hard document shall be original document or duplicate copy,

the detailed shall negotiate with CONTRACTOR as common sense.

Page 11 of 11