You are on page 1of 176

SOUTHERN OUTER BANGKOK RING ROAD PROJECT

SOBRR Contract No. 1

Erection of Precast Segmental Viaduct: Span-by-Span Method using Overhead Erection Gantry
Padipat Chaemmangkang, Ph.D.

SOBRR CONTRACT NO. 1


1 1

Precast Segments Fabrication


Match Casting The successful use of precast segmental construction for bridges relies on the ease with which the contractor can erect and fix the segments and this in turn relies heavily on the quality of the joint between them. To ensure the best possible fit between the segments the concept of Match Casting was developed whereby each segment is cast directly against its neighbor.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


2

Precast Segments Fabrication


Short Line Match Casting Principle: Method of casting in which the form is stationary while the segments move from the casting position to the match casting position and then to the storage.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


3

Precast Segments Fabrication


Short Line Match Casting (Continued)
- much less space needed compared to long line (approximately three times the segment length) - the entire process is centralized - horizontal and vertical curves and twisting of the structure are obtained by adjusting the conjugate segment - the forms are reusable for other projects Disadvantages: - to obtain the desired structural configuration, the match cast segment must be accurately positioned. This requires a special geometry control software, the right setup in the casting yard and very skilled surveyors.
VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Advantages:

SOBRR CONTRACT NO. 1


4

Precast Segments Fabrication


Short Line Match Casting (Continued)

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


5

Precast Segments Fabrication


Long Line Match Casting Principle: Method of casting segments on a long casting bed which makes up the soffit of a complete cantilever or span between field closure pours. One or more formwork units move along this line. The formwork units are guided by the preset soffit.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


6

Precast Segments Fabrication


Long Line Match Casting (Continued)
Advantages: - geometry control is done when constructing the soffit which simplifies the geometry control and segment production - after stripping the forms, it is not necessary to take away the segments immediately

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


7

Precast Segments Fabrication


Long Line Match Casting (Continued)
Disadvantages: - requires a large area (minimum length is normally slightly more than half the length of the longest span) - requires a firm foundation which will not settle or deflect under the weight of the segments - if the structure is curved, the long line has to be designed curved also - since the form is mobile, the equipment for casting has to move from place to place - the soffit cannot be reused for a new project - the soffit can be made for one casting curve only
VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


8

Precast Segments Fabrication


Long Line Match Casting

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


9

Precast Segments Fabrication


SOBRR Project Contract No. 1 Casting Yard

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


10

Precast Segments Fabrication


SOBRR Project Contract No. 1 Casting Yard

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


11

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


12

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


13

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


14

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


15

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


16

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


17

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


18

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


19

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


20

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR CONTRACT NO. 1


21

Precast Segments Fabrication


Geometry Control The effect of match casting the precast segments is to ensure an exact fit between segments on erection, as a result of this there is very little scope to adjust the bridge deck alignment on site and consequently it is important to ensure that each segment is accurately cast and more importantly that any errors which occur during casting are picked up and rectified. This is generally of much greater importance for short line casting than for long line.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


22

Precast Segments Fabrication


Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


23

Precast Segments Fabrication


Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


24

Precast Segments Fabrication


Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


25

Precast Segments Fabrication


Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


26

Precast Segments Fabrication


Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


27

Precast Segments Fabrication


Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


28

Precast Segments Fabrication


Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


29

Erection of Precast Segments


There are two principal methods of precast segmental erection: the Free Cantilever Method (FCM) and the Span-by-Span Method. Within these, there are 3 basic techniques for handling and placing the segments: - by Crane - by Lifting Frame - by Launching Girder (Erection Gantry)

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


30

Span-by-Span Method
This system is based on the principle of assembling an entire span onto a temporary support, stressing the segments together to form the single span deck and then placing the span on its permanent supports. Advantages: - Relatively fast - Simple geometry control - Spans are stable once placed less temporary works Disadvantages: - Limited span and structure size due to need for full span gantry or falsework.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


31

Span-by-Span Method
Underslung Erection Gantry This system is based on the use of two or more trusses spanning between the piers on which the segments are placed and the span assembled. The segment placing is generally carried out by a crane or lifting frame.
- Relatively stable support of segments during assembly - Relatively cheap equipment for supporting and moving segments Disadvantages: - Not good on curved structure - Limited by ground conditions below requires min. clearance below structure Advantages:

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

SOBRR CONTRACT NO. 1


32

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

SOBRR CONTRACT NO. 1


33

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

SOBRR CONTRACT NO. 1


34

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

SOBRR CONTRACT NO. 1


35

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

SOBRR CONTRACT NO. 1


36

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

SOBRR CONTRACT NO. 1


37

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

SOBRR CONTRACT NO. 1


38

Span-by-Span Method
Overhead Erection Gantry In this system the individual segments are hung from an overhead gantry. Once the segments are all in their approximate position they are then aligned and connected (glue/unglue) together to form the final span, which is then lowered onto its bearings.
- Easy to launch and move - Can cope with curved structure - Not limited by ground conditions Disadvantages: - Segments are relatively unstable in temporary condition - Adjustment and gluing of segments is more difficult
VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Advantages:

SOBRR CONTRACT NO. 1


39

GANTRY TECHNICAL SPECIFICATION

SOBRR CONTRACT NO. 1


40

DESIGN CRITERIA Viaduct Perimeters Maximum Design Span Length (Erection) 45m Maximum Design Span length (Launching) 54m Maximum Design Span Weight 1000T Maximum Design Segment Weight 85T Maximum Numbers of Segment per Span 15nos.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


41

Erection Gantry Technical Specification

DESIGN CRITERIA (CONT.) Viaduct Alignment Maximum Design Gradient 4.5% Maximum Design Crossfall 6% Minimum Radius in Plan 210m

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


42

Erection Gantry Technical Specification

MT ELEMENT NO.

LENGTH AT TOP CHORD (MM) 9681 8180 10080 8300 10200 10200

LENGTH AT BOTTOM CHORD (MM) 7740 8180 10080 10200 8300 10200

WEIGHT OF MT ELEMENT (TONS) 8.89 8.95 12.12 25.97 21.11 22.11

11 & 1 10 & 2 9&3 8&4 7&5 6

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


43

Erection Gantry Main Truss (MT) 2 Trusses

UCB

Function: Lifting of Precast Segments and Relocating LCB

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


44

Erection Gantry Upper Cross Beam (UCB) 1 No.

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


45

Erection Gantry Upper Cross Beam (UCB)

ULRS1 (2 Nos.)

ULRS2 (2 Nos.)

Function: Support Structure for MT allowing Longitidinal and Transverse Movements as well as Rotational of MT

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


46

Erection Gantry Universal Lower Roller Support (ULRS) 4 Nos.

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


47

Erection Gantry Universal Lower Roller Support (ULRS)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


48

Erection Gantry Universal Lower Roller Support (ULRS)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


49

Erection Gantry Universal Lower Roller Support (ULRS)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


50

Erection Gantry Universal Lower Roller Support (ULRS)

LCB1 (1 No.)

LCB2 (1 No.)

Function: Transverse Load Spreader from MT to LCB Support Leg (SL)

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


51

Erection Gantry Lower Cross Beam (LCB) 2 Nos.

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


52

Erection Gantry Lower Cross Beam (LCB)

SL (2 Nos.)

SL (2 Nos.)

SL (2 Nos.)

Function: Support Structure for LCB

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


53

Erection Gantry LCB Support Leg (SL) 6 Nos.

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


54

Erection Gantry LCB Support Leg (SL)

RSL (1 No.)

FSL (1 No.)

Function: Temporary Support to MT during some Stages of Operation

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


55

Erection Gantry Front and Rear Support Leg (FSL/RSL) 2 Nos.

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


56

Erection Gantry Rear Support Leg (RSL)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


57

Erection Gantry Front Support Leg (FSL)

SPB

Function: Precast Segment Erection and Relocation of LCB/SL

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


58

Erection Gantry Lifting Spreader Beam (SPB) 1 No.

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


59

Erection Gantry Lifting Spreader Beam (SPB)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


60

Erection Gantry Lifting Spreader Beam (SPB)

CB (1 No.)

CB Storage Area

Function: Individual Precast Segment Attachment to both SPB during Lifting and SBS during Erection

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


61

Erection Gantry Connection Beam (CB) 24 Nos.

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


62

Erection Gantry Connection Beam (Standard & Deviator Segments)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


63

Erection Gantry Connection Beam (Pier Segments)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


64

Erection Gantry Connection Beam (Pier Segments)

SBS

Function: Individual Precast Segment Suspension to MT during Erection

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


65

Erection Gantry Suspension Bar System (SBS) 17 Nos.

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


66

Erection Gantry Suspension Bar System (SBS)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


67

Erection Gantry Suspension Bar System (SBS)

PB

PB

Function: Support for FSL Operation and Provision of Longitudinal Stability of Front LCB/SL (LCB2 for Launching Direction Shown)

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


68

Erection Gantry Pier Bracket (PB)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


69

Erection Gantry Pier Bracket (PB)

CPU for MT (Element 9)

CPU for UCB

Chain Spanner Wheel for MT (Element 3)

Function: Longitudinal Movement of MT and UCB

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


70

Erection Gantry Chain Pulling Units (CPU)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


71

Erection Gantry Chain Pulling Units (CPU) Upper Cross Beam

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


72

Erection Gantry Chain Pulling Units (CPU) MT (Element 9)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


73

Erection Gantry Chain Pulling Units (CPU) MT (Element 9)

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 : 12 June 2006

SOBRR CONTRACT NO. 1


74

Erection Gantry Overall Structure

GANTRY OPERATIONS

75

SOBRR CONTRACT NO. 1

Erection Gantry Operations 1 ASSEMBLY 2 ERECTION OPERATION 3 LAUNCHING OPERATION

SOBRR CONTRACT NO. 1


76

ASSEMBLY

77

SOBRR CONTRACT NO. 1

Stage 1

SOBRR CONTRACT NO. 1


78

Erection Gantry Assembly 45M Span

SOBRR CONTRACT NO. 1


79

Erection Gantry Assembly 45M Span

Stage 2

SOBRR CONTRACT NO. 1


80

Erection Gantry Assembly 45M Span

Stage 3

SOBRR CONTRACT NO. 1


81

Erection Gantry Assembly 45M Span

SOBRR CONTRACT NO. 1


82

Erection Gantry Assembly 45M Span

Stage 4

SOBRR CONTRACT NO. 1


83

Erection Gantry Assembly 45M Span

SOBRR CONTRACT NO. 1


84

Erection Gantry Assembly 45M Span

Stage 5

SOBRR CONTRACT NO. 1


85

Erection Gantry Assembly 45M Span

SOBRR CONTRACT NO. 1


86

Erection Gantry Assembly 45M Span

Stage 6

SOBRR CONTRACT NO. 1


87

Erection Gantry Assembly 45M Span

SOBRR CONTRACT NO. 1


88

Erection Gantry Assembly 45M Span

Stage 7

SOBRR CONTRACT NO. 1


89

Erection Gantry Assembly 45M Span

SOBRR CONTRACT NO. 1


90

Erection Gantry Assembly 45M Span

Stage 8

SOBRR CONTRACT NO. 1


91

Erection Gantry Assembly 45M Span

Stage 9

SOBRR CONTRACT NO. 1


92

Erection Gantry Assembly 45M Span

SOBRR CONTRACT NO. 1


93

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


94

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


95

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


96

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


97

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


98

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


99

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


100

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


101

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


102

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


103

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


104

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


105

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


106

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


107

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


108

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


109

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


110

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


111

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


112

Erection Gantry Assembly 45M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


113

Erection Gantry Assembly 45M Span

Erection Gantry

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 : 12 June 2006

SOBRR CONTRACT NO. 1


114

ERECTION AND LAUNCHING OPERATION

SOBRR CONTRACT NO. 1


115

Averaged Erection Cycle: Single Decks - 3 shifts per span Twin Decks - 5 shifts per span Erection cycles include launching of the Erection Gantry, erection of all segments, installation and stressing of required PT, and load transferring of span weight.

SOBRR CONTRACT NO. 1


116

Erection and Launching Operations Erection Cycle

Single Decks 3 shifts per span: - Span erection (max. 15 segments): 1 shift - PT installation, stressing and load transferring onto span jacks: 1 shift - Launching of the Gantry into next span: 1 shift Twin Decks - 5 shifts per span: - Span erection (max. 15 segments): 2 shifts - PT installation, stressing and load transferring onto span jacks: 2 shifts - Launching of the Gantry into next span: 1 shift

SOBRR CONTRACT NO. 1


117

Erection and Launching Operations Erection Cycle

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


118

Erection and Launching Operations Erection Cycle

Stage 1: upon completion of Span P(N-1) / P(N) two bounds -Store CB at respective position shown. -MT CPU fixity at pier P(N). -Brace LCB2 against previously erected viaduct. -Load transfer MT support from jack shim to crane wheel of ULRS

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


119

Erection and Launching Operations 45M Span

Stage 2 -Deactivate LCB2 prop to PB. -Move MT transversely to centerline of twin deck. -Align MT for launching. -Move UCB to centerline of pier P(N-1). -Launch MT forward until C.G. is over pier P(N); Keep UCB at centerline of pier P(N-1). -Engage MT fixity pin to ULRS2. -Activate FSL.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


120

Erection and Launching Operations 45M Span

Stage 3 -Activate RSL to free ULRS1. -Deactivate LCB; Lift LCB1 off SL using UCB. -Move and position ULRS1/LCB1 near mid-span of P(N-1) / P(N). -Rotate LCB 1 by 90.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


121

Erection and Launching Operations 45M Span

Stage 4 -Lift up and position LCB1 between MT. -Move ULRS1/LCB1 to mid-span of P(N) / P(N+1). -Lower down LCB1.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


122

Erection and Launching Operations 45M Span

Stage 5 -Rotate LCB1 by 90 and move ULRS1/LCB1 to pier P(N+1). -Engage LCB1 onto SL.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


123

Erection and Launching Operations 45M Span

Stage 6 -Deactivate FSL and load transfer MT support to ULRS. -Move FSL away and install LCB1 prop to PB. -Release LCB1 temporary prop. -Deactivate RSL.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


124

Erection and Launching Operations 45M Span

Stage 7 -Disengage MT fixity from ULRS2. -Launch MT forward to erection position; Keep UCB at centerline of pier P(N+1).

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


125

Erection and Launching Operations 45M Span

Stage 8 -Move MT transversely to centerline of left / right bound. -Move in CB storage trailer and position between pier P(N-1) and P(N). -Launch MT backward until C.G. is over P(N); Keep UCB at centerline of pier P(N+1). -Engage MT fixity pin to ULRS2. -Activate RSL on single deck.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


126

Erection and Launching Operations 45M Span

Stage 9 -Move UCB to pier P(N-1); Disengage and lift SL to span between P(N) and P(N+1) to be lowered to ground. -Move UCB to pier P(N); Disengage and lift PB to span between P(N) and P(N+1) to be lowered to ground.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


127

Erection and Launching Operations 45M Span

Stage 10 -Move UCB to lift and park 6 nos. of CB onto CB storage trailer. -Keep 1 no. of CB (for pier segment) suspended on SPB and move UCB to centerline of pier P(N+1). -Deactivate RSL.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


128

Erection and Launching Operations 45M Span

Stage 11 -Disengage MT fixity from ULRS2. -Launch MT forward to erection position; Keep UCB at centerline of pier P(N+1). -Load transfer MT support from crane wheel to jack shim. -Transfer MT CPU fixity from pier P(N) to P(N+1). -Gantry is ready for span P(N) / P(N+1) construction.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


129

Erection and Launching Operations 45M Span

Stage 12 -Rotate and fix RSL. -Deliver segment over previously erected deck. -Pick up segments using UCB/SPB/CB. -Move and hang segments to suspension bars on MT. -Stagger segments as shown to allow for last segment rotation.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


130

Erection and Launching Operations 45M Span

Stage 13 -Rearrange and joint segments using UCB/SPB/CB from pier P(N) to about final level. -Install longitudinal PT required. -Stress longitudinal PT required at pier P(N+1) and lower ULRS jacks in stages to load transfer span weight from Gantry to piers.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


131

Erection and Launching Operations 45M Span

Stage 14 -Release and remove suspension bars from CB and store in MT. -Brace LCB2 against placed viaduct. -Store CB using UCB on placed viaduct. -Load transfer MT support from jack shim to crane wheels. -Repeat stages 8 to 14 for adjacent viaduct.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

SOBRR CONTRACT NO. 1


132

Erection and Launching Operations 45M Span

ERECTION GANTRY KINEMATICS

FOR 49.5M-54M-49.5M SPAN

SOBRR CONTRACT NO. 1


133

Stage 1 - Span erection for Span 45-2/45-3 completed.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


134

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 3 -Deactivate FSL/RSL -Launch MT to position shown -Erect Span 45-3/45-4

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


135

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 4 -Erect Span on Pier 45-4 as shown

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


136

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 7 -Deactivate RSL -Launch MT to position shown -Erect Span 45-4/45-5

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


137

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 8 -Erect Span on Pier 45-5 as shown

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


138

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 11 -Deactivate RSL -Launch MT to position shown -Erect Span 45-5/45-6

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


139

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 1 -Shorten FSL module during MT launching into Span 45-19/45-20 -Erect Span 45-19/45-20

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


140

Erection Gantry Kinematics 40M-70M-40M Span

Stage 2 -Launch MT to position shown -Activate FSL/RSL

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


141

Erection Gantry Kinematics 40M-70M-40M Span

Stage 3 -Move ULRS1/LCB1 to position shown with special support shims on deck

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


142

Erection Gantry Kinematics 40M-70M-40M Span

Stage 4 -Deactivate FSL/RSL -Launch MT to position shown

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


143

Erection Gantry Kinematics 40M-70M-40M Span

Stage 5 -Launch MT to position shown -Activate FSL/RSL

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


144

Erection Gantry Kinematics 40M-70M-40M Span

Stage 6 -Move ULRS2/LCB2 to position shown with special support shims on deck

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


145

Erection Gantry Kinematics 40M-70M-40M Span

Stage 7 -Deactivate FSL/RSL -Launch MT to position shown

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


146

Erection Gantry Kinematics 40M-70M-40M Span

Stage 8 -Launch MT to position shown -Activate FSL/RSL

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


147

Erection Gantry Kinematics 40M-70M-40M Span

Stage 9 -Move ULRS1/LCB1 to Pier 46-2

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


148

Erection Gantry Kinematics 40M-70M-40M Span

Stage 10 -Deactivate FSL/RSL -Launch MT to position shown

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


149

Erection Gantry Kinematics 40M-70M-40M Span

Stage 11 -Launch MT to position shown -Activate FSL/RSL

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


150

Erection Gantry Kinematics 40M-70M-40M Span

Stage 12 -Move ULRS2/LCB2 to Pier 46-3

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


151

Erection Gantry Kinematics 40M-70M-40M Span

Stage 13 -Remove and lower PB from Pier 46-2 -Gantry is ready to erect Span 46-2/46-3

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

SOBRR CONTRACT NO. 1


152

Erection Gantry Kinematics 40M-70M-40M Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


153

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


154

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


155

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


156

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


157

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


158

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


159

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


160

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


161

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


162

Erection and Stressing Works First Span

Span-by-Span Method

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


163

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


164

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


165

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


166

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


167

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


168

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


169

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


170

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


171

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


172

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


173

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


174

Erection and Stressing Works First Span

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

SOBRR CONTRACT NO. 1


175

Erection and Stressing Works First Span