Company Profile

TOTAL SOLUTION FOR PRE-ENGINEERED STEEL STRUCTURES

TRI VIET
STEEL BUILDINGS CO., LTD

COMPANY PROFILE

www.trivietsteel.com.vn

2012

Company Profile

INDEX

INTRODUCTION Letter of Introduction General information PERSONNEL ORGANIZATION Organization structure Organizational chart List of technical staff DESIGN CAPACITY Technical design capacity Design standards PRODUCTION CAPACITY Factory introduce Production capacity Production process CONSTRUCTION CAPACITY The stages of construction Construction schedule Construction safety EQUIPMENT MANUFACTURING LIST OF TYPICAL PROJECTS TRI VIET STEEL BUILDINGS SOME TYPICAL PROJECTS PARTNERS OF TRI VIET STEEL BUILDINGS

2-4 2 3 4-7 4 5 6-7 8-9 8 9 10 - 21 10 - 12 13 14 - 21 22 26 22 - 25 26 26 27 - 28 29 - 30 31 - 47 48

Company Profile

I. INTRODUCTION

Letter of introduction
Tri Viet Steel Buildings is a professional company operating in pre-engineered building branch in Viet Nam. With the tendency to be a leading supplier of pre-engineered steel structure, not only fabricating and supplying steel structure products, but also supplying Total solution for preengineered buildings for the customers with all-in services: Design Production Installation. Tri Viet Steel Buildings is always confident and proud of our capability in order to bring the best solutions to the customers, meet the capacity with low expenses. In order to meet high technical demands of scale projects, Tri Viet Steel Buildings continuosly improves specialized and managed capabilities, and applies ISO 9001:2008 quality management system to our company. In addition, our company has built up working culture with advantage environment, use talented persons, promote the independence and creativeness of each staff with the aim of making our company grow up and develop firmly. Tri Viet Steel Buildings has pre-engineered steel structure factory with the area of 20,000 m , synchronously equiped with production line of automatic machines with design capacity of 1,5000 tons / month. With professional and devoted engineers, we support and supply free the service Consulting, supplying design solutions and making quotation to the customers. Although the projects are conducting in any phases, we always support and supply the best solutions to you. Contacting with us, you are supported rapidly and free. Being a leading supplier of pre-engineered steel structure in Viet Nam with the best quality and service is Tri Viet Steel Buildings mission. We commit to build and develop our company with the quality first and the customers satisfaction is a sole aim. Thanks a lots for your attention to Tri Viet Steel Buildings products. We hope to cooperate and serve you. Best regards,
2

Company Profile

GENERAL INFORMATION
TRI VIET STEEL BUILDINGS CO.,LTD
Mr Nguyen Phi Thuong Company Director

Name Represented by Address:

: :

Head Office & Factory: 4B Khanh Binh, Tan Uyen, Binh Duong Province Tel : (+84.650) 365.3080 Fax : (+84.650) 365.3079 Ho Chi Minh City Office: 386/15 Le Van Sy, W. 14, Dist. 3, HCMC Tel : (+84.8) 3526.0218 Fax : (+84.8) 3526.0219

Email Website Business license

: info@trivietsteel.com.vn : www.trivietsteel.com.vn : No. 4602001062 by the Department of Planning and Investment of Binh Duong province in 2004. : 3700570307 : 040 0101 00 44978 in Maritime Bank Ho Chi Minh Branch

Tax Account Number

Main business activities: Fabrication, business, installation frame of pre-engineered steel buildings. Fabrication, business mechanics Civil, industrial construction.

Company Profile

PERSONNEL ORGANIZATION
ORGANIZATION STRUCTURE
Company director Mr Nguyen Phi Thuong

Head of department functions


Factory : Mr Nguyen Tri Thuc Factory Manager Mr U Chee Chow Technical Manager Technical Dept. : Mr. Tran Minh Trung-Technical Manager Dept.

Project Management : Mr. L Vn Minh Project Management Dept. Material Dept. Accounting Dept. Sales Dept. HR Dept. Tender Dept. : Ms. Nguyen Thi Anh Thuyen Material Dept. : Mr. Tran Ngoc Thu Account Manager Dept. : Mr. Vo Quang Vinh Sales Manager Dept. : Ms. Le Thi Hong Van HR Manager Dept. : Mr. Trinh Phi Tung Tender Manager Dept.

The staff situation of the company


The administrative staff The technical staff Plant Employees Execution of Employees : 30 persons : 40 persons : 120 persons : 50 persons

Company Profile

ORGANIZATIONAL CHART

ORGNIZATIONAL CHART OF FACTORY

Company Profile

LIST OF TECHNICAL STAFF


NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 NAME Nguyen Phi Thuong Nguyen Tri Thuc U Chee Chow Le Van Minh Tran Minh Trung Trinh Phi Tung Vo Quang Vinh Vu Thai Son Duong Minh Luan Vu Ba Thang Nguyen Chau Hoa Luu Van Chau Cao Anh Hung Le Hoang Duy Hung Do Anh Tuan Nguyen Quoc Toan Bui Quang Tung Tran Anh Duy Bui Dong Duong Nguyen Ngoc Phat Nguyen Ngoc Thanh Huynh Vu Bao Nguyen Van Thang Dang Quang Thuy Nguyen Van Thi Huynh Kim Nhat Nguyen Van Phuc Nguyen Trung Nguyen Nguyen Tien Muoi Vu Huu Binh Le Van Duoc Le Van Vang Pham Van Binh EDUCATION University University University University University University University University University University University University University University University University College University University University University College University University University University University College College University College University University EXPERIENCE 14 Years 15 Years 17 Years 9 Years 8 Years 11 Years 10 Years 9 Years 5 Years 5 Years 6 Years 6 Years 5 Years 6 Years 5 Years 9 Years 7 Years 5 Years 5 Years 2 Years 3 Years 2 Years 2 Years 3 Years 5 Years 3 Years 3 Years 9 Years 7 Years 8 Years 11 Years 9 Years 9 Years PROFESSIONAL POSITION General Director Factory Manager Factory Technical Manager Construct Building Technical Manager Tender Manager Sales Manager Project Excutive Project Excutive Project Excutive Construct Building Construct Building Construct Building Construct Building Construct Building Safety Dept. Safety Dept. Production Designer Production Designer Production Designer Production Designer Production Designer Architectural Designer Architectural Designer Contruction Estimater Contruction Estimater Contruction Estimater Production Engineer Production Engineer Production Engineer Production Engineer Production Engineer Production Engineer

Company Profile

NO. 34 35 36 37 38 39 40 41 43 44 45 46

NAME Nguyen Van Hung Ha Ninh Giang Tran Thanh Son Tran Duy Tinh Tran Dinh Ha Bui Van Cang Vu Trong Hoang Ngo Thi Thanh Nguyen Truong Quoc Tuan Nguyen Thi Thu Doan Ngoc Tra Nguyen Phan Ha Nhi Nguyen Viet Truong

EDUCATION University University College College College University University University University University University University University

EXPERIENCE 8 Years 7 Years 6 Years 6 Years 6 Years 8 Years 8 Years 8 Years 8 Years 4 Years 3 Years 3 Years 3 Years

PROFESSIONAL POSITION Production Engineer Maintenance Maintenance Maintenance Maintenance Quality Control Sales Excutive Sales Excutive Sales Excutive Tender officer Tender officer Tender officer Tender officer

Company Profile

DESIGN CAPACITY
TECHNICAL DESIGN CAPACITY
Architectural design drawings: Provide solutions to design, analyze and guide the investors' optimal choice. After reaching plan, complete the design of architecture, structure, materials and intentions expressed in the drawings, elevation, section, perspective.

Design production drawings: Once the design drawings are approved, the structure of the works will be shown on detailed drawings and clearly coded numbers.

Design estimate: Calculate extract the amount, for the tenders, construction, completion, issues arising in volume.

Company Profile

DESIGN STANDARDS
INTERNATIONAL STANDARD
AWS D1.1 Edition 2006 AISC. 2005 American Institute of Steel Constructions MBMA. 2002 Metal Building System Manu Quality Manual

VIET NAM STANDARD


TCXD VN 338 : 2005 - Steel Structures - Design standards TCVN 3223 : 1994 - Welding electrodes for carbon steel and low alloy steel. TCVN 1916 : 1995 - Bolts, screws, nuts and screws implanted. Technical Requirements

CHECK LAB
TPI NDT MPI Third Party Inspection Non-Destructive Testing Magnetic Particle Inspection

Company Profile

10

PRODUCTION CAPACITY
FACTORY INTRODUCE

A. HUMAN RESOURCES.
In factory, we are currently working about 150 people, including about 100 production workers and maintenance (including heads), four engineers in charge of production for each project and the rest is protected, accounting, personnel indirectly, forklift driver, truck,... Production workers are divided into groups according to their functions as: the cut, the accessories, the drill, the shape, the welding, assembly of accessories, the finishing, the rub abrasive cleaning, spraying the ball, the paint, ... Each team managed by team leaders and direct executive producer.

Company Profile

11

B. SAFETY EQUIPMENT .
All staff and workers at the plant is equipped with helmets, protective clothing, steel tip shoes, gloves fully under the provisions of protection for mechanical engineering. Also, depending on the requirements for the specialized groups such as cutting, welding, drilling, painting, ... that workers are equipped with facilities like: Black glass and special glass for workers welding in charge welding; glass for workers in charge of sanding abrasive cleaning components, spray paint, masks for workers spraying;

C. PLANT GENERAL ARRANGEMENT.


The total area is near the campus 20.000m plants, of which the production desk is near 13.000m . The area around the dump finished products occupy 3.000m2. Regional offices, cafeterias, parking, storage of supplies and accessories are arranged separated from the main production areas to ensure their utility.
2 2

Company Profile

12

The plant is arranged in a closed production lines, facilitate the import of raw materials into areas cut and finished product inventory, including the use by special-use vehicles is 15 meters long meeting.

Paint area is arranged at the end of production areas, has covered area is 1.500m2, completed structures will be painted in the paint shop to dry 1-2 days, then will be carried out beach area warehouse contained and continues to be completely dried in the sun, make sure the factory coating layer is completely dry, limiting the scratches and paint miles.

All divisions, departments and regional plants are arranged according to synchronization, there is close monitoring in 24/24 of the Division of Protection.

Company Profile

13

PRODUCTION CAPACITY
Production capacity of the Tri Viet Steel Buildings capacity 1.000 tons per month, can lift up to 1.500 tons of products per month

Blasting is used as the standard SA 2.0 or 2.5 depending on design requirements. After spray painting will be finished soon lining paint stick better and to avoid rust. Overall production at the factory engineers supervise production and QC staffs cut by drawing shop drawing and sticking by the standards required by the original design documents. The design drawings, shop drawing, testing records, production records are being set up and monitored throughout the production process. After the end of production, all records are stored and marked by customer code to facilitate the management.

Company Profile

14

PRODUCTION PROCESS

Checking dimensions, specification of materials before cutting

MATERIAL

Checking dimensions, straight after cutting

CUTTING

Checking dimensions, straight after assembling

H-BEAM ASSEMBLING

Checking weld height, quality and testing

WELDING

Checking angle, straight, plane surface

STRAIGHTENING

Checking after finished welding

FINISH WELDING

Checking cleaning of surface

SURFACE CLEANING & SHOT BLASTING

Checking thickness of paint-coat

PAINTING

CHECK & STORAGE

Company Profile

15

A. MATERIALS.
CHECKING SCOPE (1.500 x 6.000) mm 1 Length Width Thickness Width Thickness Width Thickness STANDARD Tolerance 0.2mm

NO.

MATERIALS

SPECIFICATION

Steel plate

Thickness: (4, 5, 6, 8, 10, 12, 14, 16, 18, 20,) mm Thickness: (1.5; 1.8; 2.0; 2.4; 2.5;) mm Width: 1.200 mm

Steel coil

Accurate

Sheet coil

Thickness: (0.35; 0.40; 0.45; 0.48; 0.53; 0.55) mm

Accurate

Figure 1: Steel Coil

Figure 2: Steel Plate

Figure 3: Sheet plate

Figure 4: Sheet Coil

Company Profile

16

B. CUTTING
Cutting follow the detail figure, dimension in approved shop drawings. 1. Machines:
Steel cutting maniche CNC: Equipment system software, the CNC cutting, drawing CSD, with the automatic, automatic programming, cutting simulation, cost calculation, cutting steel curved shape. CNC Cutting Machine: cutting system with 10 cutting heads are parallel, cut steel with thickness of 18mm, 20mm, 24mm, Hydraulic Cutting Machine: cutting steel as straight and oplique, maximum thickness is 16mm

Figure 5: CNC Cutting Machine

Figure 6: HYDRAULIC Cutting Machine

2. Performance:
Steel plate is accurately marked following detail drawing. Steel plate is moved to the position to cut by the crane, and only cut after checking the accurate position. Completed products after cutting are piled as predetermined position to prepare for shaped press.

3. Checking
Demension: length, width are accurate as detail demension of each product after cutting. The edge of steel plate has to be straight, even.

Company Profile

17

C. ASSEMBLING
1. Machines:
Vertical Assembling Machine by a hydraulic system presses one flange plate, one web plate welded automatically to make building components even and oblique. Horizontal Assembling Machine by two hydraulic systems presses 2 flange plate and one web plate welded automatically to make structural members even, oblique.

Figure 7: Hydraulic Assembling Machine

Figure 8: Hydraulic Assembling Machine

2. Performance:
Each flange and web are pressed by the crane. After welding to locate a face of flange, structural member is turned up to press and weld the remained flange. The building components are welded with the distance from 300 - 400 mm a position. The shaped building components are gatherd to weld area to prepare for continual weld period.

3. Checking:
Demension: length, width are accurate as detail demension of each structural member after shaping. The joints of flange and web are straight, flat, even weld line. Flange & web plate are perpendicular and equal together. The touch between flange and web is tight, the gap does not exceed 2mm.

Company Profile

18

D. WELDING
1. Machines:
Automatic welding machine: welded to wings anh abdomen, used for sodering the components are to equals and oblique. Automatic wheel weld machine: cling on the web of building components by magnetic force, permanent magnet and the wheels to weld building components equal, oblique and curved

Figure 9: Automatic Wheel Welding Machine

Figure 10: Automatic Welding Machine

2. Performance:
The building components are welded by automatic weld line. The building components after welding a face are turned up to weld other face until welding 4 faces completely. The welded building components are gatherd to mould area to prepare for straight mould period.

3. Checking:
Welding line has to be straight, evenly. Weld joints have to tight on the flange and web. Testing the height of weld line as design drawing and as the standards in Vietnam Standard of Steel Structure. The defects, damages must be found and repaired before transfering to next period.

Company Profile

19

E. STRAIGHTENING
1. Machines:
Vertical hydraulic mould machine used for vertical building components. Repairing, moulding beam flange is deformed after welding. Cross hydraulic mould machine used for vertical & curved building components. Repairing, moulding beam flange is deformed after welding.

Figure 11: Hydraulic Mould Machine 2. Performance:


Building components after continual weld, the flange is deformed because of temperature effect. Using mould machine mould procedure suitably based on curved or straight building components. Building components after moulding are gathered to completing area to complete weld period of sub-details, making hole

3. Checking:
The flange plate after moulding has to be straight, flat. Flange & web plate are perpendicular and equal together.

F. FINISHED WELDING:
1. Machines:
CO2 gas and wire weld machine: used for welding the small details such as stifferner, pate. Magnetic field driller, hydraulic hole bore machine are used to locate the holes on structural members.

2. Performance:
Building components after moulding are complted sub-detals such as: stifferner, purlin pate, braced beam, making holes of purlins, beam, Building components after completion.

3. Checking:
All details must be installed fully, following dimension and location.

Company Profile

20

G. SHOT BLASTING AND SURFACE CLEANING:


1. Machines:
Surface of building components is cleaned by a system of automatic shot blasting. Building components are in and out shot blasting by a automatic roller. Standard of cleaning surface is SA 2.0.

Figure 12: Cleaning Surface 2. Performance:


Figure 13: Shot Blasting Machine

Conducting the welding cinder, cutting cinder by the grinder. After completion, building components will be cleaned. Building components after grind are gathered to the area of cleaning surface by crane and move to the location of cleaning surface by the roller. Cleaning surface of structural members may be at the same time. The period of cleaning surface must be even, building components have to be cleaned all locations of surface. After cleaning surface, all building components are gathered to painting area to prepare for paiting period.

3. Checking:
Building components after cleaning surface must be clear, not be rust, Building components after cleaning surface must be paint a primer coat to prevent the oxidation making building components surface rust.

Figure 14: Product After Shot Blasting

Company Profile

21

H. PAINTING:
1. Machines:
Fang bolt steam-engine with the capacity of 50HP provides the steam to all paiting parts. The system of half-automatic paint maching. The machine to test thickness of electrical piant.

2. Performance:
Building components surface before painting must be dry. Paint each coat and overall paint. After each dried painting coat, testing thickness of paint before painting next coat.

3. Checking:
Period of waiting dried surface is 6 hours. Thickness of each coat of paint is as design drawing.

Figure 15: Completed Products

I. CHECKING AND STORAGE:


Building components after completed paint are tested one more before handing over warehouse deparment to gather to the storage for delivery to the building site.

Figure 16: Completed Products

Company Profile

22

CONSTRUCTION CAPACITY
THE STAGES OF CONSTRUCTION
1. Receiving and storage of construction materials.
The receipt of materials is strictly controlled, to avoid the maximum lack or excess of the materials in the construction. Preservation of materials ia a very important part to ensure supplies are not warped and scratched paint. Check the materials carefully prior to installation.

2. Installation of foundation bolts.


Tri Viet Steel Buildings to focus investment in equipment to installation of foundation bolts, this is the important part directly affecting the deployment and installation the rafter as well as quality of construction.

Company Profile

23

3. Erection of main frame.


As part of the main installation of pre-engineered steel buildings, to the coordination and ensure 100% accuracy on right angle, height, plane. The equipment such as: Truck cranes, forklifts, meter theodolite, laser projectors,are used throughout the installation process. The protective equipment safety to ensure the best, especially with the requirements of construction work on high.

Company Profile

24

4. Install roof religious.


The erection of the roff religion was conducted after the main frame erection complete and accrurate alignment, the bolts, tie bars have been closely tied. Roof to be installed and calibration very carefully, for ensure to quality and aesthetic of construction.

Company Profile

25

5. Install religious wall.


With the installation of the same religious roof, but a shorter length of aperture. Requires the good combination about installation of the wall with respect to building concrete.

6. Complete construction.
As the final work to complete the steel buildings, wich requires meticulous checking, precision made stages.

Company Profile

26

CONSTRUCTION SCHEDULE
Construction period: The close coordination between divisions, departments to ensure for the period of construction works completed. The plan to ensure progress: Employee monitoring construction schedule will be updated and reported regularly, there are plans for additional reserves to ensure the contract schedule.

CONSTRUCTION SAFETY
Safety Department was held with strict regulations on labor safety regulations for workers, have regulations to control from production to construction and installation. Equipment safety is the maximum investment, operation monitoring occupational safety and always updated regularly arranged throughout the building works.

Company Profile

27

EQUIPMENT MANUFACTURING
The plant facilities and equipment of factory Tri Viet Steel Buildings include the following:

NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

EQUIPMENT CNC Oxy-Gas Seamless 10 head Machine cut steel plate hydraulic 7.5m Machine cut steel plate hydraulic 2.5M. Automatic pressure forming machine and welding steel components combined engagement Automatic vending machines and presses the limits of structural steel combination Automatic arc welding port 1.000VA sink. Turtle semiautomatic arc welding sink. Gas welding machine welding wire used 500 VA. Straight bending machine auto components. Whip hand edge From drilling CNC beam drill head Steam machine screw 30 and 50 HP. Structure at the 3 tons, 5 tons, 8 tons Beam Cutting machine Punching machine code version.. Butt hole drilling machine. Blasting Machine Hand sanding grinding machines for professional use. Industrial paint spraying machine Paint thickness gauge Electronic Weighing 5 tons Machine 100 tons of furnace Machine unexpected holes Amada Cutting beams

QUATITY 1 1 1 1 1 4 10 20 1 2 2 1 2 12 1 2 1 1 15 6 1 1 1 3 1

Company Profile

28

Company Profile

29

EXPERIENCE THE IMPLEMENTATION OF THE STEEL BUILDINGS


AREA 2 (M ) 31,920 13,125 19,032 72,915 10,350 26,640 12,135 22,229 3,985 26,880 2,659 9,959 35,654 3,954 18,000 11,070 5,000 17,520 11,812 15,628 87,247 14,676 5,500 10,000 17,600 27,135 4,500 7,000 13,400 CONTRACT VALUE (VND) 7,722,922,000 13,150,000,000 30,900,100,000 17,799,560,000 6,634,000,000 9,723,600,000 2,935,977,000 10,197,000,000 2,402,700,000 8,457,478,000 5,549,000,000 3,866,000,000 13,429,000,000 7,389,000,000 8,395,000,000 3,949,000,000 3,620,000,000 6,576,000,000 5,698,000,000 15,750,000,000 42,968,000,000 11,000,000,000 4,600,000,000 7,342,000,000 14,417,000,000 15,128,000,000 2,570,000,000 4,680,000,000 8,670,000,000

NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

PROJECTS NAME OMEXEY Funiture Factory CHEMPACK-VINA Nylon- Factory FORMOSA- TAFFETA Factory GOLDEN FORTUNE Funiture Factory SON HA Factory JRD Motor Car Factory TOA VIET NAM Paint Factory HANG PHU Funiture Factory VIET NGU Frozen Processing Factory WORLDTEC VINA Factory TAN THUAN THANH Packing Factory GOLDEN PACIFIC Factory DONA STANDARD FOOTWEAR Factory PHUONG NAM Factory KINGJIM Factory CONNEEX-AIKO Factory MIJU VINA Factory CS WIND-TOWER Factory UNI PRESIDENT Factory KIM TIN MDF Factory MAPLETREE phase 2 Warehouse KIRIN ACECOOK Factory HA TIEN Cement Factory BACH TUYET Factory LIKSIN Factory MAPLETREE phase 1 Warehouse EVER-METRO Factory DONG HOA Factory HOA PHAT Factory

CUSTOMER TAIWAN KOREA TAIWAN TAIWAN VIETNAM MALAYSIA THAILAND TAIWAN VIETNAM KOREA VIETNAM TAIWAN HONGKONG VIETNAM JAPAN SINGAPORE KOREA KOREA TAIWAN VIETNAM SINGAPORE JAPAN VIETNAM VIETNAM VIETNAM SINGAPORE KOREA TAIWAN VIETNAM

YEAR 2004 2004 2005 2005 2005 2005 2005 2007 2007 2007 2007 2007 2007 2007 2007 2007 2008 2008 2008 2008 2008 2008 2008 2008 2009 2009 2009 2009 2009

Company Profile

30

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

HUNG CA Factory DAM PHU MY Port Factory HA NOI BEER Factory HUNG VUONG TAY NAM Factory TINH BIEN Supermaket TAN MAI Warehouse AN HUNG TUONG Factory MASSAN Factory PTSC VUNG TAU Warehouse ANG SON CEMENT Factory II TAN SON NHAT Airport BUON ME THUOT Airport KIM KHANG Factory QUYNH QUANG Factory ICHIBAN Workshop JIMMY FOOD Workshop AN THINH SG Workshop PARK CORP Warehouse FIRST SOLAR Factory DAI DONG TIEN Plastic Factory

VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM VIETNAM JAPAN VIETNAM VIETNAM VIETNAM USA VIETNAM

10,148 7,227 11,251 11,000 9,000 7,790 13,230 7.300 1.300 2.100 Tons 200 Tons 600 Tons 5.616 3.712 2.800 12.464 3.359 21.883 116.000 7.200

5,644,539,000 6,533,000,000 9,240,000,000 11,860,000,000 4,650,000,000 16,900,000,000 12,517,104,600 21.910.950.409 5.335.705.336 53.122.616.000 7.276.500.000 19.337.512.400 5.509.900.000 2,706,184,372 3,260,000,000 2,635,300,000 2,572,247,000 15,864,959,705 4,711,141,435 9,260,000,000

2009 2009 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2011 2011 2011 2011 2011 2011 2011 2011

Company Profile

31

TYPICAL PROJECTS
Some typical projects has executed and is executing for 2004 2012:
Area : 31.920 m . : Tan Uyen, Binh Duong.
2

OMEXEY FURNITURE FACTORY

Location

Area

: 18.960 m2

TAFETA FOMOSA FACTORY

Location : Nhon Trach IP, Dong Nai Province.

Company Profile

32

Area

: 13.125 m2

NYLON CHEMPACK-VINA FACTORY

Location : Tam Phuoc IP, Long Thanh, Dong Nai.

Area

: 25.500 m .

HIGH POINT WORKSHOP

Location : Tan Uyen, Binh Duong.

Company Profile

33

Area

: 15.628 m2

KIM TIN MDF FACTORY

Location : Phuoc Long, Binh Phuoc.

Area

: 26.640 m2

JRD OTO MANUFACTORY

Location: An My, Tuy An, Phu Yen Province.

Company Profile

34

Area

: 114.382 m2.

MAPLETREE VIETNAM WAREHOUSE

Location : VSIP II, Binh Duong.

Company Profile

35

Area

: 14.676 m2.

KIRIN-ACECOOK FACTORY

Location : My Phuoc II IP, Binh Duong.

Area

: 18.000 m .

KINGJIM FACTORY

Location : My Phuoc III IP, Binh Duong.

Company Profile

36

TOA PAINT VIET NAM FACTORY


Area : 12.135 m2. Location: Tan Dong Hiep A IP, Binh Duong Province.

Area

: 17,600 m .

LIKSIN PACKAGE WORKSHOP

Location : Duc Hoa, Long An.

Company Profile

37

Area : 13,400 m2.

HOA PHAT BINH DUONG STEEL FACTORY

Location : Song Than IP, Binh Duong Province.

BACH TUYET PAINT FACTORY


Area : 10.000 m2. Location: Hiep Phuoc IP, Nha Be, HCM City.

Company Profile

38

Area

: 10,148 m2.

HUNG CA COLD STORE - FACTORY

Location: Sa Dec, Dong Thap Province.

Area

: 11,812 m .

UNI PRESIDENT FACTORY

Location : Binh Duong Province.

Company Profile

39

Area

: 11,251 m2.

HA NOI BEER FACTORY (CARLSBERG BEER) Location : Phu My, Ba Ria - Vung Tau.

Area

: 5.000 m .

MIJU VINA FACTORY

Location : Nhon Trach IP, Dong Nai Province.

Company Profile

40

Area

: 11,000 m2.

HUNG VUONG TAY NAM WAREHOUSE

Location : Sa Dec, Dong Thap Province.

Area

: 10,350 m .

SON HA OFFICE - FACTORY

Location : Bien Hoa City, Dong Nai Province.

Company Profile

41

Area

: 7.300 m2.

MASAN FACTORY

Location: Di An, Binh Duong Province.

TAN SON NHAT AIRPORT


BILLBOARD & SHELVES

Workload Location

: 200 Tons. : Ho Chi Minh City.

Company Profile

42

Workload : 200 Tons.

ANG SON II CEMENT FACTORY

Location : Van Ninh, Quang Ninh, Quang Binh Province.

Area: 1.300 m2

PTSC VUNG TAU WAREHOUSE

Location : Vung Tau City.

Company Profile

43

BUON MA THUOT AIRPORT PASSENGER SHELTERS

Workload: 600 Tons Location : Buon Ma Thuot City, Daklak Province.

Area:

3.712 m

QUYNH QUANG WORKSHOP

Location : Ho Chi Minh City.

Company Profile

44

TAY NINH KUO YUEN BATING FACTORY


Area : 13. 469 m Location : Tay Ninh Province.
2

FIRST SOLAR FACTORY


Area: 116. 000 m Location : Cu Chi, Ho Chi Minh City.
2

Company Profile

45

Area

: 5.616 m2.

KIM KHANG STEEL FACTORY

Location : Long An Province.

DAI DONG TIEN PLASTIC FACTORY


Area: 7.200 m Location : Nhon Trach IP, Dong Nai Province.
2

Company Profile

46

Area

: 21.883 m

PARK CORP FACTORY

Location

: Tra Vinh Province

Area

: 3.976 m . : Ho Chi Minh City.

MERCEDES BENZ FACTORY

Location

Company Profile

47

Some other projects:

An Hung Tuong Factory

Cargill Workshop

Dona Footwear Factory

Dong Hoa Workshop

Trade Center Nam Ky Khoi Nghia

Goldens Workshop

Golden Fotuner Factory

Ichiban Workshop

Le Merian

Sunrise City

Nguyen Kim Supermarket

Phuong Nam Pulp Mills Tower

Plus Garage

Tay Ninh for Lease Workshop

Park Corp Tien Giang Tower

Pepsi Co. Workshop

Huada Factory

Hung Dong Plastic Factory

Company Profile

48

PARTNERS.

Company Profile

49

TRI VIET STEEL BUILDINGS CO., LTD


Head office & Factory 4B, Khanh Binh, Tan Uyen, Binh Duong Province, Vietnam. Tel: (+84.650) 365 3080 - Fax: (+84.650) 365 3079 Representative Office 386/15 Le Van Sy St, W. 14, Dist. 3, HCM City, Vietnam. Tel: (+84.8) 3526 0218 - Fax: (+84.8) 3526 0219 Email : info@trivietsteel.com.vn Website : www.trivietsteel.com.vn