Bill No.

1: General Condition And Preliminaries ITEM DESCRIPTION UNIT QTY RATE

1/11
AMOUNT

The Preliminaries cost shall include the following items;

Provide Third Party Insurance against all claims for damages and injuries to property and persons. Inclusive

Provide Insurance of Works for all permanent and temporary works.

Inclusive

Provide Workmen's Compensation Insurance and against accident or injury to workmen and PERKESO registration. Inclusive

Cut and clear access paths and working areas, benching and bridging at the Sites. Inclusive

Clear the sites on completion of works

Inclusive

Provides S.O. with Final Report (5 copies). Final Report must be ebdorsed by Certificate Geotechnical Engineer.

Inclusive

Transport all personnel, necessary plant, equipment and materials from the Contractor's depot to the following sites and from the following sites to the Contractor's Depot including all loading and unloading, all supervision and labour charges for the investigating work. Inclusive

Total Preliminaries 10% of total item in Bill No. 2 to 6

LS

Bill No. 2: Deep Boring with Boring Plants ITEM 2.1 Boring plant - Mobilization DESCRIPTION UNIT QTY RATE

2/11
AMOUNT

2.1.1 Bring the boring plant to the site, and remove the same from the site after completion of boring, including erecting the plant at borehole location, when the site is:2.1.1.1 Up to 25 Km from main office 2.1.1.2 Over 25 Km and up to 75 Km from main office 2.1.1.3 Over 75 Km and up to 125 Km from main office 2.1.1.4 Over 125 Km and up to 175 Km from main office 2.1.1.5 Over 175 Km and up to 225 Km from main office 2.1.1.6 Over 225 Km and up to 275 Km from main office 2.1.1.7 Over 275 Km and up to 325 Km from main office 2.1.1.8 Over 325 Km and up to 375 Km from main office 2.1.1.9 Over 375 Km and up to 425 Km from main office 2.1.1.10 Over 425 Km and up to 475 Km from main office 2.1.1.11 Over 475 Km and up to 525 Km from main office 2.1.1.12 Over 525 Km from main office 2.1.2 Move the boring plant from one borehole position to next, including dismantling it at the old position and erecting it at the new position A All dry flat land and undulating land up to 25 degree gradient accessible by road eg. School field, playground, etc. (normal access) B Hillslope of more than 25 degree. Naturally waterlogged areas. (Difficult access) C1 Floating - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) C2 Fixed - Over rivers, lake, nearshore, etc. where staging or pontoon if if required. (Extreme access) 2.1.3 Extra over 2.1.2 when the new position is more than 500m from the old position but the two positions are within the same site. A All dry flat land and undulating land up to 25 degree gradient accessible by road eg. School field, playground, etc. (normal access) B Hillslope of more than 25 degree. Naturally waterlogged areas. (Difficult access) C1 Floating - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) C2 Fixed - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) per shift per shift per shift per shift per shift per shift per shift per shift 2 no no no no no no no no no no no no L.S

Bill No. 2 : Deep Boring with Boring Plants ITEM DESCRIPTION UNIT QTY RATE

3/11
AMOUNT

2.1.4 Extra over 2.1.2 when the new position is at a site different for that of the old position but the two different sites are grouped together in the works. A All dry flat and undulating land up to 25 degree gradient accessible by road e.g. school field, playground, etc. (Normal Access) B Hillslopes of more than 25 degree. Naturally waterlogged areas. (Difficult access) C1 Floating - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) C2 Fixed - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) 2.1.5 For boring works over water either in river, nearshore or lake where staging is required for boring rigs and workmen: 2.1.5.1 Floating platform - Pontoon & Barge 2.1.5.2 Stilt / fixed platform - Stilt to be driven into the ground 2.2 Boring In Soil per platform per platform per shift per shift per shift per shift no -

2.2.1 Carry out boring whether case or uncased: 2.2.1.1 Depth from existing ground level not exceeding (n.e.) 10m 2.2.1.2 -Ditto- exceeding 10m but n.e. 20m 2.2.1.3 -Ditto- exceeding 20m but n.e. 30m 2.2.1.4 -Ditto- exceeding 30m but n.e. 40m 2.2.1.5 -Ditto- exceeding 40m but n.e. 50m 2.2.1.6 -Ditto- exceeding 50m 2.3 Drilling in Rock metre metre metre metre metre metre 20 20 20 15 10

2.3.1 Carry out diamond core drilling of 30.2mm minimum diameter into any kind of rock including delivery of cores in standard boxes to the specified Laboratory: 2.3.1.1 Depth from existing ground level not exceeding (n.e.) 10m 2.3.1.2 -Ditto- exceeding 10m but n.e. 20m 2.3.1.3 -Ditto- exceeding 20m but n.e. 30m 2.3.1.4 -Ditto- exceeding 30m but n.e. 40m 2.3.1.5 -Ditto- exceeding 40m but n.e. 50m 2.3.1.6 -Ditto- exceeding 50m 2.3.2 Extra over Item 2.3.1.1 if the core is of 54.0mm minimum diameter, taken as directed by the S.O. 2.3.3 Extra over Item 2.3.1 if the rock is one of the following types: granite granodiorite, quartz - porphyry, rhyolite, veinquartz, siliceous sandstone or quatzite. 2.3.4 Extra over Item 2.3.1 and 2.3.2 if the rocks are other than those in Item 2.3.3. metre 10 metre 10 metre 10 metre metre metre metre metre metre 5 7 10 10 -

Bill No. 2: Deep Boring with Boring Plants ITEM 2.4 In-situ Field Test DESCRIPTION UNIT QTY RATE

4/11
AMOUNT

2.4.1 Carry out standard penetration test: 2.4.1.1 Depth from existing ground level not exceeding (n.e.) 10m 2.4.1.2 -Ditto- exceeding 10m but n.e. 20m 2.4.1.3 -Ditto- exceeding 20m but n.e. 30m 2.4.1.4 -Ditto- exceeding 30m but n.e. 40m 2.4.1.5 -Ditto- exceeding 40m but n.e. 50m 2.4.2 Carry out Vane Shear Test 2.4.2.1 Depth from existing ground level not exceeding (n.e.) 10m 2.4.2.2 -Ditto- exceeding 10m but n.e. 20m 2.4.2.3 -Ditto- exceeding 20m but n.e. 30m 2.4.2.4 -Ditto- exceeding 30m but n.e. 40m 2.4.2.5 -Ditto- exceeding 40m 2.5 Sampling no no no no no 5 5 5 5 4 no no no no no 5 5 5 5 4

2.5.1 Obtain disturbed samples with split-barrel tubes or otherwise for the purpose of doing classification tests on the samples: 2.5.1.1 Depth from existing ground level not exceeding (n.e.) 10m 2.5.1.2 -Ditto- exceeding 10m but n.e. 20m 2.5.1.3 -Ditto- exceeding 20m but n.e. 30m 2.5.1.4 -Ditto- exceeding 30m but n.e. 40m 2.5.1.5 -Ditto- exceeding 40m 2.5.2 Obtain undisturbed samples with thin-wall tube sampler: 2.5.2.1 Depth from existing ground level not exceeding (n.e.) 10m 2.5.2.2 -Ditto- exceeding 10m but n.e. 20m 2.5.2.3 -Ditto- exceeding 20m but n.e. 30m 2.5.2.4 -Ditto- exceeding 30m but n.e. 40m 2.5.2.5 -Ditto- exceeding 40m 2.5.3 Extra over Item 2.5.2 if approved piston-samplers are used as instructed by the S.O. 2.6 Mazier undisturbed sampling (Air-foam drilling) lump sum no no no no no 20 10 10 10 5 no no no no no 20 10 10 10 5

2.6.1 Carry out core drilling using triple tube core barrel with retractable shoe (Mazier) to obtain of minimum 74mm diameter undisturbed sample: 2.6.1.1 Depth from existing ground level not exceeding (n.e.) 10m 2.6.1.2 -Ditto- exceeding 10m but n.e. 20m 2.6.1.3 -Ditto- exceeding 20m but n.e. 30m 2.6.1.4 -Ditto- exceeding 30m but n.e. 40m 2.6.1.5 -Ditto- exceeding 40m no no no no no -

Bill No. 3: Sounding and Piezocone ITEM 3.1 DESCRIPTION Sounding and Piezocone Plant - Mobilization UNIT QTY RATE

5/11
AMOUNT

3.1.1 Bring the boring plant to the site, and remove the same from the site after completion of boring, including erecting the plant at borehole location, when the site is:3.1.1.1 Up to 25 Km from main office 3.1.1.2 Over 25 Km and up to 125 Km from main office 3.1.1.3 Over 125 Km and up to 225 Km from main office 3.1.1.4 Over 225 Km and up to 325 Km from main office 3.1.1.5 Over 325 Km and up to 425 Km from main office 3.1.1.6 Over 425 Km and up to 475 Km from main office 3.1.2 Move the boring plant from one borehole position to the next, including dismantling it at the old position and erecting it at the new position. A All dry flat and undulating land up to 25 degree gradient accessible by road e.g. school field, playground, etc. (Normal Access) B Hillslopes of more than 25 degree. Naturally waterlogged areas. (Difficult access) C1 Floating - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) C2 Fixed - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) 3.1.3 Extra over 2.1.2 when the new position is at a site different for that of the old position but the two different sites are grouped together in the works. A All dry flat and undulating land up to 25 degree gradient accessible by road e.g. school field, playground, etc. (Normal Access) B Hillslopes of more than 25 degree. Naturally waterlogged areas. (Difficult access) C1 Floating - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) C2 Fixed - Over rivers, lake, nearshore, etc. where staging or pontoon if required. (Extreme access) per shift per shift per shift per shift per shift per shift per shift per shift no no no no no no -

Bill No3. : Sounding and Piezocone ITEM 3.2 Deep Sounding Test DESCRIPTION UNIT QTY RATE

6/11
AMOUNT

3.2.1 Carry out Deep sounding test: 3.2.1.1 Depth from existing ground level not exceeding (n.e.) 10m 3.2.1.2 -Ditto- exceeding 10m but n.e. 20m 3.2.1.3 -Ditto- exceeding 20m but n.e. 30m 3.2.1.4 -Ditto- exceeding 30m but n.e. 40m 3.2.1.5 -Ditto- exceeding 40m but n.e. 50m 3.2.2 Extra over 3.2.1 if friction reducer is used 3.3 Piezocone metre metre metre metre metre hole -

3.3.1 Carry out Piezocone tests 3.3.1.1 Depth from existing ground level not exceeding (n.e.) 10m 3.3.1.2 -Ditto- exceeding 10m but n.e. 20m 3.3.1.3 -Ditto- exceeding 20m but n.e. 30m 3.3.1.4 -Ditto- exceeding 30m but n.e. 40m 3.3.1.5 -Ditto- exceeding 40m but n.e. 50m 3.3.2 Carry out Dissipation Test metre metre metre metre metre hour -

Bill No. 4: Other Field Tests ITEM 4.1 Mackintosh Probes DESCRIPTION UNIT QTY RATE

7/11
AMOUNT

4.1.1 Carry out Mackintosh probe to a depth not exceeding 15 meters. or 400 blows whichever come first. 4.1.1.1 For total number of probes not exceeding (n.e.) 50 4.1.1.2 -Ditto- exceeding 50 but exceeding (n.e.) 250 4.1.1.3 -Ditto- exceeding 250 4.2 Hand Bores metre metre metre 30 -

4.2.1 Carry out hand bores, including the provision of disturbed samples: 4.2.1.1 Depth from existing ground level not exceeding (n.e.) 2.5m 4.2.1.2 -Ditto- exceeding 2.5m but n.e. 5.0m 4.2.1.3 -Ditto- exceeding 5.0m 4.2.2 Allow for determining over-night water table in hand bores 4.2.3 Obtain undisturbed samples with thin-wall tube samplers from the hand bores 4.2.3.1 Depth from existing ground level not exceeding (n.e.) 2.5m 4.2.3.2 -Ditto- exceeding 2.5m 4.3 Penetration Field Vane shear Test (Geonor Vane) no no metre metre metre holes no -

4.3.1 Carry out Vane Shear Test using Penetration Vane 4.3.1.1 Depth from existing ground level not exceeding (n.e.) 10m 4.3.1.2 -Ditto- exceeding 10m but not exceeding 20m 4.3.1.3 -Ditto- exceeding 20m but not exceeding 30m 4.3.1.4 -Ditto- exceeding 30m but not exceeding 40m 4.3.1.5 -Ditto- exceeding 40m 4.4 Plate Loading Test no no no no no no -

4.4.1 Carry out Plate Loading Test (test 4.1 Part 9:BS1377:1990) 4.5 Insitu California Bearing Ratio Test

4.5.1 Carry out In-situ California Bearing Ratio Test (test 4.3 Part 9:BS 1377:1990) 4.6 Permeability Test no -

4.6.1 To carry out permeability test in soil by Constant Head Method (Clause 21.4 BS 5930:1981) 4.6.2 To carry out permeability test in soil by Variable Head Method (Clause 21.4 BS 5930:1981) 4.6.3 To carry out permeability test in rock by single or double Packer (Clause 21.5 BS 5930:1981) 4.7 Field Density Test no no no -

4.7.1 To carry out field density test by Sand Replacement method (Small Pouring Cylinder Method) (Test 2.1 Part 9:BS 1377:1990) 4.7.2 To carry out field density test by Sand Replacement method (Large Pouring Cylinder Method) (Test 2.1 Part 9:BS 1377:1990) 4.7.3 Water replacement method (Test 2.3 Part 9:BS 1377:1990) 4.7.4 Core cutter method (Test 2.4 Part 9:BS 1377:1990) no no no no -

Bill No. 4: Other Field Tests ITEM 4.8 Trial Pit DESCRIPTION UNIT QTY RATE

8/11
AMOUNT

4.8.1 Excavate trial pit of size 2m x 2m xm deep and carry out loging and maping side wall and backfilling. 4.9 Piezometer no no -

4.9.1 Supply and install piezometer in borehole as specified by the Engineer including taking reading during the site work in progress for minimum 2 weeks reading. The depth of piezometer tip is not exceeding (n.e) 5m 4.9.2 -Ditto- for depth exceeding 5m but n.e 10m 4.9.3 -Ditto- for depth exceeding 10m but n.e 20m 4.1 Inclinometer

metre metre

4.1.1 Supply and install biaxial PVC inclinometer pipe in prebore for the depth is not exceeding (n.e.) 10m from ground 4.1.2 -Ditto- for depth exceeding 10m but n.e. 20m 4.1.3 -Ditto- for depth exceeding 20m but n.e. 30m 4.2 Settlement Plate no metre metre -

4.2.1 Supply and install settlement plate of 600mm x 600mm x 10mm thick with 50mm ext. dia. G.I. pipes welded on the plate and 75mm int. dia. G.I. pipes as protective casing for depth not exceeding 5m 4.2.2 -Ditto- for depth exceeding 5m but n.e. 10m 4.2.3 -Ditto- for depth exceeding 10m but n.e. 20m no metre metre -

Bill No. 5: Collection Of Soil And Water Samples In Bulk ITEM 5.1 Soil Samples DESCRIPTION UNIT QTY RATE

9/11
AMOUNT

5.1.1 Collect representative disturbed samples in bulk at one location on the site, at depth not exceeding 1.5m from existing ground level: 5.1.1.1 -Ditto- not exceeding 5 kg. 5.1.1.2 Extra over Item 5.1.1.1 for bulk quantities exceeding 5 kg measured as a unit of 25 kg or part thereof, up to a maximum of 100 kg. 5.2 Soil Samples for Natural Moisture Content unit 3 no 3

5.2.1 Collect a set of 2 sealed sample for the determine of natural moisture content at the laboratory (testing measured separately) in the course of sampling in Item 5.1. 5.3 Water Sample set 3

5.3.1 Collect 1 litre of representative ground water sample in a water tight clean container from a hand bore or deep bore. 5.4 Block Sample no 3

5.4.1 Collect 1 block sample of any material of 0.3m X 0.3m for carrying out laboratory testing including transport to approved laboratory. no 3

Bill No. 6: Laboratory Testing ITEM 6.1 Classification Tests DESCRIPTION UNIT QTY RATE

10/11
AMOUNT

6.1.1 Carry out classification tests: 6.1.1.1 Moisture content (Test 1) 6.1.1.2 Liquid limit (Test 2) 6.1.1.3 Plastic limit (Test 3) 6.1.1.4 Plasticity Index (Test 4) 6.1.1.5 Linear shrinkage (Test 5) 6.1.1.6 Specific gravity (Test 6) 6.1.1.7 Particle size distribution for coarse-grained soils (Test 7A or 7B) 6.1.1.8 Particle size distribution for fine-grained soils (Test 7C or 7D) 6.1.1.9 Dispersion Test (Hydrometer) 6.1.1.10 Brightness Test 6.1.1.11 Pilcon Hand Vane Tests 6.1.1.12 Pinhole test 6.2 Soil Compaction Test no no no no no no no no no no no no 20 20 20 20 12 20 20 20 -

6.2.1 Carry out compaction test on remoulded samples, following the testing procedure as mentioned in the test numbers, but with only one specimen at a given moisture content: 6.2.1.1 with a 2.5 kg hammer (Test 12) 6.2.1.2 with a 4.5 kg hammer (Test 13) 6.2.1.3 With a vibrating hammer for granular soils (Test 14) 6.3 Detailed Compaction Studies no no no -

6.3.1 Carry out compaction test with a 2.5 kg hammer on remoulded samples, to test 12: 6.3.1.1 At least 5 specimen at difference moisture shall be compacted to obtain the curve of "dry density against moisture content" 6.3.1.2 Firstly, compaction tests same as Item 6.3.1.1 shall be carried out. Secondly for each of the specimen compacted, unsoaked California Bearing Ratio (Test 16) shall be carried out, on both the top and bottom of the specimen. The curve of "CBR against moisture content" shall also be reported. 6.3.1.3 -Ditto- the 4 day soaked CBR test shall be carried out instead of the unsoaked CBR. 6.3.1.4 -Ditto- unsoaked CBR test shall be carried out on the top of the specimen and unsoaked CBR shall be carried out on the bottom of the specimen. 6.3.2 Extra over Item 6.3.1 if the compaction is done with 4.5 kg hammer. 6.3.3 Extra over Item 6.3.1 if the compaction is done with a vibrating hammer. no series series series series series -

Bill No. 6: Laboratory Testing ITEM 6.4 Soils strength tests DESCRIPTION UNIT QTY RATE

11/11
AMOUNT

6.4.1 Carry out strenght tests on undisturbed samples: 6.4.1.1 Unconfined compression strenght (Test 20) or ASTM.D2 166-166 (1972) 6.4.1.2 Unconsolidated undrained triaxial compression without porewater measurement (Test 21) for one specimen only. 6.4.1.3 Similar to 6.4.1.2 - but involving at least 3 specimens to obtain the cohesion value and friction angles. 6.4.1.4 Unconsolidated undrained triaxial compression without porewater measurement in accordance with the method recommended by Bishop and Henkel. At least 3 specimens are required to obtain the cohesion value and friction angles. 6.4.1.5 One-dimensional consolidation )load-unload-load curve) (Test 17) 6.4.2 Carry out California Bearing Ratio test on one specimen of remould sample after compacting (Compacting measurement together) the sample to the procedure stated in Item 6.2.2.1.: 6.4.2.1 unsoaked CBR on the top and bottom of the specimens. 6.4.2.2 Soaked CBR on the top and bottom of the specimens. 6.4.2.3 unsoaked CBR on the top of the specimen and soaked CBR on the specimen. 6.4.3 Extra over Item 6.4.2 when the compaction as in accordance with the procedure stated in Item 6.2.1.2 6.5 Soils chemical tests no no no no series no 2 5 series 2 no 3 no 8

6.5.1 Carry out chemical tests on soil or water samples: 6.5.1.1 Organic matter content (Test 8) 6.5.1.2 Total Sulphate content (Test 9) 6.5.1.3 Sulphate content of ground water (Test 10) 6.5.1.4 pH value (Test 11) no no no no 3 3 3 3