You are on page 1of 6

http://www.naukrigulf.com/job-listings-Planning-Engineer-Oil-Gas-Petro-Project-o r-Turnaround-Experience--Doha-Qatar-Royale-Recruitment-Group-2-to-8-years-051012 000039-?xz=1_0_3&jobId=051012000039&key=primavera&loc=&exp=2&srchRank=1&srchId=1 35036338077237800&currPage=1&sort=relevance&freshness=&compType=&companyId= DR15R13PW86M2M95BZ9U7KDU7WR9ZBQ46 A.

Personal Detail Place / Date of Birth: Duri, 4 February 1966 Sex: Male Marital Status: Married + (2 Children) Healthy: Excellent Passport No.: AH 531076 B. Education Background Primary School: SDN 2 Caltex Duri Riau 1979 Secondary School: SMPN 1 Caltex Duri Riau 1982 Senior High School: SMAN 1 Caltex Duri Riau 1985 Engineer Certificate: University in Bandung West Java (Graduated Of Technical Division) 1993 Electrical Degree. C. Skills Thorough knowledge of Electrical Principles. Computer literate. Speak and Write English. D. WORK EXPERIENCE (briefly) Engineering Abilities: To manage the electrical installation project Electrical Industry; Refinery, Mining and Combine Cycle work on site, Field Design Electric al System pre-commissioning installation. Supervise Installation of High voltage equipment for Switchyard, Transmission line and, Substation. Medium and low vol tage Switch gear, Circuit Breakers and MCC with controls and relay systems. QA/QC Abilities: QA/QC Documentation, Electrical Specification and Installation to commissioning Procedures. Inspection and testing all electrical equipment in accordance to assist in updating Operations Function codes, standards and proced ure are ANSI (American National Standard Institute), NEC (National Electrical Co de), NEMA (National Electrical Manufactures Association). Profesional Experiences (1992 2008) 15 (Fifteen) years experience on Electrical Systems, Maintenance Service and Con struction Plant for Petrochemical, Nickel / gold Mining, Oil and Gas, On-Shore & Off- Shore. D.14 British Petroleum Designation: QA/QC - E&I Inspector Job Location: Guna Nusa Fabricator Cilegon & LNG Tangguh Papua. Project: BP Tangguh GPF Project (Constructed & Installation Two Platforms FPSO) & LNG Tangguh Onshore Project ; 2 Train, 3 unit Gas Turbine Power Generation Reason for leaving: Project completion 2006 2008 Facility Portion of Tangguh LNG Projects Are: Two (2) Platforms (GPF), Two(2) Train Process Facilities and Three Units Emergen cy Diesel Generators, Three Unit Gas Turbines & Boilers 3 x 35 MW, and Utiliy Fa cilities + Main Substation and 8 (Eight) Substation. Perform routine inspection and document result in accordance with approved Project Owner procedures and spe cifications.

HEALTH AND SAFETY Take leadership in assuring that electrical activities are performed safely and in accordance with the LNG safety policies Knowledgeable of and audit compliance to BP Safety and Maintenance Procedures HS E regulations Provide guidance for safe work practices and personal protective equipment (PPE) used by crafts and contractors Ensure proper documentation of special operating and maintenance instructions as sociated with electrical equipment Knowledgeable of the following: National Electric Code National Electric Safety Code IEEE Documents and White pages D.13 Tripatra/Fluor Chevron Duri. Designation: SLN Construction Superintendent Supervision Job Location: Chevron Duri (Oil & Gas) Project name: Flexible Project Management Present: April. 2006 Dec'26. 2006 Reason for leaving: Project completion 2006 D.12 Combine Cycle Gas Turbine Suban Pahse 2 Gas Plan Project Designated: Pre-Commissioning & Commissioning and Facility Acceptance Coordinato r. Reason for leaving: Completion of Contract (March 2006). PT. Thiess Contractors Indonesia / Conoco Phillips. Expansion to an existing Gas Production Facility. Duties And Responsibility Consist of review of quotations from the vendor and conduct T. B.E technical Bid Evaluations. Witness F. A.T and at the conclusion of site installation conduct S. A.T. Source calibration equipment for site process instrumentation and personnel. My team consists of one site Instrument Engineer and one site Electrical enginee r along with a crew of 70 personnel to carry out site installation and site acce ptance tests by means of a Quality Controlled hand over system to the client. I then had the over all responsibility of supervising other Engineers in the Mec hanical and Piping fields to full fill engineering interface between the client and the J. V partner Hyundai Engineering. Cleared all punch lists. D. 11 Construction Service CHEVRON Project 2004 Thiess Contractors Indonesia. Designated: Estimator Engineer and Monitoring E/I Construction Activities Job Location: Caltex Construction Service Duri Project, Oil and Gas Present: February.' 04. 2004 March' 01. 2006 Duties And Responsibility Handling some of electrical & instrumentation, civil work and mechanical work or der incoming from Client (Chevron Pacific Indonesia) to estimate / Calculate and negotiate. To conduct Kick of meeting Work Order Approved between Client and TH IESS Contractor C/W Construction Teams. Witness F. A.T and at the conclusion of site installation conduct S. A.T. Organize and supervise Electrical & Instrument construction activities, quality, testing, documentation, Pre-commissioning, co mmissioning and start-up. D. 10 ABERDEEN - (FPSO) Off-shore oil and Gas Industry, Shell Power Generator System Installation' 2003 Designated: Operating Engineer Electrical Inspector Eng. (QA/QC) Job Location: North East of Aberdeen (Shell Oil Company Aggreko).

Reason for leaving: Project completion (July 24' 02

Jun' 03).

Duties And Responsibility Full Inspection and monitoring Portable Power Plant Installation, Diesel Power G enerator Systems (300 KW / 200 MW) Multi Voltage /50Hz/ 60Hz and Load Banks Prec ision testing for Both Resistive/ Reactive Loads (2.5 Mw 100 Mw). Perform routine inspection and document result in accordance with approved Proje ct Owner procedures and specifications. D.09 PT. Caltex Pacific Indonesia Steam Flood project Designated: QA/QC Electrical & Instrumentation Inspector/ Engineering (Pre-commissioning and Commissioning) Owner Representative Job Location: Central Gathering Station 10. Duri Project. Oil & Gas Facilities Sumatra. Reason for leaving: Project completion. (September. 04' 00 September. 2001 Combine Cycle & Gathering System Project: Coordinated construction activities 3 x 100 MW Siemens Westinghouse combustion t urbines 501D. Controlled daily activities of the sub-contractor PT. Siemens Indonesia on sched ule requirement and engineering interface. Respond to (RFI) request for informat ion and worked with engineering in Head Office. In addition to my task of completing electrical system for hand over, I controll ed the following: E & I, millwright, Building's, and Painting. Compiled all chec k sheets, involved with pre commissioning, commissioning and start up achieved c ontractual acceptance of plant hand over by the client. Duties And Responsibility QA/QC documentation and review Contractor construction electrical procedures. Supervise and Monitor Installation of Cable, Cable tray, Lighting, Distribution control panel, all electrical equipment and Grounding system, etc. Perform routine inspection and document result in accordance with approved CPI p rocedures. Monitor activities of supervision contractor and construction Contractors. Witness and verify Continuity, Merger, HI-POT and Component testing for Medium V oltage & Low Voltage equipment. Monitor Quality control on construction progress activities. Responsible from equipment installation and continue energizing of electrical eq uipment to pre-commissioning and commissioning. Issued punch listing for out standing works. Review Tested documentation, witness and accept all required Testing for CPI (Cl ient). 10. Etc D.8 Middle East UAE. Oil Refinery & Power Generation Plant Designated: Electrical Maintenance Eng. Job Location: Al Mubaraz island (FPSO) Abu Dhabi Oil & Gas Company (ADOC) Abu Dhabi GULF (UAE). Reason for Leaving: Project completion. (Augustus'04' 99 April. 04' 00). Duties And Responsibility Maintenance and operational of plant facilities. Turbine generator power supply to Transformer, and than going to switch gear, from switch gear going to ALL WEL L HEADS Platform / Central Platform, MCC, Distribution Panel, Motor Electric Ove r Hauls, Lighting and lighting Panels Distribution, all Electrical Equipment and Modification. D.7 Newmont Gold Mining (COMBINE CYCLE) Project Designated: Field Engineer Electrical and Quality Control Engineer Job Location: PT. Flour Daniel Sumbawa Batu Hijau Project (Power Plan &

Gold Mining) New-Mont Nusa Tenggara. Reason for Leaving: Completion of Project. (October 1998

July'30. 99)

Power Facility Portion of Batu of Batu Hijau Four (4) 28 MW Coal Unit and Nine ( 9) Diesel Generator Units, and a 150 KV Transmission Line. Project Cost US $ 1.8 Billion. Combine Cycle Project (Coal Power House & Diesel Generator) Duke Flour Daniel Indonesia Coordinated all construction activities on a diesel powered power plant. (Associ ated Switch Yard 11 KV-150 KV). Phase two of the contract, coal-fired power plant with four turbines. Responsibl e for electrical trades With Electrical speciallist Commissioning bringing total to a round 25 personnel . Controlled all QA/QC documentation. Involved with commissioning team for client hand over, and acceptance. Duties And Responsibilty Manage the electrical Contractors daily construction activities, schedule and pr ogress. QA/QC documentation and specification and verify, contractor procedures. Generate Field Change Request (FCR), Field Purchase Request (FPR) and Request fo r Information (RFI). Inspect and approve Electrical Installation on site. Witness and verify Continuity, Merger, HI-POT and component testing for Medium v oltage & Low voltage equipment. Inspection of Connection and Installation switch gear and MCC panel. Expedite materials for construction and issue field instruction to contractor. Supervise and Inspect Subcontractor (SIEMENS) construction activities. Witness Pre commissioning and commissioning testing. Review all test packages; prepare QA/QC documentation for Turn over to client. D.6 INCO Nickel Mining Project, Flour Daniel Designated: QA/QC - E/I Engineer. Job Location: PT. SNEF/ Fluor Daniel Soroako, PT. Inco Expansion Project (Soroako South Sulawesi) (Feb 1998 Oct 1998). Reason for Leaving: Project completion 1998 Certificate. Duties And Responsibility Responsible for project operational safety requirement QA/QC documentation and review contractor installation procedures. Implement & enforce all company policies, procedures and practices. Planing construction electrical and Instrumentation schedule. Monitor construction activities and progress. Witness and monitor electrical and Instrumentation equipment testing. Responsible for test packages documentation from pre-commissioning to final hand over to client. D. 5 UNOCAL' 76 Combine Cycle Project Unit # 4. 5. 6, Bectel Designated: Electrical Engineer for Start-up to Commissioning/ Owner Represent. Job location: Unocal Salak Geothermal Project Unit # 4,5 & 6 (West Java) Reason for Leaving: Project completion (1998) / Certificate. Duties And Responsibility Perform evaluation and recommendation for power generation project electrical op eration system start-up to commissioning acceptance. Assigned as Commissioning Electrical Engineer. Trouble shooting, maintenance for power plant and distribution during shut-down Unit # 4,5,6 and MCC panel and lo cal panel for lighting Power Generation Facility Area and-Resource Production Fa cility Area. Responsibility too for cleaning ISO-phase Bus Duck and prepared, termination ele ment Space heater and confirmation main transformer. Install and link grounding clutiss on generator out put for Turbine Generator Unit # 4, 5, 6.

Inspected and Cleaned Unit # 400, 500, 600 Lube oil Clarifier Heaters. Verify Drawing & specification of Electrical Equipment. QA/QC Electrical Documentation. Verify Punch listing for all Electrical works prior to final acceptance. Planed schedule for electrical start-up, cables modification, installation and o ther construction activities. D.4 AMOCO Petrochemical Project Designated: QA/QC. Electrical Engineer Job Location: Merak PTA 1 AMOCO Petrochemical Plant Project Cilegon West Java / PT. IKPT CHIYODA J/O Reason for Leaving: Project Completion (1997) Certificate. Duties And Responsibility Supervise and Monitor Installation of Cable, cable tray, Lighting, Distribution control panel, electrical equipment and Grounding system, etc Prepare and Verify construction Drawing, Specification and installation procedur es of Electrical Equipment. Supervise & Inspection of electrical equipment Installation, testing to commissi oning. Witness cable termination for Medium and Low voltage Power to Switch Gear, MCC, MV/LV electrical Motor. Responsible to QA/QC and Construction Managers. D.3 Unocal'76 Geothermal power Generator Project Unit # 4, 5 & 6. Designated: Field Engineer / Engineering Dept. Job Location: Salak Geothermal Project (West Java) Fluor Daniel JO IKPT. Reason for Leaving: Project completion (1996 1997) Certificate. Combine Cycle Geothermal Power Generation Directed construction activities on caterpillar generators series 3512. Controlled all QA/CC documentation pre commissioning, commissioning and start up . I controlled a very small and dedicated local craft force to achieve start up in a very isolated and troubled province. We achieved start up on schedule and I trained local staff to switch over to mai ntenance duties. Duties And Responsibility Verify all Drawings and Specification of Electrical and Instrument. Support the project program for verifying construction quality. Supervision and Inspection to Subcontractor in construction Activity Installatio n and Hook-Up some Instrument Equipment and Planning Installation Electrical Mot or Connection, Power Supply and Compressor. Handling RFI from Subcontractor and Connected all Paper Work Reporting to Engineering Manager. D.2 Mivan Apartment Project. Designated: QA/QC Electrical Engineer. Job location: Dukuh Golf Apartment Project, Kemayoran, Jakarta Utara Leaving for Job: Project completion (1995 1996) Certificate. Duties And Responbility Verify Drawing, Specification and Equipment. Inspection of connection pooller and control cables. Supervisor of Installation cable Tray, Lighting and Light distribution panels. Direct Medium Voltage & Low Voltage Equipment testing (continuity, Megger test a nd HI-pot test. (Feeder, pncc & swgr panels). Prepare document & record or documentation for turn over package)

D.1 Unocal Power Generation Project Unit # 123. Designated: Unocal Electrical and Instrument Supervision. Job Location: Gunung Salak Geothermal Plant Project Unit 1,2,3, (West Java) UNOCAL' 76. Reason for Leaving: Complete Project (1993) Certificate. Duties And Resposibility Supervise to Subcontractor in Construction Activity Installation in Hook up all Instruments on general Electric (Gas Turbine) Ingersoll (Condensate Pump) and In stallation such (Installation Cable Tray). CCS (Compressor Anti Surge Control), PLC. Control all Drawing & Specification of electrical and Instrument. Supervises of Connection all Electrical Motor, Blacke Dur (welding Procedure Spe cification) Bailey Controls (West Pump Station) Pneumatic Products (Installation Operation & Maintenance). Inspection & Check for Pre Commissioning & Commissioning. Report to Construction Manager An ambitious and experienced electrical engineer with significant industry knowl edge gained via working continuously with management teams, coordination with su pervision of various projects Off-Shore, On-Shore and Construction. Pursue a car eer that will provide a rule of: E & I Inspection, Construction Manager & QA/ QC manager