Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Safety Notice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Tips for Using This Document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Reminders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Time-Saving Navigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Colored Tabs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Where Am I? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 General Casing and Liner Operations . . . . . . . . . . . . . . . . . . . . 5 Risk Identification and Procedures . . . . . . . . . . . . . . . . . . . . . . . . . 5 Quality Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Casing Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Tubing Material Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Casing Slip/Casing Compatibility and Design . . . . . . . . . . . . . . . . . 7 Dog Legs, Hole Diameter, Annular Clearance, and Deviation . . . . 7 Buckling Due to Temperature Effects While Drilling . . . . . . . . . . . . 8 Shoe Track Length . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Wiper Plug Planning and Selection . . . . . . . . . . . . . . . . . . . . . . . . . 9 Autofill Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Inner String . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Liner Hanger Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Liner Hangers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Pressure Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Liner Top Packers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Liner Tieback Sleeve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Running Tool Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Casing Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Centralizer Planning and Selection . . . . . . . . . . . . . . . . . . . . . . . . 14 Bow-Spring Centralizers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Rigid Centralizers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Solid Body Centralizers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Bow-Spring Centralizer Subs . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Quick Reference for Centralizer Selection and Installation . . . 16 Examples of Centralizer Types . . . . . . . . . . . . . . . . . . . . . . . . . 17
Table of Contents Introduction General Casing/Liner Operations Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Study Pipe Handling
11
Table of Contents
Guide Shoes and Float Equipment Planning and Selection . . . . . 18 Quick Reference for Guide Shoe and Float Equipment Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 Examples of Casing Accessories . . . . . . . . . . . . . . . . . . . . . . . 20 Engineering and Field Planning Summary . . . . . . . . . . . . . . . . 23 Engineering Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Contingency Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Field Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Pipe Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Pre-Run Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Vessel-to-Rig Pipe Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Casing Handling from Rig Pipe Rack to Rotary Table . . . . . . . 28 Making Up and Running CasingSlip to Slip . . . . . . . . . . . . . 29
Table of Contents Introduction General Casing/Liner Operations Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Study Pipe Handling
22
Introduction
Introduction
Purpose
This best practice is an effort by the Casing, Liner Running, and Cementing Network to provide the Unocal Global Drilling Community with best practice recommendations to improve the success of Unocal's global casing, liner running, and cementing operations. Unocal spends millions of dollars each year on casing, liner running, and cementing operations. Poor planning and operational execution not only can lead to failure, but can result in the loss of hydrocarbon recovery from the wellbore.
Visit the Engineering Network LiveLink site to view this best practice, the Global Best Practices for Cementing document, and to obtain additional information. Table of Contents Introduction
Critical thinking and sound judgment will never be replaced by a best practice or standard operating procedure (SOP), but these recommendations can help operators identify some of the common risks and provide experienced-based solutions. Risk identification and mitigation is the essence of our daily work; this best practice can be used as a roadmap towards measures to prevent or mitigate problems. This best practice is a companion to the Global Best Practices for Cementing published by the Casing, Liner Running, and Cementing Network in 2002. You can access the Global Best Practices for Cementing at the following URL:
https://myteam.unocal.com/myteam/llisapi.dll/ Global_Best_Practices_for_Cementing.pdf?func=doc.Fetch&nodeId= 4844684&docTitle=Global+Best+Practices+for+Cementing
You can access the Central Drilling Group website by copying and pasting the following URL into your browser:
http://mymigportalv2.unocal.com:7778/portal/ page?_pageid=34,66322&_dad=portal&_schema=PORTAL
Safety Notice
Eng. & Field Planning Summary
Job safety is top priority in any operation. The recommended practices listed in this document are intended to stimulate critical thought and minimize the risk of accidents or injuries to personnel. This document is not intended to replace or supersede the sound judgment of experienced personnel. Unocal management encourages all parties to continually strive to handle and run pipe as safely as possible. All involved individuals will be required to actively participate in pre-job safety meetings intended to identify and eliminate any/all unsafe conditions. Inexperienced individuals, individuals failing to exhibit an acceptable attitude towards safety, and other individuals deemed potentially at risk (for any reason) should be identified and removed from the location. This Global Best Practices for Casing and Liner Running is a living document and suggestions are appreciated.
Casing and Liner Running Best Practices 33
Pipe Handling
Introduction
Table of Contents Introduction General Casing and Liner Operations: Provides recommendations for casing and liner design, planning, and running Liner Hanger Assemblies: Contains information about liner hangers, liner top packers, liner tieback sleeves, and running tools Casing Accessories: Provides recommendations for the selection and application of centralizers, float equipment, wiper plugs, and autofill equipment Engineering and Field Planning Summary: Provides information that should be considered in engineering, contingency, and field planning procedures Pipe Handling: Contains additional information on pipe/casing handling
Introduction
Reminders
In many of the sections, you will find white text in the blue column at the left of the page, topped with an orange bar. These comments are emphasized to indicate their importance in the success of the job.
Time-Saving Navigation
This document is easily navigated from either the Table of Contents or the colored tabs located at the right side of every page.
Table of Contents
Casing Accessories
The Table of Contents allows you to view the subtopics discussed within each major section. To navigate to a particular topic, just click on the entry.
Colored Tabs
The blue and orange tabs at the right of each page offer quick navigation to any major section of the document, including the Table of Contents, from any page in the document.
Where Am I?
Pipe Handling
The title of the section you are viewing is always located in the upper right corner of the page, in the same color as its corresponding tab.
44
This section provides recommendations for casing and liner equipment design and procurement. Risks, design considerations, and typical problems are also provided.
A key to successful operations is the identification of goals, objectives, and risks. A well planned procedure and proper selection of equipment will provide the best chance of success.
Quality Control
Quality is crucial to success in every aspect of a casing or liner running job. Quality must be included in all aspects of a job including the condition and selection of mechanical equipment, the risk analysis of conditions and equipment chosen for a particular operation, the specific procedures used, and the effective communication of specific wellbore conditions and goals. Failure in any of these aspects can result in overall job failure even though most aspects of a job may be successful. Success is realized for casing and liner operations when all of these aspects are well thought out and incorporated into the job plan. Most often, the issues that are well thought out and managed during an operation do not pose a problem; problems usually result from those aspects of a job that were not identified or considered.
55
Casing Design
Various factors can impact casing design such as environment, load, well work, and geology. Often, the highest induced load cases to consider for design are those associated with intentional well work operations such as hydraulic fracturing and should not be overlooked. Geologic considerations such as flowing plastic salt stringers must also be incorporated in the risk analysis of material selection. Salt at elevated temperatures acts as a fluid at overburden pressure. For these instances, the casing collapse rating must be designed to exceed the overburden pressure at depth. The casing must also be designed either to withstand the annular pressure build-up due to the temperature increase of production operations, or the well pressure system must be managed during production operations to mitigate this risk to the wellbore.
Table of Contents Introduction
It is important to understand as much as possible about the life of a wellbore in order to effectively design the tubing and casing for a given well. The well's design must account for any corrosion, erosion, sulfide stress cracking, or chloride stress cracking for the life of the well. Chloride stress cracking will usually only occur as a result of a planned wellbore intervention operation such as acidizing.
Consider the life of the well when selecting casing grade and metallurgy.
When selecting casing grade and metallurgy, the life of the well must be considered, especially for tubular strings exposed to production fluids in high temperature environments containing corrosive components. For a well with small reserves and a short life, it may be acceptable to run carbon steel tubing and accept 10 mils of wall loss per year. In contrast, for a well with very large reserves and a long life, it would probably be appropriate to use corrosion resistant alloys (CRA), which would mitigate corrosion concerns and enable the well to be exposed to corrosive production fluids. A vast array of materials is available with specifications to meet the design requirements for the working environment throughout the entire service life of the well. Design requirements for tubing materials will vary and should always be based on the expected length of the life of the well and corrosion resulting from temperature and production fluids composition. There are many industry-related sites and literature from casing manufacturers providing suitable material based on various partial pressures of CO2, H2S, and free sulfur. Use industry best practices and API recommended practices for selection, manufacturing, and inspection of tubular goods.
66
Connections
Casing and liner connections must meet the minimum job requirements for the application. The torque rating of the connections must be greater than the torque created during field execution if a liner is to be rotated. Be aware of all connections and torque ratings in the liner hanger/packer assembly. All thread compounds used should also meet the manufacturer's recommendations. Include a connection specification sheet with make-up procedures and torque values in the drilling program for quick reference by the Unocal Drill Site Manager (DSM).
Table of Contents Introduction
Casing slips must be compatible with the actual casing outside diameter (OD) that is to be run. Casing can be manufactured 1% over the specified OD and still be within API allowances. For example, 9 5/8-in. (9.625-in.) casing can actually be 9.72-in. OD and still meet API specifications. If a standard designed 9 5/8-in. casing slip is utilized with the larger OD casing, the taper on the bowl would allow only 2/3 of the slip segment to enter the bowl before taking weight during the hanging off process. In this circumstance, the compression load exerted on the casing by the slips is significantly increased. This scenario can cause casing collapse. To prevent this situation, caliper the casing and size the casing slips accordingly. The design of casing, casing slips, and wellhead equipment must include the hanging load of the casing as well as all additional loads that may be applied. Substantial additional loads may be placed on the surface equipment and casing by hanging off drill pipe on storm packers and/or pressure testing above packers set in the casing string. Normally, emergency slips used with mandrel hanger systems have limited ratings that must be evaluated for all subsequent operations once they have been installed. An emergency slip fully rated to the full casing capacity should be obtained during the procurement process.
General Casing/Liner Operations Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Summary
Pipe Handling
77
Table of Contents
For wells with intermediate casing strings, it is important to mitigate buckling of the casing and its resulting excessive casing wear. As the well is drilled to deeper depths at higher temperatures, the thermal effects of the well can cause buckling of the casing in an uncemented section of the well. To prevent excessive casing wear from this effect, apply additional tension in the casing to offset the forces created by the temperature effect. To prevent temperature-induced buckling, apply additional tension after running and cementing by pulling on the casing in excess of its weight before setting the slips. In situations in which it is not possible to pull enough tension in the casing above the freeze point to prevent buckling, the recommendation is to bring the top of cement higher. Applying additional tension by bumping the plug and holding internal pressure on the casing while the cement is setting should be considered after all other options have been explored.
88
Casing Accessories
Pipe Handling
Autofill Equipment
The use of autofill equipment provides valuable benefits to casing and liner running operations by allowing for faster running speeds, saving time to fill the casing as it is run, reducing surge pressures on the well, and reducing loss of returns. To ensure proper use of autofill equipment, adhere to the following recommendations:
Introduction Table of Contents
Conventional ball-activated autofill equipment has a low-flow entry area which may lead to solids buildup and plugging. When available, use large-bore ball activated autofill equipment to eliminate this problem. Employ autofill float equipment that can be activated independent of the setting of the liner hanger should a well control condition arise while running in hole. Evaluate the risk before running mechanically activated autofill equipment that requires a ball to be dropped to convert it to non-autofill mode. A preferred option is to run the casing with the ball in place such that the system functions as flow activated. Evaluate operations and specify the appropriate setting pressure when using pressure-activated autofill equipment. Setting pressure can vary greatly depending on the application. Deactivation of autofill equipment is not an exact value and should be evaluated. Consider using differential-fill float equipment when there is a need for autofill equipment that is designed to maintain a set pressure differential between the casing and annulus. Typically this is 90% of the annulus pressure. If surge pressure is a concern, consider using a ball-converted ported sub (liner bypass tool) that has ports to allow fluid to enter the casing above the float equipment and reduces surge pressure. When run in combination with a large cross sectional area of the autofill, the bypass tool can significantly reduce the downhole effects of surge. The Unocal Drilling Engineer should provide specification sheets and operating parameters of all autofill components to all parties including the liner vendor, float equipment vendor, and Unocal DSM.
Ball-in-place autofill equipment should be sized so that it activates at high flow rates to prevent the float from tripping prematurely.
Casing Accessories
Pipe Handling
1010
Inner String
If you are running an inner string while a cement placement technique is decided upon, consider the following: Additional time is required to run and pull an inner string. The total hook load for the casing and inner string must be known to ensure that the hoisting equipment has sufficient capacity. The landing and wellhead running string must have the capacity to handle the full weight of casing. Stab-in seal assemblies, if applicable, must be fit-for-purpose. Use screw-in, stab-in equipment to run and land casing with the drill pipe. Landing casing with this type of equipment allows mandrel hangers to pass through surface restrictions easier since the casing at the top is free to have lateral motion through surface restrictions. Check wellhead assemblies for pressure integrity and mechanical reliability prior to job execution. Every effort should be made to ensure that the casing is full to the wellhead with the designed fluid before beginning the cement job.
Table of Contents Introduction General Casing/Liner Operations
Before beginning the inner string cement job, ensure that the casing is full to the wellhead with the designed fluid.
Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Summary Pipe Handling
1111
Liner Hangers
The liner hanger design and installation procedures must meet all the objectives for the total life of the well. A ported hanger body is an example of a liner hanger design in which the entire life of the well must be considered. A hydraulic hanger has a port hole designed in the body for activating the hanger. This port hole in the hanger body is isolated by elastomers which, with time and exposure to downhole conditions, will deteriorate and possibly leak. Liner hangers can be hydraulically or mechanically set. Hydraulically set hangers are preferred because they are more reliable; however, it must be taken into account that the pressure ratings are lower. The top of the liner hanger setting depth should be spaced out in base pipe (not across a coupling) above the previous casing shoe track. For certain size assemblies, an integral liner hanger/packer assembly is available. These tools are shorter than conventional tools and can provide a higher differential pressure rating. All applicable pre-job information should be documented between the Unocal Drilling Engineer and liner hanger vendor. Any revised data based on actual conditions must be highlighted and communicated to the rig site.
Casing Accessories
Consider the burst and collapse pressure ratings of the hanger and tieback sleeve in the early phases of the initial well design.
Pressure Limitations
The collapse and burst ratings of most liner hanger systems larger than 7 in. are lower than the liner itself. Consider the burst and collapse pressure ratings of the hanger and tieback sleeve that may be run on a given well in the early phase of initial well design. The setting pressure of the hydraulic liner hanger must be sized or pinned within an appropriate range in accordance with other pressure dependent tools and operations, so that the liner hanger can be set when planned. The liner hanger company should provide (on location) a calculation program for pressure ratings based on actual conditions. Perform a thorough review of ball dropping and ball sizing procedures on every job.
1212
Introduction
Casing Accessories
When using liner hangers, consider specific running conditions requiring special features such as the need to rotate the liner, righthand release, and wellbore conditions.
Casing Accessories
Casing Accessories
This section provides recommendations for the selection and application of centralizers, guide shoes, and float equipment. Use equipment from reputable vendors, and before procuring any equipment of unproven performance, inspect quality and fit-for-purpose design, accessing technical resources as necessary.
Table of Contents
Run a centralizer calculation program to accurately determine the number and placement of centralizers necessary to achieve the recommended standoff once actual well deviation surveys are input. For liner jobs in which cement is to be brought into the lap, it is advisable to include centralizers in the lap area to aid the placement of cement uniformly around the casing perimeter. Prevent damage of centralizers when running through existing liner tops or downhole components such as wellhead housings by assessing job risks and choosing the appropriate type of centralizer. Pre-install stop collars and centralizers prior to running casing when possible. Avoid using fixed-end (held by set screws on the end ring), bow-spring centralizers. In general, do not use any of the slip-on type centralizers on flush joint casing with stop collars since they have a tendency to stack.
1414
Casing Accessories
Bow-Spring Centralizers
Bow-spring centralizers are designed for over-gauge holes; however, they can be used in other hole conditions to provide effective centralization. Bowspring centralizers compensate for over gauge, open hole sections with flexible bows designed to have an outside diameter slightly larger than bit size. Refer to API specifications for running and restoring forces when evaluating and selecting bow-spring centralizers.
Introduction
Table of Contents
Place bow-spring and rigid centralizers over collars or stop rings so that they are pulled into the well or pulled from the well to prevent them from collapsing upon themselves.
Bow-spring centralizers may be used in high-angle holes; however, other types of centralizers may be more appropriate. It is always best to place bow-spring and rigid centralizers over collars or stop rings so that they are pulled into the well or pulled from the well to prevent them from collapsing upon themselves. Limit pipe movement to reciprocation since rotation is likely to damage the bow springs. Physical dimensional checks should be made to confirm that centralizers will fit over collars.
Rigid Centralizers
Inside previous casing strings or open hole sections that are in gauge, rigid centralizers provide adequate centralization. This type of centralizer with non-flexible bows should be run with an outside diameter slightly smaller than the smallest diameter in the well (the OD must be checked to ensure that they will not collapse). Double bow-spring centralizers are classified as rigid centralizers. The benefit of this type of centralizer is that it has some flexibility, which allows it to pass through tight spots or dog legs. It is always best to place rigid centralizers over collars or stop rings so that they are pulled into the well or pulled from the well to prevent them from collapsing upon themselves.
Pipe Handling
1515
Casing Accessories
optimal centralization may not be achieved, and therefore pipe movement is recommended when using solid body centralizers. To aid in situations requiring the casing to be worked down, use spiral blade, solid body centralizers.
Table of Contents
Introduction
Application
Centralizer
Installation
Install over casing couplings. If there is tight clearance or more than one per joint, install over stop rings.
Surface, intermediate, or Bow-Spring Centralizer long string casing. Typical Hinged Type API sizes like 13 3/8-in. casing in a 17 1/2-in. hole or 9 5/8-in. casing in a 12 1/4-in. hole, where the actual size is over gauge. Low risk and low-cost applications such as in liner laps. Bow-Spring Centralizer Slip-On Type
Install over stop ring, placing just above couplings to minimize damage. Install over casing couplings in larger diameter casing and over stop ring in lower clearance conditions. Place across shoe track and any critical points.
Casing Accessories
Inside previous casing with Rigid Centralizer normal clearances (9 5/8-in. casing in a 13 3/8-in. casing). Where clearance prevents Integral Centralizer Sub standard bow or rigid centralizers from being used, i.e., 11 3/4-in. liner in 13 3/8-in. casing, and in flush joint casing applications that require the mitigation of centralizer stacking. High angle sections, especially for larger casing sizes, and for applications in which it is difficult to get casing to bottom. Solid Body Centralizer
1616
Casing Accessories
Examples of Centralizer Types
* Centralizers with set screws on the bottom band are not recommended because if you pull up on the
casing and the upper band contacts a ledge or previous casing, it can compress or collapse and damage the centralizer.
1717
Casing Accessories
Casing Accessories
1818
Casing Accessories
Quick Reference for Guide Shoe and Float Equipment Selection
Application
Operations in which a double-valve float Guide Shoe collar is to be used to provide a shoe track. For holes with restriction or ledges. For applications in which single-valve float shoes are run. For application in which a single-valve float collar is run. Reamer Shoe Single-Valve Float Collar Single-Valve Float Shoe Introduction
Equipment
Table of Contents
For low cement-in-place differentials or if Single-Valve Float Shoe with side jets casing can be shut-in if floats do not hold. When there is a concern of casing becoming hydraulically locked. For quicker drill-out times. Anti-Plug Rotation Feature For applications with high differentials or Double-Valve Float Collar liners in which additional mitigation is desired to prevent flowback after cement displacement or when guide shoes are run. In tight clearance hole conditions in Autofill Float Collar with ball in place and which there is a low risk of having a well no bypass ports. It requires pumping to control incident. In deepwater when the activate floats. casing can be picked up before entering the stack, and on shelf when there is a very low risk of the well flowing when picking up the casing. When running autofill float collar with Autofill Float Collar with bypass ports ball in place and the ability to pump with high flow conversion rates while picking up casing and liner equipment without activating the floats is needed. When running tieback string and need to Orifice Float Collar sting seal into receptacle without becoming hydraulically locked with floats in the string and need ability to bleed back to sting into the receptacle. In large diameter casing strings (i.e., 16-in. and larger casing strings). Casing run and hung conventionally. Stab-In Float Collar
General Casing/Liner Operations Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Summary Pipe Handling
When using stab-in float collars and also Screw-In/Stab-In Adapter to land casing via threads in the top of the float collar on screw-in versions.
1919
Casing Accessories
Application
In large diameter casing strings (i.e., 16-in. and larger), or casing strings when casing is to be run on drill pipe.
Equipment
Screw-In/Stab-In Float Collar Table of Contents
In tight clearance conditions and when Combination Float Collar/Bow-Spring running casing or liner with premium Centralizer threads, or to avoid having to order both a float shoe and an integral centralizer sub with premium threads.
Introduction
Guide Shoe
Reamer Shoe
2020
Casing Accessories
Converted
Orifice Collar
2121
Casing Accessories
Stab-In Stinger
Screw-In Stinger
2222
The following information is provided to assist the engineer or DSM in the thought processes that are involved in engineering and field planning procedures and should be used as examples of the types of things that should be considered in job planning. This list is not comprehensive; engineering and field plans should include information that is applicable to the specific situation.
Introduction
Engineering Planning
Ensure that liner hangers and the liner/casing running tools are designed for the combined loads of liner weight, mud weight differential, and pressure tests. Determine from torque and drag modeling whether rotation may be required to get the liner to bottom. In choosing a setting pressure on the liner hanger, determine whether differential pressures could be created during execution that could accidentally set the liner hanger. The liner hanger systems should be designed with a tieback sleeve length allowing the bottom of the tieback stem to be partially stung into the tieback sleeve when cementing the tieback casing. For liners on directional wells with relatively high torque and drag, establish a way to determine, using pressure, if the liner has been released from the running tool. Determine if the spotting of heavy mud/loss circulation material on bottom prior to pulling out of hole to run the liner will affect the setting pressures of the liner hanger and liner top packer. If multiple vendors are employed, it is imperative that the Unocal Drilling Engineer coordinating the operation ensures that good communication exists between all parties and that equipment compatibility issues are addressed. Determine if heavy weight drill pipe is needed in the running string based on torque and drag modeling.
Casing Accessories
If multiple vendors are employed, the Unocal Drilling Engineer must ensure that good communication exists between all parties and that equipment compatibility issues are addressed.
Pipe Handling
Drillpipe wiper darts and balls must be able to pass through HWDP. Determine if non-rotating wiper plugs should be utilized for the liner/casing application.
2323
Ball-in-place autofill equipment should be sized so that it activates at high flow rates to prevent the float from tripping prematurely. Conventional ball-activated autofill equipment has a low flow entry area, which may lead to solids buildup and plugging. When available, use large-bore, ball activated autofill equipment to eliminate this problem. In wellbores with severe dog legs, consider the use of a specialized guide shoe to guide the bottom off of any ledges encountered. The float or guide shoe should have side ports to prevent it from becoming plugged. A minimum of two floats is recommended. Determine if float equipment is to be installed on shore or at the rig site. Determine if backup float equipment is needed. Determine whether a Unocal representative needs to witness the assembly and inspection of equipment for quality control purposes prior to shipment. Determine if centralizers will be run in the liner lap if cement is to be brought into the liner lap. The design of the centralizers should prevent stacking as the casing is run into the wellbore. Determine whether only a preliminary integrity test is required after setting the liner top packer (LTP) followed by a full pressure test after the cement sets. The LTP test pressure should be greater than or equal to the planned LOT/ FIT after drilling out. When a pack-off bushing is being used, make sure that an isolated back side test can be performed. The packoff bushing and seal assembly length must be long enough and compatible (including safety margin) to allow the required pipe movement during operations and to avoid pulling seals out of seal bore.
Introduction
Casing Accessories
2424
Contingency Planning
A contingency plan for each of the following circumstances should be discussed in advance of actual job execution as applicable.
A contingency plan for possible well circumstances should be discussed before the job. Table of Contents
Communication of overall liner execution objectives including Getting liner to bottom Minimizing mud losses Getting a primary cement job Releasing the running tool Getting a test on the backside
Introduction
Casing or liner fails to get to required depth Severe loss circulation encountered while running or cementing Premature or failed release of drill pipe or liner wiper plugs Wiper plug does not bump Float equipment failure Hydraulic liner hanger does not set Liner top packer fails to hold required pressure
Field Planning
Ensure that adequate communication of critical issues has been performed between major vendors, Unocal employees, and rig crews. Ensure that the procedure is detailed enough and understood for successful job executions including contingencies. Determine the maximum over pull on the drill pipe and liner that can be performed based on actual well conditions. Ensure that the drill pipe has been rabbited or gauged for the largest drill plug wiper dart dimension to be pumped. Understand the setting pressure on a hydraulic hanger. Understand the consequences of swab/surge parameters based on a wellbores geometry, mud properties, and planned running speeds to verify acceptable conditions. Calculate liner running speeds and surge pressures. Determine how many joints can be run without filling and not exceeding defined pressure differentials.
Casing Accessories
Ensure that adequate communication of critical issues has been performed between major vendors, Unocal employees, and rig crews.
2525
Determine if hole conditions or previous losses necessitate a slow pump start-up speed. Ensure that sufficient mud is on location for expected losses while running liner, plus the volume required to displace cement without returns.
Introduction
Understand the rate and pressure needed to convert autofill float equipment. Determine when autofill float equipment will be activated if no losses occur. Determine in advance key milestone depths based on joint numbers such as the following: Where the shoe enters a diameter change Where the shoe enters the open hole Where the shoe passes troublesome zones (shales, faults, permeable interval) Where the shoe enters or exits high dog legs Where the liner hanger passes any downhole diameter change Compare string loads and over pull to rig hoisting capacity and number of lines strung Where to change elevators if required
General Casing/Liner Operations Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Summary Pipe Handling
2626
Pipe Handling
Pipe Handling
Safe handling of pipe is important to preventing damage to the pipe. The following text provides recommendations for safe handling and transport of pipe.
Table of Contents
Pre-Run Preparation
Pipe should be ordered and delivered to the location early enough to be off-loaded in a safe manner, drifted, tallied, and visually inspected off the critical path. All items to be run downhole should be dimensionally checked (drifted, OD measured, length measured, etc.) for compatibility with hole diameter, downhole or wellhead minimum ID restrictions, and OD of all concentric tools to be used during the completion process. Enough additional joints of pipe should be ordered to allow for joints found to be defective (joints with possible thread damage, joints damaged during the delivery process, or joints which will not drift). In some cases, additional couplings, seal rings, and pup joints (if needed for spacing) should also be ordered early enough to be drifted, tallied, and visually inspected.
Introduction
Casing Accessories
1. After the vessel transporting the casing is secured alongside the rig, lift the casing from the vessels deck to the rig's pipe racks. Ensure that casing protectors are in place. 2. Ensure that the proper slings, hooks, or clamps are used and that each sling is equipped with a tag line. Casing hooks must have a blunt end to prevent them from digging into plastic protectors and damaging the threads. Slings, shackles, and hooks must have current inspection and loading certificates. Ensure that there will be sufficient light and that visibility is good when moving tubulars. Ensure that there is clear communication between the rigger and the crane operator. 3. Ensure that slings used are able to handle the expected loads. Refer to the business units lifting procedures/guidelines for additional information. 4. Transfer the casing to the pipe rack and lay the casing out evenly. If possible, have the box end a little bit higher than the pin end to prevent cleaning fluid residue to accumulate in the box end.
2727
Pipe Handling
5. Remove box and pin protectors and drift the casing with the proper size drift for the size casing being used. Discard any joints that do not drift. Mark them and send them back to the warehouse. Ensure that the type of defect is noted on the joint, painted in red, and mentioned in the shipping manifest. 6. Clean threads with a nontoxic solvent, soap, and high-pressure wash gun. Thoroughly dry and inspect threads. Check the location of the white band marking them. The bottom of the white band must be on the bottom of the buttress triangle. Install clean dry protectors or quick-release protectors. 7. Measure and record the first row of casing (measurements from top of box to bottom of triangle on the pin end for buttress thread connection). 8. Prior to adding the second row of casing, put planking down on top of the first row directly above the load bearing areas on the pipe racks to avoid buckling or bending the joints. (Cover pin and box with plastic sheets/tarpaulin to avoid contamination from cleaning upper layers).
Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Summary Pipe Handling
2828
Pipe Handling
Making Up and Running CasingSlip to Slip
Proper alignment is critical in the process of making up the casing. Even small errors in the alignment can lead to connection damage.
Alignment is critical in the process of making up the casing. Even small errors in the alignment of tubing and casing during make-up can lead to connection damage. For premium connections or to avoid seal damage, use a stab-in guide. Power and backup tongs are to be properly aligned and with load cell and snub line at 90 degrees to tong. Pre-calibrate torque gauges and check snub lines for proper length. Once the make-up torque has been determined (manufacturer's recommended make-up or base of triangle in the case of buttress thread connection), the dump valve on the power tong should be set at optimum value and compensated for over torque depending on speed of make up. Dump valve settings will be determined by the Unocal DSM.
Table of Contents Introduction General Casing/Liner Operations Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Summary Pipe Handling
2929
Contacts Lawrence Weber, Consulting Drilling Engineer Tel.: (281) 287-5224 Fax: (281) 287-5390 e-mail: lawrence.weber@unocal.com Casing, Liner Running, and Cementing Network https://myteam.unocal.com/myteam/llisapi.dll/ Team_Roster_and_Contact_Information.doc?func=doc.Fetch&nodeId=5239 843&docTitle=Team+Roster+and+Contact+Information Central Drilling Group To access the Central Drilling Group website, copy and paste the following URL into your browser: http://mymigportalv2.unocal.com:7778/portal/ page?_pageid=34,66322&_dad=portal&_schema=PORTAL
Liner Hanger Assemblies Casing Accessories Eng. & Field Planning Summary
Unocal Corporation Central Drilling Group 14141 Southwest Freeway Sugar Land, TX 77478 USA June 2004
Pipe Handling