Design Intent Memorandum


Kawatha Barrage (Storage) Project
1.0

Introduction

Kawatha Barrage (storage) Project is a proposed Minor Irrigation Project


envisaging construction of R.C.C. Barrage across Mun River and earthen
embankments on left and right flanks to irrigate 1722 ha of land. Mun River is a
tributary of Purna River which is the main tributary of Tapi River. The Barrage site is
located upstream of Village Kawatha in Balapur Taluka of Akola District. The
location of the Barrage site at Latitude: 20' 50' 24 " and Longitude: 76' 46' 23" has
been decided by the Project authorities. The catchment area up to Kawatha
Barrage site is 2314.31 km2.
2.0

Hydrology

Hydrology of the project has been submitted by Project Authorities letter No.
WAP/Kawatha Barrage/Akola/2011 dated 7-02-2011 in the form of report titled:
Volume II Hydrology. The inputs provided in the report were further modified vide
Executive Engineer, Akola Irrigation Division, Akola letter No 3550/TS-2/Kawatha
Barrage/12 dated 15-05-2012 and No. 4317/TS-2/Kawatha Barrage/ 12 dated 8-062012 . The main design inputs for barrage on the above basis are as follows:
i.
ii.
iii.
iv.
v.
vi.

1 in 100 yr Flood
=
9149.12 say 9150 cumecs
F. R. L. (Pond Level)
=
242.5
m
1 in 500 yr Flood / SPF
=
12607 cumec
Observed HFL corresponding to 1 in 500 yr Flood / SPF
=
246.63 m
River Bed Slope
=
0.0011
Average River Bed Level
=
232.5
m

At Pond Level, the water shall spread inside the reservoir created by the
embankment Dam. Before monsoon, the gates shall be opened fully so that the
design discharge may pass safely through the barrage.
It is intimated by Project authorities that the farmers shall lift water from the
reservoir created through lift by themselves and as such no Outlet or Head
Regulator is proposed.
The design of embankment dam and hydro-mechanical works is not in the
scope of work of WAPCOS. In the absence of G-D curve at the barrage site, cross
sectional data provided in the drawing L Section of Barrage Line has been used
for the computation of G-D Curve. Manning's coeff has been assumed as 0.03
which is given in the Hydrology report. The un-retrogressed curve has been derived
as per provisions of IS 2912. The River bed slope has been taken as 0.0011 which
is provided in the report titled Volume II Hydrology mentioned above. Vide letter
No. 3329/TS-6/Kawatha Barrage/ 12 dated 6-07-2012 some observed water level
values along with corresponding discharges were provided by Project Authorities.
However these values were dependent on the passage of discharge through a
saddle portion at 0.00 RD which shall not be there after construction of

embankment dam, therefore, the G - D curve values computed as per above para
were adopted for design of various components of barrage.
Retrogression values of 0.3 m at high flood and 1.8 m for low discharges are
adopted as per provisions of IS 6966.
Following salient Water Levels (retrogressed as well as un-retrogressed) were
computed on the basis of G-D curve :
S.
No.
1
2
3
4
5

3
3.1

100Yr.R.F.
500 yr R.F.
75% 100Yr.R.F.
50% 100Yr.R.F.
25% 100Yr.R.F.

Discharge
Water Level
(cumec)
(m)
Retro Levels (m)
9150
245.63
244.93
12607
246.53
246.24
6862.5
244.89
243.91
4575
243.98
242.72
2287.5
242.52
240.98
See annexure - I for the detailed calculations

Hydraulic Design
Waterway

From the cross section of the river it was found that the average river bed
level is about 232.5 m in the central portion of river. It was further intimated vide
letter No. 3329/TS-6/Kawatha Barrage/ 12 dated 6-07-2012 that to protect right
bank the waterway of barrage should not be provided beyond RD 640 m. Therefore
the barrage waterway was required to be shifted towards 0 RD. As higher ground
was found at LHS, the waterway was divided into two portions with different sill
levels so as to minimise earthwork as well for better river training etc.
The waterway has been provided as follows:
8 nos bays each of clear waterway of 15 m with crest level at 233.5 m and pier
width 2.5 m have been provided on RHS. These bays are further divided into two
portions of 4 bays each (separated by a double pier of thickness 5 m having 25 mm
thick expansion joint with seal). On LHS, 5 no bays each of clear waterway 15 m
with crest level at 236.5 m and pier width 2.0 m are proposed. A double pier of
thickness 4.0 m having 25 mm thick expansion joint with seal has also been
proposed to separate RHS and LHS portion of waterway.

RHS Portion Bays


LHS Portion Bays
Piers RHS Portion
Double Pier RHS Portion
Piers in LHS Bays
Double Pier between RHS and LHS Portion

No.
8
5
6
1
4
1

Width(m)
15
15
2.5
5.025
2
4.525

Total (m)
120
75
15
5.025
8
4.525

Total waterway between abutments = 227.55 m


The above waterway has been provided to pass safely the design flood of
9150 cumec (1 in 100 yr Flood). The freeboard is checked for design flood of 12607
cumec (1 in 500 yr Flood). Due to uncertainty of computed G-D curve and safety of

embankment dam provided on both sides of Barrage, the observed high flood level
of 246.63 is considered for freeboard computation in place of computed value by GD curve (which is lower than observed value at EL 246.53 m). Afflux for 1 in 100
year flood is about 0.27 m and for 1 in 500 year is about 0.75 m therefore affluxed
HFL for 1 in 500 year flood is 247.38 m. It is seen from the calculations that the
afflux is well within limits.
Top of piers are provided with 1.52 m freeboard above this level at EL 248.9
m. The top deck level of bridge provided is further 2 m above at EL 250.9 m
See Annexure - II for detailed hydraulic calculations
3.2

Energy Dissipation Arrangement

Since rock level is very deep and barrage is founded on soil, a stilling basin
has been provided to take care of excessive scouring and undermining of
foundation.
The stilling basin requirement have been based on different conditions viz
design discharge passing with 20% concentration and flood passing with various
gate openings 1 m, 2m, 3m etc at pond level.
A condition has also been tested when 25% of design discharge (i.e. 2287.5
cum) is released from barrage through equal partial release from all gates of RHS
portion and pond level is maintained on upstream.
Based on all such considerations and as per provisions of IS4997, stilling
basin with cistern level at 230 m and length 30 m has been provided for RHS bays
& stilling basin with cistern level at 232 m with 25 m length has been provided for
LHS bays. Basin Blocks have also been provided in the basin.
See Annexure - II for detailed hydraulic calculations
3.3

Silt Factor

Silt factor has been taken as 1.09 as per value provided by Executive
Engineer, Akola Irrigation Division, Akola vide letter No 3550/TS-2/Kawatha
Barrage/12 dated 15/05/2012.
3.4

R.C.C. Cutoff Walls

Cut offs are barriers provided below the floor of the structure both at the
upstream and downstream ends. They extend from bank to bank and also in the
longitudinal direction along the flow. The main purpose of cut offs is to lengthen the
seepage path below the structure and also to prevent piping action below the floor.
RCC cutoffs are chosen due to relatively hard foundation strata where driving of
sheet piles is difficult and sheet piles may get damaged leading to unsafe seepage
flow beneath barrage.
Upstream cut off is required for safety against scour and also to reduce the
seepage pressures beneath the floor. Downstream cut off is required for safety
against scour and also safety against piping action. The cut offs in the longitudinal
direction also known as cross cut offs provide boxing effect adding to the stability of
the blocks / units of the structure. They should be continuous and leak proof. The
depth to which these are taken below the floor levels depends on the safety factor
adopted in the designs. As a general practice in the design of barrages and weirs on

permeable foundation, seepage below barrage is natural but the magnitude of


seepage will depend upon the permeability of foundation strata. However the
scouring, exit gradient and piping are taken care.
For safety against scour the required depth for upstream / downstream cutoffs are EL 226.93 m (u/s) / 221.56 m (d/s) for RHS bays and 232.28 m (u/s) /
228.24 m (d/s) for LHS bays respectively. However upstream / downstream cut-offs
have been provided upto the level of EL 225 m (u/s) / 221.5 m (d/s) for RHS bays
and 229.0 m (u/s) / 226.2 m (d/s) for LHS bays respectively for consideration like soil
strata, uplift force distribution etc. Since relatively impermeable strata may be
encountered at the downstream cutoff location above EL 221.5 m and this may
cause the uplift pressure to build up below the raft floor, it is proposed to provide
1200 mm thick layer of pervious material (sand) overlain by 600 thick inverted filter.
Pressure release pipes shall be provided with outlet in basin blocks and end sill to
safely release the water pressure. Non-return valves shall also be provided to avoid
ingress of water below the raft. Cross cutoffs shall also be provided below double
piers and abutments. The grade of concrete proposed for RCC cut off is
M20 MSA 20.
3.5

Flexible protection works

Flexible protection works in the form of CC blocks and loose stone launching
apron have been designed as per provisions of IS: 6966 on the upstream and
downstream of the Barrage. The C.C. blocks of 1.5X1.5X0.9m size over 0.6m thick
spawls on the upstream end of barrage floor and over 0.60m thick inverted filter and
partly over 0.60m spawls have been provided on the downstream side of RCC floor..
The C.C. blocks on upstream and downstream end are provided to cater scour 1.5R
and 2.0R for a length of 1D and 1.5D, where D is the depth of scour below apron
level and R is the normal Laceys scour depth. Beyond C.C. blocks protection with
loose stone apron both on the upstream and downstream ends have been provided.
While computing the requirements of this loose stone apron, launching slope of 2:1
has been considered. The protections works are designed for a design flood
corresponding to 9150 cumecs. This protection works form first line of defence for
the barrage against scouring and shall need monitoring, maintenance and renewal
as per requirement after every flood season.
3.6 Looseness Factor:
The looseness factor has been worked out to be 0.5.
3.7 Exit Gradient:
The foundation strata consists mainly of alluvial deposits and conglomerates.
The fresh (hard) rock is encountered at considerable depth. The cut-offs have been
taken up to El 225.00 m (u/s) / EL 221.5 m (d/s) for RHS bays and 229.0 m (u/s) /
226.2 m (d/s) against scour, seepage and exit gradient condition. With this
arrangements, the exit gradient worked out as per Khoslas formula is more than 1 in
6 against the safe exit gradient of 1 in 6 to 7 as per IS:6966.
For Hydraulic Design refer Annexure-II.

4.0 Raft Floor

i.

ii.

iii.
iv.

R.C.C raft foundation has been provided due to following considerations.


The soil below foundation is having low safe bearing capacity. By combining
the footings of piers with raft, the unit pressure on the soil below piers get
redistributed due to redistribution of pressure over raft.
If random distribution of compressive zones exists in the soil foundation, raft
structure acts as a bridge over the compressible zones and the differential
settlements are minimized.
A raft floor takes advantage of the weight of piers to resist the uplift pressure.
In seismic areas as in the present case raft foundation is structurally superior
in comparison of gravity floor with large thickness which is more vulnerable
to cracking. The piers and abutments/ end piers are constructed
monolithically in RCC M20 MSA40. For the purpose of structural design of
raft: it would be divided into various zones depending on the intensity of
loading transferred to the raft from external loading through piers. The raft
would be designed as beam on elastic foundation.

Earthquake Forces:
According to IS:1893-2002 classifications, the location of the barrage falls
under Earth Quake Zone-III. The design horizontal acceleration coefficient according
to the above codes is 0.12 and vertical acceleration is 0.08. The earthquake forces
are analyzed with the seismic coefficient method.
The following forces have been considered for the analysis and design of raft.
(i) Dead Loads of Gantry cum Road bridge, piers and raft.
(ii) Live Load due to Gantry cum Road Bridge IRC class A
(iii) Impact and breaking effects of live loads
(iv) Temperature forces transmitted through bridge bearings
(v) Dead and live load of gates, stoplogs counter weights and hoist bridge
(vi) Braking effect of gantry crane
(vii) Buoyancy
(viii) Differential hydrostatic pressure with one gate open and other adjacent gate
closed
(ix) Seismic forces and moments and
(x) Hydrodynamic forces due to earthquake.
To resist the worst combination of the above forces and moments raft
thickness of 2.5m for RHS and 2.0 m for LHS portion is proposed.
5.0 Stability Analysis
5.1 Piers & Abutments
The top of the piers has been kept at EL248.9 to hold the gates clear off the
maximum flood while making ample allowance for passing the floating debris under
the gate. The height of the piers in the zone away from Gate Bridge and Gantry cum
road bridge zones have been reduced as per dispersion requirement of loads. On
downstream side the pier height is reduced from 248.9 to 238.5 m in incremental
way allowing partial submergence of the piers on d/s and no submergence on u/s
under pond level condition. The height of the piers away from gate bridge and gantry
bridge is kept as minimum as possible and extended upto the ends of raft for

countering the uplift, to avoid excessive cantilever action of raft and dead weight
requirement while computing the overall stability of the structure. The barrage is
divided into three units with 4+4+5 bays. Each unit is separated from other with a
double pier. The units localize the settlements if any and allow expansion and make
easy of construction.
5.2 Stability
The stability of gated barrage is checked against sliding, floating during flood
condition and overturning for both non earth quake and earth quake conditions as
per IS:6512. The factor of safety against sliding are more than the desired safe
values of 1.5 and 1.2 respectively. For all possible combination of forces the
resultant falls within the middle third and it is safe against overturning and tension.
The maximum base pressures worked out for NEQ and EQ conditions are below the
safe bearing pressure. The factor of safety against floating under flood condition is
adequate.

6.0 Flared out Walls/ Flank Walls/ Guide Bunds


In continuation of the abutments, flank walls are provided on the upstream
and downstream side. The flank walls ensure smooth entry and exit of water from
diversion structure. Guide bunds are provided beyond flank walls to further train the
inflow and outflow of discharge through barrage. These details are being worked out
and are tentatively shown in the drawings.
7.0 Geotechnical Investigation:
The Geotechnical investigation were carried out by Project authorities. The
following reports prepared by Project Authorities were forwarded to WAPCOS:
1. Geotechnical Report, Geological Division, CDO, Nasik
2. Revised Geotechnical Report prepared by M/S Shreya Services, Nagpur
8.0 Bridge:
A single Lane Gantry cum Road Bridge for class 'A' loading without foot-path
is provided on the barrage portion. The width of bridge is taken as 6.5 m to
accommodate the gantry. The bridge deck top level is provided at 250.9 m whereas
the embankment top may be kept at EL 248.9 m Therefore, in continuation of this
bridge, approaches for app. Length of 40 m on embankments dam top with 1 in 20
slope may be provided to connect the bridge deck level with embankment top level
as per actual site conditions. The embankment Dam top width may also be reduced
from 6.5 m to required top width in this transition zone as per actual site conditions.

References
1.

IS: 2912:1999 Liquid Flow Measurements in Open Channels - Slope-Area


Method.

2.

IS:4997:1968 Criteria for design of hydraulic jump type stilling basins with
horizontal and sloping apron

3.

IS: 6512: 1984 Criteria for design of solid gravity dams.

4.

IS: 6966-Part 1: 1989 Guidelines for hydraulic design of barrages and weirs:
Part 1 Alluvial Reaches.

5.

IS:14344-Design and construction of Diaphragm for under seepage ControlCode of Practice.

6.

CBIP Publication No.179_Manual on Barrages and Weirs on Permeable


Foundation Vol-I&II.

7.

M. Hetenyi-Beams on Elastic Foundation.

8.

IRC-5-Standard Specifications and code of practice for Road BridgesSection I-General Features.

9.

IRC-6- Standard Specifications and code of practice for Road BridgesSection II-Loads and Stresses.

G-D Curve - Mun River


Kawatha Barrage Site
248.0
247.0
246.0

Un- Retrogressed

245.0
244.0
243.0
242.0
241.0

Retrogressed

Elevation (m)

240.0
239.0
238.0
237.0
236.0
235.0
234.0
233.0
232.0
231.0
230.0
229.0
228.0

Discharge (Cumec)

Mun River Cross Section at Barrage Site


248

246

244

ELEVATION (m)

242

240

238

236

234

232

230
0

100

200

300

400

500
RD (m)

600

700

800

900

Design Calculations
Kawatha Barrage

Annexure - I

G-D Curve

G-D Curve Mun River at Proposed Barrage site


Water
Area
P
Level
233.5
62.00
234.0
88.39
234.5
118.56
235.0
153.53
235.5
188.85
236.0
227.78
236.5
267.78
237.0
307.78
237.5
350.68
238.0
396.93
238.5
444.94
239.0
494.94
239.5
544.94
240.0
594.94
240.5
650.79
241.0
727.54
241.5
824.09
242.0
949.74
242.5
1153.79
243.0
1410.14
243.5
1721.99
244.0
2061.64
244.5
2415.39
245.0
2787.14
245.5
3180.99
246.0
3587.64
246.5
4002.01
247.0
4422.01

Mun River
R
55.31
65.54
70.64
75.72
80.88
85.98
86.11
86.34
101.49
101.58
111.68
111.77
111.91
112.09
172.33
192.56
222.74
392.88
482.90
632.92
662.95
712.96
752.97
783.01
813.03
843.03
843.04
843.04

Avg. Vel.
1.12
1.35
1.68
2.03
2.33
2.65
3.11
3.56
3.46
3.91
3.98
4.43
4.87
5.31
3.78
3.78
3.70
2.42
2.39
2.23
2.60
2.89
3.21
3.56
3.91
4.26
4.75
5.25

1.19
1.35
1.56
1.77
1.95
2.12
2.36
2.58
2.53
2.74
2.78
2.98
3.18
3.36
2.68
2.68
2.64
1.99
1.98
1.89
2.09
2.24
2.40
2.58
2.75
2.90
3.12
3.34

Assuming N =
0.03
Slope =
Computed Water Levels are:
Q (cumec) Un-Retro. W. L. (m)
100Yr.R.F. 9150
245.63
500 Yr R.F. 12607.09
246.53
75% of 100Yr.R.F. 6862.5
244.89
50% of 100Yr.R.F. 4575
243.98
25% of 100Yr.R.F. 2287.5
242.52
Discharge at FRL*
Discharge at HFL*

2606.22
5445.1

Q
73.96
119.28
185.12
271.90
367.46
482.13
630.70
794.02
886.06
1088.64
1236.20
1475.51
1730.79
2001.26
1744.76
1951.15
2179.36
1891.23
2279.72
2659.36
3597.27
4626.16
5808.09
7183.36
8731.88
10415.80
12497.04
14758.52

Retrogression Retro levels


1.8
231.70
1.79
232.21
1.79
232.71
1.78
233.22
1.76
233.74
1.75
234.25
1.73
234.77
1.71
235.29
1.70
235.80
1.68
236.32
1.66
236.84
1.63
237.37
1.60
237.90
1.57
238.43
1.60
238.90
1.57
239.43
1.55
239.95
1.58
240.42
1.53
240.97
1.49
241.51
1.37
242.13
1.25
242.75
1.11
243.39
0.94
244.06
0.75
244.75
0.55
245.45
0.30
246.20
0.2
246.80

0.0011
Retro. W. L. (m)
244.93
246.24
243.91
242.72
240.98

W.L.
Observed
(m)
246.63

242.94
244.35

* Communicated vide Exective engineer, akola Irrigation Division vide letter No 4317/TS-2/Kawatha Barrage/12
Dated 8/6/2012

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

233.5 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.305
1.445
1.375
1.465
1.185
1.215
1.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.653
1.375
1.410
1.420
1.325
1.200
1.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.26
6.88
7.05
7.10
6.63
6.00
5.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.17
5.00
5.00
5.00
5.01
5.00
5.00

1.145
1.025
1.145
0
0
0
0
0
0
0
0
0
0
0
0

1.120
1.085
1.085
0.573
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

5.60
5.43
5.43
2.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
62.00

55.31

R
V
Q
1.1209004 1.1929432 73.962478

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

234 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.185
1.805
1.945
1.875
1.965
1.685
1.715
1.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.093
0.995
1.875
1.910
1.920
1.825
1.700
1.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.93
4.98
9.38
9.55
9.60
9.13
8.50
8.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
5.26
5.00
5.00
5.00
5.01
5.00
5.00

1.645
1.525
1.645
0
0
0
0
0
0
0
0
0
0
0
0

1.620
1.585
1.585
0.823
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

8.10
7.93
7.93
4.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
88.39

65.54

R
V
Q
1.3486655 1.3495156 119.28031

Design Calculations
Kawatha Barrage

Assumed Elevation
234.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.685
2.305
2.445
2.375
2.465
2.185
2.215
2.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.343
1.495
2.375
2.410
2.420
2.325
2.200
2.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.43
7.48
11.88
12.05
12.10
11.63
11.00
10.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

2.145
2.025
2.145
0.285
0
0
0
0
0
0
0
0
0
0
0

2.120
2.085
2.085
1.215
0.142
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

10.60
10.43
10.43
6.08
0.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
118.56

70.64

R
V
Q
1.6784533 1.5614015 185.12367

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

235 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.495
1.185
2.805
2.945
2.875
2.965
2.685
2.715
2.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.248
0.840
1.995
2.875
2.910
2.920
2.825
2.700
2.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.24
8.40
9.98
14.38
14.55
14.60
14.13
13.50
13.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.02
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

2.645
2.525
2.645
0.785
0
0
0
0
0
0
0
0
0
0
0

2.620
2.585
2.585
1.715
0.392
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

13.10
12.93
12.93
8.58
1.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
153.53

75.72

R
V
Q
2.0276464 1.7710734 271.90405

Design Calculations
Kawatha Barrage

Assumed Elevation
235.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.065
0.995
1.685
3.305
3.445
3.375
3.465
3.185
3.215
3.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.032
0.530
1.340
2.495
3.375
3.410
3.420
3.325
3.200
3.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
2.65
13.40
12.48
16.88
17.05
17.10
16.63
16.00
15.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

3.145
3.025
3.145
1.285
0
0
0
0
0
0
0
0
0
0
0

3.120
3.085
3.085
2.215
0.642
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

15.60
15.43
15.43
11.08
3.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
188.85

80.88

R
V
Q
2.3349743 1.9457923 367.46288

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

236 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.565
1.495
2.185
3.805
3.945
3.875
3.965
3.685
3.715
3.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.282
1.030
1.840
2.995
3.875
3.910
3.920
3.825
3.700
3.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.41
5.15
18.40
14.98
19.38
19.55
19.60
19.13
18.50
18.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.03
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

3.645
3.525
3.645
1.785
0.285
0
0
0
0
0
0
0
0
0
0

3.620
3.585
3.585
2.715
1.035
0.142
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

18.10
17.93
17.93
13.58
5.17
0.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
227.78

85.98

R
V
Q
2.6492852 2.1167077 482.13311

Design Calculations
Kawatha Barrage

Assumed Elevation
236.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.065
1.995
2.685
4.305
4.445
4.375
4.465
4.185
4.215
4.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.532
1.530
2.340
3.495
4.375
4.410
4.420
4.325
4.200
4.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.66
7.65
23.40
17.48
21.88
22.05
22.10
21.63
21.00
20.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.11
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

4.145
4.025
4.145
2.285
0.785
0
0
0
0
0
0
0
0
0
0

4.120
4.085
4.085
3.215
1.535
0.392
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

20.60
20.43
20.43
16.08
7.67
1.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
267.78

86.11

R
V
Q
3.1097035 2.3553444 630.70234

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

237 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.565
2.495
3.185
4.805
4.945
4.875
4.965
4.685
4.715
4.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.782
2.030
2.840
3.995
4.875
4.910
4.920
4.825
4.700
4.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.91
10.15
28.40
19.98
24.38
24.55
24.60
24.13
23.50
23.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.24
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

4.645
4.525
4.645
2.785
1.285
0
0
0
0
0
0
0
0
0
0

4.620
4.585
4.585
3.715
2.035
0.642
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

23.10
22.93
22.93
18.58
10.18
3.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
307.78

86.34

R
V
Q
3.5647783 2.5798638 794.01757

Design Calculations
Kawatha Barrage

Assumed Elevation
237.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.475
2.065
2.995
3.685
5.305
5.445
5.375
5.465
5.185
5.215
5.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.237
1.270
2.530
3.340
4.495
5.375
5.410
5.420
5.325
5.200
5.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.19
6.35
12.65
33.40
22.48
26.88
27.05
27.10
26.63
26.00
25.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.02
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

5.145
5.025
5.145
3.285
1.785
0.07
0
0
0
0
0
0
0
0
0

5.120
5.085
5.085
4.215
2.535
0.927
0.035
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

25.60
25.43
25.43
21.08
12.68
4.64
0.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
350.68

101.49

R
V
Q
3.4552152
2.526728 886.06033

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

238 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.975
2.565
3.495
4.185
5.805
5.945
5.875
5.965
5.685
5.715
5.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.487
1.770
3.030
3.840
4.995
5.875
5.910
5.920
5.825
5.700
5.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.44
8.85
15.15
38.40
24.98
29.38
29.55
29.60
29.13
28.50
28.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.09
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

5.645
5.525
5.645
3.785
2.285
0.57
0
0
0
0
0
0
0
0
0

5.620
5.585
5.585
4.715
3.035
1.427
0.285
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

28.10
27.93
27.93
23.58
15.18
7.14
2.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
396.93

101.58

R
V
Q
3.9075437 2.7426958 1088.6445

Design Calculations
Kawatha Barrage

Annexure - I

G-D Curve

Assumed Elevation
238.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.235
1.475
3.065
3.995
4.685
6.305
6.445
6.375
6.465
6.185
6.215
6.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.118
0.855
2.270
3.530
4.340
5.495
6.375
6.410
6.420
6.325
6.200
6.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.18
4.28
11.35
17.65
43.40
27.48
31.88
32.05
32.10
31.63
31.00
30.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

6.145
6.025
6.145
4.285
2.785
1.07
0
0
0
0
0
0
0
0
0

6.120
6.085
6.085
5.215
3.535
1.927
0.535
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

30.60
30.43
30.43
26.08
17.68
9.64
5.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

0.03
0.0011
Perimeter

P
444.94

R
111.68

3.984037

V
Q
2.7783737 1236.2027

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

239 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.735
1.975
3.565
4.495
5.185
6.805
6.945
6.875
6.965
6.685
6.715
6.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.368
1.355
2.770
4.030
4.840
5.995
6.875
6.910
6.920
6.825
6.700
6.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.68
6.78
13.85
20.15
48.40
29.98
34.38
34.55
34.60
34.13
33.50
33.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.03
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

6.645
6.525
6.645
4.785
3.285
1.57
0
0
0
0
0
0
0
0
0

6.620
6.585
6.585
5.715
4.035
2.427
0.785
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

33.10
32.93
32.93
28.58
20.18
12.14
7.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
494.94

111.77

R
V
Q
4.4281908 2.9812105 1475.5129

Design Calculations
Kawatha Barrage

Assumed Elevation
239.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.235
2.475
4.065
4.995
5.685
7.305
7.445
7.375
7.465
7.185
7.215
7.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.618
1.855
3.270
4.530
5.340
6.495
7.375
7.410
7.420
7.325
7.200
7.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.18
9.28
16.35
22.65
53.40
32.48
36.88
37.05
37.10
36.63
36.00
35.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.08
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

7.145
7.025
7.145
5.285
3.785
2.07
0
0
0
0
0
0
0
0
0

7.120
7.085
7.085
6.215
4.535
2.927
1.035
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

35.60
35.43
35.43
31.08
22.68
14.64
10.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
544.94

111.91

R
V
Q
4.8695052 3.1761303 1730.7925

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

Summation

Annexure - I

G-D Curve
240 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.735
2.975
4.565
5.495
6.185
7.805
7.945
7.875
7.965
7.685
7.715
7.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.868
2.355
3.770
5.030
5.840
6.995
7.875
7.910
7.920
7.825
7.700
7.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.68
11.78
18.85
25.15
58.40
34.98
39.38
39.55
39.60
39.13
38.50
38.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.15
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

7.645
7.525
7.645
5.785
4.285
2.57
0
0
0
0
0
0
0
0
0

7.620
7.585
7.585
6.715
5.035
3.427
1.285
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

38.10
37.93
37.93
33.58
25.18
17.14
12.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

R
5.3074601

V
3.3638213

Q
2001.2634

A
594.94

P
112.09

Design Calculations
Kawatha Barrage

Annexure - I

G-D Curve

Assumed Elevation
240.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

Summation

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.195
0
0
2.235
3.475
5.065
5.995
6.685
8.305
8.445
8.375
8.465
8.185
8.215
8.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.097
0.097
0.000
1.118
2.855
4.270
5.530
6.340
7.495
8.375
8.410
8.420
8.325
8.200
8.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.92
2.92
0.00
11.18
14.28
21.35
27.65
63.40
37.48
41.88
42.05
42.10
41.63
41.00
40.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
30.00
0.00
10.25
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

8.145
8.025
8.145
6.285
4.785
3.07
0
0
0
0
0
0
0
0
0

8.120
8.085
8.085
7.215
5.535
3.927
1.535
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

40.60
40.43
40.43
36.08
27.68
19.64
15.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

R
3.7764283

V
2.6809945

Q
1744.7577

A
650.79

P
172.33

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

241 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.695
0.335
0.225
2.735
3.975
5.565
6.495
7.185
8.805
8.945
8.875
8.965
8.685
8.715
8.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.347
0.515
0.280
1.480
3.355
4.770
6.030
6.840
7.995
8.875
8.910
8.920
8.825
8.700
8.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.42
15.45
5.60
14.80
16.78
23.85
30.15
68.40
39.98
44.38
44.55
44.60
44.13
43.50
43.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

8.645
8.525
8.645
6.785
5.285
3.57
0
0
0
0
0
0
0
0
0

8.620
8.585
8.585
7.715
6.035
4.427
1.785
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

43.10
42.93
42.93
38.58
30.18
22.14
17.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
727.54

192.56

R
V
Q
3.7782563 2.6818596 1951.1534

Design Calculations
Kawatha Barrage

Assumed Elevation
241.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0.385
1.195
0.835
0.725
3.235
4.475
6.065
6.995
7.685
9.305
9.445
9.375
9.465
9.185
9.215
9.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.192
0.790
1.015
0.780
1.980
3.855
5.270
6.530
7.340
8.495
9.375
9.410
9.420
9.325
9.200
9.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.77
23.70
30.45
15.60
19.80
19.28
26.35
32.65
73.40
42.48
46.88
47.05
47.10
46.63
46.00
45.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

9.145
9.025
9.145
7.285
5.785
4.07
0
0
0
0
0
0
0
0
0

9.120
9.085
9.085
8.215
6.535
4.927
2.035
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

45.60
45.43
45.43
41.08
32.68
24.64
20.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
824.09

222.74

R
V
Q
3.6997268 2.6445687
2179.356

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

242 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0
0.055
0.165
0.885
1.695
1.335
1.225
3.735
4.975
6.565
7.495
8.185
9.805
9.945
9.875
9.965
9.685
9.715
9.595

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.028
0.110
0.525
1.290
1.515
1.280
2.480
4.355
5.770
7.030
7.840
8.995
9.875
9.910
9.920
9.825
9.700
9.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.83
3.30
15.75
38.70
45.45
25.60
24.80
21.78
28.85
35.15
78.40
44.98
49.38
49.55
49.60
49.13
48.50
48.28

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

9.645
9.525
9.645
7.785
6.285
4.57
0.19
0
0
0.44
0.1
0
0
0
0

9.620
9.585
9.585
8.715
7.035
5.427
2.380
0.095
0.000
0.220
0.270
0.050
0.000
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

48.10
47.93
47.93
43.58
35.18
27.14
23.80
1.90
0.00
6.60
8.10
1.50
0.00
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
0.00
30.00
30.00
30.00
0.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
949.74

392.88

R
V
Q
2.4173971 1.9913171 1891.2285

Design Calculations
Kawatha Barrage

Assumed Elevation
242.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0
0
0
0
0
0
0.445
0.555
0.665
1.385
2.195
1.835
1.725
4.235
5.475
7.065
7.995
8.685
10.305
10.445
10.375
10.465
10.185
10.215
10.095

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.222
0.500
0.610
1.025
1.790
2.015
1.780
2.980
4.855
6.270
7.530
8.340
9.495
10.375
10.410
10.420
10.325
10.200
10.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.67
15.00
18.30
30.75
53.70
60.45
35.60
29.80
24.28
31.35
37.65
83.40
47.48
51.88
52.05
52.10
51.63
51.00
50.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

10.145
10.025
10.145
8.285
6.785
5.07
0.69
0.4
0
0.94
0.6
0.44
0
0
0

10.120
10.085
10.085
9.215
7.535
5.927
2.880
0.545
0.200
0.470
0.770
0.520
0.220
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

50.60
50.43
50.43
46.08
37.68
29.64
28.80
10.90
6.00
14.10
23.10
15.60
6.60
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.00
30.01
30.00
30.00
30.00
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
1153.79

482.90

R
V
Q
2.3892967 1.9758553 2279.7172

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

243 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0
0
0.225
0.015
0.275
0.215
0.485
0.945
1.055
1.165
1.885
2.695
2.335
2.225
4.735
5.975
7.565
8.495
9.185
10.805
10.945
10.875
10.965
10.685
10.715
10.595

0.000
0.000
0.000
0.000
0.112
0.120
0.145
0.245
0.350
0.715
1.000
1.110
1.525
2.290
2.515
2.280
3.480
5.355
6.770
8.030
8.840
9.995
10.875
10.910
10.920
10.825
10.700
10.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
0.00
3.37
3.60
4.35
7.35
10.50
21.45
30.00
33.30
45.75
68.70
75.45
45.60
34.80
26.78
33.85
40.15
88.40
49.98
54.38
54.55
54.60
54.13
53.50
53.28

0.00
0.00
0.00
0.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

10.645
10.525
10.645
8.785
7.285
5.57
1.19
0.9
0.33
1.44
1.1
0.94
0
0
0

10.620
10.585
10.585
9.715
8.035
6.427
3.380
1.045
0.615
0.885
1.270
1.020
0.470
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

53.10
52.93
52.93
48.58
40.18
32.14
33.80
20.90
18.45
26.55
38.10
30.60
14.10
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.01
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
1410.14

632.92

R
V
Q
2.2279777 1.8858869 2659.3598

Design Calculations
Kawatha Barrage

Assumed Elevation
243.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0
0
0.395
0.725
0.515
0.775
0.715
0.985
1.445
1.555
1.665
2.385
3.195
2.835
2.725
5.235
6.475
8.065
8.995
9.685
11.305
11.445
11.375
11.465
11.185
11.215
11.095

0.000
0.000
0.000
0.198
0.560
0.620
0.645
0.745
0.850
1.215
1.500
1.610
2.025
2.790
3.015
2.780
3.980
5.855
7.270
8.530
9.340
10.495
11.375
11.410
11.420
11.325
11.200
11.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
0.00
5.93
16.80
18.60
19.35
22.35
25.50
36.45
45.00
48.30
60.75
83.70
90.45
55.60
39.80
29.28
36.35
42.65
93.40
52.48
56.88
57.05
57.10
56.63
56.00
55.78

0.00
0.00
0.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

11.145
11.025
11.145
9.285
7.785
6.07
1.69
1.4
0.83
1.94
1.6
1.44
0
0
0

11.120
11.085
11.085
10.215
8.535
6.927
3.880
1.545
1.115
1.385
1.770
1.520
0.720
0.000
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

55.60
55.43
55.43
51.08
42.68
34.64
38.80
30.90
33.45
41.55
53.10
45.60
21.60
0.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.03
0.00
0.00

A
Summation

Annexure - I

G-D Curve

P
1721.99

662.95

R
V
Q
2.5974777 2.0890218 3597.2694

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

244 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0
0
0.405
0.895
1.225
1.015
1.275
1.215
1.485
1.945
2.055
2.165
2.885
3.695
3.335
3.225
5.735
6.975
8.565
9.495
10.185
11.805
11.945
11.875
11.965
11.685
11.715
11.595

0.000
0.000
0.203
0.650
1.060
1.120
1.145
1.245
1.350
1.715
2.000
2.110
2.525
3.290
3.515
3.280
4.480
6.355
7.770
9.030
9.840
10.995
11.875
11.910
11.920
11.825
11.700
11.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
0.00
6.08
19.50
31.80
33.60
34.35
37.35
40.50
51.45
60.00
63.30
75.75
98.70
105.45
65.60
44.80
31.78
38.85
45.15
98.40
54.98
59.38
59.55
59.60
59.13
58.50
58.28

0.00
0.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

11.645
11.525
11.645
9.785
8.285
6.57
2.19
1.9
1.33
2.44
2.1
1.94
0.5
0
0

11.620
11.585
11.585
10.715
9.035
7.427
4.380
2.045
1.615
1.885
2.270
2.020
1.220
0.250
0.000

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

58.10
57.93
57.93
53.58
45.18
37.14
43.80
40.90
48.45
56.55
68.10
60.60
36.60
5.00
0.00

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.03
20.01
0.00

A
Summation

Annexure - I

G-D Curve

P
2061.64

R
712.96

2.891674

V
Q
2.2439231
4626.156

Design Calculations
Kawatha Barrage

Assumed Elevation
244.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0
0.000
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
0.00

0.00
0.00

0
0.175
0.905
1.395
1.725
1.515
1.775
1.715
1.985
2.445
2.555
2.665
3.385
4.195
3.835
3.725
6.235
7.475
9.065
9.995
10.685
12.305
12.445
12.375
12.465
12.185
12.215
12.095

0.000
0.088
0.540
1.150
1.560
1.620
1.645
1.745
1.850
2.215
2.500
2.610
3.025
3.790
4.015
3.780
4.980
6.855
8.270
9.530
10.340
11.495
12.375
12.410
12.420
12.325
12.200
12.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

0.00
2.63
16.20
34.50
46.80
48.60
49.35
52.35
55.50
66.45
75.00
78.30
90.75
113.70
120.45
75.60
49.80
34.28
41.35
47.65
103.40
57.48
61.88
62.05
62.10
61.63
61.00
60.78

0.00
30.00
30.01
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

12.145
12.025
12.145
10.285
8.785
7.07
2.69
2.4
1.83
2.94
2.6
2.44
1
0.4
0

12.120
12.085
12.085
11.215
9.535
7.927
4.880
2.545
2.115
2.385
2.770
2.520
1.720
0.700
0.200

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

60.60
60.43
60.43
56.08
47.68
39.64
48.80
50.90
63.45
71.55
83.10
75.60
51.60
14.00
2.00

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.03
20.01
10.01

A
Summation

Annexure - I

G-D Curve

P
2415.39

752.97

R
V
Q
3.2077975 2.4046196 5808.0881

Design Calculations
Kawatha Barrage
Assumed Elevation
Assumed
RD
RL
Depth
0
246.375
30
245.695
60
245.095
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

245 m

n for Main River


Slope
Mean Depth Length
Area

0.03
0.0011
Perimeter

0
0
0

0.000
0.000

30
30

0.00
0.00
0.00

0.00
0.00

0.225
0.675
1.405
1.895
2.225
2.015
2.275
2.215
2.485
2.945
3.055
3.165
3.885
4.695
4.335
4.225
6.735
7.975
9.565
10.495
11.185
12.805
12.945
12.875
12.965
12.685
12.715
12.595

0.112
0.450
1.040
1.650
2.060
2.120
2.145
2.245
2.350
2.715
3.000
3.110
3.525
4.290
4.515
4.280
5.480
7.355
8.770
10.030
10.840
11.995
12.875
12.910
12.920
12.825
12.700
12.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

3.37
13.50
31.20
49.50
61.80
63.60
64.35
67.35
70.50
81.45
90.00
93.30
105.75
128.70
135.45
85.60
54.80
36.78
43.85
50.15
108.40
59.98
64.38
64.55
64.60
64.13
63.50
63.28

30.00
30.00
30.01
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

12.645
12.525
12.645
10.785
9.285
7.57
3.19
2.9
2.33
3.44
3.1
2.94
1.5
0.9
0

12.620
12.585
12.585
11.715
10.035
8.427
5.380
3.045
2.615
2.885
3.270
3.020
2.220
1.200
0.450

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

63.10
62.93
62.93
58.58
50.18
42.14
53.80
60.90
78.45
86.55
98.10
90.60
66.60
24.00
4.50

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.03
20.01
10.04

A
Summation

Annexure - I

G-D Curve

P
2787.14

783.01

R
V
Q
3.5595174 2.5773249 7183.3588

Design Calculations
Kawatha Barrage

Assumed Elevation
245.5 m
n for Main River
Assumed
Slope
RD
RL
Depth
Mean Depth Length
Area
0
246.375
0
30
245.695
0
0.000
30
60
245.095
0.405
0.203
30
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

0.03
0.0011
Perimeter
0.00
0.00
6.08

0.00
30.00

0.725
1.175
1.905
2.395
2.725
2.515
2.775
2.715
2.985
3.445
3.555
3.665
4.385
5.195
4.835
4.725
7.235
8.475
10.065
10.995
11.685
13.305
13.445
13.375
13.465
13.185
13.215
13.095

0.565
0.950
1.540
2.150
2.560
2.620
2.645
2.745
2.850
3.215
3.500
3.610
4.025
4.790
5.015
4.780
5.980
7.855
9.270
10.530
11.340
12.495
13.375
13.410
13.420
13.325
13.200
13.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

16.95
28.50
46.20
64.50
76.80
78.60
79.35
82.35
85.50
96.45
105.00
108.30
120.75
143.70
150.45
95.60
59.80
39.28
46.35
52.65
113.40
62.48
66.88
67.05
67.10
66.63
66.00
65.78

30.00
30.00
30.01
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

13.145
13.025
13.145
11.285
9.785
8.07
3.69
3.4
2.83
3.94
3.6
3.44
2
1.4
0.34

13.120
13.085
13.085
12.215
10.535
8.927
5.880
3.545
3.115
3.385
3.770
3.520
2.720
1.700
0.870

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

65.60
65.43
65.43
61.08
52.68
44.64
58.80
70.90
93.45
101.55
113.10
105.60
81.60
34.00
8.70

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.03
20.01
10.06

A
Summation

Annexure - I

G-D Curve

P
3180.99

813.03

R
V
Q
3.9125135 2.7450209 8731.8771

Design Calculations
Kawatha Barrage

Annexure - I

G-D Curve

Assumed Elevation
246 m
n for Main River
0.03
Assumed
Slope
0.0011
RD
RL
Depth
Mean Depth Length
Area
Perimeter
0
246.375
0
0.00
30
245.695
0.305
0.153
30
4.58
30.00
60
245.095
0.905
0.605
30
18.15
30.01
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

1.225
1.675
2.405
2.895
3.225
3.015
3.275
3.215
3.485
3.945
4.055
4.165
4.885
5.695
5.335
5.225
7.735
8.975
10.565
11.495
12.185
13.805
13.945
13.875
13.965
13.685
13.715
13.595

1.065
1.450
2.040
2.650
3.060
3.120
3.145
3.245
3.350
3.715
4.000
4.110
4.525
5.290
5.515
5.280
6.480
8.355
9.770
11.030
11.840
12.995
13.875
13.910
13.920
13.825
13.700
13.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

31.95
43.50
61.20
79.50
91.80
93.60
94.35
97.35
100.50
111.45
120.00
123.30
135.75
158.70
165.45
105.60
64.80
41.78
48.85
55.15
118.40
64.98
69.38
69.55
69.60
69.13
68.50
68.28

30.00
30.00
30.01
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

13.645
13.525
13.645
11.785
10.285
8.57
4.19
3.9
3.33
4.44
4.1
3.94
2.5
1.9
0.84

13.620
13.585
13.585
12.715
11.035
9.427
6.380
4.045
3.615
3.885
4.270
4.020
3.220
2.200
1.370

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

68.10
67.93
67.93
63.58
55.18
47.14
63.80
80.90
108.45
116.55
128.10
120.60
96.60
44.00
13.70

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.03
20.01
10.06

A
Summation

P
3587.64

843.03

R
V
Q
4.2556263 2.9032476
10415.8

Design Calculations
Kawatha Barrage

Annexure - I

G-D Curve

Assumed Elevation
246.5 m
n for Main River
0.03
Assumed
Slope
0.0011
RD
RL
Depth
Mean Depth Length
Area
Perimeter
0
246.375
0.125
0.00
30
245.695
0.805
0.465
30
13.95
30.01
60
245.095
1.405
1.105
30
33.15
30.01
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

1.725
2.175
2.905
3.395
3.725
3.515
3.775
3.715
3.985
4.445
4.555
4.665
5.385
6.195
5.835
5.725
8.235
9.475
11.065
11.995
12.685
14.305
14.445
14.375
14.465
14.185
14.215
14.095

1.565
1.950
2.540
3.150
3.560
3.620
3.645
3.745
3.850
4.215
4.500
4.610
5.025
5.790
6.015
5.780
6.980
8.855
10.270
11.530
12.340
13.495
14.375
14.410
14.420
14.325
14.200
14.155

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

46.95
58.50
76.20
94.50
106.80
108.60
109.35
112.35
115.50
126.45
135.00
138.30
150.75
173.70
180.45
115.60
69.80
44.28
51.35
57.65
123.40
67.48
71.88
72.05
72.10
71.63
71.00
70.78

30.00
30.00
30.01
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

14.145
14.025
14.145
12.285
10.785
9.07
4.69
4.4
3.83
4.94
4.6
4.44
3
2.4
1.34

14.120
14.085
14.085
13.215
11.535
9.927
6.880
4.545
4.115
4.385
4.770
4.520
3.720
2.700
1.870

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

70.60
70.43
70.43
66.08
57.68
49.64
68.80
90.90
123.45
131.55
143.10
135.60
111.60
54.00
18.70

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.03
20.01
10.06

A
Summation

P
4002.01

843.04

R
V
Q
4.7471199 3.1226877 12497.035

Design Calculations
Kawatha Barrage

Annexure - I

G-D Curve

Assumed Elevation
247 m
n for Main River
0.03
Assumed
Slope
0.0011
RD
RL
Depth
Mean Depth Length
Area
Perimeter
0
246.375
0.625
0.00
30
245.695
1.305
0.965
30
28.95
30.01
60
245.095
1.905
1.605
30
48.15
30.01
90
120
150
180
210
240
270
300

244.775
244.325
243.595
243.105
242.775
242.985
242.725
242.785

330
360
390
420
450
480
510
530
540
545
550
555
565
570
575
580
585
590
595
600
605
610
615
620
625
630
640
660
690

242.515
242.055
241.945
241.835
241.115
240.305
240.665
240.775
238.265
237.025
235.435
234.505
233.815
232.195
232.055
232.125
232.035
232.315
232.285
232.405
232.355
232.475
232.355
234.215
235.715
237.43
241.81
242.1
242.67

720
750
780
810
830
840

241.56
241.9
242.06
243.5
244.1
245.16

2.225
2.675
3.405
3.895
4.225
4.015
4.275
4.215
4.485
4.945
5.055
5.165
5.885
6.695
6.335
6.225
8.735
9.975
11.565
12.495
13.185
14.805
14.945
14.875
14.965
14.685
14.715
14.595

2.065
2.450
3.040
3.650
4.060
4.120
4.145
4.245
4.350
4.715
5.000
5.110
5.525
6.290
6.515
6.280
7.480
9.355
10.770
12.030
12.840
13.995
14.875
14.910
14.920
14.825
14.700
14.655

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
20
10
5
5
5
10
5
5
5
5
5
5
5

61.95
73.50
91.20
109.50
121.80
123.60
124.35
127.35
130.50
141.45
150.00
153.30
165.75
188.70
195.45
125.60
74.80
46.78
53.85
60.15
128.40
69.98
74.38
74.55
74.60
74.13
73.50
73.28

30.00
30.00
30.01
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.01
30.01
30.00
20.00
10.31
5.15
5.25
5.09
10.02
5.26
5.00
5.00
5.00
5.01
5.00
5.00

14.645
14.525
14.645
12.785
11.285
9.57
5.19
4.9
4.33
5.44
5.1
4.94
3.5
2.9
1.84

14.620
14.585
14.585
13.715
12.035
10.428
7.380
5.045
4.615
4.885
5.270
5.020
4.220
3.200
2.370

5
5
5
5
5
5
10
20
30
30
30
30
30
20
10

73.10
72.93
72.93
68.58
60.18
52.14
73.80
100.90
138.45
146.55
158.10
150.60
126.60
64.00
23.70

5.00
5.00
5.00
5.33
5.22
5.29
10.92
20.00
30.01
30.02
30.00
30.00
30.03
20.01
10.06

A
Summation

P
4422.01

843.04

R
V
Q
5.2453168 3.3375125 14758.522

Kawatha Barrage
Project

Hydraulic Calculations

Hydraulic Calculations for Design flood

Annexure- II

As per IS 6966

A.
Design Flood
Design Flood Discharge (1 in 100 yr) =Q=
9150 cumecs
has been taken as provided by Project Authorities for design of all components of Barrage except
Freeboard for which Design Discharge has been taken as 1 in 500 yr flood = Q' =
12607 cumec as provided by Project authorities.
B.

Lacey's Regime Width

Laceys Regime width = 4.83Q =


C.

462.017 m

Looseness Factor

RHS Portion
LHS Bays
Piers RHS Portion
Double Pier RHS Portion
Piers in LHS Bays
Double Pier between RHS and LHS Portion

No.
8
5
6
1
4
1

Total waterway between abutments=


Hence
Looseness factor

Width(m) Total Sill


(m) Elevation (m)
15
120
233.5
15
75
236.5
2.5
15
5
5
2
8
4.5
4.5
---------227.5 m
0.4924

D.
Intensity of Discharge
Intensity of discharge = Q / Total width provided between abutments
=
Discharge per unit width
Discharge per unit width = q =
40.2198 cumec/m
Silt Factor = f =
1.09 (By Project Authorities)
E.
Scour Depth
q
Scour Depth= R 1 . 35

1
2

Hence Scour Depth = R =

15.4 m

F.
Velocity of Approach
Velocity of Approach = Va = q/R =
Head due to velocity = Ha =

15.3983 for looseness factor<1

Va2/(2g)

2.61195 m/s
=0.34772 m

Mallikpur Curve

say 0.5

Kawatha Barrage
Project

G.

Hydraulic Calculations

Annexure- II

Water way calculation with 8 bays at EL 233.5 (RHS portion)


and 5 bays at 236.5 (LHS portion)
for Design Discharge(1 in 100 yr flood)
9150 cumecs
With all gates fully opened

Water Level corresponding to design flood(Un-Retro.)


Afflux assumed =
Affluxed Water Level
Sill Level of the RHS Portion =

=
=
=
=

245.63
0.2691
245.90
233.5

m
m
m
m

Dischage Q1 from RHS Portion


= C L ( (H +Ha)

Drownded Weir Formula


Drowning ratio =

3/2

3/2

- Ha )

d/s HFL - crest level of spillway


u/s HFL - crest level of spillway

Therefore
Drowning Ratio
Cd
L
H
Discharge Q1 =

=
=
=
=
=

Discaharge Q2 from LHS Bays


Sill Level of the LHS Bays =

0.9783 i.e.
0.9783
1.17373 (from Mallikpur Curves)
120
12.40
6381.02 cumecs

236.5 m

= C L ( (H +Ha)3/2 - Ha3/2)
Drownded Weir Formula
Drowning ratio = d/s HFL - crest level of spillway
u/s HFL - crest level of spillway
Therefore
Drowning Ratio
Cd
L
H
Discharge=Q2

=
=
=
=
=

Hence
Total Discharge = =Q1+Q2=

0.97137 i.e.
0.9714
1.22152 (from Mallikpur Curves)
75
9.40
2768.98 cumecs

9150 cumecs

Hence Affluxed HFL for 1 in 100 yr discharge is calculated as

245.9 m

Kawatha Barrage
Project

H.

Hydraulic Calculations

Annexure- II

Afflux Calculation for Discharge(1 in 500 yr flood)


With all gates fully opened

Water Level corresponding to design flood(Un-Retro.)


Afflux assumed =
Affluxed Water Level
Sill Level of the RHS Portion =
Dischage Q1 from RHS Portion
Drownded Weir Formula
Drowning ratio =

=
=
=
=

12607 cumecs

246.63
0.7472
247.38
233.5

m
m
m
m

= C L ( (H +Ha)3/2 - Ha3/2)

d/s HFL - crest level of spillway


u/s HFL - crest level of spillway

Therefore
Drowning Ratio
=
Cd
=
L
=
H
=
Discharge=Q1
=
Discaharge Q2 from LHS Bays
Sill Level of the LHS Bays =

0.94616 i.e.
0.9462
1.34737 (from Mallikpur Curves)
120
13.8772
8641.27 cumecs
236.5 m

= C L ( (H +Ha)3/2 - Ha3/2)
Drownded Weir Formula
Drowning ratio = d/s HFL - crest level of spillway
u/s HFL - crest level of spillway
Therefore
Drowning Ratio
Cd
L
H
Discharge=Q2

=
=
=
=
=

Hence
Total Discharge = =Q1+Q2=

0.93131 i.e.
0.9313
1.41372 (from Mallikpur Curves)
75
10.88
3965.73 cumecs

12607 cumecs

Hence Affluxed HFL for 1 in 500 yr discharge is calculated as


J.

247.38 m

Conclusions

Computed affluxed waterlevel for design discharge of 1 in 500 yr flood is

Piers shall be taken 1.52 m above this affluxed water level


Hence Pier Top =
247.38 +
1.52 =
248.90 m
Bridge Top =
248.9 +
2=
250.9 m
A slope of 1 in 20 shall be provided at the embankment top for length
=
40 m
on either side

247.38 m.

Kawatha Barrage
Project

K.

Hydraulic Calculations

Annexure- II

Cistern Parameters

The cistern levels are calculated for design flood of 1 in 100 yr flood. For determination of levels and
length 20 % concentration is considered. G-D curves computed for river is used for various levels
Calculations are given below:
Critical Depth=
yc
=
(q2/g)1/3
Required Cistern Level = D/S Retrogressed HFL - y2
Cistern Length required = 5(y2-y1)
2 1/3
Scour Depth = R = 1.35 (q /f)
Design Parameters for 100% Q with Retrogression and 20% concentration
one gate closed codition
RHS Bays
LHS Bays
Q
6381.02
2769
Waterway
120
75
q
53.1752
36.92
1.2 * q
63.8102
44.304

Cistern
Cistern

U/S HFL Affluxed


D/S HFL
HL
yc
HL/yc

245.899
244.93 Retro
0.97
7.45925
0.12991

245.9
244.93
0.97
5.8487
0.1657

y1/yc
y1
y2/yc
y2
Level
Length

0.66
4.92311
1.44178
10.7546
234.175
29.1574

0.64
3.7432
1.4765
8.6356
236.29
24.462

Design Parameters for passing 25% Q with Retrogression and 20% concentration
at Pond Level by opening RHS Bays
Q
2287.5
Waterway
120
q
19.0625
1.2 * q
22.875
U/S Pond Level
242.5
D/S HFL
240.98 Retro
HL
1.52
yc
3.76425
HL/yc
0.4038
y1/yc
0.54
y1
2.0327
y2/yc
1.67335
y2
6.29891
Cistern Level
234.681
Cistern Length
21.331

Kawatha Barrage
Project

Hydraulic Calculations

cistern Level shall also be checked for condition when all gates are opened by 1; 2; 3 m etc.
at pond Level condition
As per cl 4.3.1.1 of IS 6531 "Canal Head Regulator - Criteria and Design"
Discharge through partly open gates = 2/3 C(2g) (H13/2-H23/2)
g= Acc due to gravity =
9.81 m/s2
H1 =
Head upto bottom level of gate opening
H2 =
Head upto top level of gate opening
C =
Constant whose value varies from 0.85 to 1.2 depending upon many factor
Taking C =
1
Pond Level =
242.5 m
Sill level of Centrl Bays =
233.5
For opening =
1m
H1 =
9m
H2 =
8m
Discharge for one gate opening
12.9121
=
cumecs
Total Discharge =
103.297 cumecs all 8 RHS bays open
D/s HFL for such case =
232 m
top level of End Sill
Q
12.9121
Waterway
15
q
0.86081
1.2 * q
1.03297
U/S Pond Level
242.5
D/S HFL
232.00
HL
10.50
yc
0.47735
Hl/yc
21.9964
y1/yc
0.14
y1
0.06683
y2/yc
3.71029
y2
1.77111
Cistern Level
230.229
Cistern Length
8.52141
For opening =
2m
H1 =
9m
H2 =
7m
Discharge for one gate opening
25.0404
=
cumecs
Total Discharge =
200.323 cumecs all 8 RHS bays open
D/s HFL for such case =
233 m
Retrogressed
Cistern parameter for such case
Q
25.0404
Waterway
15
q
1.66936
1.2 * q
2.00323
U/S Pond Level
242.5
D/S HFL
233.00
HL
9.50
yc
0.74233
Hl/yc
12.7975
y1/yc
0.18
y1
0.13362
y2/yc
3.24455
y2
2.40854
Cistern Level
230.591
Cistern Length
11.3746

Annexure- II

Kawatha Barrage
Project

For opening =
3
H1 =
9
H2 =
6
Discharge for one gate opening
36.3305
=
Total Discharge =
290.644
D/s HFL for such case =
233.5

Hydraulic Calculations

Annexure- II

m
m
m
cumecs
cumecs all 8 RHS bays open
m
Retrogressed

Cistern parameter for such case


Q
36.3305
Waterway
15
q
2.42203
1.2 * q
2.90644
U/S Pond Level
242.5
D/S HFL
233.50
HL
9.00
yc
0.95137
Hl/yc
9.46
y1/yc
0.21
y1
0.19979
y2/yc
2.98285
y2
2.83781
Cistern Level
230.662
Cistern Length
13.1901
For opening =
4
H1 =
9
H2 =
5
Discharge for one gate opening
46.7149
=
Total Discharge =
373.719
D/s HFL for such case =
234

m
m
m
cumecs
cumecs all 8 RHS bays open
m
Retrogressed

Cistern parameter for such case


Q
46.7149
Waterway
15
q
3.11433
1.2 * q
3.73719
U/S Pond Level
242.5
D/S HFL
234.00
HL
8.50
yc
1.12497
Hl/yc
7.55577
y1/yc
0.23
y1
0.25874
y2/yc
2.83608
y2
3.1905
Cistern Level
230.81
Cistern Length
14.6588
Hence Provide Centrl Bays Stilling basin at cistern top elevation
30 m along with Basin blocks

230 m and length

Kawatha Barrage
Project

Hydraulic Calculations

Similarily for LHS Bays


Discharge through partly open gates = 2/3 C(2g) (H13/2-H23/2)
g= Acc due to gravity =
9.81 m/s2
H1 =
Head upto bottom level of gate opening
H2 =
Head upto top level of gate opening
C =
Constant whose value varies from 0.85 to 1.2 depending upon many factor
Taking C =
1
Pond Level =
242.5 m
Sill level of LHS Bays =
236.5
For opening =
1m
H1 =
6m
H2 =
5m
Discharge for one gate opening
10.3844
=
cumecs
Total Discharge =
51.922 cumecs all 5 LHS bays open
D/s HFL for such case =
234.5 m
top level of End Sill
Cistern parameter for such case
Q
10.3844
Waterway
15
q
0.69229
1.2 * q
0.83075
U/S Pond Level
242.5
D/S HFL
234.50
HL
8.00
yc
0.41282
Hl/yc
19.3789
y1/yc
0.15
y1
0.06192
y2/yc
3.57725
y2
1.47676
Cistern Level
233.023
Cistern Length
7.07421
For opening =
2
H1 =
6
H2 =
4
Discharge for one gate opening
19.7758
=
Total Discharge =
98.8791
D/s HFL for such case =
234.5
Cistern parameter for such case
Q
19.7758
Waterway
15
q
1.31839
1.2 * q
1.58207
U/S Pond Level
242.5
D/S HFL
234.50
HL
8.00
yc
0.63425
Hl/yc
12.6133
y1/yc
0.18
y1
0.11417
y2/yc
3.24455
y2
2.05786
Cistern Level
232.442
Cistern Length
9.71848

m
m
m
cumecs
cumecs all 5 LHS bays open
m
top level of End Sill

Annexure- II

Kawatha Barrage
Project

Hydraulic Calculations

For opening =
3
H1 =
6
H2 =
3
Discharge for one gate opening
28.0555
=
Total Discharge =
140.277
D/s HFL for such case =
234.5

Annexure- II

m
m
m
cumecs
cumecs all 5 LHS bays open
m
top level of End Sill

Cistern parameter for such case


Q
28.0555
Waterway
15
q
1.87037
1.2 * q
2.24444
U/S Pond Level
242.5
D/S HFL
234.50
HL
8.00
yc
0.80079
Hl/yc
9.99018
y1/yc
0.2
y1
0.16016
y2/yc
3.06386
y2
2.45349
Cistern Level
232.047
Cistern Length
11.4667
Hence Provide LHS Bays Stilling basin at cistern top elevation 232 m and length
25 m along with Basin blocks

L.

Scour Depth for Various Condition

Silt Factor =
f=
1.09
Scour Depth = R =
1.35 (q2/f)1/3
U/S scour level is at Scour depth R whereas D/S scour Level is at 1.25 R

Q
9150

Waterw
Q1
ay
6382.00 142.25
2769.00 85.25

1.2 x q
53.84
32.48

R
18.70
13.35

1.25 R
23.37
16.69

U/S
Scour
U/S WL D/S WL Level
245.63 244.93 226.93
245.63 244.93 232.28

These levels shall be further checked for safe exit gradients

D/S Scour
Level
221.56
228.24

Kawatha Barrage
Project

Hydraulic Calculations

M.
CC Blocks (Protection works)
No concentration is taken in this case
Silt Factor =
f=
For RHS Bays
Design Discharge=
Q =
Discharge through RHS bays = Q1 =
Waterway
Discharge Intensity=
q=
Scour Depth =
R=
1.5 R
2.0 R
River Bed Level u/s
River Bed Level d/s
For U/S CC block Calculation
Depth of Scour below Apron = D
Therefore D

Annexure- II

1.09
9150
6382.00
142.25
44.8647
16.5211
24.7817
33.0422

cumecs
cumecs
m
m
m
m

U/S Scour Depth


D/S Scour Depth

232.5 m
232 m

=
=

U/S Apron Level -(Affluxed HFL- U/S Scour Depth(1.5R))


11.65 m

For D/S CC block Calculation


Depth of Scour below Apron = D
= D/S Apron Level - (D/S HFL - D/S Scour Depth(2R))
Therefore D
=
20.11 m
D/S CC block Protection is 1.5 times the depth of Scour
1.5 D
=
30.1683 m
Hence Provide CC Blocks 8 rows u/s and 20 rows d/s
Ten rows of CC blocks shall be provided over inverted filter and
ten rows over stone spawls seperated by a curtain wall as shown in drawing
For LHS Bays
Design Discharge=
Q =
Discharge through LHS bays = Q2 =
Waterway
Discharge Intensity=
q=
Scour Depth =
R=
1.5 R
2.0 R
Apron Level u/s
Apron Level d/s

9150
2769.00
85.25
32.4809
13.3234
19.9851
26.6468

cumecs
cumecs
m
m
m
m

U/S Scour Depth


D/S Scour Depth

236 m
234 m

For U/S CC block Calculation


Depth of Scour below Apron = D
Therefore D
For D/S CC block Calculation

=
=

U/S Apron Level -(Affluxed HFL- U/S Scour Depth(1.5R))


10.36 m

Depth of Scour below Apron = D


= D/S Apron Level - (D/S HFL - D/S Scour Depth(2R))
Therefore D
=
15.72 m
D/S CC block Protection is 1.5 times the depth of Scour
1.5 D
=
23.5752 m
Hence Provide CC Blocks 7 rows u/s and 16 rows d/s
Eight rows of CC blocks shall be provided over inverted filter and
Eight rows over stone spawls seperated by a curtain wall as shown in drawing

Kawatha Barrage
Project

N.

Hydraulic Calculations

Annexure- II

Launching apron

RHS Bays Upstream Depth of scour below the floor level on U/S side = L =
11.65
(5)*=L =
Consider slope to be 2H : 1V Then launched length
26.054
If 1 m thickness of launching apron is adoped Qty of stones=26.054
For 1.5 m thick Launching apron, length of unlaunched apron=
17.369

M
M
M3
m

(1.5R with u/s WL)

M
M
M3
m

(2R with d/s WL)

RHS Bays Downstream Depth of scour below the floor level on D/S side = L =
20.112
(5)*=L =
Consider slope to be 2H : 1V Then launched length
44.972
If 1 m thickness of launching apron is adoped Qty of stones=44.972
For 1.5 m thick Launching apron, length of unlaunched apron=
29.982

Hence Provide 1500 thick launching apron for length 18 m u/s and 30 m d/s
LHS Bays Upstream Depth of scour below the floor level on U/S side = L =
10.36
(5)*=L =
Consider slope to be 2H : 1V Then launched length
23.155
If 1 m thickness of launching apron is adoped Qty of stones=23.155
For 1.5 m thick Launching apron, length of unlaunched apron=
15.436

M
M
M3
m

(1.5R with u/s WL)

M
M
M3
m

(2R with d/s WL)

say 16 m

LHS Bays Downstream Depth of scour below the floor level on D/S side = L =
15.72
(5)*=L =
Consider slope to be 2H : 1V Then launched length
35.144
If 1 m thickness of launching apron is adoped Qty of stones=35.144
For 1.5 m thick Launching apron, length of unlaunched apron=
23.429

say 24 m

Hence Provide 1500 thick launching apron for length 16 m u/s and 24 m d/s

Kawatha Barrage
Project

O.

Hydraulic Calculations

Flared Out Walls

Flared out walls are to be provided on upstream and downstream of Barrage between LHS
bays and RHS bays and also between embankment and adjoining LHS / RHS Abutment
Flared out Walls between RHS bays and LHS bays
Design Data
U/S

D/S

1
2
3
4

Apron Level LHS bay =


232.5 m
232 m
Apron Level RHS bay =
236 m
234 m
Level Difference =
3.5 m
2m
Silt factor =
1.09
(See Hydraulic Design memo)
Design Parameters
1 Top thickness of Flareed out wall
Minimum Top thickness of flared out /flank wall is 600 mm
C. 5.7.1.1 of IS 11130 "Criteria for Structural design of Barrages and weirs"
However 1500 mm is adopted as top thickness.
2 Length of Flank Wall
The length of the flankwall as per cl 5.7 of IS 11130
Upstream
At guide bund (upstream end of upstream flaredout wall) slope provided to the sides:
2H :
1V
For
3.5 m level difference
Horizonal Length=
7m
Vertical Length =
3.5 m
Sloping length L1=
7.82624 m
Length of upstream wall
2 to
2.5 times L1
Length of upstream wall
15.6525 to
19.5656 m
However Provide
16 m length of flared out wall as shown in drawing
Downstream
At guide bund (downstream end of downstream flank wall) slope provided to the sides:
2H :
1V
For
2 m level difference
Horizonal Length=
4m
Vertical Length =
2m
Sloping length L2=
4.47214 m
Length of upstream wall
2.5 to
3 times L2
Length of upstream wall
11.1803 to
13.42 m
However Provide
12 m length of flared out wall as shown in drawing

Annexure- II

Kawatha Barrage
Project

Hydraulic Calculations

Flared out Walls between LHS Abutment and Embankment Dam


Design Data
U/S
D/S
Apron Level LHS bay =
236 m
234 m
NSL Embankment dam side =
248.9 m
248.13 m
Level Difference =
12.9 m
14.13 m
Silt factor =
1.09
(See Hydraulic Design memo)
Design Parameters
1 Top thickness of Flareed out wall
Minimum Top thickness of flared out /flank wall is 600 mm
C. 5.7.1.1 of IS 11130 "Criteria for Structural design of Barrages and weirs"
However 1500 mm is adopted as top thickness.
2 Length of Flank Wall
The length of the flankwall as per cl 5.7 of IS 11130
Upstream
At guide bund (upstream end of upstream flaredout wall) slope provided to the sides:
2H :
1
For
12.9 m level difference
Horizonal Length=
25.8 m
Vertical Length =
12.9 m
Sloping length L1=
28.8453 m
Length of upstream wall
2 to
2.5 times L1
Length of upstream wall
57.6906 to
72.1132 m
However Provide
70 m length of flared out wall as shown in drawing
1
2
3
4

Downstream
At guide bund (downstream end of downstream flank wall) slope provided to the sides:
2H
1
For
14.13 m level difference
Horizonal Length=
28.26 m
Vertical Length =
14.13 m
Sloping length L2=
31.5956 m
Length of upstream wall
2.5 to
3 times L2
Length of upstream wall
78.9891 to
94.79 m
However Provide
80 m length of flared out wall as shown in drawing

Annexure- II

Kawatha Barrage
Project

Hydraulic Calculations

Annexure- II

Flared out Walls between RHS Abutment and Embankment Dam


Design Data
U/S
D/S
Apron Level RHS bay =
232.5 m
232 m
NSL Embankment dam side =
248.9 m
248.13 m
Level Difference =
16.4 m
16.13 m
Silt factor =
1.09
(See Hydraulic Design memo)
Design Parameters
1 Top thickness of Flareed out wall
Minimum Top thickness of flared out /flank wall is 600 mm
C. 5.7.1.1 of IS 11130 "Criteria for Structural design of Barrages and weirs"
However 1500 mm is adopted as top thickness.
2 Length of Flank Wall
The length of the flankwall as per cl 5.7 of IS 11130
Upstream
At guide bund (upstream end of upstream flaredout wall) slope provided to the sides:
2H :
1
For
16.4 m level difference
Horizonal Length=
32.8 m
Vertical Length =
16.4 m
Sloping length L1=
36.6715 m
Length of upstream wall
2 to
2.5 times L1
Length of upstream wall
73.343 to
91.6788 m
However Provide
75 m length of flared out wall as shown in drawing
1
2
3
4

Downstream
At guide bund (downstream end of downstream flank wall) slope provided to the sides:
2H
1
For
16.13 m level difference
Horizonal Length=
32.26 m
Vertical Length =
16.13 m
Sloping length L2=
36.0678 m
Length of upstream wall
2.5 to
3 times L2
Length of upstream wall
90.1694 to
108.20 m
However details in this regard shall be finalized after receipt of contour map of downstream area of Barrage

Kawatha Barrage
Project

Exit gradient Calculation

Pond Level

Annexure-II

242.5

Crest

10.5

H =

U/S RiverBed

232.5
232

D/S River Bed

Stilling Basin 230.0

U/S CutOff
d = 10.5

RHS Bay

225

D/S Cutoff

221.5

b= 64

Exit Gradient Calculations


Maximum water head acting for exit gradient = H
Depth of downstream cutoff = d =
Total Floor Length = b =

=
=

10.5
10.5
64
6.095238

= b/d =

Exit Gradient

3.588362

Where

GE =

0.168036

Where GE =

or I in

6.0

Hence Safe

1 1 2
2

H 1
d

Kawatha Barrage
Project

Exit gradient Calculation

Pond Level

Annexure-II

242.5

Crest

8.5

H =

U/S RiverBed

236
234

D/S River Bed

Stilling Basin 232.0

U/S CutOff
d = 7.8

LHS Bay

229

D/S Cutoff

226.2

b= 62

Exit Gradient Calculations


Maximum water head acting for exit gradient = H
Depth of downstream cutoff = d =
Total Floor Length = b =

=
=

8.5
7.8
62
7.948718

= b/d =

Exit Gradient

4.505687

Where

GE =

0.163416

Where GE =

or I in

6.1

Hence Safe

1 1 2
2

H 1