You are on page 1of 9

PO Box : 182845 Dubai, UAE

Mobile : + 971 050 211 00 59 / Email : aybek02@hotmail.com

+90 532 580 46 61

Aybek Otceken
Experience Aug 2011 Dubai Rapid Link Civil Consortium Dubai, UAE

Red & Green Line Phase 2 Underground Stations & Tunnels Construction Manager Dubai Rapid Link Civil Consortium is represented by Obayashi Kajima Yapi Merkezi Co Joint Venture. Responsibilities Defect liability period Rectification/monitoring works in Underground stations and bored tunnel. Road Handing over to RTA Authorities Coordination with Client, Engineer and third party contractors.

Aug 2011

Yap Merkezi Construction Co Dubai Branch Dubai, UAE

Proxy/Branch Manager of Yap Merkezi Construction Co. Representing Yapi Merkezi Construction Co in Dubai Rapid Link Civil Consortium. Responsibilities To negotiate with all kind of person and/or enterprise on behalf of the company; To represent the company before all public institutions and private organizations, legal and real persons; To make and to file any application to any public institutions (including visa applications) and to perform the procedures; To sign progress payment reports related to works undertaken by our company, to issue invoices and to collect them; To execute relations with partners in frame of consortium, joint venture and similar partnerships which our company participates, to represent the company at the meetings, to write correspondences and to sign agreements on condition that not mean compromise and release; Regarding Employers and Inspection Authorities of works undertaken by the company excluding contract amendments, peace and release documents; to make any correspondence to issue and sign minutes for meetings, surveys and deliveries to be performed, to authorize the leader of the consortium or the joint venture with

the powers granted herein to execute and to perform all kind of transactions required and possible on behalf of our company about above-mentioned matters same as company representatives

Sep 2007 Aug 2011 Dubai Rapid Link Civil Consortium Green Line Phase 2 Al Ras Underground Station Construction Manager

Dubai, UAE

Dubai Rapid Link Civil Consortium is represented by Obayashi Kajima Yapi Merkezi Co Joint Venture. Responsibilities Take over all duties of the earlier construction manager, management of the civil activities to expedite civil works. Planning, execution of site works, monitoring of working schedule and preparation/modification of construction sequence to expedite civil works. Design Coordination of Structural Works with consultant (ATKINS) Budget preparation and monitoring during the construction works monthly cost control reporting Subcontractors contract management and Claim Management Coordination with Client and the Engineer for the execution of the works. From Sep 2010, take over responsibilities of Al Fahidi station works as construction manager to complete landscaping, road works and handover to authorities. From March 2011, take over responsibilities of Al Ghubaiba Station works as construction manager to complete landscaping works Management of three underground stations for completion of remaining works till taking over by client. Coordination of Finishing works and Rail Contractors . Construction Activities TBM Shaft construction Expedite delay of activities for Green line Tunneling Top-down underground station excavation & structure works Bottom-up Entrance Structure construction planning Temporary Shoring for Entrance Secant piles Temporary Cofferdam for construction of Entrance Construction Planning and execution works (Planning) Reclaiming land for Entrance structure in Dubai Creek in narrowest part (Planning only, Execution scope is cancelled.) Strutting Works (Yongnam Modular System) Dewatering works (Deep Wells, well point system, closure of deep wells) Utility Diversion Works Pressurized Water line and Electricity

Temporary Road Diversion works (RTA Standards), Road Reinstatement Jet grouting works for repair of diaphragm walls Major leakage during excavation of underground structure PU grouting, double tube grouting system (cement + sodium silicate) for stopping water ingress inside the excavated area (150m3/h) Setting site team for shop drawings and as-built drawings for all civil activities.

Supervised Subcontractors Sambo Tosfoc Middle East JV Diaphragm walls & Barrettes Al Naboodah Engineering Jetgrouting works Bumi UAE Temporary Shoring Secant piles Action Dewatering for Well point and Deep Wells Yongnam Strutting and Decking Works Chan Chan (Downer Edi) Excavation Works Pubali Construction Direct Man power supervision

ATKINS Design Consultant Client and Client Representative Systra Parsons - Engineer RTA Client Appreciations Letter from RTA and Systra Parsons for Management of Safety in Al Ras Underground Station. Sep 2005 Sep 2007 Dubai Rapid Link Civil Consortium Dubai, UAE

Red Line Phase 1 Union Square Underground Station Chief Civil Engineer Dubai Rapid Link Civil Consortium is represented by Obayashi Kajima Yapi Merkezi Co Joint Venture. Responsibilities Planning and monitoring of schedule and construction sequence. Daily & Weekly Monitoring of Construction Activities for reporting senior manager. Design Coordination of Structural Works with consultant (ATKINS) Coordination of Technical issues & site matter with Engineer representative (Systra Parsons). Preparation of Shop drawings for Structure Works Coordination and technical consulting of Diaphragm Wall shop drawings and structure reinforcement drawings. Construction Material Management, Source Planning and Ordering of Construction Materials such rebar & structural steel Overall responsibility execution works, 2 senior civil engineer & 6 civil engineer. Supervision of Strut Optimization works Cost Saving Preparation of Method statement, work procedure and

inspection and testing plan for construction activities. Budget preparation and monitoring during the construction works Subcontractors contract management Consulting other underground station for technical issues, Construction Activities Permanent Diaphragm Wall & Barrette Construction Works (47m depth-1200MM) by BC Cutter and bentonite system Supervision of Barrette Test Osterberg Cell Test Bi-directional loading test One test for overall the project Top-down underground station excavation & structure works Strutting Works (Yongnam Modular System) Dewatering works (Deep Well) Instrumentation and Monitoring Works Utility Diversion Works (NDRC, Micro Tunneling, HDD, Trust Boring) Micro Tunneling for Sewer line dia 1000mm Horizontal Direction Drilling for Electrical Diversion 33 kV Trust Boring for dia 300mm Water line Design & Relocation of Temporary Bus Terminal in Deira Taxi Stand Preparation of TBM Machine launching shafts for Red line Supervised Subcontractors Sambo Tosfoc Middle East JV Diaphragm walls & Barrettes National Dewatering for Dewatering works NCC Utility Diversion Works Abdul Mannan Const Direct manpower supplier Yongnam Strutting works ATKINS Design Consultant

Client and Client Representative Systra Parsons Engineer RTA Client

Appreciations Award for achievement of Main Box works completion 4 months earlier than target schedule from RTA Client June 2003 Sep 2005 Yapi Merkezi Construction Co. Istanbul, Turkey Taksim Kabatas Funicular System - Construction Site Engineer - Tunnel Engineer This projects includes two cut & cover station and NATM bored tunnel Responsibilities Management of Site Activities for two cut & cover stations and

NATM tunnel works. Construction Activities Taksim Station Construction of retaining wall system Mini piles (dia 300mm) and ground anchors and excavation works till commencement of tunnel works (3 months) Kabatas Station Construction of retaining wall system Secant piles (Secondary piles were constructed by jetgrouting method) Kabatas Station Ground Anchor works & Pipe Temporary Strutting works Kabatas Station Shotcrete works, Soil improvement of tunnel portal, self drilling soil nails (Atlas Copco), excavation works Instrumentation and Monitoring Works Bottom Up construction method Structure works Kabatas Road Diversion 3 Stages Major Road of Istanbul NATM Bored Tunnel Excavation works Umbrella Arch system if necessary. Three different section tunnel excavation 12 m dia to 5 m dia. Tunnel Lining works, Invert formwork design and fabrication. Rail works Installation of rail using direct fixing method. Installation of prefabricated tunnel walkway and cable tray along the tunnel. Supervised Subcontractors Zetas Secant piles with Jetgrouting and ground anchors Kasktas Mini Piles and Ground anchors Ozgun Ins Company NATM Tunneling works Yapiray Rail works Garaventa Funicular system installation works Partner

Arslan Haftiyat Bulk Excavation Works Client and Client Representative IBB Istanbul Greater City Municipality

Education

2002 Istanbul Technical University Istanbul, Turkey Geotechnical Engineering Faculty Incomplete (To be completed 2009) Study of Geotechnical design works Thesis not yet completed due to location change to Dubai Apply for Thesis in 2011-2012 Semester Thesis Subject : Case Study: Optimization of temporary strutting during underground station excavation in Dubai Metro Project GPA 3.50 over 4.00 1998 20002 Dokuz Eylul University Izmir, Turkey Civil Engineering Faculty Civil Engineer GPA 2.70 over 4.00 Study of Civil Engineer design & execution works Completion Thesis Structural design roof steel roof construction

and cost comparison to the other construction materials

Computer knowledge

Microsoft Word, Excel, PowerPoint Very Good AutoCAD 2006/2007 - Very Good Microsoft Project Very Good Sap2000 Simple Beam Design

Interests

Computers, Cars, Driving, Traveling, reading, and music.

Personal Information

Nationality : Turkish Date of Birth : 27/05/1980 Marital Status : Married, 26/04/2009 Child 1 year old Driving License : UAE & Turkish Driving License 1998 Visa Status Residence Visa Expires 10/2014 Completed 6 years residence ship in Dubai

Page 1 of 1

Dubai Metro
Union Square Baniyas Road Dubai 0000 United Arab Emirates

In Ref To: LETTER-033472

Letter
To: Cc (10): Mr Shunichi Shimamura - DURL Consortium

LETTER-033472
Mr Adnan Ahmed Al-Hammadi - Roads & Transport Authority Mr Mutaz AlQudah - Roads & Transport Authority Mr Iain Carter - Roads & Transport Authority Mr Mike Black - JT Metro JV Mr Fakhruddin Dohadwala - JT Metro JV Mr Naim Isli - JT Metro JV Mr Aybek Otceken - JT Metro JV Mr Abd El Hady Mohamed Hafez - The Engineer Mr YD Prasad - The Engineer Mr Andreas Tauschinger - The Engineer

From: Sent: Attribute 1:

Mr Anthony Burchell - The Engineer Thursday, 24 July 2008 09:26:07 AM GST (GMT +04:00) CL Administrative Phase 2 - Green Line Rail / Civil 3.03 Others N/A Appreciation of Safety Standards at Al Ras Station

Attribute 2: Status: Subject:

Dear Sir, Please find enclosed a letter from RTA QHSE Acting Director concerning the high level of safety standards at Al Ras Station. Please convey RTA and the Engineer's appreciation to your managers and engineers concerned and particularly to your Construction Manager. Yours Faithfully, For and on behalf of SYSTRA/PARSONS (The Engineer)

Anthony Burchell Engineer's Representative Project Director vm/pki

File Attachments Zip Download RTA Al Ras HSE Audit on 06-07-08 - Appreciation Letter.pdf Refer To Mail No. From From Company Subject

http://mea.aconex.com/ViewCorrespondence?Correspondence_ID=541424668&CORR... 24-Jul-08

~..
,,

/!~ .

v!)

"'-' Ig c..J I9 L9 j lJ-=>


ROADS & TRANSPORT

b.J I ~
AUTHORITY

GOVERNMENT OF DURAl

SYSTRA / Parsons
p.a. Box 111081 Dubai UAE. Tel: +971 (0) 4 2340202 Fax: +971 (0) 4 2340204

Attention:

Mr. Anthony Burchell Project Director

nUBAI METRO ~ROJECT

Subject: Appreciation for OH & S practices at AI Ras Station


Dear Sir, We would like to thank you for the High level of conunitment in implementing the Occupational Health & Safety Standards at AL RAS Station which we noticed during our Audit

/ site inspection on 06/07/2008 which reflects the Engineer's

staff level of professionalism with regards to Safety led by Mr. Y.D.Prasad . In addition we would like to thank DURL Construction manager Mr. Aybek Otceken and AL RAS Station Safety Team for their efforts. Yours Faithfully,

Rail Agency - CEO Office CEO ~ Rail Agency. Rail ProjectsConstruction Department Agency - H&S Manager

- r-- ;>Rail

Tel.+9714 2844444 Fax+9714 2065555 p.a. Box118899, Dub'ai,

UAE

www.rta.ae.roc

I. ,~.p.

1l1IA99y\.P'

+9VI E rl 0000 lJ.LI,5l.iJ. +9VI E rIlE EEEE Lill~

------

You might also like