COMMON STANDARD SHEDULE OF RATES FOR ALL ENGINEERING DEPARTMENTS FOR THE YEAR 2012-13

Board of Chief Engineers

WITH EFFECT FROM 01 - 06 - 2012

LABOUR RATES - 2012-13


(A) SKILLED WORKMEN First Class 1 2 3 4 5 6 7 8 a b c d e f g h Mason and stone Cutter Brick Layer Carpenter Painter Plumber Welder Fitter Electrician (A) SEMI-SKILLED WORKMEN SECOND CLASS 43 44 45 46 47 48 49 50 51 72 73 74 75 76 1 b c d e f g h I 1 2 3 4 5 Mason Brick Layer and Stone Cutter Carpenter Painter Plumber Blacksmith Welder Fitter Electrician (A) UNSKILLED WORKMEN Day Day Day Day Day 250 250 250 Deleted 250 Head mazdoor(Mukaddar) Man mazdoor Watch man Picottah man Woman Mazdoor Day Day Day Day Day Day Day Day Day 285 285 285 300 285 285 285 285 285 Day Day Day Day Day Day Day Day 315 315 315 350 350 315 315 355

RATES OF MATERIALS & WORK ITEMS


Sl. No. 1 S.S. Item No. 2 Description 3 (A) STONE AND ROAD MATERIALS ROUGH STONE QUARRIED INCLUDING WEDGING, BREAKING, BURNING, SPLITING AND STACKING For R.R Masonary Work (other than Granite, Dolomite and Trap) For SS Revetment work 225 mm For SS Revetment work 300 mm For SS Revetment work450 mm Gravel including stacking Quarry rubbish HBG Stone Chips 2.36mm and below Sand for mortar, ceiling coat including washing screening etc., Sand for filling and blindage Grinding lime mortar or Surkhi mortar Shell lime slaked and screened White cement Unit (per) 4 SoRate for 2011-12 5

1 2 3 4 90 91 92 93 94 98 99 100

22.a b.I b.ii b.iii 34 35 a B 36.a B C D E

1 cum 1 cum 1 cum 1 cum 1 Cum 1 Cum 1 Cum 1 Cum 1 Cum 1 Cum 1 Cum 1 Kg.

145.00 116.70 136 114 75 75 260 335 248 85 8.47 27

HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE FREE FROM DUST OBTAINED BY QUARRYING, WEDGING, BREAKING, BURNING AND SPLITTING INCLUDING STACKING. 25 33.a - do 6mm size (SS 5)
Blasting charges Machine crushing charges

1 cum

454.00 70.00

26

- do -

10mm

size (SS 5)
Blasting charges Machine crushing charges

1 cum

593.00 70.00

27

- do -

12mm

size (SS 5)
Blasting charges Machine crushing charges

1 cum

727.00 70.00

28

- do - 20mm

size (SS 5)
Blasting charges Machine crushing charges

1 cum

891.00 70.00

29

- do -

25mm

size (SS 5)
Blasting charges Machine crushing charges

1 cum

874.00 70.00

30

- do -

40mm

size (SS 5)
Blasting charges Machine crushing charges

1 cum

530.00 70.00

31

- do -

50mm

size (SS 5)
Blasting charges

1 cum

410.00 70.00 480.00 378.00 70.00 448.00 341.00 70.00 411.00

32

- do -

60mm

size (SS 5)
Blasting charges

1 cum

33

- do -

65mm

size (SS 5)
Blasting charges

1 cum

36 37

HARD BROKEN STONE OF GRANITE TRAP DOLERITE AND DOLAMITE FREE FROM DUST OBTAINED BY QUARRYING WEDGING, BREAKING, BURNING AND SPLITTING INCLUDING STACKING (QUARTZITE AND BASALT WITH AGGREGATE IMPACT OF LESS THAN 20)

NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if the metal is obtained by blasting (2) Add 25% extra per cum if the metal is obtained by machine crushing excluding cost of blasting.

70.00 25%

45

33a

-do- 2.36 to 5 mm size (IRC&MORTH)


Blasting charges Machine crushing charges

1 cum

278.00 70.00

46

-do- 5 to 7mm size (IRC&MORTH)


Blasting charges Machine crushing charges

1 cum

452.00 70.00

47

-do- 9.5 to 11.2mm size (IRC&MORTH)


Blasting charges Machine crushing charges

1 cum

593.00 70.00

48

-do- 12mm to 14 mm size ( IRC and MORTH )


Blasting charges Machine crushing charges

1 cum

727.00 70.00

49

-do- 19 mm to 22 mm size ( IRC and MORTH )


Blasting charges Machine crushing charges

1 cum

998.00 70.00

50

-do- 25 mm to 27 mm size ( IRC and MORTH )


Blasting charges Machine crushing charges

1 cum

874.00 70.00

51

-do- 40 mm to 45 mm size ( IRC and MORTH )


Blasting charges Machine crushing charges

1 cum

530.00 70.00

52

-do- 50 mm to 55 mm size ( IRC and MORTH )


Blasting charges

1 cum

410.00 70.00 480.00

53

-do- 60 mm to 63 mm size ( IRC and MORTH )


Blasting charges

1 cum

478.00 70.00 548.00

54

-do- 65 mm size ( IRC and MORTH )


Blasting charges

1 cum

341.00 70.00 411.00

55

-do- 75 mm size ( IRC and MORTH )


Blasting charges

1 cum

273.00 70.00 343.00

56 57 2

NOTE:- Add extra Rs. /- per cum for items 33 (a) to 33 (j) if the metal is obtained by blasting Add 25% extra per cum if the metal is obtained by machine crushing excluding cost of blasting.

1 cum 70 1 cum 25%

108 109 110 111

1.a B C D

III RATES OF WORKS (A) CLEARING SITE Clearing heavy Jungle Clearing light Jungle Clearing Scrub Jungle Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps. Cutting and removing Palmyrah trees including stacking of girth 30 to 100 cm. - do - 100 to 200 cm. Uprooting and removing Palmyrah stumps including stacking of girth 30 to 100 cm. - do - 100 to 200 cm.

1 Sqm 1 Sqm 1 Sqm 1 Sqm

2.50 2.30 2.30 3.70

112

2.a.I

Each Each Each Each

31.00 48.00 34.00 52.00

113 114

Ii 2.b.I

115

Ii

(S ) ROAD WORK ITEMS Picking old metalled surface to a depth of 40 to 100 mm and spreading metal including watering with an initial lead of 2 Hectometers and rolling with power rollers watering and spreading gravel for blindage and power roller rolling including hire charges of power roller( 8 to 10 T ) barricading and diversion of traffic and wetting the new consolidation for a fortnight(for compacted thickness of ) 5 (a) (b) (c ) (d ) (e) HARD METAL 40 mm thick ness 50 mm thick ness 75 mm thick ness 100 mm thick ness 150 mm thick excluding hire charges Binding wire 10 10 10 10 10 sqm sqm sqm sqm sqm 164.70 186.70 205.70 221.30 396.30 65.00

159 160 161 162 163 172

1 Kg.

HIRE CHARGES OF PLANT& MACHNIERY FOR ROAD & BRIDGE WORKS FOR THE YEAR 2011-12
Sl. No. 1 1 Description Machine 2 Dozer( D 80 ) Activity 3 Spreading Cutting Cleaning Clearing Spreading GSB WMM Soil Ordinary Soil Marshy Soil unsuitable Soil loading Aggregate loading Transportation of soil, GSB,WMM, Hot mix etc 4 Per Hour Unit
SoRate for 2012-13
( Rupees)

2399

Mortor Grader

Per Hour

2797

Hydraulic Excavator Front end loader Tipper- 5.5 Cum

Per Hour Per Hour Per Hour Per Hour


Per tonne Km

2600.30 1431 818.30

4 5

Per Km

Vibratory roller 8 tonne

Earth/Soil, GSB,WMM

Per Hour

2384.90

7 8 9 10 11 36

Smooth wheeled roller 8 tonne Water tanker 6 Kilolitre Tractor Tractor with rotavator

Soil compaction ,BM compaction Water transport Pulling Scarifying

Per Hour Per Hour Per Hour Per Hour Per Hour Per Hour Per Hour Per Hour Hour Hour Hour Hour Hour Hour Hour Hour

920.06 372 361 367 367 370 564 42.00 271.70 240.20 378.30 316.40 140.60 127.50 920.60 818.30

Tractor with ripper Scarifying attachment Concrete mixer (a)0.28 cum (b) 1.0 cum Plate compacter Concrete mixing Concrete mixing For compacting in medians

42

Concrete mixer 300/200(diesel) Concrete mixer 300/200(electric) Concrete mixer 600/400(diesel) Concrete mixer 600/400(electric) Needle vibrator 40 mm ( petrol ) Needle vibrator 40 mm ( electric ) Road roller diesel 10 t Tipper 5 cum

Building Civil Items - Building-SOR-2012-13


Sl. No Item Code Description of item Unit

1 A 1

2 BMT-A.01

3 BRICKS & BUILDING BLOCKS

Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm (ex-quarry price - excluding cost of 1000 Nos conveyance, loading & unloading) - do- modular size 19 x 9 x 9 cm (ex-quarry price - excluding cost of 1000 Nos conveyance, loading & unloading)

2 B

BMT-A.02

NATURAL FLOORING STONES (ex-quarry price - excluding cost of conveyance, loading & unloading) BMT-B.01 BMT-B.02 BMT-B.03 BMT-B.04 BMT-B.05 BMT-B.06 BMT-B.07 BMT-B.08 Kadapa slab 40 mm thick and size not less than 0.457 Mx0.457 M 1 Sqm Kadapa slab 50 mm thick and size not less than 0.457 Mx0.457 M 1 Sqm Shahabad /Tandur Rough Stone slabs of minimum of 25 mm thick 10 Sqm Shahabad / Tandur Rough Stone slabs of minimum 40 mm thick Polished Shahabad/ Tandur stone slabs of 15 to 18 mm thick (0.457x0.304) or any other size as specified Polished black Kadapa slabs minimum of 15 mm thick (0.457x0.457M) Polished Bethamcherla pure (marble type) white stone minimum 25 mm thick (0.254Mx0.254M) Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M x0.254M) WALL & FLOOR TILES (landing cost - including cost of conveyance, loading & unloading) BMT-C.01 BMT-C.06 BMT-C.07 Ceramic tiles 7.3mm thick 1st quality of all shades (as per manufacture specification) White glazed Tiles of any size Ist quality Glazed coloured Tiles of any size Ist Quality TIMBER & ROOFING MATERIALS (landing cost - including cost of conveyance, loading & unloading) Note: Before proposing the Teak Wood Items, the estimating authorities shall obtain prior approval from the competent authority 1 sqm 1 sqm 1 sqm 10 Sqm 10 Sqm 10 Sqm 10 Sqm 10 Sqm

21 22 23 24 25 26 27 28 C 37 42 43 E

107 110 111 114 121 122 123 124 125 126

BMT-E.01 BMT-E.04 BMT-E.05 BMT-E.08 BMT-E.15 BMT-E.16 BMT-E.17 BMT-E.18 BMT-E.19 BMT-E.20

Medium Teak Wood scantlings: up to 2.0 M Medium Teak Wood Plancks: any thickness Best Teak Wood scantlings: up to 2.0 M Best Teak Wood Plancks: any thickness Sal Wood scantlings: any length Sal Wood Plancks: any thickness A.C sheet Corrugated 6 mm thick A.C sheet plain 4 m thick A.C sheet plain 6 m thick

1 cum 1 cum 1 cum 1 cum 1 cum 1 cum 1 sqm 1 sqm 1 sqm

Plain or Corrugated Galvanized iron sheets as per IS 277 (0.1 mm 1 kg to 0.8 mm thickness) MILD, GALVANIZED & STAINLESS STEEL (landing cost - including cost of conveyance, loading & unloading)

F 127 BMT-F.01

MS. Hallow door frames manufactured by cold roll formed process steel sheet 1.25mm thick bright CRCA confirming to IS 4351 - 1976 1 Rm with Hinges tower Bolts etc. Supplying Galvanized Steel Barbed wire conforming to IS 278 1978 : Type A - IOWA Type Designation as per standard Supplying Galvanized Steel Barbed wire conforming to IS 278 1978 : Type B - Glidden Type Designation as per standard Rabbit wire mesh (chicken mesh) 1 Kg 1 Kg 1 Sqm

133 134 154

BMT-F.07 BMT-F.08 BMT-F.28

155

BMT-F.29

Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with 1 Sqm push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108 Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, 1 Sqm bolts, nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., complete for finished item of work as per special spn 1105

156

BMT-F.30

G 170 171 172 173 174 183 184 185 186 187 188 189 190 191 192 199 200 201 207 208 209 H 236 BMT-H.01 BMT-G.14 BMT-G.15 BMT-G.16 BMT-G.17 BMT-G.18 BMT-G.27 BMT-G.28 BMT-G.29 BMT-G.30 BMT-G.31 BMT-G.32 BMT-G.33 BMT-G.34 BMT-G.35 BMT-G.36 BMT-G.43 BMT-G.44 BMT-G.45 BMT-G.51 BMT-G.52 BMT-G.53

FIXTURES FOR DOORS & WINDOWS


MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 100 mm Long

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 150 mm Long MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 200 mm Long MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 250 mm Long MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long
MS-Powder Coated Butt hinges (IS:205)- 75 mm Long

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long MS-Powder Coated Butt hinges (IS:205)- 125 mm Long MS-Powder Coated Butt hinges (IS:205)- 150 mm Long
Aluminium Door Handles (IS:208) 75 mm Long

Aluminium Door Handles (IS:208) 100 mm Long Aluminium Door Handles (IS:208) 125 mm Long Aluminium Door Handles (IS:208) 150 mm Long MS-Powder Coated Door Handles (IS:208) 125 mm Long MS-Powder Coated Door Handles (IS:208) 150 mm Long
MS-Powder Coated Aldrop (IS:2681) 200 mm long

MS-Powder Coated Aldrop (IS:2681) 250 mm long MS-Powder Coated Aldrop (IS:2681) 300 mm long
MS-Powder Coated Flat Latches: 250 mm long

MS-Powder Coated Flat Latches: 300 mm long MS-Powder Coated - Door Stoppers WATER PROOFING CHEMICALS & ADMIXTURES Impervious Water Proofing compound Chloride free super plasticizer for high range water reducing admixture : Conflow SNS I or Zoriplast SP 350 (Dosage: 200 ml to 500 ml per bag of 50 Kgs Cement) or equivalent. Chloride free super plasticizer for high early strength and high range water reducing admixture: Conflow SNS 2 or Zoriplast SP 450 (Dosage: 300 ml to 400 ml per bag of 50 Kgs Cement) or equivalent. Set accelerator and plasticizer: Conflow SNA or Zoriset or Equivalent (Dosage:1 Kg to 3 Kgs per bag of 50 Kgs Cement depending on the setting time required ) GLASS

1 Kg

BMT-H.09

Litre

BMT-H.10

Litre

BMT-H.11 I 331 332 333 343 344 BMT-I.01 BMT-I.02 BMT-I.03 BMT-I.13 BMT-I.14

Kgs

Plain Float Glass 4 mm thick Plain Float Glass 5 mm thick Plain Float Glass 6 mm thick Pin headed Glass 4 mm thick Pin headed Glass 5 mm thick

1 sqm 1 sqm 1 Sqm 1 sqm 1 sqm

J 352 353 354 356 359 375 377 378 381 382 BMT-J.01 BMT-J.02 BMT-J.03 BMT-J.05 BMT-J.08 BMT-J.24 BMT-J.26 BMT-J.27 BMT-J.30 BMT-J.31

PAINTS & POLISHES Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Cement Primer Waterbase Exterior Gr-2 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Red Oxide Iron Primer Paint Grade -1 Wood Primer Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent White Lead Water proof Cement paint Water proof Cement paint Pack 1 Kg 1 Kg 1 Litre 1 Litre 1 Kg 1 Kg 25 Kg

Supply of paint grade white line for wash 25 Kg supply of ready mixed Synthetic Enamel paints in all shades Grade 1 Litre I supply of ready mixed Synthetic Enamel paints in all shades Grade 1 Litre II A. DISMANTLING clearing away and carefully stacking materials useful for reuse.

R 805 806 807 808 809 810 811 812 813 814 815 816 817 818 BMT-S.14 819 V BMT-S.15 BMT-S.01 BMT-S.02 BMT-S.03 BMT-S.04 BMT-S.05 BMT-S.06 BMT-S.07 BMT-S.08 BMT-S.09 BMT-S.10 BMT-S.11 BMT-S.12 BMT-S.13

Stone masonry in cement mortar Terracing work in roofs or floors Flat stones in roof or floors including lifting Pan tiled or Mangalore tiled roof without roof timbers. Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers Wrought and framed timber in roofs or floors Old lime mortar plaster Old cement mortar plaster Dry rough stone revetment for aprons and stacking within 40 M lead Revetment for aprons and stacking grouted within 40 lead Kadapa slabs or Shahabad stone slabs flooring on sand bed Through scraping of old plastered surface Washing of plastered surface with soap, soda and water (or with soda lime and water) clean removal of lime plaster from walls and raking out joints 20mm deep or from terraced roof and raking out joints 100 mm deep Clean removal of cement plaster from walls and raking out joint 200 mm deep LABOUR CHARGES Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, excluding cost of fixing in position Labour charges for fixing Iron Doors, Iron Windows and Window Grills in position MISCELLANEOUS ITEMS CEMENT JALI - 25 mm thick CEMENT JALI - 40 mm thick CEMENT JALI - 50 mm thick Aluminium sheet 24 Gauge 7.5mm thick Aluminium Grill (as approved by the department) 3.58 Kg/Sqm. Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1" (25.4 mm ) thick Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1/2" (12.7 mm ) thick White Cement

1 Cum 10 Sqm 10 Sqm 10 Sqm 10 Sqm 1 Cum 10 Sqm 10 Sqm 1 Cum 1 Cum 10 Sqm 10 Sqm 10 Sqm 10 Sqm 10 Sqm

850

BMM-V.14

1 Kg

851 W 875 876 877 878 879 880 881 928

BMM-V.15

1 Kg

BMS-W.15 BMS-W.16 BMS-W.17 BMS-W.18 BMS-W.19 BMS-W.20 BMS-W.21 BMS-W.68

1 sqm 1 sqm 1 sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Kg

HIRE CHARGES FOR CENTRING AND SCAFFOLDLING


Unit of Measurement Material Hirecharges 62 74 1048 Labour Charges 372 592 898
Centring Charges for 2012-13

A B C

FOOTINGS PEDESTALS PLINTH BEAMS

per 1 cum per 1 cum per 1 cum

434 666 1946

HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height upto 3.66 M Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,
Unit of Measurement Material Hirecharges Labour Charges
Centring Charges for 2012-13

D E F G H

LINTELS CHAJJAS SUNSHADES COLUMNS BEAMS SLABS - Up to 150 mm thick

per 1 cum per 1 sqm per 1 cum per 1 cum per 1 sqm

890 176 134 1347 151

762 117 1070 898 101

1652 293 1204 2245 252

HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height upto 3.66 M Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc.,
Unit of Measurement D E F G H Material Hirecharges 619 122 93 936 105 Labour Charges 596 92 836 701 79
Centring Charges for 2012-13

LINTELS CHAJJAS SUNSHADES COLUMNS BEAMS SLABS - Up to 150 mm thick

per 1 cum per 1 sqm per 1 cum per 1 cum per 1 sqm

1215 214 929 1637 184

HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for BRICK MASONRY/ STONE MASONRY - 1 sqm
Unit of Measurement A B Material Hirecharges 5.46 5.46 Labour Charges 40.43 60.65
Centring Charges for 2012-13

1st - Floor 2nd - Floor

per 1 sqm per 1 sqm

45.89 66.10

HIRE CHARGES FOR ACCESS SCAFFOLDING - upto 3.66 M using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for PLASTERING to WALLS - 1 sqm
Unit of Measurement A B Material Hirecharges 0.55 0.55 Labour Charges 4.04 6.06
Centring Charges for 2012-13

1st - Floor 2nd - Floor

per 1 sqm per 1 sqm

4.59 6.61

HIRE CHARGES FOR STAGE SCAFFOLDING - upto 3.66 M using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for CEILING PLASTERING - 1 sqm
Unit of Measurement A B Material Hirecharges 1.28 Labour Charges 8.00
Centring Charges for 2012-13

1st - Floor 2nd - Floor

per 1 sqm per 1 sqm

9.28 13.28

1.28

12.00

SS RATE FOR 201213

3472

4687

84 96 840 1084 1446 1205 3374 2410

419 314 372

56380 105486 80024 120036 40012 50924 194 139 144 52

247 63 63 13

2120

1855

19 29 41 55 68 9 17 25 33 49 55 82 92 25 37 86 112 134 42 54 37

24

75

75

70

334 427 460 220 376

117 70 105 117 84 41 959 410 199 152

275 114 95 86 95 144 30 33 46 33 48 30 10 31 32

18

3.50

198 257 352 265 975 869 498 25

SSR-2008-09 SlNo. 1 2 3 4 5 6 7 8 9 10 11 12 Labour charges for wrought and put up including fixing in position frames, shutters , for Doors, windows, ventilators etc. Fully panelled Door Glazed and Panelled Door Framed and planked Doors Ledged,Braced and planked Doors Windows Glazed Windows panelled Windows lodged, braced,and panelled Window frameed and planked Ventilators Glazed,fixed with double frame with wire netting Swing Ventilators Glazed Weldedmesh Doors and Windows GI or AC sheet Door and Windows 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 1 Sqm 473.00 457.00 447.00 383.00 457.00 601.00 383.00 364.00 457.00 492.00 383.00 193.00

A. LOADING AND UNLOADING CHARGES BY MANUAL MEANS ( idle hire charges of trucks are not added)
Earth / Sand /Gravel Descriptio Sl No. n of item Murrum/ / Surki/ Rs / cum

Rubble/ size stone/ cut stone/ Coarse aggregate, Lime in Rs/cum

cement in Rs/tonne

steel in Rs./tonne

brick work Rs/1000 No

2 1 Loading 2 Unloading

3 13.50 6.75

4 27.10 13.55

5 44.70 44.70

6 53.60 53.60

7 37.30 37.30

Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head charges D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )

Earth / Sand /Gravel Descriptio Sl No. n of item Murrum/ / Surki/ Rs / cum

Rubble/ size stone/ cut stone/ Coarse aggregate, Lime in Rs/cum

cement in Rs/tonne

steel in Rs./tonne

brick work Rs/1000 No

2 1 Loading 2 Unloading

3 94.40 33.60

4 108.00 54.00

5 133.70 133.70

6 142.60 142.60

7 184.10 184.10

Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head charges. E.LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)

Sl No.

Description of item

Earth / Sand /Gravel Murrum/ / Surki/ Rs / cum

Rubble/ size stone/ cut stone/ Coarse aggregate, Lime in Rs/cum 4 95.00 14.10

2 1 Loading 2 Unloading

3 47.50 14.10

Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head charges

IRRIGATION SSR Sl. No.


1 3 15 32 33 34 35 36 37 38 39 41 61 80 13 14 15 10 4 11 M-063 M-189 Binding wire Curing Compound G I Pipe 100 mm dia B Class G I Pipe 15 mm dia A class G I pipe 25 mm dia A class G I pipe 40 mm dia B class G I pipe 50 mm dia A class G I Pipe 80 mm dia B Class G.I Bolts / Nuts and Washers G.I sheet ( plain ) Hectometer stone one line dressed PVC pipe of 100 mm dia Water proofing compound MS pipe 200 / 300 mm dia MS pipe 32 mm dia MS pipe 25 mm dia Petrol Diesel Rivets Barbed wire Water

Description
2

Unit
3 Kg ltr Rm Rm Rm Rm Rm Rm kg tonne Each Rm kg kg Rm Rm ltr ltr kg kg litre

S. Rate 2012-13
4 65 123 650 95 145 265 290 450 97 57,375 208 157 66 159 150 136 75.00 46.00 86 74 90

MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. PLAIN ENDED PIPES CONFORMING TO B.I.S. 458/2003 , EX-FACTORY, EXCLUDING TRANSPORTATION, TAXES & DUTIES SoR For 2012-13 Size Unit NP - 2 Class NP - 3 Class NP - 4 Class 129 80 mm dia Metre 149 100 mm dia Metre 176 150 mm dia Metre 209 200 mm dia Metre 227 225 mm dia Metre 243 250 mm dia Metre 348 778 802 300 mm dia Metre 433 980 1000 350 mm dia Metre 499 1084 1107 400 mm dia Metre 612 1238 1250 450 mm dia Metre 673 1349 1545 500 mm dia Metre 995 2020 2395 600 mm dia Metre 1276 2512 3207 700 mm dia Metre 1570 3317 4194 800 mm dia Metre 1972 4166 5218 900 mm dia Metre 2390 5170 7121 1000 mm dia Metre 2850 6098 8255 1100 mm dia Metre 3393 7181 9651 1200 mm dia Metre 4609 9291 13364 1400 mm dia Metre 5357 12054 16142 1600 mm dia Metre 7009 15973 21642 1800 mm dia Metre 2. SoRATES FOR R.C.C. COLLARS MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. COLLARS CONFORMING TO B.I.S. 458/2003 (RATE PER EACH COLLAR) SUITABLE FOR R.C.C. PLAIN ENDED PIPES INCLUDING TRANSPORTATION BUT EXCLUDING TAXES & DUTIES Size 80 mm dia 100 mm dia 150 mm dia 200 mm dia 225 mm dia 250 mm dia 300 mm dia 350 mm dia 400 mm dia 450 mm dia 500 mm dia 600 mm dia 700 mm dia 800 mm dia 900 mm dia 1000 mm dia 1100 mm dia 1200 mm dia 1400 mm dia 1600 mm dia 1800 mm dia Unit NP - 2 Class Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each
38 40 42 55 59 65 86 106 116 183 209 281 366 517 618 722 885 1076 1388 1770 1854

SoR For

2012-13 NP - 4 Class

NP - 3 Class

124 152 173 230 274 360 486 614 716 897 1134 1420 1799 2308 2975

124 152 173 230 274 360 486 614 716 897 1134 1420 1799 2308 2975

6. SoRATES FOR CONVEYANCE OF R.C.C. PLAIN ENDED PIPES Rate upto 5 Rate upto 5 Rate for Kms Lead Kms Lead Rate for every every including including additional 1 additional 1 Loading, Loading, KM lead or KM lead or unloading and unloading and part thereof. part thereof. stacking stacking 3 4 5 6

Sl.No.

Description

CONVEYANCE OF R.C.C. PLAIN ENDED PIPES ON ALL WEATHER ROADS INCLUDING LOADING, UNLOADING AND STACKING (per Metre) SoR For 2012-13 NP - 2 Class 80 mm dia 100 mm dia 150 mm dia 200 mm dia 225 mm dia 250 mm dia 300 mm dia 350 mm dia 400 mm dia 450 mm dia 500 mm dia 600 mm dia 700 mm dia 800 mm dia 900 mm dia 1000 mm dia 1100 mm dia 1200 mm dia 1400 mm dia 1600 mm dia 1800 mm dia 2.64 3.19 4.73 6.16 7.15 8.25 12.21 15.95 18.48 23.43 25.52 36.96 47.08 55.44 63.58 94.27 103.51 116.82 141.35 163.79 188.43 0.11 0.11 0.22 0.22 0.33 0.33 0.44 0.99 1.1 1.32 1.54 2.42 3.41 3.41 3.41 7.04 7.04 7.48 7.48 7.48 7.48 NP - 3 Class & NP - 4 Class

32.23 34.76 41.03 44.99 49.28 73.7 81.95 98.23 129.03 155.76 167.86 188.43 256.08 307.23 409.64

0.88 0.99 1.32 1.54 1.54 3.41 3.96 3.96 7.48 7.48 8.14 8.14 8.47 8.47 11.88

Sl. No. 1

19. SoRATES FOR PVC PIPES FOR THE YEAR 2012-13 TEST PRESSURE Description 2.5 Kgs/cm2 4.0 Kgs/cm2 6 Kgs/cm2 10 Kgs/cm2 2 3 4 5 6 Manufacture, Supply and delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (third revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in AP excluding Excise duty and Sales Tax etc. DIA IN MM Rate/Metre 20 25 32 40 50 63 75 90 110 125 140 Rs. Rs. Rs. Rs.
12 18 29 44 68 99 142 201 301 393 486

59 89 117 142

45 66 90 131 170 213

27 42 65 89 129 187 238 308

Labour charges for Drilling of Bores 8'' (200mm ) S/u piles 8'' (200mm ) D/u piles 10'' (250mm ) S/u piles 10'' (250mm ) D/u piles 12'' (300mm ) S/u piles 12'' (300mm ) D/u piles 15'' (375mm ) S/u piles 15'' (375mm ) D/u piles STEEL WEIGHTS 25mm Dia 20mm Dia 16mm Dia 12mm Dia 10mm Dia 8mm Dia 6mm Dia Door of Size 2' 6"x 6' 6" 3' 0"x 4' 0" 3' 6"x 6' 6" 3' 6"x 7' 6" 4' 1"x 7' 0" 4' 0"x 7' 6" Window of Size 2' 6"x 4' 0" 3' 0"x 4' 0" 3' 0"x 4' 6" 3' 6"x 4' 0" 4' 0"x 5' 0" 5' 0"x 4' 6" 6' 0"x 4' 6" Piles 65/Kg Ver Beam 140/Kg Steel Kg 12.00 15.00 15.90 16.85 23.11 28.89 31.80 1.61 2.144 2.105 2.26 3.854x R/m 2.466x R/m 1.578x R/m 0.890x R/m 0.620x R/m 0.395x R/m 0.220x R/m Frame 1.41 1.35 1.53 1.70 1.67 1.76 Frame 0.89 0.94 1.13 0.99 Shutter 1.44 1.90 2.11 2.65 2.67 2.95 Shutter 0.87 1.02 1.18 1.18 Total Cft 2.85 3.45 3.64 4.35 4.34 4.71 Total Cft 1.76 1.96 2.31 2.17 3.10 3.715 4.404 Total Cum 0.081 0.098 0.103 0.1243 0.123 0.133 Total Cum 0.05 0.056 0.0654 0.061 0.088 0.1053 0.1247 Lintle 120/Kg 21/8 27/8 25.50 / 8 31/8 28/8 39/8 39/8 51/8
21/ 8 X 250

20% MA

656.25 843.75 796.88 968.75 875.00 1218.75 1218.75 626.88

787.50 1012.50 956.25 1162.50 1050.00 1462.50 1462.50 752.25

0.040781

0.04333 0.075048 0.047294

0.026621 0.033418

0.059614 0.064003

C. Beam 120/Kg

Column 65/Kg

Sunshade 3/Rm

Roof slab 96/Kg

RR Masonary CM (1:8) 1.10 Rough stone 0.34 CM (1:8) 1.00 Labour charges

Dry Packing 1.10 Stone 1.00 Labour

Gravel Backing 1.10 Stone 1.16 Gravel

Observed Data for Cup board of Size 3' 0" x 6' 0" Frames Shutters Verticals Verticals 2x 0' 8" x 0' 4" x 0' 1" 2x2x 6' 0" x 0' 3" x 0' 1" 0.368 Cft 0.202 Cft 0.480 Cft 0.420 Cft 0.870 Cft 2.34 Cft 0.066 Cum

Horizantals 2x3' 8" x 0' 4" x 0' 1"

Horizantals 2x7x 1' 6" x 0' 3" x 0' 1" Planks 2x6x 1' 2" x 0' 9" x 0' 1" or 1.67 Sqm Horiz Vert Labour charges 2x5' 0''x 0' 21/2'' x 0' 3'' 4x4' 6''x 0' 21/2'' x 0' 3'' 0.52 Hor 0.90 1.42

3x2x 0'16''x 0' 21/2'' x 0' 11/2'' =0.05 6x1x3 ' 6''x 0' 21/2'' x 0' 11/2'' =0.55

0.028886

0.045595

0.333333 0.083333 0.364835 0.44

1/2'' x 0' 11/2'' =0.05 0.6

CONVEYANCE CHARGES - 2012-13


Lead in Earth, Gravel, Km Sand Metal Cuddapah slabs Bricks Lead in KM Earth, Gravel, Sand Metal Cuddapah slabs

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

28.00 39.20 52.20 63.40 74.60 85.80 97.00 108.20 119.40 130.60 141.80 153.00 164.20 175.40 186.60 197.80 209.00 220.20 231.40 242.60 253.80 265.00 276.20 287.40 298.60 309.80 321.00 332.20 343.40 354.60 363.90 373.20 382.50 391.80 401.10 410.40 419.70 429.00 438.30 447.60 456.90 466.20 475.50 484.80 494.10 503.40

26.70 37.40 52.20 63.40 74.60 85.80 97.00 108.20 119.40 130.60 141.80 153.00 164.20 175.40 186.60 197.80 209.00 220.20 231.40 242.60 253.80 265.00 276.20 287.40 298.60 309.80 321.00 332.20 343.40 354.60 363.90 373.20 382.50 391.80 401.10 410.40 419.70 429.00 438.30 447.60 456.90 466.20 475.50 484.80 494.10 503.40

39.30 55.00 76.80 93.30 109.70 126.20 142.70 159.20 175.70 192.20 208.70 225.20 241.70 258.20 274.70 291.20 307.70 324.20 340.70 357.20 373.70 390.20 406.70 423.20 439.70 456.20 472.70 489.20 505.70 522.20 535.90 549.60 563.30 577.00 590.70 604.40 618.10 631.80 645.50 659.20 672.90 686.60 700.30 714.00 727.70 741.40

44.50 62.30 83.10 100.90 118.70 136.50 154.30 172.10 189.90 207.70 225.50 243.30 261.10 278.90 296.70 314.50 332.30 350.10 367.90 385.70 403.50 421.30 439.10 456.90 474.70 492.50 510.30 528.10 545.90 563.70 578.50 593.30 608.10 622.90 637.70 652.50 667.30 682.10 696.90 711.70 726.50 741.30 756.10 770.90 785.70 800.50

47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90
Loading Un Loding

512.70 522.00 531.30 540.60 549.90 559.20 568.50 577.80 587.10 596.40 605.70 615.00 624.30 633.60 642.90 652.20 661.50 670.80 680.10 689.40 698.70 708.00 717.30 726.60 735.90 745.20 754.50 763.80 773.10 782.40 791.70 801.00 810.30 819.60 828.90 838.20 847.50 856.80 866.10 875.40 884.70 894.00 903.30 912.60 13.50 6.75

512.70 522.00 531.30 540.60 549.90 559.20 568.50 577.80 587.10 596.40 605.70 615.00 624.30 633.60 642.90 652.20 661.50 670.80 680.10 689.40 698.70 708.00 717.30 726.60 735.90 745.20 754.50 763.80 773.10 782.40 791.70 801.00 810.30 819.60 828.90 838.20 847.50 856.80 866.10 875.40 884.70 894.00 903.30 912.60 27.10 13.55

755.10 768.80 782.50 796.20 809.90 823.60 837.30 851.00 864.70 878.40 892.10 905.80 919.50 933.20 946.90 960.60 974.30 988.00 1001.70 1015.40 1029.10 1042.80 1056.50 1070.20 1083.90 1097.60 1111.30 1125.00 1138.70 1152.40 1166.10 1179.80 1193.50 1207.20 1220.90 1234.60 1248.30 1262.00 1275.70 1289.40 1303.10 1316.80 1330.50 1344.20

Bricks

815.30 830.10 844.90 859.70 874.50 889.30 904.10 918.90 933.70 948.50 963.30 978.10 992.90 1007.70 1022.50 1037.30 1052.10 1066.90 1081.70 1096.50 1111.30 1126.10 1140.90 1155.70 1170.50 1185.30 1200.10 1214.90 1229.70 1244.50 1259.30 1274.10 1288.90 1303.70 1318.50 1333.30 1348.10 1362.90 1377.70 1392.50 1407.30 1422.10 1436.90 1451.70 37.30 37.30

Andhra Pradesh Standard Data I. Roads and Bridges

RBR_FNDN

Chapter - 11
FOUNDATION
Index-code S. No 1 Description 2 Amount Rs. 6

Unit 3

Quantity 4

Rate Rs. 5

RBR-FNDN-1

Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and (I) Ordinary soil (A) Manual Means (i) Upto 3 m depth Unit = cum Taking output = 10 cum a) Labour Mate Mazdoor (Unskilled) b&c) Overheads & Contractors Profit Cost for 10 cum = a+b+c Rate per cum = (a+b+c)/10
Note : 1. Cost of dewatering may be added, where required, up to 5 per cent of labour cost. Assessment for dewatering shall be made as per site conditions. 2. The cost of shoring and shuttering, where needed, may be added on cost of excavation for open foundation. 3. The excavated earth if found suitable, can be used partly for backfilling in trenches & partly for road work. Hence cost of disposal has not been added except for marshy soil. This note is common to all cases of item 11.1 excluding 11.1 V

day day

3.64
250.00

RBR-FNDN-2
I

Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH Sand filling Unit = cum a) Labour Mate Mazdoor (Unskilled) b) Material Sand c&d) Overheads & Contractors Profit Rate per cum = a+b+c+d
II

day day cum

0.31 1.00

250.00

Earth filling (For marshy soil) Unit = cum Taking output = 6 cum a) Labour Mate Mazdoor (Unskilled) b&c) Overheads & Contractors Profit Cost for 6 cum = a+b+c Rate per cum = (a+b+c)/6 Note : Cost of transportation of good quality earth has not been included. Only labour for carrying carted
earth with a lead of 50 m to the foundation pits has been taken in the rate. The cost of carted earth may be worked out separately if the same is n

day day

3.12
250.00

Backfilling of foundation trenches shall normally be done with excavated earth. The cost of this operation is included in item 11.1. Only in case the excavated earth is not of suitable quality, sand filling or backfilling with carted earth may be resort

484

Index-code

S. No 1 4

Description

Unit

Quantity 4

Rate Rs. 5

RBR_FNDN Amount Rs.


6

RBR-FNDN-4

2 3 Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. P.C.C grade M 10

(i) Nominal mix 1:3:6

Unit = cum (a) Material Cement Coarse sand 40 mm aggregate Water (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) (c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted with water measuring device and preferably also with load cell.

t cum cum kl day day day hour hour

0.22 0.45 0.9 1.2 0.10 1.39 0.40 0.13 4.00%

90.00

315.00 250.00 370.00 372.00

Water tanker 6 kl capacity

(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c) e&f) Overheads & Contractors Profit Rate per cum = a+b+c+d+e+f
(ii) Nominal mix 1:3:6 (Hand mixing) (MORD)

Unit = cum (a) Material Cement Coarse sand 40 mm aggregate 20 mm aggregate 10 mm aggregate (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled)
(c) Formwork@4% on cost of material (a) and labour (b)

t cum cum cum cum day day day

0.220 0.45 0.570 0.280 0.050 0.10 2.36 4.00%

315.00 250.00

d&e) Overheads & Contractors Profit Rate per cum = a+b+c+d+e

RBR-CCPV-5

Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. Unit = cum Taking output = 75 cum (172.50 t) (100 x 3.75 x 0.200) a) Labour Mate day Mason (1st class) day Mason (2nd class) day Mazdoor (Unskilled) day Mazdoor (Skilled) day Surveyor day Mazdoor (Semi-Skilled) day Blacksmith for cutting of dowel bars including day removal of burrs, fabrications & fixing of dowel bars.

5.00 5.00 150.00 6.00 2.00 6.00 1.00

315.00 285.00 250.00 250.00 285.00 250.00 285.00

485

Index-code

S. No 1

Description 2

Unit 3 hour hour hour hour hour hour hour cum

Quantity 4 36.00 9.00 9.00 9.00 4.00 5.00 2.00 67.50

Rate Rs. 5 370.00 140.60 42.00

RBR_FNDN Amount Rs.


6

b) Machinery Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh batcher and suitable capacity calibrated water tank Needle vibrator Screed vibrator Plate vibrator Concrete joint cutting machine for initial & final cuts Water tanker 6 kl capacity Air Compressor (1 hour initial + 1 hour final) c) Material Crushed stone coarse aggregates, grading will be as per Clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90 cum/cum of concrete (25 mm & 12.5 as per IS:383 and conforming to Clause Sand mm blending) 1500.2.4.2 @ 0.45 cum/cum of concrete Cement @ 310 kg/cum of concrete Polythene sheet 125 micron Mild steel dowel bar 25 mm dia of grade S 240. 500 mm long 20 Nos. at culvert/bridge slab and at construction joint including 5 per cent wastage. (4 x 20 x 0.500) + 5 per cent wastage = 42 m @ 2.80 kg per m = 117.6 kg. Bitumen primer @ 200 ml per joint for 23 joints Bituminous sealant 800 ml per joint for 23 joints Jute rope 12 mm dia including 5 per cent wastage Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm (thick) cut-out of rubber filler board or similar material including 5 per cent wastage Polythene sheathing, covering 2/3rd dowel bars (20x23) and tight fit including 5 per cent wastage Plasticizer 0.5 per cent by weight of cement Curing compound (if used) @ 0.33 litre per sqm Water for curing Joint filler board 20 mm thick as per IS:1838 (4 x 3.75 x 0.200 = 3 sqm) d) Formwork @ 3% of (a+b+c) e&f) Overheads & Contractors Profit Cost for 75 cum = a+b+c+d+e+f Rate per cum = (a+b+c+d+e+f)/75

372.00

cum t sqm

33.75 26.25 412.50

t kg litre m m

0.118 5.00 19.00 90.00 90.00

No. litre litre kl sqm

483.00 122.00 131.25 18.00 3.00

15.00

70.00

90.00

486

RBR_FNDN

Remarks 7

487

Remarks 7

RBR_FNDN

488

Remarks 7

RBR_FNDN

489

Andhra Pradesh Standard Data I. Roads and Bridges

RBR-SBBS

Chapter - 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Index-code S. No 1 Description 2 iii

Unit 3

Quantity 4

Rate Rs. 5

Amount Rs. 6

RBR-SBBS-2

Gravel / Soil - Aggregate Base (Table 400.2) Grading C a) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN capacity to achieve the desired density, complete as per Technical Specification Clause 402 MORD
Unit = cum Taking output = 300 cum a) Labour Mate Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery Motor grader 110 HP @ 50 cum per hour
Three wheel 80-100 kN static roller @ 10 cum per hour

day day day hour hour hour hour hour

2.40 8.00 6.00 30.00 6.00 5.00 12.00

250.00 250.00

920.60

OR Vibratory Roller 80-100 kN Water tanker 6 kl capacity Tractor with Rotavator 25 cum per hour c) Material For well graded granular sub-base materials as per Table 400.2 For Grading C Material 9.5 mm to 4.75 mm @ 66 per cent 2.36 mm below @ 34 per cent Water d&e) Overheads & Contractors Profit Cost for 300 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/300 Cost for 300 cum = a+b+c+d+e (Vibratory Roller) Rate per cum = (a+b+c+d+e)/300

372.00 367.00

cum cum kl

255.00 129.00 30.00

90.00

RBR-SBBS-10

9 II

Water Bound Macadam with Crushable Screenings such as Gravel or Morrum WBM Grading 2 (using Graded Metal)

(i)

Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 MORD / 404 MORTH.
(A) By Manual Means Unit = cum Taking output = 360 cum a) Labour Mate Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural Area works (OR) Three wheel 80-100 kN static roller @ 30 cum per hour for R&B & Urban Works (OR)

day day day hour

12.08 250.00 36.00

250.00 250.00 920.60

hour

12.00

vibratory roller 80-100 kN @ 60 cum per hour Water tanker 6 kl capacity c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6, 7, 8 & 9 MORTH) Aggregate Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm for compacted thickness of 75 mm Crushable type such as Moorum or gravel for Grading 2 @ 0.22 cum per 10 sqm Binding Material Binding Material @ 0.06 cum per 10 sqm for Grading 2 material (for R&B & Urban Works Only) Water d&e) Overheads & Contractors Profit Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/360 Cost for 360 cum = a+b+c+d+e (Vibratory Roller)

hour hour

6.00 24.00

372.00

cum cum

435.60 105.59

cum kl

28.80 144.00
90.00

315

Index-code

S. No 1

Description 2

Unit 3

Quantity 4

Rate Rs. 5

Amount RBR-SBBS Rs. 6

Rate per cum = (a+b+c+d+e)/360

(B) By Mechanical Means


Unit = cum Taking output = 360 cum a) Labour Mate Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery Motor grader 110 HP @ 50 cum per hour for spreading
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural Area works (OR) Three wheel 80-100 kN static roller @ 30 cum per hour for R&B & Urban Works (OR)

day day day hour hour

2.68 15.00 7.20 36.00

250.00 250.00 2797.00 920.60

hour

12.00

vibratory roller 80-100 kN @ 60 cum per hour Water tanker 6 kl capacity c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6, 7, 8 & 9 MORTH) Aggregate Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm for compacted thickness of 75 mm Crushable type such as Moorum or gravel for Grading 2 @ 0.22 cum per 10 sqm Binding Material Binding Material @ 0.06 cum per 10 sqm for Grading 2 material (for R&B & Urban Works Only) Water d&e) Overheads & Contractors Profit Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/360 Cost for 360 cum = a+b+c+d+e (Vibratory Roller) Rate per cum = (a+b+c+d+e)/360
(ii)

hour hour

6.00 24.00

372.00

cum cum

435.60 105.59

cum kl

28.80 144.00
90.00

WBM Grading 2 (using single grade metal) Providing, laying, spreading and compacting stone aggregates of 63 mm nominal single size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 MORD. (A) By Manual Means
Unit = cum Taking output = 360 cum a) Labour Mate Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural Area works (OR) Three wheel 80-100 kN static roller @ 30 cum per hour for R&B & Urban Works (OR)

day day day hour

12.08 250.00 36.00

250.00 250.00 920.60

hour

12.00

vibratory roller 80-100 kN @ 60 cum per hour Water tanker 6 kl capacity c) Material (Refer Tables 400.7, 8, 9 and 10) Aggregate
Grading 2 Hand broken stone aggregate 63 mm nominal size (passing 80 mm & retained on 50 mm sieve) @ 0.91 cum per 10 sqm for compacted thickness of 75 mm Crushable type such as Moorum or gravel for Grading 2

hour hour

6.00 24.00

372.00

cum

435.60

cum kl

105.59 144.00
90.00

@ 0.22 cum per 10 sqm Water d&e) Overheads & Contractors Profit Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/360 Cost for 360 cum = a+b+c+d+e (Vibratory Roller) Rate per cum = (a+b+c+d+e)/360

(B) By Mechanical Means


Unit = cum Taking output = 360 cum a) Labour Mate

day

316

Index-code

S. No 1

Description 2

Unit 3 day day hour hour

Quantity 4 2.68 15.00 7.20 36.00

Rate Rs. 5 250.00 250.00 2797.00 920.60

Amount RBR-SBBS Rs. 6

Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery Motor grader 110 HP @ 50 cum per hour for spreading
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural Area works (OR) Three wheel 80-100 kN static roller @ 30 cum per hour for R&B & Urban Works (OR)

hour

12.00

vibratory roller 80-100 kN @ 60 cum per hour Water tanker 6 kl capacity c) Material (Refer Tables 400.7, 8, 9 and 10) Aggregate Grading 2 Hand broken stone aggregate 63 mm nominal size (passing 80 mm & retained on 50 mm sieve) @ 0.91 cum per 10 sqm for compacted thickness of 75 mm Crushable type such as Moorum or gravel for Grading 2 @ 0.22 cum per 10 sqm Water d&e) Overheads & Contractors Profit Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/360 Cost for 360 cum = a+b+c+d+e (Vibratory Roller) Rate per cum = (a+b+c+d+e)/360
III (i)

hour hour

6.00 24.00

372.00

cum

435.60

cum kl

105.59 144.00
90.00

WBM Grading 3 (using Graded Metal)

Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD / 404 MORTH.
(A) By Manual Means Unit = cum Taking output = 360 cum a) Labour Mate Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural Area works (OR) Three wheel 80-100 kN static roller @ 30 cum per hour for R&B & Urban Works (OR)

day day day hour

12.08 250.00 36.00

250.00 250.00 920.60

hour

12.00

vibratory roller 80-100 kN @ 60 cum per hour Water tanker 6 kl capacity c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6, 7, 8 & 9 MORTH) Aggregate Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10 sqm for compacted thickness of 75 mm Crushable type such as Moorum or gravel for Grading 3 @ 0.22 cum per 10 sqm Binding Material Binding Material @ 0.06 cum per 10 sqm for Grading 2 material (for R&B & Urban Works Only) Water d&e) Overheads & Contractors Profit Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/360 Cost for 360 cum = a+b+c+d+e (Vibratory Roller) Rate per cum = (a+b+c+d+e)/360

hour hour

6.00 24.00

372.00

cum cum

435.60 105.59

cum kl

28.80 144.00
90.00

(B) By Mechanical Means


Unit = cum Taking output = 360 cum a) Labour Mate Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery Motor grader 110 HP @ 50 cum per hour for spreading Three wheel 80-100 kN static roller @ 10 cum per hour for Rural Area works
(OR)

day day day hour hour

2.68 15.00 7.20 36.00

250.00 250.00 2797.00 920.60

317

Index-code

S. No 1

Description 2

Unit 3 hour

Quantity 4 12.00

Rate Rs. 5

Amount RBR-SBBS Rs. 6

Three wheel 80-100 kN static roller @ 30 cum per hour for R&B & Urban Works
(OR)

vibratory roller 80-100 kN @ 60 cum per hour hour Water tanker 6 kl capacity hour c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6, 7, 8 & 9 MORTH) Aggregate Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10 sqm cum for compacted thickness of 75 mm Crushable type such as Moorum or gravel for Grading 3 cum @ 0.22 cum per 10 sqm Binding Material Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum material (for R&B & Urban Works Only) Water kl d&e) Overheads & Contractors Profit Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/360 Cost for 360 cum = a+b+c+d+e (Vibratory Roller) Rate per cum = (a+b+c+d+e)/360 Note : Whenever BT is taken up simultaneously binding material
(ii) WBM Grading 3 (using Single Grade Metal)

6.00 24.00

372.00

435.60 105.59

28.80 144.00
90.00

Providing, laying, spreading and compacting stone aggregates of 40 mm Single nominal size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD.

(A) By Manual Means Unit = cum Taking output = 360 cum a) Labour Mate Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery Three wheel 80-100 kN static roller @ 10 cum/ hour or vibratory roller 80-100 kN @ 60 cum per hour Water tanker 6 kl capacity c) Material (Refer Tables 400.7, 8, 9 and 10) Aggregate Grading 3 Hand broken stone aggregate 40 mm nominal size @ 0.91 cum per 10 sqm for compacted thickness of 75 mm
Crushable type such as Moorum or gravel for Grading 3 @ 0.22 cum per 10 sqm

day day day hour

12.08 250.00 36.00

250.00 250.00 920.60

hour hour

6.00 24.00

372.00

cum

435.60

cum kl

105.59 144.00
90.00

Water d&e) Overheads & Contractors Profit Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/360 Cost for 360 cum = a+b+c+d+e (Vibratory Roller) Rate per cum = (a+b+c+d+e)/360 (B) By Mechanical Means Unit = cum Taking output = 360 cum a) Labour Mate Mazdoor (Skilled) Mazdoor (Unskilled) b) Machinery
Motor grader 110 HP @ 50 cum per hour for spreading

day day day hour hour hour hour

2.68 15.00 7.20 36.00 6.00 24.00

250.00 250.00 2797.00 920.60

Three wheel 80-100 kN @ Static roller or vibratory roller 80-100 kN @ 60 cum per hour Water tanker 6 kl capacity c) Material (Refer Tables 400.7, 8, 9 and 10) Aggregate
Grading 3 Hand broken stone aggregate 40 mm nominal size @ 0.91 cum per 10 sqm for compacted thickness of 75 mm Crushable type such as Moorum or gravel for Grading 3 @ 0.22 cum per 10 sqm

372.00

cum

435.60

cum kl

105.59 144.00
90.00

Water d&e) Overheads & Contractors Profit Cost for 360 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/360 Cost for 360 cum = a+b+c+d+e (Vibratory Roller)

318

Index-code

S. No 1

Description 2

Unit 3

Quantity 4

Rate Rs. 5

Amount RBR-SBBS Rs. 6

Rate per cum = (a+b+c+d+e)/360

319

RBR-SBBS

HOULDERS
Remarks 7

320

Remarks 7

RBR-SBBS

321

Remarks 7

RBR-SBBS

322

Remarks 7

RBR-SBBS

323

Remarks 7

RBR-SBBS

324

Andhra Pradesh Standard Data Buildings


Index-code S No 1 Description 2

BLD-CSTN

Unit 3

Quantity Rate Rs. 4


5

Amount Rs. 6

BLD-CSTN-1 BLD-CSTN-1-3

MORTARS
3

Cement Mortar (1 : 2) Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total Cement Mortar (1 : 3) Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total Cement Mortar (1 : 4) Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total

kg. cum cum day

720.00 1.05

0.20

250.00

BLD-CSTN-1-4

kg. cum cum day

480.00 1.05 1.05

0.20

250.00

BLD-CSTN-1-5

kg. cum cum day

360.00 1.05 1.05 0.20


250.00

BLD-CSTN-1-6

Cement Mortar (1 : 5) Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total

kg. cum cum day

288.00 1.05 1.05

0.20

250.00

BLD-CSTN-1-7

Cement Mortar (1 : 6) Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total Cement Mortar (1 : 8) Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total

kg. cum cum day

240.00 1.05 1.05

0.20

250.00

BLD-CSTN-1-8

kg. cum cum day

180.00 1.05 1.05

0.20

250.00

659

Index-code

S No 1

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

BLD-CSTN-2-5

13

Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level. Unit = 1cum A. MATERIALS: Cement Coarse aggregate 40 mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Water (including for curing) B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity C. LABOUR: Mason 1st class Mazdoor (unskilled) Water Charges 1% Grand Total Plain Cement concrete (1:6:10) using 40 mm metal with Concrete mixture upto Plinth level Unit = 1cum A. MATERIALS: Cement Coarse aggregate 40 mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Water (including for curing) B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity C. LABOUR: Mason 1st class Mazdoor (unskilled) Grand Total

kg cum cum cum cum kl hour day day

162.00 0.90 0.45 0.90 0.45 1.20 1.00 0.10 1.39 -

90.00

315.00 250.00

BLD-CSTN-2-9

17

kg cum cum cum cum kl hour day day

129.60 0.90 0.54 0.90 0.54 1.20 1.00 0.10 1.39

90.00 370.00 315.00 250.00

RBR-FNDN-2

Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH Sand filling Unit = cum a) Labour Mate Mazdoor (Unskilled) b) Material Sand c&d) Overheads & Contractors Profit Rate per cum = a+b+c+d
21

day day cum

0.31 1.00

250.00

BLD-CSTN-2-13

R.C.C. M-20 Nominal Mix


corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.

NEW RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


A. MATERIALS: 20mm HBG graded metal Sand Cement B. LABOUR: 1st Class Mason 2nd Class Mason Mazdoor (Both Men and Women) B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity Cost of Diesel for Miller Cost of Petrol for Vibrator Water (including for curing) BASIC COST per 1 cum cum cum Kgs day day day hour Liters Liters kl 0.900 0.450 400.000 0.133 0.267 3.600 1.000 0.133 0.667 1.200
315.00 285.00 250.00 370.00 46.00 75.00 90.00

660

Index-code

S No 1 B

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS: 20mm HBG graded metal Sand Cement B. LABOUR: 1st Class Mason 2nd Class Mason
Mazdoor (Both Men and Women)

cum cum Kgs day day day hour kl

0.900 0.450 400.000 0.167 0.167 4.700 1.000 1.200


315.00 285.00 250.00 370.00 90.00

B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity Water (including for curing) BASIC COST per 1 cum
C

RCC SLABS, BEAMS


A. MATERIALS: 20mm HBG graded metal Sand Cement B. LABOUR: 1st Class Mason 2nd Class Mason Mazdoor (Both Men and Women) B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity Water (including for curing) BASIC COST per 1 cum
Note: LIFT CHARGES - for all RCC Items 1. For Lift Charges of Labour, increase @ 10% on labour charges for each upper floor on Ground Floor Rate 2. For Lift Charges of Materials only, for lifting Concrete above 6.1 M (2nd floor onwards)

cum cum Kgs day day day hour kl

0.900 0.450 400.000 0.067 0.133 2.500 0.267 1.200


315.00 285.00 250.00 370.00 90.00

Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per 26 BLD-CSTN-2-18 11.7 drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded 1000 Unit = t & (a) Material 1200 HYSD bars including 5 per cent for overlaps and wastage Binding wire (b) Labour for cutting, bending, shifting to site, tying and placing in position Blacksmith / Bar bender Mazdoor (Unskilled) Sundries on Material (c) Overheads on (a+b) (d) Contractors profit on (a+b+c) Rate per t = a+b+c+d

t kg

1.05 6.00
65.00

day day

2.00 6.40

285.00 250.00

BLD-CSTN-3
iv

BRICK WORK, HONEY - COMBWORK


Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms Unit = 1cum A. MATERIALS: Cement Bricks traditional size 23 x 11 x 7 cms 2nd class Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: Mason 1st class Mason 2nd class Mazdoor (unskilled) Grand Total
v

kg Nos cum cum day day day

48.00 512.00 0.20 0.20 0.24 0.56 1.89


315.00 285.00 250.00

Brick Masonry in CM (1:8) with Bricks traditional size 23 x 11 x 7 cms 2nd Class Unit = 1cum A. MATERIALS: Cement Bricks traditional size 23 x 11 x 7 cms 2nd class Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR:

kg Nos cum cum

36.00 512.00 0.20 0.20

661

Index-code

S No 1

Description 2

Unit 3 day day day

Quantity Rate Rs. 4 0.24 0.56 1.89


5 315.00 285.00 250.00

Amount BLD-CSTN Rs. 6

Mason 1st class Mason 2nd class Mazdoor (unskilled) Grand Total 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, seigniorage charges, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials. unit:10sqm A. MATERIALS: Country bricks, second class traditional size 23x11x7cm Cement Sand Seigniorage charges for sand B. LABOUR: Mason 1st class Mason 2nd class Mazdoor (unskilled) Add water charges 1% Grand Total

BLD-CSTN-3-3

31

nos kg. cum cum day day day

565.000 106.000 0.220 0.220 0.600 0.600 2.750 1.00%


315.00 285.00 250.00

BLD-CSTN-4-8

44

RR Masonry in CM (1:6) Unit = 1cum A. MATERIALS: Cement CR Stone Rough Stone Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum Fine aggregate (Sand) Seigniorage charges for F.A Seigniorage charges for Stone B. LABOUR: Mason 1st class Mazdoor (unskilled) Grand Total

kg cum cum cum cum cum cum day day

79.20 0.44 0.50 0.16 0.33 0.33 1.10 1.20 2.00


315.00 250.00

BLD-CSTN-4-9

45

RR Masonry in CM (1:8) Unit = 1cum A. MATERIALS: Cement CR Stone Rough Stone Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum Fine aggregate (Sand) Seigniorage charges for F.A Seigniorage charges for Stone B. LABOUR:

kg cum cum cum cum cum cum

59.40 0.44 0.50 0.16 0.33 0.33 1.10 1.20 2.00


315.00 250.00

day Mason 1st class Mazdoor (unskilled) day Grand Total Note : When Mortar mix is changed proportionate quantity of cement has to be substituted. No change in other data

BLD-CSTN-4-10

46

Dry Stone Masonry for Retaining Walls Unit = 1cum A. MATERIALS: Rough Stone Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum Seigniorage charges for Stone B. LABOUR: Mason 1st class Mason 2nd class Mazdoor (unskilled) Grand Total

cum cum cum day day day

1.04 0.16 1.20 0.33 0.77 1.10


315.00 285.00 250.00

BLD-CSTN-6 BLD-CSTN-6-1

PLASTERING
53

Plastering with CM (1:3), 12 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:3) Seigniorage charges for F.A B. LABOUR:

cum cum

0.15 0.15

662

Index-code

S No 1

Description 2

Unit 3 day day

Quantity Rate Rs. 4 0.60 0.96


5 315.00 250.00

Amount BLD-CSTN Rs. 6

Mason 1st class Mazdoor (unskilled) Grand Total

663

Index-code

S No 1 54

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

BLD-CSTN-6-2

Plastering with CM (1:4), 12 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:4) Seigniorage charges for F.A B. LABOUR: Mason 1st class Mazdoor (unskilled) Grand Total

cum cum day day

0.15 0.15 0.60 0.96


315.00 250.00

BLD-CSTN-6-3

55

Plastering with CM (1:5), 12 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortor (1:5) Seigniorage charges for F.A B. LABOUR: Mason 1st class Mazdoor (unskilled) Grand Total

cum cum day day

0.150 0.150 0.60 0.96


315.00 250.00

BLD-CSTN-6-7

59

Plastering with CM (1:4), 20 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:4) Seigniorage charges for F.A B. LABOUR: Mason 2nd class Mazdoor (unskilled) Grand Total

cum cum day day

0.210 0.21 0.94 1.60


315.00 250.00

BLD-CSTN-6-8

60

Plastering with CM (1:3), 20 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:3) Seigniorage charges for F.A B. LABOUR:

cum cum

0.210 0.21 0.94 1.60


315.00 250.00

day Mason 2nd class Mazdoor (unskilled) day Grand Total Note : When Mortar mix is changed proportionate quantity of cement has to be substituted

BLD-CSTN-6-9

61

Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing. Unit = 10 sqm A. MATERIALS: Base Coat in CM(1:6), 16 mm thick Cement Fine aggregate (Sand) Top Coat in CM(1:4), 4 mm thick Cement Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: Mason 1st class Mason 2nd class Mazdoor (unskilled) Grand Total

kg cum kg cum cum day day day

43.00 0.18 14.50 0.04 0.22 0.63 1.47 3.90


315.00 285.00 250.00

BLD-CSTN-6-10

62

Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. Unit = 10 sqm A. MATERIALS: Base Coat in CM(1:5), 8 mm thick Cement kg Fine aggregate (Sand) cum Top Coat in CM(1:3), 4 mm thick Cement kg Fine aggregate (Sand) cum Seigniorage charges for F.A cum B. LABOUR: day Mason 1st class nd day Mason 2 class Mazdoor (unskilled) day Grand Total

31.70 0.11 19.20 0.04 0.15 0.63 1.47 3.90


315.00 285.00 250.00

664

Index-code

S No 1

Description

Unit

Quantity Rate Rs. 4


5

BLD-CSTN-6-11

63

2 3 RCM FACIA WORKS RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903)

Amount BLD-CSTN Rs. 6

Unit - 10 sqm A) MATERIALS Rabbit wire mesh (1.0 M panna for 0.6 M drop) Cement Mortar 1:3 for 25 mm thick Dry Cement for making Lumps 12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides Excluding HYSD Steel/ Mild steel & Binding wire B) LABOUR CHARGES 1st Class Mason Miller Operator Mazdoor (unskilled) c) Machinery Machine Mixing Mortar with Miller - Hire charges BASIC COST per 10 sqm

sqm cum kg sqm

13.30 0.25 50.00 21.80

day day day Hrs

8.00 1.00 10.00 32.00 2.00

315.00 285.00 250.00

50.00

70

BLD-CSTN-6-18

Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive streangth not lessthan 50 kg/sqm for walls for Superstructure Walls. Ground Floor Unit = 1 cum A. MATERIALS: No of blocks required for one cum of Masonry Cost of Cement Mortar (1:6) B. LABOUR Mason 1st class Mason 2nd class Man Mazdoor Woman Mazdoor Total
day cum 110.000 0.100

day day day day

0.420 0.920 0.700 2.100

315.00 285.00 250.00 250.00

BLD-CSTN-7

FLOORING
Flooring with 25mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials. Unit = 10 sqm
A. MATERIALS:

BLD-CSTN-7-1

71

Polished Shabad Stone (White) (0.457 x 0.457m) SSR item No. (36)
Cement for CM (1:8) proportion for base coat

sqm kg. kg. kg. cum cum day day day

11.00 21.60 33.00 20.00 0.12 0.12 3.10 1.10 0.86


315.00 285.00 250.00

Cement for slurry Cement for jointing Sand for CM (1:8) proportion Seigniorage charges of sand B. LABOUR: Mason 1st class Mason 2nd class Mazdoor (unskilled) Add water charges 1% Grand Total

665

Index-code

S No 1

Description

Unit

Quantity Rate Rs.


5

BLD-CSTN-7-2

72

2 3 4 Flooring with 40 mm thick Rough Cuddapah/Shabad stones, set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

Amount BLD-CSTN Rs. 6

Unit = 10 sqm A. MATERIALS: Rough Cuddapah/Shabad stones (40 mm thick) (0.457 x 0.457 m)
Cement for CM (1:8) proportion for base coat

sqm kg. kg. cum cum cum day day day

10.50 21.60 9.60 0.12 0.02 0.14 0.960 2.240 3.30


315.00 285.00 250.00

Cement for CM 1:3 proportion for pointing Sand for CM (1:8) proportion Sand for CM (1:3) proportion Seigniorage charges of sand B. LABOUR: Mason 1st class Mason 2nd class Mazdoor (unskilled) Add water charges 1% Grand Total
73

BLD-CSTN-7-3

Flooring with polished marble slab 20 mm thick set over base coat of cement mortar (1:6) 20 mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.30 kgs per sqm. Jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials. Unit = 10 sqm A. MATERIALS: Marble slab of size 0.305 M x 0.305 M Cement for CM (1:6) proportion for base coat Cement for slurry for bedding White Cement for pointing Sand for CM (1:6) Seigniorage charges of sand B. Machinery Machine for rubbing of floor C. LABOUR: Mason 1st class Mason 2nd class Mazdoor (unskilled) Add water charges 1% Grand Total

sqm kg. kg. kg. cum cum day day day day

10.10 48.00 33.00 5.00 0.20 0.20 1.00 2.10 3.00 5.00 315.00 285.00 250.00

75

BLD-CSTN-7-5

Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. Unit = 10 sqm A. MATERIALS: Vitrified tiles of 1st quality of size Cement for CM (1:8) for base coat Cement for slurry Cement for Pointing with CM (1:3) Sand for CM (1:8) Sand for pointing Seigniorage charges of sand B. LABOUR Mason 1st class Mason 2nd class Mazdoor (unskiled) Add water charges 1% Grand Total
sqm kg. kg. kg. cum cum cum day day day 10.10 21.60 33.00 6.000 0.12 0.020 0.140 0.96 2.24 3.30 1.00% 315.00 285.00 250.00

666

Index-code

S No 1

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

BLD-CSTN-7-6

76

Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
Unit = 10 sqm A. MATERIALS: Ceramic tiles Cement for CM (1:8) for base coat Cement for slurry White cement Sand for CM (1:8) Seigniorage charges of sand B. LABOUR Mason 1st class Mason 2 class Mazdoor (unskiled) Add water charges 1% Grand Total
nd

sqm kg. kg. kg. cum cum day day day

10.10 21.60 33.00 2.00 0.12 0.12 0.96 2.24 3.30 1.00%
25.00

315.00 285.00 250.00

BLD-CSTN-7-14

84

Flooring with 100mm thick Cement Concrete 1:6:10, using 40mm metal, 100mm thick and 20 mm Cement Concrete surface (Ellis Pattern, 1st Sort)
Unit = 10 sqm A. MATERIALS: Cement Concrete 1:6:10 using concrete mixer Stone Chippings 3.34 mm - 10 mm Cement B. LABOUR Mason 1st class Mason 2 class Mazdoor (unskiled) Add water charges 1% Grand Total
nd

cum cum kg day day day

1.000 0.250 120.000 0.150 0.350 5.40 1.00%

315.00 285.00 250.00

BLD-CSTN-7-15

85

Flooring with Cement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12 mm thick in CM(1:3)
Unit = 10 sqm A. MATERIALS: Cement Concrete 1:6:10 using concrete mixer Plastering with CM (1:3), 12 mm thick Grand Total

cum 10 sqm

1.00 1.00

BLD-CSTN-7-16

86

Flooring with Cement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12 mm thick in CM(1:3) using Red oxid, with polished surface
Unit = 10 sqm A. MATERIALS: Cement Concrete 1:6:10 using concrete mixer Plastering with CM (1:3), 12 mm thick Red oxid B. LABOUR Masons for polishing Grand Total

cum 10 sqm kg Nos

1.00 1.00 10.00 1.10


250.00

667

Index-code

S No 1

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

BLD-CSTN-7-18

88

Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
Unit = 10 sqm A. MATERIALS: Ceramic tiles 7.30 mm thick Sand for cm 1:3 base coat Cement for cm 1:3 base coat Cement for slurry White cement for jointing & pointing Seigniorage charges of sand B. LABOUR Mason 1st class Mazdoor (unskiled) Grand Total

sqm cum kgs kgs kgs cum day day

10.00 0.12 57.60 33.00 6.00 0.12 0.77 0.80

25.00

315.00 250.00

BLD-CSTN-7-22

92

Providing skirting to internal walls to 15 cm height/risers of steps with 25 mm thick polished Cuddapah stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
Unit = 10 sqm A. MATERIALS: 25 mm thick polished Cuddapah stone Sand for cm 1:3 base coat Cement for cm 1:3 base coat Cement for slurry Seigniorage charges of sand B. LABOUR Mason Ist class Mason 2nd class Mazdoor (unskiled) Add water charges 1% Grand Total

sqm cum kgs kgs cum day day day

10.10 0.12 57.60 33.00 0.12 0.96 2.24 3.10 1.00%


315.00 285.00 250.00

BLD-CSTN-8

ROOFING & CEILING


Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I J bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a pitch of 600) and seigniorage charges, etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials Unit = 184.518 sqm A. MATERIALS: G.I corrugated 0.80 mm thick sheets G.I scam bolts & nuts 2 x 27 (laps) x 17 = 884 G.I bolts & nuts 20 x 6 G.I J bolts 8 mm dia 2 x 5 x 27 sheets x 3 nos = 810 nos. with washers or srews, if wooden battens used. Limpet washers (for scam & J bolts) 810 = 1694 Bitumen washers Zinc cromate yellow paint Ready mixed paint B. LABOUR For roofing Carpenter II class Man mazdoor (beldar) For premier painting one coat Painter Mazdoor (coolie) For two coats of painting to over laps 884 +

BLD-CSTN-8-1

96

kgs nos nos nos

103.09 47.91 43.90

52.00

nos nos litre litre

91.82 91.82 0.14 0.20

day day day day

0.84 0.91 0.06 0.06

668

Index-code

S No 1

Description 2

Unit 3 day day LS LS

Quantity Rate Rs. 4 0.14 0.14


5

Amount BLD-CSTN Rs. 6

Painter Mazdor (coolie)


Sundries including 50 x 6 mm iron wind ties white lead etc. Add for Standard specification 1mm. Thick ridging and 1.25 mm thick sheet vallyes when such are required for a particular work. Average allowance for 10 sqm roofing.

Grand Total Rate per 10 sqm = Grand Total/10

BLD-CSTN-8-4

99

Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers complete including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials upto 600 pitch.
Unit = 216.14 sqm A. MATERIALS: 6 mm thick corrugated AC sheets T /sqm 8 mm dia G.I J bolts & nuts nos G.I washers nos Bitumen washers nos B. LABOUR Carpenter II class day Man mazdoor day Sundries including 50 x 6 mm iron wind ties white LS lead etc. Add for Standard specification 1mm. Thick ridging LS and 1.25 mm thick sheet vallyes when such are required for a particular work. Average allowance for 10 sqm roofing. Grand Total Rate per 10 sqm = Grand Total/10

0.15 22.03 22.03 22.03 0.43 0.54

120

BLD-CSTN-8-25

Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
Unit = 10 sqm A. MATERIALS: Cement Mortal 1:3 Water proof compound B. LABOUR Mason 1st class Mason 2nd class Mazdoor (unskiled) Grand Total

cum kg day day day

0.210 2.000 0.660 1.540 3.70

24.00 315.00 285.00 250.00

BLD-CSTN-9
130

BLD-CSTN-9-1

WHITE WASHING, COLOUR WASHING & DISTEMPERING White washing one coat with lime of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials
Unit: 10 sqm A. MATERIALS : Fine screened shell lime Gum, conjee water, or prickly pear juice including necessary fire wood B. LABOUR Brick Layers Mazdoor (unskilled) Sundries including brushes etc., Total cost for 10 sqm cum 0.005 L.S
847.00

day day LS

0.11 0.22

315.00 250.00

669

Index-code

S No

Description

Unit

Quantity Rate Rs.


5

1 2 3 4 131 White washing two coats with lime of approved quality to give an

Amount BLD-CSTN Rs. 6

BLD-CSTN-9-2

even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials Unit: 10 sqm A. MATERIALS : Fine screened shell lime Gum, conjee water, or prickly pear juice including necessary fire wood B. LABOUR Brick Layers Mazdoor (unskilled) Sundries including brushes etc., Total cost for 10 sqm cum 0.007 L.S
847.00

day day LS

0.160 0.32

315.00 250.00

132 White washing three coats with lime of approved quality to give an

BLD-CSTN-9-3

even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials Unit: 10 sqm A. MATERIALS : Fine screened shell lime Gum, conjee water, or prickly pear juice including necessary fire wood B. LABOUR White washer Brick Layers Man Mazdoor Women mazdoor Mazdoor (unskilled) Sundries including brushes, ladders etc., Total cost for 10 sqm cum 0.009 L.S
847.00

day day day day day LS

0.220 0.43

315.00

250.00

BLD-CSTN-9-7

136 Colour Washing, One Coat 254 Unit: 10 sqm

Rate for "White Washing" one coat Add: For Colours, etc., (50 percent of above rate) Total

10 sqm

1.000

BLD-CSTN-9-8

137 Colour Washing, Two Coats 255 Unit: 10 sqm

Rate for "White Washing" two coats Add: For Colours, etc., (50 percent of above rate) Total

10 sqm

1.000

BLD-CSTN-9-9

138 Distempering, 256 Distemper

Coats

with

Water

Bound

Unit: 10 sqm A. MATERIALS : Distemper Water Bound B. LABOUR Painter Mazdoor (unskilled) Sundries including brushes, ladders, etc., Total cost for 10 sqm

kg day day

1.340 0.500 1.300 1.000%

35.00 350.00 250.00

BLD-CSTN-9-10

139 Distempering, 2 Coats with Oil Bound Distemper 257

Unit: 10 sqm A. MATERIALS : Distemper Oil Bound B. LABOUR Painter Sundries including brushes, ladders, etc., Total cost for 10 sqm

kg day

1.700 1.200 1.000%

70.00 350.00

BLD-CSTN-10 BLD-CSTN-10-2

PAINTING & VARNISHING


141 Painting, Priming Coat on New Plastered Surface 270

Unit: 10 sqm A. MATERIALS : Cement Primer B. LABOUR Painter Sundries including brushes, soaps, putty etc.,

kg day

1.00 0.700 0.500%

117.00 350.00

670

Index-code

S No 1

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

Total cost for 10 sqm

BLD-CSTN-10-3

142 Painting Walls with Snowcem or other equal and 284 approved Water Proof Cement Paint over

Priming Coat, One Coat (All Colours) Unit: 10 sqm A. MATERIALS : Cement Paint at 5 sqm., per kg B. LABOUR Painter Mazdoor (unskilled) Sundries including brushes, etc., Total cost for 10 sqm

kg day day

2.000 0.300 1.500 1.000%

41.00 350.00 250.00

BLD-CSTN-10-4

143 Painting Walls with Snowcem or other equal and 285 approved Water Proof Cement Paint over

Priming Coat, 2 Coats (All Colours) Unit: 10 sqm A. MATERIALS : Cement Paint at 3 sqm., per kg B. LABOUR Painter Mazdoor (unskilled) Sundries including brushes, etc., Total cost for 10 sqm

kg day day

3.500 0.500 1.500 1.000%

41.00 350.00 250.00

144 Painting to new walls with 2 coats of water proof cement paint of

BLD-CSTN-10-5

apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls

Cost of Cement Primer Ist class painter 2nd class painter Cost of water proof cement Paint of approved quality 1st class painter 2nd class painter Mazdoor (unskilled) Total cost

kg day day kg day day day

1.00 0.21 0.49 3.50 0.15 0.35 1.50

117.00 350.00 300.00 41.00 350.00 300.00 250.00

BLD-CSTN-10-6

145 Painting, Priming Coat on New Wood Work 268

Unit: 10 sqm A. MATERIALS : Wood Primer B. LABOUR Painter Sundries including brushes, soap, putty etc., Total cost for 10 sqm

L day

0.700 0.700 1.000%

117.00 350.00

BLD-CSTN-10-7

146 Painting, Priming Coat on New Iron Work 269

Unit: 10 sqm A. MATERIALS : Red Oxide Primer B. LABOUR Painter Sundries including brushes, soap, putty etc., Total cost for 10 sqm

L day

0.70 0.70

105.00 350.00

BLD-CSTN-10-12

151 Painting with Synthetic Enamel paints - One Coat i - for New Wood Work, Old Wood Work & New

Iron Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc., Total cost for 10 sqm
ii

0.700

199.00

day

0.700

350.00

Painting with Synthetic Enamel paints - One Coat - For Old Iron Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc.,

0.500

199.00

day

0.700

350.00

671

Index-code

S No 1

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

Total cost for 10 sqm


iii

Painting with Synthetic Enamel paints - Two Coats - for New Wood Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc., Total cost for 10 sqm

1.200

199.00

day

1.200

350.00

iv

Painting with Synthetic Enamel paints - Two Coats - For Old Wood Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc., Total cost for 10 sqm

1.100

199.00

day

1.200

350.00

Painting with Synthetic Enamel paints - Two Coats - For New Iron Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter
Sundries including brushes, soap, putty etc.,

1.100

199.00

day

1.100

350.00

Total cost for 10 sqm


vi

Painting with Synthetic Enamel paints - Two Coats - For Old Iron Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc., Total cost for 10 sqm L 0.900
199.00

day

1.100

350.00

vii

Painting with Synthetic Enamel paints - Three Coats - for New Wood Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc., Total cost for 10 sqm

1.700

199.00

day

1.600

350.00

viii

Painting with Synthetic Enamel paints - Three Coats - For Old Iron Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc., Total cost for 10 sqm

1.600

199.00

day

1.500

350.00

BLD-CSTN-11 BLD-CSTN-11-1

WOOD WORK, ALUMINUM WINDOWS, VENTILATORS Etc.,


(Schedule Item No 286) Unit = 1 cum Materials : Teak wood large scantlings upto 2 m Labour : Carpenter Man Mazdoor Sundries including nails, screws etc., Cost per cum

DOORS,

155 Best Teak Wood wrought and put up to 2 meters

cum day day

1.000 17.700 8.800 LS


315.00 250.00

156 Best Teak Wood wrought and put up over 2

BLD-CSTN-11-2

metres and below 3 metres in length (Schedule Item No 287) Unit = 1 cum Materials : Teak wood large scantlings over 2 m and below 3 m in length

cum

1.000

672

Index-code

S No 1

Description 2

Unit 3
day day

Quantity Rate Rs. 4


17.700 8.800 LS 5 315.00 250.00

Amount BLD-CSTN Rs. 6

Labour : Carpenter Man Mazdoor Sundries including nails, screws etc., Cost per cum

BLD-CSTN-11-5

159 Fully Panelled doors - External or Internal -

Moulded panels (Schedule Item No 290)


A i

Single Shutter
800 x 2000 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) Total for each door 900 x 2000 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) Total for each door 1100 x 2000 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) Total for each door 1200 x 2100 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) Total for each door 900 x 2100 mm *Teak wood Labour, wrought and putup in position frame & shutters
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) cum sqm 0.083 1.600 LS

ii

cum sqm

0.088 1.800

iii

cum sqm

0.109 2.200 LS

iv

cum sqm

0.123 2.520

cum sqm

0.094 1.890 LS

vi

Total for each door 1500 x 2400 mm *Teak wood Labour, wrought and putup in position frame & shutters
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification)

cum sqm

0.159 3.600 LS

Total for each door


B i

Double Shutter
900 x 2000 mm *Teak wood Labour, wrought and putup in position frame & shutters
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) cum sqm 0.096 1.800

ii

Total for each door 1000 x 2000 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) Total for each door 1300 x 2200 mm *Teak wood Labour, wrought and putup in position frame & shutters
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification)

cum sqm

0.104 2.000

iii

cum sqm

0.134 2.860

Total for each door

673

Index-code

S No 1 iv

Description 2

Unit 3
cum sqm

Quantity Rate Rs. 4


0.147 3.220 5

Amount BLD-CSTN Rs. 6

1400 x 2300 mm *Teak wood Labour, wrought and putup in position frame & shutters
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification)

Total for each door * Note : Average rate for respective size scantlings and rough plank

BLD-CSTN-11-7

161 Furniture - Iron - for External doors (Schedule

Item 292) Top Tower bolts (Ave : Size) Bottom Tower bolts 150mm long Parliament hings with screws Oxidised aldrop with bolts Wind cleats with hings (Same for all doors)

Nos Nos Nos Nos Nos

2 2 6 1 2

BLD-CSTN-11-8

162 Furniture - Iron - Internal doors (Schedule Item

293) Top Tower bolts (Ave : Size) Bottom Tower bolts 150mm long Butt hings with screws Wind cleats with hings (Same for all doors)

Nos Nos Nos Nos

1 2 6 2

BLD-CSTN-11-17

171 Windows Glazed (Schedule Item No. 302) A i

Single Shutter :
600 x 1200 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters
Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)

cum sqm sqm

0.028 0.390 0.720

Total for each window


ii

800 x 1200 mm *Teak wood Glass


Labour, wrought and putup in position frame & shutters

cum sqm sqm

0.037 0.500 0.960

Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification) Total for each window
B i

Double Shutter :
1000 x 1200 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification) Total for each window 1200 x 1200 mm *Teak wood Glass
Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)

cum sqm sqm

0.041 0.700 1.200

ii

cum sqm sqm

0.061 0.710 1.440

Total for each window


iii

1500 x 1200 mm (3 Pannels) *Teak wood Glass


Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)

cum sqm sqm

0.072 0.920 1.800

Total for each window


iv

1000 x 1700 mm (2 Pannels) *Teak wood Glass


Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)

cum sqm sqm

0.059 0.970 1.700

674

Index-code

S No 1

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

Total for each window *Note : Average rate for respective size scantlings.

BLD-CSTN-11-18

172

Furniture for Double Leaf Windows Glazed With Top Lights (Schedule Item No. 303) Banel Bolts 100 mm long Top tower bolts 150 mm long Bottom bolts 150 mm long Parliament hinges Furniture for Double Leaf Windows Glazed without Top Lights (Schedule Item No. 304) Top tower bolts 150 mm long Bottom bolts 150 mm long Parliament hinges Same for all such windows Furniture for Single Leaf Windows Glazed without Top Lights (Schedule Item No. 305) Top tower bolts 150 mm long Bottom tower bolts 150 mm long Parliament hinges Same for all such windows

each each each each LS each each each

2 2 2 4

BLD-CSTN-11-19

173

2 2 4

BLD-CSTN-11-20

174

LS each each each 1 1 2

BLD-CSTN-11-21

175 Windows Panelled (Schedule Item No. 306) A i

Single Shutter
600 x 1200 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of hold fasts and wind appliances (Vide standard specification) Total for each window 700 x 1200 mm **Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of hold fasts and wind appliances (Vide standard specification) Total for each window cum sqm 0.039 0.720

ii

cum sqm

0.043 0.840

B i

Double Shutter
800 x 1200 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of hold fasts and wind appliances (Vide standard specification) Total for each window 1000 x 12000 mm *Teak wood Labour, wrought and putup in position frame & shutters
Sundries inclusive of hold fasts and wind appliances (Vide standard specification)

cum sqm

0.051 0.960

ii

cum sqm

0.059 1.200

Total for each window


iii

1200 x 1200 mm *Teak wood Labour, wrought and putup in position frame & shutters
Sundries inclusive of hold fasts and wind appliances (Vide standard specification)

cum sqm

0.081 1.440

Total for each window *Note : Average rate for respective size scantlings.
iv

900 x 1200 mm **Teak wood Labour, wrought and putup in position frame & shutters
Sundries inclusive of hold fasts and wind appliances (Vide standard specification)

cum sqm

0.056 1.080

Total for each window **Note : Average rate for respective size scantlings and rough planks.

BLD-CSTN-11-22

176 A

Windows Panelled & Glazed (Schedule Item No. 307)

Single Shutter
600 x 1200 mm **Teak wood cum 0.036

675

Index-code

S No 1

Description 2

Unit 3 sqm sqm

Quantity Rate Rs. 4 0.070 0.720


5

Amount BLD-CSTN Rs. 6

Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification) Total for each window
B i

Double Shutter
900 x 1200 mm **Teak wood Glass Labour, wrought and putup in position frame & shutters
Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)

cum sqm sqm

0.052 0.100 1.080

Total for each window


ii

1200 x 1200 mm **Teak wood Glass Labour, wrought and putup in position frame & shutters
Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)

cum sqm sqm

0.077 0.120 1.440

Total for each window


C

1500 x 1200 mm (3 Pannels) **Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification) Total for each window
**Note : Average rate for respective size scantlings and rough planks.

cum sqm sqm

0.094 0.150 1.800

177 Furniture for Windows Panelled : Single Leaf with half Shutters (Schedule Item No. 308)

Cabin hooks and eyes 200 mm long Butt hinges 75 mm size Top tower bolts 150 mm long Bottom bolts 150 mm long Same for all such windows

each each each each

2 4 1 1

BLD-CSTN-11-23

178

Furniture for Windows Panelled : Double Leaf with half Shutters (Schedule Item No. 309) Cabin hooks and eyes 200 mm long Butt hinges 75 mm size Top tower bolts 150 mm long Bottom bolts 150 mm long Same for all such windows

each each each each

4 8 2 2

Removing white wash or colour wash by steel wire brushing and/or scraping; sand papering and preparing the wall BLD-CSTN-11-32 187 surface smooth including necessary repairs to scratches complete Details of cost for 10 sq.m Labour : White washer / Mason 2nd Class Mazdoor (unskilled) Sundries such as sand paper and scraper etc. Scaffolding Add for water charges @ 1 % Add for contractor's profit and overheads Cost for 10 sq.m. Cost per sq.m

day day

0.010 0.170

285.00 250.00

BLD-CSTN-11-36

191

Washing and cleaning of decorated wall surfaces with soap, soda and water Details of cost for 10 sq.m Labour : White washer / Mason 2nd Class Mazdoor (unskilled) Sundries such as soap, soda, sand paper and scaper etc Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m

day day

0.010 0.170

285.00 250.00

BLD-CSTN-12 BLD-CSTN-12-1

DISMANTLING & DEMOLITION


Demolishing and disposal 194 materials within 100 metres lead of unserviceable

676

Index-code

S No 1 ii

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

Unreinforced cement concrete upto 15 cm thicknes Details of cost for 1 cu.m. Labour :Mazdoor (unskilled) Sundries Add for water charges @ 1 % Cost per cu m Demolition including stacking of serviceable

day

2.440

250.00

BLD-CSTN-12-2

195 materials and disposal of unserviceable materials i

within 100 metres lead R.C.C. work Details of cost for 1 cu.m. Labour :Mazdoor (unskilled) Sundries Add for water charges @ 1 % Cost per cu m

day

4.320

250.00

BLD-CSTN-13-7

205

Supplying and fixing galvanised steel barbed wire (IS : 2781962 Type I) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild steel wire, stapples or steel pins, etc., as directed (Posts and struts of wood, concrete, steel, etc.) and straining bolts shall be paid for separately).
Details of Cost per 100 metres (day line of wire) Materials: Galvanised steel barbed wire IS type I weighing 9.38 Kg/100 metre Carriage of barbed wire. G.I. staples steel pins or binding wire Labour :For fixing & stretching wire Blacksmith, 1st Class Blacksmith, 2nd Class Mazdoor (male). Sundries. Add water charges @ 1 % Cost for 100 metres day line of wire Rate per m

kg LS

9.380

63.00

day day day

0.150 0.150 0.300

285.00 285.00 250.00

Auguring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters.

up to 300 mm dia Total cost for 1 RM


A. MATERIALS :

Nil
B. LABOUR

Mazdoor C) Labour Allowance D) Overheads and Contractor's Profit b 350 mm dia 450 mm dia Total cost for 1 RM
A. MATERIALS :

Day

0.526

250.00

Nil
B. LABOUR

Mazdoor C) Labour Allowance D) Overheads and Contractor's Profit

Day

0.631

250.00

677

Index-code

S No 1

Description 2

Unit 3

Quantity Rate Rs. 4


5

Amount BLD-CSTN Rs. 6

500 mm dia to 700 mm dia Total cost for 1 RM


A. MATERIALS :

Nil
B. LABOUR

Mazdoor C) Labour Allowance D) Overheads and Contractor's Profit 750 mm dia and above please adopt MoRTH data

Day

0.789

250.00

Under Reaming for Cast-in-Situ piles


Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils with Augoring and boring equipment in site as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters.

up to 300 mm dia - DOUBLE UNDER REAMING Total cost for 1 Bulb Each
A. MATERIALS :

Nil
B. LABOUR

Mazdoor C) Labour Allowance D) Overheads and Contractor's Profit 350 mm dia 450 mm dia - DOUBLE UNDER REAMING Total cost for 1 Bulb Each
A. MATERIALS :

Day

0.56

250.00

Nil
B. LABOUR

Mazdoor C) Labour Allowance D) Overheads and Contractor's Profit

Day

0.789

250.00

500 mm dia to 700 mm dia - DOUBLE UNDER REAMING Total cost for 1 Bulb Each
A. MATERIALS :

Nil
B. LABOUR

Mazdoor C) Labour Allowance D) Overheads and Contractor's Profit

Day

0.986

250.00

678

BLD-CSTN

Remarks 7

679

Remarks 7

BLD-CSTN

680

Remarks 7

BLD-CSTN

681

Remarks 7

BLD-CSTN

682

Remarks 7

BLD-CSTN

683

Remarks 7

BLD-CSTN

684

Remarks 7

BLD-CSTN

685

Remarks 7

BLD-CSTN

686

Remarks 7

BLD-CSTN

687

Remarks 7

BLD-CSTN

688

Remarks 7

BLD-CSTN

689

Remarks 7

BLD-CSTN

690

Remarks 7

BLD-CSTN

691

Remarks 7

BLD-CSTN

692

Remarks 7

BLD-CSTN

693

Remarks 7

BLD-CSTN

694

Remarks 7

BLD-CSTN

695

Remarks 7

BLD-CSTN

696

Remarks 7

BLD-CSTN

697

Remarks 7

BLD-CSTN

698

Andhra Pradesh Standard Data I. Roads and Bridges

RBR-EECD

Chapter - 3
EARTHWORK, EROSION CONTROL AND DRAINAGE Index-code
S. No 1

Description
2

Unit 3

Quantity 4

Rate Rs. 5

Amount Rs. 6

RBR-EECD-1

Preparation of Foundation for Embankment Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means
i

Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD Unit = sqm Taking output = 100 sqm a) Labour Mate Mazdoor (Unskilled) b) Machinery Tractor with trolley c&d) Overheads & Contractors Profit Cost for 100 sqm = a+b+c+d Rate per sqm = (a+b+c+d)/100 Note : In case material is to be reused at site, transportation cost catered above (Sub-item b) for disposal shall be deleted. hour 1.500
361.00

day day

4.160
250.00

RBR-EECD-2

2 i

Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. MORD Unit = sqm Taking output = 100 sqm a) Labour Mate Mazdoor (Unskilled) b) Machinery Tractor with ripper attachment @ 60 cum per hour
Front end loader 1 cum bucket capacity @ 50 cum per hour

day day hour hour hour

0.260 0.250 0.300 0.680

250.00 367.00 1431.00 818.30

Tipper 5.5 cum capacity, 4 trips per hour c&d) Overheads & Contractors Profit Cost for 100 sqm = a+b+c+d Rate per sqm = (a+b+c+d)/100
iii

Forming embankment with Side earth by mechanical means including pre-watering of soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (4th revision) (Payment will be made based on level for finished item of work). Unit = cum Taking output = 100 cum a) Labour Mate Mazdoor (Unskilled) b) Machinery Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hr per hour Motor grader for grading @ 200 cum per hour hour Water tanker 6 kl capacity Vibratory Roller 80 - 100 kN C) Water d) Seigniorage Charge Total e) Overheads & Contractors Profit Cost for 100 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/100 Rate per cum hour hour kl cum 1.670 1.000 4.000 1.000 24.000 100.000
2600.30 2797.00 372.00 920.60 90.00 220.00
Three wheel Roller

day day

0.520

250.00

296

Index-code

S. No 1

Description
2

Unit 3

Quantity 4

Rate Rs. 5

RBR-EECD Amount Rs.


6

RBR-EECD-4

4 i

Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Techinical specification Unit = cum Taking output = 100 cum a) Labour Mate Mazdoor (Unskilled) b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour

day day hour hour hour hour hour hour hour

1.040 1.670 4.500 0.500 0.500 2.000 1.250 1.000


250.00

2600.30 818.30 2398.80 2797.00 372.00 920.60 D-80

Tipper 5.5 cum with 10 t capacity Dozer D-50 for spreading @ 200 cum per hour Motor grader for grading @ 200 cum per hour Water tanker 6 kl capacity Three wheel 80-100 kN Static Roller @ 80 cum per hour or Vibratory Roller 80 - 100 kN @ 100 cum per hour

0.00 90.00 0.00

c) Material Water kl 12.000 Compensation for earth taken from private land cum 100.000 d&e) Overheads & Contractors Profit Cost for 100 cum = a+b+c+d+e (3 Wheel Roller) Rate per cum = (a+b+c+d+e)/100 Cost for 100 cum = a+b+c+d+e (Vibratory Roller) Rate per cum = (a+b+c+d+e)/100 Note : 1. Compensation for earth will vary from place to place and will have to be assessed realistically as per particular ground situation. In case earth is available from Govt. land, compensation for earth will not be required. The position is require 2. Loading & Unloading shall not be allowed since excavation proposed with hydraulic excavator and unloading by tipping.

297

Index-code

S. No 1

Description
2

Unit 3

Quantity 4

Rate Rs. 5

RBR-EECD Amount Rs.


6

RBR-EECD-5

a) Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead upto 50 m as per Technical Specification Clause 302.3 MORD Unit = cum Taking output = 120 cum a) Labour Mate Mazdoor (Unskilled) b&c) Overheads & Contractors Profit Cost of 120 cum = a+b+c Rate per cum = (a+b+c)/120 b) Excavation in Cutting in Soil by manual means with lead beyond 50 m & upto 1000 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead beyond 50 m & upto 1000 m as per Technical Specification Clause 301 MORTH Unit = cum Taking output = 120 cum a) Labour Mate Mazdoor (Unskilled) b) Machinery Truck 5.5 cum capacity c&d) Overheads & Contractors Profit Cost of 120 cum = a+b+c+d Rate per cum = (a+b+c+d)/120

day day

46.800 250.00

day day hour

46.800 10.000

250.00 818.30

Note : In case there is a situation where the cross-section is of cut and fill and cut earth is required to be used in embankment in the immediate vicinity, the item of carriage in the truck shall be omitted.

298

RBR-EECD

Remarks 7

299

Remarks 7

RBR-EECD

300

Remarks 7

RBR-EECD

301

Andhra Pradesh Standard Data I. Roads and Bridges

RBR-SBST

Chapter - 12
SUBSTRUCTURE
Index-code
S. No 1 5 Description 2

Unit 3

Quantity 4

Rate Rs. 5

Amount Rs. 6

RBR-SBST-5

Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
Note : Water for concrete : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions Coarse Aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view

I i

For height upto 5 m Unit = cum P.C.C grade M 15

Nominal mix (1:2.5:5) using CC Mixer (MORD)


Unit = cum (a) Material Cement Coarse sand 40 mm aggregate 20 mm aggregate 10 mm aggregate (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) (c) Machinery Concrete mixer 0.4/0.28 cum capacity
(d) Formwork @ 10% on cost of material, labour and machinery (a+b+c)

t cum cum cum cum day day day hour

0.275 0.480 0.480 0.240 0.080 0.100 1.390 0.400 10.00%

315.00 250.00
370.00

e&f) Overheads & Contractors Profit Rate per cum = a+b+c+d+e+f


(ii)

Nominal mix 1:2.5:5 (Hand mixing) (MORD)


Unit = cum (a) Material Cement Coarse sand 40 mm aggregate 20 mm aggregate 10 mm aggregate (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) (c) Formwork @ 10% on (a+b) d&e) Overheads & Contractors Profit Rate per cum = a+b+c+d+e

t cum cum cum cum day day day

0.275 0.480 0.540 0.270 0.090 0.100 2.360 10.00%

315.00 250.00

10

RBR-SBST-10

Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH Unit = cum Taking output = 10 cum Granular material (a) Material Granular material (b) Labour Mate Mazdoor (Unskilled) (c) Machinery Plate compactor / power rammer Water Tanker d&e) Overheads & Contractors Profit Cost for 10 cum of granular backfill = a+b+c+d+e Rate per cum = (a+b+c+d+e)/10

cum day day hour hour

12.000 7.280 2.500 0.050

250.00
42.00

372.00

549

Index-code

S. No 1 II

Description 2

Unit 3

Quantity 4

Rate Rs. 5

RBR-SBST Amount
Rs. 6

Sandy material
Unit = cum Taking output = 10 cum (a) Material Sand (b) Labour Mate Mazdoor (Unskilled) (c) Machinery Plate compactor/power rammer Water Tanker d&e) Overheads & Contractors Profit Cost for 10 cum of granular backfill = a+b+c+d+e Rate per cum = (a+b+c+d+e)/10 cum day day hour hour 12.000 7.280 2.500 0.060

250.00
42.00

372.00

I. Roads and Bridges

Chapter - 13
SUPERSTRUCTURE Index-code
S. No 1 1 Description 2

Unit 3

Quantity 4

Rate Rs. 5

Amount Rs. 6

RBR-SPST-1

Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH Note : 1. Water for CC works : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions 2. Coarse aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view.
III R.C.C. Grade M 30 Design Mix

Unit =cum Case 1: Using Concrete Mixer (a) Material Cement Coarse sand 20 mm aggregate 10 mm aggregate (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) c) Machinery Concrete mixer 0.4/0.28 cum capacity Generator 33 KVA d) For formwork and stagings refer to sub-item (d) of I (II) above

t cum cum cum day day day hour hour

0.407 0.45 0.54 0.36 0.10 1.39 0.40 0.40

315.00 250.00 370.00

(I) For solid slab super-structure


(i) Height upto 5m

Basic Cost of Labour, Material & Machinery (a+b+c) d) Formwork and staging of (a+b+c) e&f) Overheads & Contractors Profit Rate per cum = (a+b+c+d+e+f) (ii) Height 5m to 10m Basic Cost of Labour, Material & Machinery (a+b+c) d) Formwork and staging of (a+b+c) e&f) Overheads & Contractors Profit Rate per cum = (a+b+c+d+e+f)

cum

1.00 20.00%

cum

1.00 25.00%

550

Andhra Pradesh Standard Data I. Roads and Bridges

RBR-STCL

Chapter -2
SITE CLEARANCE
Index-code S. No 1 Description 2

Unit 3

Quantity 4

Rate Rs. 5

Amount Rs. 6

RBR-STCL-2

Clearing and Grubbing Road Land


Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH. Unit = 10 sqm Taking output = 1 hectare
I A

By Manual Means
In area of non-thorny jungle (light jungle) a) Labour Mate Mazdoor (Unskilled) b) Machinery Tractor with trolley 3t c&d) Overheads & Contractors Profit Rate per hectare = a+b+c+d Rate per 10 Sqm = (a+b+c+d)/1000 hour 1.00
361.00

day day

156.00

250.00

In area of thorny jungle a) Labour Mate Mazdoor (Unskilled) b) Machinery Tractor with trolley 3t c&d) Overheads & Contractors Profit Rate per hectare = a+b+c+d Rate per 10 Sqm = (a+b+c+d)/1000 day day hour 208.00 2.00

250.00

II A

By Mechanical Means
In area of non-thorny jungle (light jungle) a) Labour Mate Mazdoor (Unskilled) b) Machinery Dozer D 50 with attachment or suitable machinery for removal of trees & stumps Tractor with trolley 3t c&d) Overheads & Contractors Profit Rate per hectare = a+b+c+d Rate per 10 Sqm = (a+b+c+d)/1000 In area of thorny jungle a) labour Mate Mazdoor (Unskilled) b) Machinery
Dozer D 50 with attachment for removal of trees & stumps

Day Day hour hour

4.160 10.00 1.00

215.00

2398.80 361.00

D- 80

day day hour hour

6.240 12.00 1.50

250.00 2398.80 361.00 D- 80

Tractor with trolley 3t c&d) Overheads & Contractors Profit Rate per hectare = a+b+c+d Rate per 10 Sqm = (a+b+c+d)/1000

Note : The top soil removed during clearing and grubbing of site, if suitable for re-use shall be transported, conserved and stacked as directed by the Engineer and shall be incidental to the work.

RBR-STCL-4

Uprooting and Removing Stumps & Roots


Uprooting and Removing Stumps & roots, compaction of backfilling and stacking of servicable material by manual means as per Technical Specification Clause 201.
A i

Lead upto 100 m Unit = each Girth above 300 mm to 600 mm a) labour Mate Mazdoor (Unskilled) b) Machinery Tractor with trolley 3t c&d) Overheads & Contractors Profit Rate for each stump with roots = a+b+c+d

day day hour

0.416 0.018

250.00 361.00

278

Index-code

S. No 1

Description 2

Unit 3

Quantity 4

Rate Rs. 5

Amount RBR-STCL Rs. 6

RBR-STCL-4

Uprooting and Removing Stumps & Roots


Uprooting and Removing Stumps & roots, compaction of backfilling and stacking of servicable material by manual means as per Technical Specification Clause 201.
ii

Girth above 600 mm to 900 mm a) labour Mate Mazdoor (Unskilled) b) Machinery Tractor with trolley 3t c&d) Overheads & Contractors Profit Rate for each stump with roots = a+b+c+d

day day hour

0.624 0.050

250.00 361.00

iii

Girth above 900 mm to 1800 mm a) labour Mate Mazdoor (Unskilled) b) Machinery Tractor with trolley 3t c&d) Overheads & Contractors Profit Rate for each stump with roots = a+b+c+d

day day hour

1.383 0.070

250.00 361.00

Andhra Pradesh Standard Data I. Roads and Bridges

Chapter - 9
PIPE CULVERTS
Index-code S. No 1 Description 2

Unit 3

Quantity 4

Rate Rs. 5

Amount Rs. 6

RBR-PCVT-5

Laying Cement Concrete Pipe NP3 on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet as per Tech Specifi Unit = m Taking output = 7.5 m (3 pipes of 2.5 m length each) 500 mm dia a) Labour Mate Mason (1st Class) Mazdoor (Unskilled) b) Material Sand at site Cement at site RCC pipe NP3 concrete pipe including collar at site c&d) Overheads & Contractors Profit Cost for 7.5 m = a+b+c+d Rate per m = (a+b+c+d)/7.5
Note : The labour rate for 300 mm dia shall be decreased by 20%

day day day cum t m

0.30 2.51 0.04 0.036 15.00

315.00 250.00

279

RBR-STCL

Remarks 7

280

Remarks 7

RBR-STCL

Remarks 7

281

Andhra Pradesh Standard Data I. Roads and Bridges

Chapter - 5
BASES AND SURFACE COURSES (BITUMINOUS)
Index-code
S. No 1 Description 2

Unit 3

Quantity 4

Rate Rs. 5

Amount Rs. 6

RBR-BASC-1 1
i a

Prime Coat
Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) Unit = sqm Taking output = 1750 sqm a) Labour Mate Mazdoor (Unskilled) b) Machinery Hydraulic broom @ 1250 sqm per hour Air compressor 210 cfm Bitumen emulsion pressure distributor @ 1750 sqm/hour Water tanker 6 kl capacity 1 trip per hour c) Material Bitumen emulsion (SS-1) @ 0.85 kg per sqm Water d&e) Overheads & Contractors Profit Cost of 1750 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/1750 day day hour hour hour hour t kl 1.040 1.400 1.400 1.000 0.500 1.480 3.000 250.00 310.00 455.10 748.00 372.00

RBR-BASC-2 2
iii

Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD. Unit = sqm Taking output = 1750 sqm a) Labour Mate Mazdoor (Unskilled) b) Machinery Hydraulic broom @ 1250 sqm per hour Air compressor 210 cfm Emulsion pressure distributor @1750 sqm per hour c) Material Bitumen emulsion (RS-1) @ 0.275 kg per sqm d&e) Overheads & Contractors Profit Cost of 1750 sqm = (a+b+c+d+e) Rate per sqm = a+b+c+d+e/1750 hour hour hour t 1.400 1.400 1.000 0.480 310.00 455.10 748.00

day day

1.040 250.00

14

RBR-BASC-14

20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing a suitable plant, laying and rolling with a three wheel 0-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either type A or Type B or Type C as per Technical Specification Clause 508 MORD.

Case - I By Manual Means


(II) Bitumen (S-65)

Unit = sqm Taking output = 500 sqm (10 cum) a) Labour Mate Mazdoor (Unskilled) Mazdoor (Semi-Skilled) b) Machinery Mixall 6/10 t capacity
Bitumen boiler oil fired 1000 litre capacity fitted with spray set

day day day hour hour hour t

21.000 7.080 4.000 4.000 2.000 0.730 182.00 920.60 250.00 250.00

Three wheel 80-100 kN static roller c) Material Bitumen (S-65) @ 14.60 kg per 10 sqm

Page 282

Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm d&e) Overheads & Contractors Profit Cost of 500 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/500

cum

13.500

Case - II By Mechanical Means


(II) Bitumen (S-65)

Unit = sqm Taking output = 4000 sqm (80 cum) a) Labour Mate Mazdoor (Unskilled) Mazdoor (Skilled) b) Machinery HMP 30/40 t per hour Electric generator set 125 KVA Front end loader 1 cum bucket capacity Tipper 5.5 cum - 10 t capacity Paver finisher Three wheel 80-100 kN static roller c) Material Bitumen (S-65) @ 14.60 kg per 10 sqm Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm d&e) Overheads & Contractors Profit Cost of 4000 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/4000 RBR-BASC-17
17 i

day day day hour hour hour hour hour hour t cum

10.000 3.520 6.000 6.000 6.000 3.640 6.000 16.000 5.840 108.000

250.00 250.00 16626.00 1148.00 1431.00 818.30 2664.00 920.60

Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 MORD. (using Three wheel 80-100 kN static roller) By Manual Means Case - II : Type B (510 - MORD)
(II) Bitumen (S-65)

Unit = sqm Taking output = 1250 sqm a) Labour Mate Mazdoor (Unskilled) Mazdoor (Semi-Skilled) b) Machinery Mixall 6/10 t capacity Three wheel 80-100 kN static roller Bitumen boiler oil fired 1000 litre capacity fitted with spray set c) Material Bitumen (S-65) @ 6.80 kg per 10 sqm Crushed sand or grit as passing 2.36 mm sieve and retained on 180 micron sieve applied @ 0.06 cum/10 sqm d&e) Overheads & Contractors Profit Cost of 1250 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/1250
B

day day day hour hour hour

15.000 2.850 2.500 2.500 2.500 250.00 250.00

920.60 182.00

t cum

0.850 7.500

By Mechanical Means

Case - II : Type B (II) Bitumen (S-65) Unit = sqm Taking output = 5000 sqm (30 cum) a) Labour Mate Mazdoor (Unskilled) b) Machinery HMP of 30/40 t per hour Electric generator set 125 KVA Front end loader 1 cum bucket capacity Tipper 5.5 cum - 10 t capacity Paver finisher Three wheel 80-100 kN static roller c) Material Bitumen (S-65) @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve and retained on 180 micron sieve applied @ 0.06 cum /10 sqm

day day hour hour hour hour hour hour t cum

4.160 2.000 2.000 2.000 1.360 2.000 10.000 3.400 30.000

250.00 16626.00 1148.00 1431.00 818.30 2664.00 920.60

d&e) Overheads & Contractors Profit Cost of 5000 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/5000

Page 283

Page 284

Page 285

Page 286

Page 287

Page 288

Page 289

Page 290

Page 291

Page 292

Page 293

Page 294

Page 295

Page 296

Page 297

Page 298

Page 299

Page 300

Page 301

Page 302

Page 303

Page 304

Page 305

Page 306

Page 307

Page 308

Page 309

Page 310

Page 311

Page 312

Page 313

Page 314

Page 315

Page 316

Page 317

Page 318

Page 319

Page 320

Page 321

Page 322

Page 323

Page 324

Page 325

Page 326

Page 327

Page 328

Page 329

Page 330

Page 331

Page 332

Page 333

Page 334

Page 335

Page 336

Page 337

Page 338

Page 339

Page 340

Page 341

Page 342

Page 343

Page 344

Page 345

Page 346

Page 347

Page 348

Page 349

Page 350

Page 351

Page 352

Page 353

Page 354

Page 355

Page 356

Page 357

Page 358

Page 359

Page 360

Page 361

Page 362

Page 363

Page 364

Page 365

Page 366

Page 367

Page 368

Page 369

Page 370

Page 371

Page 372

Page 373

Page 374

Page 375

Page 376

Page 377

Page 378

Page 379

Page 380

Page 381

Page 382

Page 383

Page 384

Page 385

Page 386

Page 387

Page 388

Page 389

Page 390

Page 391

Page 392

Page 393

Page 394

Page 395

Page 396

Page 397

Page 398

Page 399

Page 400

Page 401

Page 402

Page 403

Page 404

Page 405

Page 406

Page 407

Page 408

Page 409

Page 410

Page 411

Page 412

Page 413

Page 414

Page 415

Page 416

Page 417

Page 418

Page 419

Page 420

Page 421

Page 422

Page 423

Page 424

Page 425

Page 426

Page 427

Page 428

Page 429

Page 430

Page 431

Page 432

Page 433

Page 434

Page 435

Page 436

Page 437

Page 438

Page 439

Page 440

Page 441

Page 442

Page 443

Page 444

Page 445

Page 446

Page 447

Page 448

Page 449

Page 450

Page 451

Page 452

Page 453

Page 454

Page 455

Page 456

Page 457

Page 458

Page 459

Page 460

Page 461

Page 462

Page 463

Page 464

Page 465

Page 466

Page 467

Page 468

Page 469

Page 470

Page 471

Page 472

Page 473

Page 474

Page 475

Page 476

Page 477

Page 478

Page 479

Page 480

Page 481

Page 482

Page 483

Page 484

Page 485

Page 486

Page 487

Page 488

Page 489

Page 490

Page 491

Page 492

Page 493

Page 494

Page 495

Page 496

Page 497

Page 498

Page 499

Page 500

Page 501

Page 502

Page 503

Page 504

Page 505

Page 506

Page 507

Page 508

Page 509

Page 510

Page 511

Page 512

Page 513

Page 514

Page 515

Page 516

Page 517

Page 518

Page 519

Page 520

Page 521

Page 522

Page 523

Page 524

Page 525

Page 526

Page 527

Page 528

Page 529

Page 530

Page 531

Page 532

Page 533

Page 534

Page 535

Page 536

Page 537

Page 538

Page 539

Page 540

Page 541

Page 542

Page 543

Page 544

Page 545

Page 546

Page 547

Page 548

Page 549

Page 550

Page 551

Page 552

Page 553

Page 554

Page 555

Page 556

Page 557

Page 558

Page 559

Page 560

Page 561

Page 562

Page 563

Page 564

Page 565

Page 566

Page 567

Page 568

Page 569

Page 570

Page 571

Page 572

Page 573

Page 574

Page 575

Page 576

Page 577

Page 578

Page 579

Page 580

Page 581

Page 582

Page 583

Page 584

Page 585

Page 586

Page 587

Page 588

Page 589

Page 590

Page 591

Page 592

Page 593

Page 594

Page 595

Page 596

Page 597

Page 598

Page 599

Page 600

Page 601

Page 602

Page 603

Page 604

Page 605

Page 606

Page 607

Page 608

Page 609

Page 610

Page 611

Page 612

Page 613

Page 614

Page 615

Page 616

Page 617

Page 618

Page 619

Page 620

Page 621

Page 622

Page 623

Page 624

Page 625

Page 626

Page 627

Page 628

Page 629

Page 630

Page 631

Page 632

Page 633

Page 634

Page 635

Page 636

Page 637

Page 638

Page 639

Page 640

Page 641

Page 642

Page 643

Page 644

Page 645

Page 646

Page 647

Page 648

Page 649

Page 650

Page 651

Page 652

Page 653

Page 654

Page 655

Page 656

Page 657

Page 658

Page 659

Page 660

Page 661

Page 662

Page 663

Page 664

Page 665

Page 666

Page 667

Page 668

Page 669

Page 670

Page 671

Page 672

Page 673

Page 674

Page 675

Page 676

Page 677

Page 678

Page 679

Page 680

Page 681

Page 682

Page 683

Page 684

Page 685

Page 686

Page 687

Page 688

Page 689

Page 690

Page 691

Page 692

Page 693

Page 694

Page 695

Page 696

Page 697

Page 698

Page 699

Page 700

Page 701

Page 702

Page 703

Page 704

Page 705

Page 706

Page 707

Page 708

Page 709

Page 710

Page 711

Page 712

Page 713

Page 714

Page 715

Page 716

Page 717

Page 718

Page 719

Page 720

Page 721

Page 722

Page 723

Page 724

Page 725

Page 726

Page 727

Page 728

Page 729

Page 730

Page 731

Page 732

Page 733

Page 734

Page 735

Page 736

Page 737

Page 738

Page 739

Page 740

Page 741

Page 742

Page 743

Page 744

Page 745

Page 746

Page 747

Page 748

Page 749

Page 750

Page 751

Page 752

Page 753

Page 754

Page 755

Page 756

Page 757

Page 758

Page 759

Page 760

Page 761

Page 762

Page 763

Page 764

Page 765

Page 766

Page 767

Page 768

Page 769

Page 770

Page 771

Page 772

Page 773

Page 774

Page 775

Page 776

Page 777

Page 778

Page 779

Page 780

Page 781

Page 782

Page 783

Page 784

Page 785

Page 786

Page 787

Page 788

Page 789

Page 790

Page 791

Page 792

Page 793

Page 794

Page 795

Page 796

Page 797

Page 798

Page 799

Page 800

Page 801

Page 802

Page 803

Page 804

Page 805

Page 806

Page 807

Page 808

Page 809

Page 810

Page 811

Page 812

Page 813

Page 814

Page 815

Page 816

Page 817

Page 818

Page 819

Page 820

Page 821

Page 822

Page 823

Page 824

Page 825

Page 826

Page 827

Page 828

Page 829

Page 830

Page 831

Page 832

Page 833

Page 834

Page 835

Page 836

Page 837

Page 838

Page 839

Page 840

Page 841

Page 842

Page 843

Page 844

Page 845

Page 846

Page 847

Page 848

Page 849

Page 850

Page 851

Page 852

Page 853

Page 854

Page 855

Page 856

Page 857

Page 858

Page 859

Page 860

Page 861

Page 862

Page 863

Page 864

Page 865

Page 866

Page 867

Page 868

Page 869

Page 870

Page 871

Page 872

Page 873

Page 874

Page 875

Page 876

Page 877

Page 878

Page 879

Page 880

Page 881

Page 882

Page 883

Page 884

Page 885

Page 886

Page 887

Page 888

Page 889

Page 890

Page 891

Page 892

Page 893

Page 894

Page 895

Page 896

Page 897

Page 898

Page 899

Page 900

Page 901

Page 902

Page 903

Page 904

Page 905

Page 906

Page 907

Page 908

Page 909

Page 910

Page 911

Page 912

Page 913

Page 914

Page 915

Page 916

Page 917

Page 918

Page 919

Page 920

Electrical Datas - 2012 - 2013


BLD-ELEC-1-4 1.4 P.V.C. Conduit (Concealed) 1.4.2 Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in wall with all (b) required accessories including masonary work and labour charges etc., complete. Taking Output = 100 M a) Material 25mm dia 2mm thick PVC pipe.,ELEC-1.2.4 U' Links. ELEC-8.1.10 25mm dia deep Junction Box. ELEC-1.2.39 25mm PVC bends. ELEC-1.2.44 Cement b) Labour charges : Skilled Electrician ELEC-8.1.77 Semi skilled Electrician Helpers Mason Ist class day day day day 2 2 2 2 335.00 285.00 285.00 315.00

100 M 100 Nos Each Each kg

1 2 12 12 50

3030.00 40.00 24.20 6.10 4.40

1.4.2 Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs (b) with all required accessories including masonary work and labour charges etc., complete. Taking Output = 100 M a) Material 25mm dia 2mm thick PVC pipe.,ELEC-1.2.4 25mm dia deep Junction Box. ELEC-1.2.39 25mm PVC bends. ELEC-1.2.44 b) Labour charges : Skilled Electrician Semi skilled Electrician Helpers Sundries day day day 2 2 2 335.00 285.00 285.00

100 M Each Each

1 12 12

3030.00 40.00 24.20

C) Cost for 100 RM Rate per Metre = C/100 1Rmt

Note : 1. If 25mm dia PVC / MS pipes are used for light / fan point, add the cost of sheet metal / well seasoned wooden board / box.
BLD-ELEC-2 BLD-ELEC-2-1 2 2.1 Wiring Copper Wiring

2.1.1 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm)FINOLEX brand Fire Retardant (FR) P.V.C.

insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charg
Taking Output = 6 Points a) Material 14/0.3mm PVC FR flexible copper wire., ELEC-1.5.1 6A Switch ELEC-1.7.1 6A 2 way Ceiling Rose ELEC 1.7.15 25 x 20 cms (10" x8") Hylam sheet 3mm thick ELEC1.4.12 ...44/0.05=800 b) Labour charges : Skilled Electrician Semi skilled Electrician Helpers

100 M each each sqm

1 6 6 0.05

1001.00 18.00 21.00 880.00

day day day

0.6 1.2 0.6

335.00 285.00 285.00 1 Point

Rate per Point = C/6

2.1.4 Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch

board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.
Taking Output = each a) Material 6A 3 pin / 2 pin Socket., ELEC-1.7.4 6A switch., ELEC-1.7.1 b) Labour charges : Skilled Electrician Helpers day day 0.067 0.067 335.00 285.00 each each 1 1 27.00 18.00

Note : Labour Charges proposed for 1point considering 15 per day BLD-ELEC-3 BLD-ELEC-3-1 3 3.1 RUN OF MAINS Wiring with F.R P.V.C. insulated flexible copper cable

3.1.2 Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) Finolex FR P.V.C. insulated flexible copper

cable in existing pipe for earth continuity including all labour charges etc., complete.
Taking Output = 100 M a) Material 14/0.3mm FR PVC copper wire., ELEC-1.5.1 b) Labour charges : Skilled Electrician Semi Skilled Electrician Helpers Sundries day day day 0.34 1 0.34 335.00 285.00 285.00

100 M

1001.00

C) Cost for 100 RM Rate per Metre = C/100 1Rmt

Note : Labour Charges considered for 150 M / day 3.1.4 Supply and run of 2 of 36/0.3mm (2.5 Sq.mm)Finolex F.R P.V.C. insulated flexible copper

cable in existing pipe for mains inlcuding all labour charges etc., complete.
Taking Output = 100 M a) Material 36/0.3mm (2.5 sqmm) FR PVC copper wire., ELEC-1.5.3 b) Labour charges : Skilled Electrician Semi Skilled Electrician Helpers Sundries day day day 0.67 2 0.67 335.00 285.00 285.00 100 M 2 2389.00

C) Cost for 100 RM Rate per Metre = C/100 4.4 Note : Labour Charges considered for 150 M / day DISTRIBUTION BOARDS 1Rmt

BLD-ELEC-4-4

4.4.1 Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth

Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal c
A 40A DP Isolator / RCCB / ELCB - 1 No for incomer, 632A SP MCBs - 4Nos for outgoing. Taking Output = each a) Material SPN 4way D.B with IP-20 Protection suitable for single phase ECCB / RCCB/ DP Isolator.ELEC-2.12.1 40A D.P.Isolator / ECCB / RCCB., ELEC-2.10.2 10 kA - 6-32A range SP MCBs., ELEC-2.9.17 b) Labour charges : Skilled Electrician Semi Skilled Electrician Helpers Sundries such as hardware, cement etc, day day day LS 0.5 0.5 1 335.00 285.00 285.00 each each each 1 1 4 760.00 366.02 121.00

BLD-ELEC-5 BLD-ELEC-5-1

Note : Labour Charges considered for 2 jobs / day 5 EARTHING 5.1 EARTHING 5.1.1 Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per

size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes
a) Material Earth Work Excavation of Hard gravel Soil with small boulder for trench 1st step of size 1.5 x 0.6 x 0.9 m (5'x2'x3') S. No. 1387 Excavation of Hard disteggrated rocks and boulders for trench 2nd Step of size 1.2 x 0.6 x 1.2 m (Civil SSR) (4'x2'x4') 25% extra for narrow trench & pit and back filling with Sand, Coke, Salt etc., and leveling 40mm dia 'B' Class G.I pipe., ELEC .8.1.61 25 x 6 mm (1"X 1/4") G.I Flat duly drilled 12mm holes (4 Nos) of 200 mm (8") length., S.No 1137 Drilling of 16 Nos through holes of 12mm dia to G.I pipe ELEC - 8.1.63 G.I Nuts, Bolts an Washers.,ELEC 8.1.12 18" dia hume pipe ring.,ELEC 8.1.65 Hard Coke., ELEC 8.1.16 Salt., ELEC 8.1.17 b) labour charges for fixing pipe ring and connections Semi skilled Electrician Helpers Sundries Nos Nos 0.5 0.5 285.00 285.00

cum

0.850

200.00

cum

0.900

200.00

Mtr Each Each Set Each Kg Kg

2.5 1 16

323.00

5.00 4 1 40 20 12.00 200.00 8.00 4.00

BLD-ELEC-5-2

5.2 G.I Wire and Strip 5.2.1 Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges

etc., complete.
a) Material No.8 SWG G.I wire 100 M Length (0.104 Kg / Mtr) ELEC Kg 8.1.45 U' Nails., ELEC 8.1.10 100Nos b) labour charges Helpers Sundries. C) Cost for 100 M Rate per mtr c/100 BLD-ELEC-6 BLD-ELEC-6-1 6 6.1 SERVICE MAINS & LTOH Lines WPSC (Weather Prrof Single Core) (PVC Cleats) 1Rmt day 2 285.00

10.4 1.5

61.60 40.00

6.1.1 Supply and Run of 2 of 2.5 Sq.mm WPSC (Whether Proof Single Core) Aluminium cable

along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.
a) Material 2.5 Sq.mm WPSC Aluminium cable., S.No 166 100 M 2 6.7 1 702.00 61.60 300.00 355.00 285.00 285.00

No.10 SWG G.I wire. (0.026 Kg / Mtr) Length 100 RM., kg ELEC 8.1.45 PVC Cleats., ELEC 8.1.18 100 Nos b) labour charges Skilled Electrician Semi skilled Helper Sundries such as insulation tapes and rounding off C) Cost for 100 M Rate per mtr c/100 day day day

1 1 1

1Rmt

BLD-ELEC-7 BLD-ELEC-7-1

7 STREET LIGHT LUMINARIES 7.1 FLOURESCENT LUMINAIRE 7.1.1 Supply of 1x40W weatherproof flourescent streetlight fittingPhillips/wipro/GE brand comprising

canopy of sheet Aluminium in stove enamel finish with copper / VPIT ballast, capacitor, tube and starter etc., complete.
a) Material 1x40W WP flourscent street light fitting. ELEC 3.1.1 Lamp cost of 40W., S.No 763 Sundries and rounding off each each 1 1 1459.50 45.00

7.9.5 Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm dia GI pipe bracket and anti

tilting MS flat etc., including giving connections and labour charges etc., complete.
a) Material 25mm dia G.I pipe classB., ELEC 8.1.59 23/0060 twin core flexible copper cable., ELEC 1.6.8 Pipe bending charges M.S flat and welding charges b) Labour charges Skilled Electrician/carpenter Mason Semi skilled Electrician / Helper day day day 0.2 0.2 0.2 355.00 315.00 285.00 1 No M M LS LS 1 2 205.00 990.00

Supply & Fixing TOTAL Note : Labour Charges considered for 5 fixtures / day .

8.2.4 Supply and Transportation of 1x40W patty type tube light luminaire with copper choke, starter

etc., including 1No 40W tube etc., complete.


a) Material 1x40 patty type T.L. fitting., ELEC 3.6.17 40W FTL., ELEC 3.7.16 Sundires and rounding off each each 1 1 273.00 45.00

7.9.3 Fixing of 40W tube light luminaire on wall / Ceiling with / TW round blocks with all

accessories including giving connections and all labour charges etc., complete.
a) Material 23/0060 twin core flexible copper cable., ELEC 1.6.8 screws with rawal plugs., ELEC 8.1.9 T.W round blocks., ELEC 8.1.35 Cement and sand etc., b) Labour charges Skilled Electrician/carpenter Semi skilled Electrician / Helper Note : Labour Charges considered for 10 fixtures / day . day day 0.1 0.1 355.00 285.00 M each each LS 1 2 2 9.90 0.25 6.00

( 318 + 86.40 )

Supply & Fixing TOTAL 8.1.4 Supply and fixing of Bulk head fitting with cast Aluminium enamel painted body with water

tight, clear glass with wire guard hinged with lock and key arrangements etc., complete with lamp.
a) Material Bulkhead fitting., S.No 1099 60W Bulb.,ELEC 3.7.1 b) Labour charges Skilled Electrician Helper Sundires such as TW block / screws, cement etc., Note : Labour Charges considered for 12 Jobs / Day day day 0.083 0.083 355.00 285.00 each each 1 1 12.00

Bldngs_Elec-9-5

9.7 Fans 9.7.2 Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan (ISI Mark) with 3 Blades and

double ball bearings with all standard accessories.


a) Material 1200 mm (48") Ceiling Fan ., ELEC 5.1.1 Transportation Charges on Unit Cost 9.7.35 Labour Charges Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. a) Material 23/0060 Twin Core wire., ELEC 1.6.8 Unforseen item works, such as painting to down rod, screws etc., b) Labour charges. Skilled Electrician Helper M LS 1 9.90 each 1 1600.00 1%

day day

0.125 0.125

355.00 285.00

( 1616 + 1705.9 ) Note : Labour is Considered for 8 fans / day

ncealed in wall with all etc., complete.

3030.00 80.00 290.40 73.20 0.22 670.00 570.00 570.00 630.00 5913.82 59.14

ncealed in Roof Slabs harges etc., complete.

3030.00 480.00 290.40 670.00 570.00 570.00 5610.40 56.10

add the cost of sheet

tardant (FR) P.V.C. witch, Ceiling rose and bour charg

1001.00 108.00 126.00 44.00

201.00 342.00 171.00 1993.00 332.17

on a common switch ong with all labour

27.00 18.00 22.45 19.10 86.54

sulated flexible copper etc., complete.

1001.00 381.90 285.00 96.90 1764.80 1764.80 17.65

sulated flexible copper plete.

4778.00

224.45 570.00 190.95 5763.40 5763.40 57.63

le for single phase Earth RCCB) / Double Pole (DP) al c

760.00 366.02 484.00 167.50 142.50 285.00 2205.02

2.1 M in all soils, as per rs length with necessary

170.00

180.00 87.50 807.50 0.00

80.00 48.00 200.00 320.00 80.00

142.50 142.50 0.02 2258.02

ies and labour charges

640.64 60.00 570.00 1270.64 12.71

re) Aluminium cable ccessories including

1404.00 412.72 300.00 355.00 285.00 285.00 3041.72 30.42

ipro/GE brand comprising ballast, capacitor, tube

1459.50 45.00 1504.50

a GI pipe bracket and anti tc., complete.


205.00 1980.00

71.00 63.00 57.00 2376.00

with copper choke, starter

273.00 45.00 318.00

blocks with all complete.


9.90 0.50 12.00

35.50 28.50 86.40 404.40

nted body with water ents etc., complete with

0.00 12.00 29.47 23.66 65.12

ark) with 3 Blades and

1600.00 16.00 1616.00

9.90

44.38 35.63 89.90 1705.90

CEMENT & STEEL


STEEL ( HYSD bars avg, rate ) MONTH Date 1
January 2010 March 2010 April 2010 May 2010 June 2010 July 2010 August 2010 September 2010 October 2010 November 2010 December 2010 January 2011 February 2011 March 2011 April 2011 May 2011 June 2011 July 2011 August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 May 2012 June 2012 July 2012 August 2012 September 2012 October 2012 November 2012 December 2012 January 2013

CEMENT in MT 8mm to 40mm 2 3100 3300 4000 3700 3200 3100 2900 3500 4600 4300 4400 4600 4800 5100 5200 5500 5500 5400 5300 5300 5600 0 5500 5300 0 0 5400 0 5100 5300 5000 4400 3 34500 34500 37500 34000 32500 32500 33000 34000 34500 34500 34500 38000 39000 40000 41000 41000 41000 42000 42000 42500 43000 0 44000 44000 0 0 49500 0 48000 47500 47500 44400 6mm, MS 4 33500 33000 36000 33000 32000 32000 32000 33000 34000 32500 33000 37000 38000 38000 38500 39000 39000 39000 40000 40500 42000 0 42000 42000 0 0 47500 0 46000 45900 44500 43000 39500 39500 40000 40000 40000 41000 40000 42000 0 42000 42000 0 0 47500 0 47000 46500 46000 46000 MS Flats 5

17.02.10 26.03.10 30.04.10 1.07.10 20.07.10 26.07.10 27.08.10 29.09.10 29.10.2010 18.12.10 6.01.2011 1.02.2011 22.03.2011 29.03.11 05.05.11 03.06.11 13.07.11 16.08.11 25.08.11 04.11.11 10.11.11 0 19.01.12 26.03.12 0 0 30.04.12 0 30.07.12 30.07.12 01.09.12 26.09.12

February 2013 March 2013 April 2013 May 2013 June 2013 July 2013 August 2013 September 2013 October 2013

INDEX
SL.No 1 2 3 4 5 6 7 8 9
Labour Rates RR Masonry HBG Metal Gravel, Sand Jungle Picking Binding wire Conveyance Charges Hire Charges

Item
ROADS

Page No

9 14 15 18 19 21 22 25 29

BUILDINGS
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Bricks Cuddapah slabs Teak wood A.Csheet, GI sheet Rabit wire mesh Door and windows fixtures Imprevious water proof compound Plasticizer Glass Paints Dismantaling Expansion Joints fillars Labour charges for cup boards Labour charges for Iron Grills Cement Jalies Mastic Pads GI Bolds White cement Scaffolding charges Sanitary appliances P.V.C Fittings BASIC INPUT DATA FOR IRRIGATION WORKS 13 14 19 20 21 22 24 28 31 31 82 83 84 85 86 87 90 90 92 105 113

INDEX
SL.No
31 32 33 34 35 36 37 38 39 Labour Rates Binding wire GI Pipes GI Sheet Tarfelt Joint filler board Petrol Barbed wire Water Painting New Letters

Item

Page No
6 11 12 13 14 19 25 31 31

PUBLIC HELTH
40 41 42 43 RCC Pipes PVC Pipes Conveyance Charges Hire Charges 53 96 132 136