PROJECT SCHEDULE
DRESCRIPTION
DURATION IN MONTHS
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Project start A B C
1
2 Tunnel Conveyor Transfer Tower and Conveyor Gallery Structural Steel Fabrication (To be executed under D) Miscellaneous Works 4 (Road, Fencing, Drains, Buildings etc.) 3
Fabrication
Erection
Mechanical Works
1 Ship-Unloader / Shiploader / Combined Shipunloader-cum-Loader 2 Conveyor system 3 Misc. Items [Magnets,Metal Detectors, Belt Weighers, Hoists etc. ] Start-Erection of conveyor system
Electrical Works
Power avaliable
1 Power Distribution 2 Control system 3 Power Cables (6.6 KV) 4 External Lighting
F G
Project Management
Ready for Testing
PRELIMINARY
Technical Specification Floating Enquiries, evaluation and Award Manufacturing, Fabrication and Delivery Erection/ Installation Execution
TM INTERNATIONAL LOGISTIC LTD. KOLKATA AGGREGATE JETTY FACILITY AT PORT OF SOHAR, OMAN
Grafix Engineering Consultants Pvt. Ltd.
Port & Cargo Handling Division, New Delhi
GDP-2015
GDP 2012 SKM 200 PRELIMINARY SCHEDULE OF ENGINEERING ACTIVITIES AND SUPPLY (Port Stite & Mine Site) DRESCRIPTION PROJECT START DATE .
DURATION IN MONTHS
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Completion Selection and Finalisation of the Suppliers. Contractor's/supplier's submissions checking and interaction based on Grafix's system and detailed engineering. Interface data available from the supplier(s) of the Equipment/Bought-out items. Drawing preparation and issue of construction drawings in progressive manner. Supply of Equipment (Mechanical/ Electrical) Errection of Equipment (Mechanical/Electrical)
Port & Cargo Handling Division, New Delhi
Muara Wahau Coal Project, Indonesia Grafix Engineering Consultants Pvt. Ltd.
03-05-2011