MINISTRY OF ENERGY

IRAN POWER DEVELOPMENT COMPANY

I.P.D.C
PROJECT:

SHIRVAN GAS TURBINE POWER PLANT (BOP2 PORTION)

FUEL GAS SYSTEM DESCRIPTION

IN-HOUSE REVISIONS
B A 0 REV. B A

DOCUMENT REVISIONS
Revised as per Mapna M.Z. Let. 2001/831 Revised as per GNCE M.Z. comments Let. 22909 FOR APPROVAL DESCRIPTION M.Z. DESG.
83/10/16 83/8/15 83.7.12 Date

A.M. A.M. S.H. CHK.

83/10/16 83/8/15 83.7.12 Date

E.A. E.A. E.A. APP.

83/10/16 83/8/15 83.7.12 Date

MAPNA

FIRST ISSU

M.Z. DESG.

83.7.12 DATE

S.H. CHK.

83.7.12 DATE

E.A. APP.

83.7.12 DATE

0 REV.

DESCRIPTION

Co.

(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

Doc. No.: MP-SVG-19IE-04-FL3-001


Contract No.:

Rev. : B File No.:


SYSTEM

Kherad Water Treatment CO.

SE Code:

MF Code:

Page NO.: 1 of 7

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C
PROJECT:
PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 0 X X X X X X X A X X X X X B

SHIRVAN GAS TURBINE POWER PLANT (BOP2 PORTION)


REVISION C D E F G REMARKS PAGE 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 0 A B REVISION C D E F G REMARKS

X X

MAPNA

Co.

(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

Doc. No.: MP-SVG-19IE-04-FL3-001


Contract No.:

Rev. : B File No.:


SYSTEM

Kherad Water Treatment CO.

SE Code:

MF Code:

Page NO.: 2 of 7

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C
PROJECT:

SHIRVAN GAS TURBINE POWER PLANT (BOP2 PORTION)

CONTENTS
1.List of reference documents 2.Site location 3.Ambient & site conditions 4.Purpose of the system 5.Natural gas conditions 6.Natural Gas System Description 6.1Natural gas supply 6.2Domestic Distribution 6.2.1 Domestic Gas Reducing Station 7.Purging 8.Instrumentation & control 8.1. Main Portion 8.2. Domestic Portion 9. Cathodic Protection.

MAPNA

Co.

1.(PRIVATE JOINT reference document List of STOCK) IRAN POWER PLANT PROJECTS
MANAGEMENT Co.

Doc. No.: MP-SVG-19IE-04-FL3-001


Contract No.:

Rev. : B File No.:


SYSTEM

Kherad Water Treatment CO.

SE Code:

MF Code:

Page NO.: 3 of 7

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C
PROJECT:

SHIRVAN GAS TURBINE POWER PLANT (BOP2 PORTION)

1.Fuel gas system for GT Units P&ID 2.Fuel gas system for Domestic Consumers P&ID 3.Natural gas Piping rule and devices installation

MP-SVG-19IE-02-FN3-001 MP-SVG-19IE-02-FN3-001 ISIRI 2097

guide of natural gas system in industries

2. Site Location
Shirvan gas turbine power plant is located in the 9 Km at the east of Shirvan city and its atmosphere is dusty.

3. Ambient & Site Conditions


Site elevation Min. Abs. Temp. Max. Abs. Temp. Average humidity Average total annual precipitation Abs. Max. precipitation per 24 hours Annual mean. Temp. Design wind velocity Design Temp. Barometric pressure : 1550 m : -31 C : +44 C : 48% : 470 mm :73 mm : 13.3 C : 144 km/h : 20 C : 0.84 bar

4. Purpose of the system


The natural gas system consist of one DN500 from outlet flange of NIGC gas reducing station then two DN400 pipes supply fuel gas to the burners of six V94.2 gas turbine units and also with DN50 pipe line branched off from DN400 main headers fuel gas supplies for domestic consumers such as canteen Bld., central HVAC Bld. , Auxiliary boiler Bld. administration bld., gate house and guard house . Each of the DN400 pipe lines will supply fuel gas for three GT units.

5. Natural gas conditions


The fuel gas condition in the terminal point of each GT unit filtering fuel gas skid with are as follows : Flow rate of each G.T. : 45718 Nm3/hr Nominal pressure : 20.6 bar(g) Nominal temperature : Ambient MAPNA Nominal Inlet Pipe size : DN200
Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

Fuel gas condition at terminal point with NIGC is as follows :

Doc. No.: MP-SVG-19IE-04-FL3-001


Contract No.:

Rev. : B File No.:


SYSTEM

Kherad Water Treatment CO.

SE Code:

MF Code:

Page NO.: 4 of 7

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C
PROJECT:

SHIRVAN GAS TURBINE POWER PLANT (BOP2 PORTION) : about 24 bara : DN500 : 300000 Nm3/hr

Maximum pressure Outlet Flange size Capacity

6. Natural gas System Description


6.1.Natural gas supply One DN500 main fuel gas header(60EKD01 BR001-NG-500) coming out from NIGC reducing station (as buried) then devides to two buried DN400 pipes headers(60EKD02 BR001-NG-400 & 60EKD03 BR001-NG-400) and will supply the fuel gas for all system. These lines will feed 6V94.2 gas turbine (one header for 3 GTs) and also provide enough fuel gas for domestic consumers. These headers has been equipped with two isolating ball valves (60EKD02 AA001 & 60EKD03 AA001). The fuel gas supply lines will be routed as buried pipes and near to power house, they will be routed over rack. All fuel gas pipes are buried pipes and will be coated with adequate wrapping materials and above ground pipes will be painted. The main buried pipes are at 2 meters below plant surface and domestic buried pipes are at 1.5 meters below the plant surface. Suitable cathodic protection will be considered and to isolate the buried part from above ground part dielectric insulation joints will be considered. One DN500 insulation joints will be after NIGC outlet flange and two DN400 insulation joints will be on the DN400 headers near pipe rack. Each of the DN400 headers will convey the fuel gas for three GT units. For each unit branch line of DN 200 and one isolating DN200 ball valve will be considered. 6.2.Domestic distribution From each DN400 header, one DN50 pipe with its isolating valve will be branched (60EKD04 BR001-NG-50 & 60EKD05 BR001-NG-50) ,one will be stand by, to supply gas to the secondary gas pressure reducing station for domestic consumers. This pressure regulating station will reduce gas pressure from max. 24 bara to 60 PSIG. These two braches connected to each other and as a header (60EKD06 BR001-NG-50) is routed toward domestic gas reducing station. From the domestic gas reducing station the fuel gas will be supplied to the domestic consumers as the following areas: 1- Administration building 2- Canteen building 3- Central HVAC room building 4- Auxiliary boiler building MAPNA 5- Gate house Co. 6- Guard house (PRIVATE JOINT STOCK)

IRAN POWER PLANT PROJECTS MANAGEMENT Co.

Doc. No.: MP-SVG-19IE-04-FL3-001


Contract No.:

Rev. : B File No.:


SYSTEM

Kherad Water Treatment CO.

SE Code:

MF Code:

Page NO.: 5 of 7

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C
PROJECT:

SHIRVAN GAS TURBINE POWER PLANT (BOP2 PORTION)

6.2.1 Domestic Gas Reducing Station The domestic gas reducing station consists of to 2100% reducing station with 1400 Nm3/hr capacity. Inlet pressure to station will be max. 24 bara (at normal condition 20.6 barg) and outlet pressure from station will be 60 PSIG. The reducing station consist of two cartridge type gas filters(60EKG01 AT001 & 60EKG02 AT002) for prevention of solid entrance, two self actuated shut off valves(60EKG01 AA003 & 60EKG02 AA003) to prevent from any damage/hazard due to over pressurizing , two regulating valves(60EKG01 AA004 & 60EKG02 AA004) for reducing pressure to 60 PSIG, and two safety valves (60EKG01 AA303 & 60EKG02 AA303). Perforation of cartridges of gas filters will be 5 microns. Adequate vents and drain lines will be considered on the station. Two differential pressure indicators (PDIA) (60EKG01 CP502 & 60EKG02 CP502) including isolating valves will be considered for indicating pressure drop of cartridge filters. These PDIAs will be locally indicators.

7. Purging
For purging of the fuel gas main header lines with natural gas during commissioning of system at the end of each header on the rack one DN100 ball valve and adequate piping will be considered.

8. Instrumentation & Control


8.1. Main Portion For natural gas system the following instruments will be considered: One pressure indicator 60EKD02 CP501 mounted on the 1~3 units line with one isolating valve to indicate pressure of this header. One temperature indicator 60EKD02 CT501 mounted on the 1~3 units line with relevant thermowell. One pressure transmitter 60EKD02 CP101 mounted on the 1~3 units line with one isolating valve to send a signal to DCS. One temperature transmitter 60EKD02 CT101 mounted on the 1~3 units line with relevant thermowell to send a signal to DCS
MAPNA One pressure indicator 60EKD03 CP501 mounted on the 4~6 units line with one isolating valve to
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

indicateCo. pressure of this header.

Doc. No.: MP-SVG-19IE-04-FL3-001


Contract No.:

Rev. : B File No.:


SYSTEM

Kherad Water Treatment CO.

SE Code:

MF Code:

Page NO.: 6 of 7

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C
PROJECT:

SHIRVAN GAS TURBINE POWER PLANT (BOP2 PORTION)

One temperature indicator 60EKD03 CT501 mounted on the 4~6 units line with relevant thermowell. One pressure transmitter 60EKD03 CP101 mounted on the 4~6 units line with one isolating valve to send a signal to DCS. One temperature transmitter 60EKD03 CT101 mounted on the 4~6 units line with thermowell to send a signal to DCS.
8.2.Domestic

Portion

The cartridge filters (60EKG01 AT001 & 60EKG02 AT002) are equipped with One differential pressure indicator 60EKG01 CP502 & 60EKG02 CP502 for indicating locally pressure drop of filters. Changing in the screen color of the DPIAs is considered as visual alarm and in this case filters are dirty. Two pressure indicators 60EKG01 CP501 & 60EKG02 CP502 will be considered for indicating downstream pressure of regulator valves. Also two pressure indicators 60EKG01 CP503 & 60EKG02 CP503 for indicating the upstream pressure of regulator valves will be considered. The shut off valves (60EKG01 AA003 & 60EKG02 AA003) will close if down stream pressure of the regulator valves goes higher than 5 barg.

9. Cathodic Protection.
Necessary cathodic protection system will be considered for natural gas system.

MAPNA

Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

Doc. No.: MP-SVG-19IE-04-FL3-001


Contract No.:

Rev. : B File No.:


SYSTEM

Kherad Water Treatment CO.

SE Code:

MF Code:

Page NO.: 7 of 7