LIST OF COMPLETED PROJECT CY 2011 NAME OF PROJECT BAGUMBAYAN Furnishing of Materials for the Improvement of Day Care Construction

of Open Dug Well Repair of Damage Canal Cover BANGAG Concreting of Pathwalk Furnishing of Materials for the Flooring of Brgy. Gym Furnishing of Materials for the Construction of School Pergola Furnishing of Materials for the Completion of Stage LOCATION Bagumbayan, Lal-lo Bagumbayan, Lal-lo Bagumbayan, Lal-lo AMOUNT 29,515.00 7,260.00 4,342.00 SOURCE OF FUND LGU LGU LGU DATE IMPLEMENTED 4-Apr-11 22-Feb-11 8-Sep-11 REMARKS completed completed completed

Bangag, Lal-lo Bangag, Lal-lo Bangag, Lal-lo Bangag ES

16,380.00 15,500.00 14,920.00 19,900.00

LGU LGU LGU LGU

18-May-11 10-Jun-11 5-Sep-11 17-Oct-11

completed completed completed completed

BICUD Bicud, Lal-lo Improvement of Day Care Center Furnishing of Materials for the Installation of Electrical Wirings @ Various Bicud ES, Lal-lo School Building BINAG Repair of 2CL BOD Fabrication/Installation of Two Units Jetmatic Handpump Furnishing of Materials for the Installation of RCCP Furnishing of Materials for the Construction of Comfort Room CABAYABASAN Fabrication of Steel Interlink Barricade Framed CAGORAN Furnishing of Materials for the Flooring of Stage Furnishing of Equipment for the Maintenance of Sanitary Landfill Construction of Health Center Furnishing of Materials for the Construction of Comfort Room CATAYAUAN Furnishing of Materials for the Const. Of Drainage Canal Furnishing Jetmatic Handpump CATUGAN

10,895.00 9,525.00

LGU LGU

9-Mar-11 16-May-01

completed completed

Binag ES Binag, Lal-lo Binag, Lal-lo Binag ES

44,805.00 8,460.00 11,260.00 22,607.00

LGU LGU LGU LGU

25-Jan-11 14-Jun-11 18-May-11 5-Oct-11

completed completed completed completed

Cabayabasan, Lal-lo

20,527.00

LGU

7-Jul-11

completed

Cagoran, Lal-lo Cagoran, Lal-lo Cagoran, Lal-lo Cagoran ES

4,700.00 98,072.00 99,226.00 11,440.00

LGU LGU LGU LGU

28-Apr-11 6-Jan-11 4-Jul-11 7-Dec-11

completed completed completed completed

Catayauan, Lal-lo Catayauan, Lal-lo

14,400.00 6,045.00

LGU LGU

4-Apr-11

completed completed

Construction of Footbridge Installation of RCCP CSU Fabrication/Installation of Canopy Furnishing of Materials for the Perimeter Fence of Pasture Area DALAYA Installation of Tiles @ Dalaya Day Care Center FUSINA Furnishing of Materials for the Installation of Street Lights Furnishing of Materials for the Installation of Street Lights LOGAC Installation of Tiles @ Multi Purpose Building MAGAPIT Rehab. Of Roofing of Sch. Bldg. Furnishing of Materials for the Installation of Tiles @ Day Care Center Furnishing of Materials for the Electrification of Stage MAXINGAL Furnishing/Installation of Jetmatic Handpump NAGUILIAN Protection Works PARANUM Improvement of Paranum ES SAN LORENZO Furnishing of Materials for the Installation of RCCP SAN MARIANO Construction/Installation of Two (2) Units Baby Artesian Well STA. MARIA Painting of Street Light Post Furnishing of Jetmatic Handpump Furnishing of Materials for the Installation of Tiles

Catugan, Lal-lo Catugan, Lal-lo

93,000.00 91,858.00

LGU LGU

30-May-11 11-Apr-11

completed completed

CSU-Lal-lo CSU-Lal-lo

65,000.00 44,100.00

LGU LGU

26-Apr-11 6-Jun-11

completed completed

Dalaya, Lal-lo

33,358.00

LGU

completed

Fusina, Lal-lo Fusina, Lal-lo

22,800.00 7,200.00

LGU LGU

9-Mar-11 6-Jun-11

completed completed

Logac, Lal-lo

27,620.00

LGU

28-Apr-11

completed

Magapit NHS Magapit, Lal-lo Magapit NHS

80,928.00 22,085.00 12,130.00

LGU LGU LGU

7-Feb-11 14-Mar-11 18-Jan-11

completed completed completed

Maxingal, Lal-lo

14,790.00

LGU

15-Feb-11

completed

Naguilian, Lal-lo

99,549.00

LGU

11-Apr-11

completed

Paranum, Lal-lo

72,203.00

LGU

9-Aug-11

completed

San Lorenzo, Lal-lo

66,880.00

LGU

4-Apr-11

completed

San Mariano ES

77,610.00

LGU

completed

Sta. Maria, Lal-lo Sta. Maria, Lal-lo Sta. Maria ES

5,340.00 6,045.00 24,540.00

LGU LGU LGU

3-May-11 7-Jul-11

completed completed completed

TUCALANA Fabrication/Installation of Window Grills @ ALS Lal-lo Community Learning Center LGU Repainting of Municipal Hall Building Repair of Drainage Canal Repair of Radio Station Tower Maintenance of Municipal Building (MNC & DSWD Office) Replacement of Classroom Windiows @ Lal-lo NHS Main Improvement of ARH Center @ Lal-lo NHS-main Repair of Drainage Canal Improvement of D.A. Office Repair of Gutter @ Municipal Hall Building Repainting of Roofing of Various LGU Buildings Replacement of Service Drop of Municipal Hall

Tucalana, Lal-lo

15,522.00

LGU

21-Mar-11

completed

LGU-Compound LGU-Compound LGU-Compound LGU-Compound Lal-lo, Cagayan Lal-lo, Cagayan LGU-Compound LGU-Compound LGU-Compound LGU-Compound LGU-Compound GRAND TOTAL

94,290.00 28,337.00 22,630.00 8,813.00 20,980.00 20,320.00 28,337.00 49,689.00 26,460.00 69,459.00 67,524.00 1,789,176.00

LGU LGU LGU LGU LGU LGU LGU LGU LGU LGU LGU

4-Jul-11 1-Mar-11 27-May-11 7-Dec-11 27-Mar-11 5-Sep-11 5-Sep-11 18-Jul-11

completed completed completed completed completed completed completed completed completed completed completed