You are on page 1of 3

ANKUR SAINI

sainiankur1@gmail.com saini_ankur1@yahoo.co.in

RF OPTIMIZATION ENGINEER PROFESSIONAL SYNOPSIS


Bachelor of Electronics & Telecommunications with more than 3 Years of experience in Telecom industry & I have done telecom training from TNS Noida. Current project Network optimization for Airtel_Nokia Pune. Latest project optimization & coordination for UNITECH_ HUAWEI Tamilnadu. Proficient in GSM System Integration & Optimization. Widespread knowledge of telecom test equipments including TEMS drive test Tool. Successfully completed six domestic projects. Skilled and motivated with knowledge in FDMA and TDMA technologies and can achieve proficiency in any related or specific field in a relatively short time. Extensive knowledge of Microsoft Excel, Microsoft Word, Windows 98, Windows2000 Windows2000/NT Windows XP. Ability to perform quality work with in deadlines with or without direct supervision. Able to bring effective solutions to complex problems in turn ensuring customer acknowledgement of the expertise level of the resources of the company. Reflection,TEMS Drive Test Tool(version:3.2 ,5.1,6.0,6.1,7.1,8.0.1), Assistant, Genex Probe, Mapinfo, Mapsource, Globalmapper, MCOM, RL Tool, Google Earth, Garmin GPS 12, 72, 60. Excellent written and oral communications, interpersonal, analytical, abstract reasoning and organizational skills. Strong analytical skills, the ability to meet deadlines, multi-task, and prioritize.

WORK EXPERIENCE
1.

MOBILECOMM TECHNOLOGIES INDIA Pvt. LTD : Gurgaon Designation : RF Engineer Duration : July 2009 to till date. Project Name Designation Duration : Network Optimization Pune. : Optimization Engg. : May2010 to till date

1.

PROJECT BRIEF:
To analyze statistical tend of KPIs, to rank and optimize the cells affecting the Network KPIs.Primary verification of drive data and talking necessary corrective measures, like neighbor list addition, and interference analysis. Daily performance monitoring of the sites using various ND reports.

Page 1 of 3

Analysis the current status of cells using various MML commands on Reflection Tool. Performed a neighbor list audit utilizing the handoff matrix, identified handoff failures and low handoff usage between different sectors in the network. Performed statistical trending of (%) blocking of TCH and SDCCH, # of blocks, # of drops, # of attempts, %Uplink/%Downlink Quality and %Incoming/%Outgoing Handover, and Erlang usage for the network. Preparation of Parameters and planning frequencies foe new sites,Coverage and Capacity planning according to the necessity,Frequency planning for BCCH retuning, for new and existing sites. Analysis of the Layer 3 messages for basic troubleshooting related to handover and other parameter verification.Improve Quality of Service (QoS) of assigned area through resolution of worst performing cells and cluster optimization.Responsible for network LAC and SDCCH dimensioning. Performed RF cell site design with respect to site location, antenna placement, antenna type, antenna height, antenna azimuths, antenna down tilts, equipment location, cable types Integration of new cell sites into existing network along with multicarrier configuration. Responsibilities for monitoring and improving network performance on cell sites and micro cells to meet objectives for call drops and call blocks continuous network improvements through parameter changes, down tilts, antenna changes, and border sector configurations.Closely monitored cell traffic statistics. Involves in BTS integration & rehoming activities, parameter audit, pre/post drive test analysis and ensuring the smooth cutover of sites. Performs drive test to verify status of network coverage in street levels, in building and commercial establishments as well as comparative data of competitors.

2.

Project Name Designation Duration

: Network Optimization TAMIL NADU. : Optimization Engg : July 2009 to April 2010

PROJECT BRIEF: Setting up the network for UNITECH Telecom GSM N/W in Tamil Nadu, Vendor
2.

Huawei Technologies India Pvt Ltd in Coimbatore Region. Did BCCH (Frequency), BSIC, Neighbor planning for the network using Naster planning tool and MIPT. Responsible for optimizing, analyzing, and improving performance of GSM Network. Monitor and drive test data to improve system performance indicators such as dropped calls, Hand off failures, established calls and to meet threshold goals.

ADACELLWORKS : Gurgaon Designation : Drive Test Engg. Duration : Feb 2009 to July 2009 Project Name : Drive Test & Optimization UP WEST Job Profile:

Posted as an Engineer for doing RF Drive test and Optimization for Zte project of Aircel operator in UP West.
Page 2 of 3

3.

TELEPOINT SERVICES INDIA Pvt. LTD : Chandigarh Designation : RF Engineer Duration : March 2008 to Feb 2009 1. Project Name : RF DRIVE TEST & OPTIMIZATION-RANCHI Job Profile: 2. Project Name Job Profile: : RF Survey & LOS for ADACELLWORKS

Posted as an Engineer for doing RF Drive test and Optimization for Ericsson project of Aircel operator in Jharkhand.

Posted as an Engineer for doing RF survey and Transmission network survey for NOKIA project of IDEA operator in MAHARASTA

4.

ISS Pvt. LTD : Gourgoan Designation : RF Engineer Duration : July 2007 to March 2008 1. Project Name : LOS for ERICSSION Job Profile: 2. Project Name Job Profile: : RF and LOS for Metrotel

Posted as an Engineer for doing RF survey,AES survey and Transmission network survey for ERICSSION project of AIRTEL operator in UP West.

Posted as an Engineer for doing RF survey and LOS survey, for NOKIA project of AIRTEL operator in BIHAR doing RF survey and Transmission Network Design.

PERSONAL DETAILS

Date of Birth -6thAug1984. Fathers Name - Shri S.C.Saini. Nationality - Indian. Marital Status - Single. Address - 408/2chaw mandi Roorkee , Haridwar, Pin:247667 Contact No. 09158874720, 09582567104 , 9719967556 Preferred Location Meerut (UP West) Pass port - Available. Ankur saini

Page 3 of 3

You might also like