You are on page 1of 14

WBS Code

WBS Name
01
.City Center Office Building Addition
01.01.D&E
Design and Engineering
01.01.Found Foundation
01.01.StructureStructure
01.01.Mechanicals
Mechanical/Electrical Systems
01.01.Mechanicals.Lifts
Elevator
01.01.Mechanicals.HVAC
HVAC
01.01.Mechanicals.Systems
Plumbing and Electrical
01.01.Ex-FinishExterior Finishes
01.01.Ex-Finish.Brick
Brick
01.01.Ex-Finish.Roof
Roof
01.01.Ex-Finish.Win
Doors and Windows
01.01.Int-FinishInterior Finishes
01.01.Int-Finish.Fixtures
Plumbing and Lighting Fixtures
01.01.Int-Finish.Coverings
Floor and Carpeting
01.01.Int-Finish.Carp
Carpentry
01.01.Int-Finish.Paint
Paint

Predecessors

Relation
ship
Type
Lag

EC1010
EC1030
EC1050

FS
FS
FS

0
0
0

Review and Approve Designs


Start Office Building Addition Project

EC1000

FS
FS

0
0

Begin Building Construction


Site Preparation
Excavation
Install Underground Water Lines
Install Underground Electric Conduit
Form/Pour Concrete Footings
Concrete Foundation Walls
Form and Pour Slab
Backfill and Compact Walls
Foundation Phase Complete

EC1030
EC1090
EC1100
EC1230
EC1230
EC1320, EC1330
EC1340
EC1350
EC1360
EC1370

FS
SS
FS
FS
FS
FS
FS
FS
FS
FS

0
0
0
0
0
0
0
0
0

Erect Structural Frame


Floor Decking

EC1370
EC1390

FS
FS

0
0

Activity ID
Activity Name
Total
CITY CENTER EXTENTION PROJECT
City Center Office Building Extention
Design and Engineering
EC1000
Design Building Addition
EC1050
Assemble Technical Data for Heat Pump
EC1160
Review Technical Data on Heat Pumps
EC1030
EC1010
Foundation
EC1090
EC1100
EC1230
EC1320
EC1330
EC1340
EC1350
EC1360
EC1370
EC1380
Structure
EC1390
EC1420

FS

FS
FS
FS
FS
FS

0
0
0
0
0

EC1520, EC1680 FS

Rough-In Phase Begins

EC1440

FS

Install Elevator Cab and Finishes


Install Elevator Rails and Equipment

EC1620, EC1690 FS
EC1460, EC1490 FS

0
0

Prepare and Solicit Bids for Heat Pump


Review Bids for Heat Pump

EC1160
EC1190

FS
FS

0
0

FS
FS

0
0

FS

FS
FS
FS
FS
FS
FS

0
0
0
0
0
0

FS
FS
SS
SS

0
0
7
4

Building Enclosed
Close-In Phase Begins

EC1600, EC1580 FS
EC1550
FS

0
0

Brick Exterior Walls


Prepare and Solicit Bids for Brick Exterior
Review Bids for Brick
Award Contract for Brick

EC1280, EC1540
EC1070
EC1180
EC1220

0
0
0
0

EC1430

Concrete First Floor

EC1540
EC1480
EC1460
EC1470
EC1410

Structure Complete
Concrete Second Floor
Erect Stairwell and Elevator Walls
Concrete Basement Slab
Begin Structural Phase

Mechanical/Electrical Systems
EC1690
Rough In Complete
EC1490
Elevator
EC1710
EC1520
HVAC
EC1190
EC1240

EC1420
EC1460, EC1470,
EC1480
EC1430
EC1430
EC1430
EC1390

EC1240
Award Contract for Heat Pump
Fabricate and Deliver Heat Pump and ControlsEC1270
EC1290, EC1620,
EC1630
EC1650
Set Heat Pump
EC1660, EC1670,
EC1490
EC1680
Startup and Test HVAC
EC1820
EC1830
Test and Balance HVAC Equipment
EC1650
EC1670
Relocate HVAC Chiller
EC1740
EC1770
Install AC Grills and Registers
EC1620, EC1500
EC1630
Insulate Ducts
EC1440
EC1500
Install HVAC Ducts
Plumbing and Electrical
EC1650, EC1640
EC1660
Connect Equipment
EC1620, EC1510
EC1640
Install Wiring and Cable
EC1430
EC1440
Set Mechanical and Electrical Equipment
EC1500
EC1510
Rough-In Plumbing/Piping
Exterior Finishes
EC1270
EC1290

EC1620
EC1590
Brick
EC1550
EC1180
EC1220
EC1260

FS
FS
FS
FS

EC1040
Assemble Brick Samples
EC1070
Review and Approve Brick Samples
EC1280
Deliver Brick
Roof
EC1600
Insulation and Built-up Roofing
Doors and Windows
EC1560
Install Door and Window Frames
EC1580
Install Exterior Doors and Windows
Interior Finishes
EC1700
Drywall in Offices

EC1820
EC1840
EC1850
EC1860

FS
FS
FS

0
0
0

EC1550, EC1580 FS,FF

EC1550
EC1560

SS
FS

5
0

EC1620, EC1690 FS

EC1800, EC1810,
EC1710, EC1720
EC1830
EC1840
EC1850

FS
FS
FS
FS

0
0
0
0

EC1790
EC1740

FS
SS

0
0

Install Floor and Carpeting


Prepare and Solicit Bids for Flooring
Review Bids for Flooring
Award Contract for Flooring
Assemble and Submit Flooring Samples
Review and Approve Flooring
Fabricate and Deliver Flooring

EC1310, EC1740,
EC1760, EC1770
EC1080
EC1170
EC1250
EC1030
EC1060
EC1300

FS
FS
FS
FS
FS
FS
FS

0
0
0
0
0
0
0

Install Ceiling Grid


Finish Carpentry and Millwork

EC1700
EC1790

FS
FS

0
0

Paint Building Interior

EC1700

SS

Touch-up and Clean-up


Finishes Complete
Punch List
Building Addition Complete

Plumbing and Lighting Fixtures


EC1810
Install Plumbing Fixtures
EC1760
Install Lighting Fixtures
Floor and Carpeting

EC1790
EC1170
EC1250
EC1300
EC1060
EC1080
EC1310

EC1030
EC1040
EC1260

Carpentry
EC1740
EC1800
Paint
EC1720

Successors

Relationship
Type
Lag

EC1030
EC1160
EC1190
EC1040, EC1050,
EC1060, EC1090
EC1000

Free Float Total Float


0
0
0

0
0
0
0
0

EC1100
EC1230
EC1320, EC1330
EC1340
EC1340
EC1350
EC1360
EC1370
EC1380, EC1390

SS
FS
FS
FS
FS
FS
FS
FS
FS

0
0
0
0
0
0
0
0
0

EC1410, EC1420
EC1430

FS
FS

0
0

0
0
0

0
0
0
0

0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
470
0
0
0

0
0
470
130
130
130
130
130
130
130
130
130
470
316
130
130

EC1460, EC1470,
EC1440, EC1480

SS,FS,FS,FS

7,0,0,0

130

EC1550
EC1540
EC1540, EC1520
EC1540

FS
FS
FS
FS
FS

0
0
0
0
0

0
0
0
12
422

130
130
142
142
422

EC1700, EC1710

FS

0
0

0
0

EC1680, EC1520

FS

EC1820
EC1690

FS
FS

0
0

EC1240
EC1270

FS
FS

0
0

17
0
91
220
0
0
0

237
91
91
220
0
0
0

EC1290
EC1650

FS
FS

0
0

0
0

0
0

EC1660, EC1670

FS

EC1690
EC1840
EC1680
EC1790
EC1650
EC1630, EC1510

FS
FS
FS
FS
FS
SS,FS

0
0
0
0
0
4,0

EC1680
EC1660
EC1490, EC1500
EC1640

FS
FS
FS
SS

0
0
0
5

0
0
0
23
143
0
0
6
124
0
61
0

0
0
0
23
143
189
6
6
130
189
191
275

FS
FS

0
0

0
299
0

130
299
130

FS
FS
FS
FS

0
0
0
0

0
0
0
0

130
363
363
363

EC1630, EC1650,
EC1640, EC1700,
EC1710

EC1590, EC1560,
EC1600
EC1220
EC1260
EC1280

EC1070
EC1180
EC1550

FS
FS
FS

0
0
0

EC1620

FS

EC1580
EC1600, EC1620

FS
FF,FS

0
0

EC1740, EC1720

SS,FS

7,0

EC1830
EC1850
EC1860

FS
FS
FS

0
0
0

0
0
233
0
0
0
0
29
0
0

363
363
363
130
130
159
159
159
0
0

0
0
0
0

0
0
0
0
7
7
21
0

EC1820
EC1790

FS
FS

0
0

0
7
21
0

EC1800, EC1810
EC1250
EC1300
EC1310
EC1080
EC1170
EC1790

FS
FS
FS
FS
FS
FS
FS

0
0
0
0
0
0
0

0
0
0
0
0
0
231

0
231
231
231
231
231
231

8,8,0
0

0
0

0
0

0
77

77
77

EC1760, EC1770,
EC1790
EC1820

EC1820

SS,SS,FS
FS

FS

Activity ID
Activity Name
Original Duration
Total
691
CITY CENTER EXTENTION PROJECT
691
.City Center Office Building Extention
691
Design and Engineering
111
EC1000
Design Building Addition
55
EC1050
Assemble Technical Data for Heat Pump
7
EC1160
Review Technical Data on Heat Pumps
27
EC1030
Review and Approve Designs
22
EC1010
Start Office Building Addition Project
0
Foundation
144
EC1090
Begin Building Construction
0
EC1100
Site Preparation
43
EC1230
Excavation
24
EC1320
Install Underground Water Lines
12
EC1330
Install Underground Electric Conduit
12
EC1340
Form/Pour Concrete Footings
24
EC1350
Concrete Foundation Walls
24
EC1360
Form and Pour Slab
12
EC1370
Backfill and Compact Walls
5
EC1380
Foundation Phase Complete
0
Structure
154
EC1390
Erect Structural Frame
48
EC1420
Floor Decking
34
EC1430
Concrete First Floor
36
EC1540
Structure Complete
0
EC1480
Concrete Second Floor
36
EC1460
Erect Stairwell and Elevator Walls
24
EC1470
Concrete Basement Slab
24
EC1410
Begin Structural Phase
0
Mechanical/Electrical Systems
575
EC1690
Rough In Complete
0
EC1490
Rough-In Phase Begins
0
Elevator
227
EC1710
Install Elevator Cab and Finishes
5
EC1520
Install Elevator Rails and Equipment
2
HVAC
575
EC1190
Prepare and Solicit Bids for Heat Pump
14
EC1240
Review Bids for Heat Pump
10
EC1270
Award Contract for Heat Pump
6
EC1290
Fabricate and Deliver Heat Pump and Controls
422
EC1650
Set Heat Pump
12
EC1680
Startup and Test HVAC
2
EC1830
Test and Balance HVAC Equipment
2
EC1670
Relocate HVAC Chiller
7
EC1770
Install AC Grills and Registers
5

EC1630
Insulate Ducts
EC1500
Install HVAC Ducts
Plumbing and Electrical
EC1660
Connect Equipment
EC1640
Install Wiring and Cable
EC1440
Set Mechanical and Electrical Equipment
EC1510
Rough-In Plumbing/Piping
Exterior Finishes
EC1620
Building Enclosed
EC1590
Close-In Phase Begins
Brick
EC1550
Brick Exterior Walls
EC1180
Prepare and Solicit Bids for Brick Exterior
EC1220
Review Bids for Brick
EC1260
Award Contract for Brick
EC1040
Assemble Brick Samples
EC1070
Review and Approve Brick Samples
EC1280
Deliver Brick
Roof
EC1600
Insulation and Built-up Roofing
Doors and Windows
EC1560
Install Door and Window Frames
EC1580
Install Exterior Doors and Windows
Interior Finishes
EC1700
Drywall in Offices
EC1820
Touch-up and Clean-up
EC1840
Finishes Complete
EC1850
Punch List
EC1860
Building Addition Complete
Plumbing and Lighting Fixtures
EC1810
Install Plumbing Fixtures
EC1760
Install Lighting Fixtures
Floor and Carpeting
EC1790
Install Floor and Carpeting
EC1170
Prepare and Solicit Bids for Flooring
EC1250
Review Bids for Flooring
EC1300
Award Contract for Flooring
EC1060
Assemble and Submit Flooring Samples
EC1080
Review and Approve Flooring
EC1310
Fabricate and Deliver Flooring
Carpentry
EC1740
Install Ceiling Grid
EC1800
Finish Carpentry and Millwork
Paint
EC1720
Paint Building Interior

5
24
267
1
36
36
2
338
0
0
314
17
14
14
5
0
30
1
24
24
7
2
5
614
36
2
0
5
0
45
5
7
592
12
24
14
5
0
28
278
60
36
12
12
12

Early Start

Early Finish
18-Jan-13
18-Jan-13
18-Jan-13
18-Jan-13
18-Jan-13
6-May-13
16-May-13
5-Apr-13
18-Jan-13
6-May-13
6-May-13
6-May-13
5-Jul-13
8-Aug-13
8-Aug-13
26-Aug-13
27-Sep-13
31-Oct-13
18-Nov-13
22-Nov-13
22-Nov-13
29-Jan-14
18-Mar-14
7-May-14
7-May-14
7-May-14
29-Jan-14
24-Jun-13
16-May-14
10-Jun-14
17-Apr-15
10-Jun-14
24-Jun-13
24-Jun-13
12-Jul-13
26-Jul-13
5-Aug-13
18-Mar-15
14-Apr-15
2-Sep-15
3-Apr-15
18-Jun-15

11-Sep-15
11-Sep-15
11-Sep-15
21-Jun-13
5-Apr-13
15-May-13
21-Jun-13
6-May-13

Predecessors

Successors

EC1010
EC1030
EC1050
EC1000

EC1030
EC1160
EC1190
EC1040, EC1050, EC1060, EC1090
EC1000

EC1030
EC1090
EC1100
EC1230
EC1230
EC1320, EC1330
EC1340
EC1350
EC1360
EC1370

EC1100
EC1230
EC1320, EC1330
EC1340
EC1340
EC1350
EC1360
EC1370
EC1380, EC1390

EC1370
EC1390
EC1420
EC1460, EC1470, EC1480
EC1430
EC1430
EC1430
EC1390

EC1410, EC1420
EC1430
EC1460, EC1470, EC1440, EC1480
EC1550
EC1540
EC1540, EC1520
EC1540

22-Nov-13
4-Jul-13
7-Aug-13
23-Aug-13
23-Aug-13
26-Sep-13
30-Oct-13
15-Nov-13
22-Nov-13
22-Nov-13
26-Jun-14
29-Jan-14
18-Mar-14
7-May-14
26-Jun-14
26-Jun-14
10-Jun-14
10-Jun-14

4-Sep-15
16-Apr-15 EC1520, EC1680
EC1440
23-Apr-15
23-Apr-15 EC1620, EC1690
12-Jun-14 EC1460, EC1490
4-Sep-15
12-Jul-13 EC1160
25-Jul-13 EC1190
2-Aug-13 EC1240
18-Mar-15 EC1270
3-Apr-15 EC1290, EC1620, EC1630
16-Apr-15 EC1660, EC1670, EC1490
4-Sep-15 EC1820
14-Apr-15 EC1650
24-Jun-15 EC1740

EC1700, EC1710
EC1680, EC1520
EC1820
EC1690
EC1240
EC1270
EC1290
EC1650
EC1660, EC1670
EC1690
EC1840
EC1680
EC1790

22-Aug-14
16-May-14
27-Mar-14
3-Apr-15
22-Aug-14
27-Mar-14
22-May-14
6-May-13
21-Jul-14
6-May-13
26-Jun-14
17-Jun-13
8-Jul-13
26-Jul-13
6-May-13
6-May-13
2-Aug-13
21-Jul-14
21-Jul-14
3-Jul-14
3-Jul-14
7-Jul-14
6-May-13
17-Apr-15
31-Aug-15
4-Sep-15
18-Jun-15
13-Aug-15
18-Jun-15
6-May-13
28-Jul-15
13-Jun-13
17-Jul-13
7-Aug-13
6-May-13
6-May-13
14-Aug-13
8-Jun-15
8-Jun-15
13-Aug-15
28-Apr-15
28-Apr-15

28-Aug-14
19-Jun-14
6-Apr-15
6-Apr-15
13-Oct-14
16-May-14
26-May-14
22-Aug-14
22-Aug-14
21-Jul-14
21-Jul-14
8-Jul-13
26-Jul-13
2-Aug-13

EC1620, EC1500
EC1440

EC1650
EC1630, EC1510

EC1650, EC1640
EC1620, EC1510
EC1430
EC1500

EC1680
EC1660
EC1490, EC1500
EC1640

EC1600, EC1580
EC1550

EC1630, EC1650, EC1640, EC1700, EC1710

EC1280, EC1540
EC1590, EC1560, EC1600
EC1070
EC1220
EC1180
EC1260
EC1220
EC1280
EC1030
EC1070
17-Jun-13 EC1040
EC1180
5-Aug-13 EC1260
EC1550
22-Aug-14
22-Aug-14 EC1550, EC1580
EC1620
14-Jul-14
7-Jul-14 EC1550
EC1580
14-Jul-14 EC1560
EC1600, EC1620
11-Sep-15
5-Jun-15 EC1620, EC1690
EC1740, EC1720
2-Sep-15 EC1800, EC1810, EC1710, EC1720
EC1830
4-Sep-15 EC1830
EC1850
11-Sep-15 EC1840
EC1860
11-Sep-15 EC1850
19-Aug-15
19-Aug-15 EC1790
EC1820
29-Jun-15 EC1740
EC1790
12-Aug-15
12-Aug-15 EC1310, EC1740, EC1760, EC1770
EC1800, EC1810
17-Jul-13 EC1080
EC1250
7-Aug-13 EC1170
EC1300
13-Aug-13 EC1250
EC1310
EC1030
EC1080
13-Jun-13 EC1060
EC1170
8-Sep-14 EC1300
EC1790
28-Aug-15
27-Jul-15 EC1700
EC1760, EC1770, EC1790
28-Aug-15 EC1790
EC1820
13-May-15
13-May-15 EC1700
EC1820

Resources

Budgeted Labor
Budgeted
UnitsNonlabor Units
At Completion LaborTotal
UnitsFloat
20034
634
20034
0
20034
634
20034
0
20034
634
20034
0
1330
0
1330
0
Paul Kim, Paul Kim
883
0
883
0
Paul Kim
58
0
58
0
Paul Kim
216
0
216
0
Paul Kim
173
0
173
0
0
0
0
0
4339
0
4339
470
0
0
0
130
Excavator
346
0
346
130
Excavator, Excavator
384
0
384
130
Plumber, Plumber
192
0
192
130
Electrician, Electrician
192
0
192
130
Ironworker, Rough Carpenter, Equipment
1152
Operator, Ironworker, 0Rough Carpenter,1152
Equipment 130
Operator
Ironworker, Laborer-Construction, Rough
1152
Carpenter, Ironworker,0Laborer-Construction,
1152 Rough130
Carpenter
Finish Carpenter, Ironworker, Rough Carpenter,
768
Laborer-Construction,
0
Finish Carpenter,
768 Ironworker,
130 Rough Carpenter, Labore
Excavator, Finish Carpenter, Excavator, Finish
154 Carpenter
0
154
130
0
0
0
470
3878
0
3878
316
Ironworker, Ironworker
768
0
768
130
Ironworker, Ironworker, Ironworker
806
0
806
130
Ironworker, Laborer-Construction, Rough576
Carpenter, Finish Carpenter
0
576
130
0
0
0
130
Ironworker, Laborer-Construction, Rough576
Carpenter, Finish Carpenter
0
576
130
Laborer-Construction
192
0
192
142
Ironworker, Laborer-Construction, Laborer-Construction,
960
Rough Carpenter,
0
Finish Carpenter
960
142
0
0
0
422
5280
518
5280
0
0
0
0
0
0
0
0
237
77
0
77
91
Elevator Installer
38
0
38
91
Elevator Installer, Elevator Installer
38
0
38
220
4262
518
4262
0
Project Controls, Project Controls
115
0
115
0
Project Controls, Project Controls
77
0
77
0
0
0
0
0
Project Controls, Project Controls
3379
0
3379
0
Equipment Operator
96
0
96
0
Equipment Operator
19
0
19
0
Equipment Operator, Equipment Operator38
0
38
0
Equipment Operator, Electrician, HVAC Crew
77
58
77
0
0
0
0
23

HVAC Crew, HVAC Crew


HVAC Crew, HVAC Crew

77
384
941
0
Electrician, Electrician
576
Equipment Operator
288
Plumber, , Plumber,
77
1277
50, EC1640, EC1700, EC1710
0
0
778
Laborer-Construction, Laborer-Construction
269
Project Controls, Project Controls
115
Project Controls, Project Controls
115
Project Controls, Project Controls
38
0
Paul Kim
240
0
384
Laborer-Construction, Laborer-Construction
384
115
Finish Carpenter, Finish Carpenter
38
Finish Carpenter, Finish Carpenter
77
3930
Finish Carpenter
288
Finish Carpenter, Laborer-Construction, Painting
38
Crew
0
Painting Crew, Finish Carpenter, Laborer-Construction
77
0
154
Plumber
38
Electrician,
115
2893
Floor and Carpet Layer
96
Project Controls, Project Controls
192
Project Controls, Project Controls
115
Project Controls, Project Controls
38
0
Paul Kim
224
Project Controls, Project Controls
2227
384
Finish Carpenter
288
Finish Carpenter
96
96
Painting Crew
96

77
384
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
115
0
6
0
13
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
96
96

77
384
941
0
576
288
77
1277
0
0
778
269
115
115
38
0
240
0
384
384
115
38
77
3930
288
38
0
77
0
154
38
115
2893
96
192
115
38
0
224
2227
384
288
96
96
96

143
189
6
6
130
189
191
275
130
299
130
130
363
363
363
363
363
363
130
130
159
159
159
0
0
0
0
0
0
7
7
21
0
0
231
231
231
231
231
231
0
0
0
77
77

You might also like