sr. no.

1
a
b

description of item
excavation of foundation
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4

No

length(L)
3
1
3
2
2
1

breadth(B)
11.8
6.2
3.4
5.2
2.05
3.05

depth(D) Quantity(Q)
0.9
0.9
0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9
0.9
0.9

28.674
5.022
8.262
8.424
3.321
2.4705
56.1735

0.15
0.15
0.15
0.15
0.15
0.15

4.779
0.837
1.377
1.404
0.5535
0.41175
9.36225

0.15
0.15
0.15
0.15
0.15
0.15

3.105
0.531
0.999
0.99
0.423
0.3015
6.3495

0.15
0.15
0.15
0.15
0.15
0.15

2.565
0.435
0.855
0.84
0.3675
0.25875
5.32125

total
2
a
b

PCC
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4

3
1
3
2
2
1

11.8
6.2
3.4
5.2
2.05
3.05

0.9
0.9
0.9
0.9
0.9
0.9
total

brick masonary(L-1)
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4

3
1
3
2
2
1

11.5
5.9
3.7
5.5
2.35
3.35

0.6
0.6
0.6
0.6
0.6
0.6
total

brick masonary(L-2)
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4

3
1
3
2
2
1

11.4
5.8
3.8
5.6
2.45
3.45

0.5
0.5
0.5
0.5
0.5
0.5
total

5
a
b

brick masonary(L-3)
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4

3
1
3
2
2
1

11.3
5.7
3.9
5.7
2.55
3.55

0.4
0.4
0.4
0.4
0.4
0.4

0.45
0.45
0.45
0.45
0.45
0.45

6.102
1.026
2.106
2.052
0.918
0.639
12.843

0.6
0.6
0.6
0.6
0.6
0.6

6.048
1.008
2.16
2.088
0.954
0.657
12.915

3
3
3
3
3
3

30.24
5.04
10.8
10.44
4.77
3.285
64.575

0.7
0.7

4.704
4.473
9.177

total
6
a
b

plinth level
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4

3
1
3
2
2
1

11.2
5.6
4
5.8
2.65
3.65

0.3
0.3
0.3
0.3
0.3
0.3
total

7
a
b

wall
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4

3
1
3
2
2
1

11.2
5.6
4
5.8
2.65
3.65

0.3
0.3
0.3
0.3
0.3
0.3
total

parapet
long wall
short wall

2
2

11.2
10.65

0.3
0.3
total

plastering(inner face)
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2

11.25
14
14
7.25
11.5
10
9

3.75
3.75
3.75
3.75
3.75
3.75
3.75

42.1875
52.5
52.5
27.1875
43.125
37.5
33.75
288.75

3.75
3.75

84
79.875
163.875

0.1
0.1

0.12
0.432
0.552
17.892

total
10

plastering(outer face)
Long wall
short wall

2
2

11.2
10.65
total

11

R.C.C Work
chhaja
window-1
window-2

1
4

2
1.8

0.6
0.6

11.2

10.65

0.15

1.2
1
2
1.8
0.6
1.4
1.4

0.3
0.3
0.3
0.3
0.3
0.6
0.3

0.1
0.1
0.1
0.1
0.1
0.15
0.15

total
slab
lintal
D1
D2
w1
w2
V1
step-1
step-2

1
5
1
4
3

total

0.036
0.15
0.06
0.216
0.054
0.126
0.063
0.705

12
a
b

D.P.C
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4

3
1
3
2
2
1

11.2
5.6
4
5.8
2.65
3.65

0.3
0.3
0.3
0.3
0.3
0.3

10.08
1.68
3.6
3.48
1.59
1.095
21.525

total
13

door/window/ventilator
D1
D2
w1
w2
V1

1
5
1
4
3

1.2
1
2
1.8
0.6

0.3
0.3
0.3
0.3
0.3

2.2
2.2
1.4
1.4
0.45

Volume
0.792
3.3
0.84
3.024
0.243
8.199

0.6
0.6
0.6
0.6
0.6
0.6
0.6
total

9.4875
7.2
7.3125
7.8
9
3.7125
3.0375
47.55

total
14

earth work
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2

5.75
4
3.25
4
4
2.25
2.25

2.75
3
3.75
3.25
3.75
2.75
2.25

area
2.64
11
2.8
10.08
0.81
27.33

15

Flooring
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2

5.75
4
3.25
4
4
2.25
2.25

area
15.8125
12
12.1875
13
15
6.1875
5.0625
79.25

2.75
3
3.75
3.25
3.75
2.75
2.25
total

16
A

17
A

White Wash
Inner Side
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2
Outter Side
Long wall
short wall

Oil Paint
Inner Side
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2

2
2

11.25
14
14
7.25
11.5
10
9

3.75
3.75
3.75
3.75
3.75
3.75
3.75

42.1875
52.5
52.5
27.1875
43.125
37.5
33.75

11.2
10.65

3.75
3.75
total

84
79.875
452.625

11.25
14
14
7.25
11.5
10
9

3.75
3.75
3.75
3.75
3.75
3.75
3.75

42.1875
52.5
52.5
27.1875
43.125
37.5
33.75

Outter Side
Long wall
short wall

2
2

11.2
10.65

3.75
3.75
total

Sr. No.
Type
Quantities
1
Excavation(m3)
56.17
2
PCC in Foundation(m3)
9.36
3
Brick Masonary in Foundation(m3)
37.43
4
Sand Filling(m3)
47.55
5 Brick Masonary in Super Structure(m3)
65.55
6
12 mm Plastering(m2)
425.30
7
RCC for Slab(m3)
17.89
8
RCC for Chajja(m3)
0.55
9
RCC for Lintals(m3)
0.71
10
White Washing(m2)
425.30
11
Oil Paint(m2)
425.30
12
Wooden Part(m2)
8.20
13
Flooring(m2)Ceramic Tiles
79.25
14
D.P.C.(m2)
21.525

Rate
95.00
1985.00
2140.00
305.00
2125.00
95.00
3025.00
3025.00
3025.00
10.00
100.00
500.00
655.00
50.00
Total Cost

Cost
5336.48
18584.07
80097.53
14502.75
139300.13
40403.03
54123.30
1669.80
2132.63
4252.95
42529.50
4099.50
51908.75
1076.25
460016.65

Total Cost

36801.33
36801.33
533619.31

Abstract of Quantities:-

Water Supply System(8%)


Electrical Supply System(8%)

84
79.875
452.625