1
a
b
description of item
excavation of foundation
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4
No
length(L)
3
1
3
2
2
1
breadth(B)
11.8
6.2
3.4
5.2
2.05
3.05
depth(D) Quantity(Q)
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
28.674
5.022
8.262
8.424
3.321
2.4705
56.1735
0.15
0.15
0.15
0.15
0.15
0.15
4.779
0.837
1.377
1.404
0.5535
0.41175
9.36225
0.15
0.15
0.15
0.15
0.15
0.15
3.105
0.531
0.999
0.99
0.423
0.3015
6.3495
0.15
0.15
0.15
0.15
0.15
0.15
2.565
0.435
0.855
0.84
0.3675
0.25875
5.32125
total
2
a
b
PCC
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4
3
1
3
2
2
1
11.8
6.2
3.4
5.2
2.05
3.05
0.9
0.9
0.9
0.9
0.9
0.9
total
brick masonary(L-1)
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4
3
1
3
2
2
1
11.5
5.9
3.7
5.5
2.35
3.35
0.6
0.6
0.6
0.6
0.6
0.6
total
brick masonary(L-2)
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4
3
1
3
2
2
1
11.4
5.8
3.8
5.6
2.45
3.45
0.5
0.5
0.5
0.5
0.5
0.5
total
5
a
b
brick masonary(L-3)
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4
3
1
3
2
2
1
11.3
5.7
3.9
5.7
2.55
3.55
0.4
0.4
0.4
0.4
0.4
0.4
0.45
0.45
0.45
0.45
0.45
0.45
6.102
1.026
2.106
2.052
0.918
0.639
12.843
0.6
0.6
0.6
0.6
0.6
0.6
6.048
1.008
2.16
2.088
0.954
0.657
12.915
3
3
3
3
3
3
30.24
5.04
10.8
10.44
4.77
3.285
64.575
0.7
0.7
4.704
4.473
9.177
total
6
a
b
plinth level
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4
3
1
3
2
2
1
11.2
5.6
4
5.8
2.65
3.65
0.3
0.3
0.3
0.3
0.3
0.3
total
7
a
b
wall
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4
3
1
3
2
2
1
11.2
5.6
4
5.8
2.65
3.65
0.3
0.3
0.3
0.3
0.3
0.3
total
parapet
long wall
short wall
2
2
11.2
10.65
0.3
0.3
total
plastering(inner face)
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2
11.25
14
14
7.25
11.5
10
9
3.75
3.75
3.75
3.75
3.75
3.75
3.75
42.1875
52.5
52.5
27.1875
43.125
37.5
33.75
288.75
3.75
3.75
84
79.875
163.875
0.1
0.1
0.12
0.432
0.552
17.892
total
10
plastering(outer face)
Long wall
short wall
2
2
11.2
10.65
total
11
R.C.C Work
chhaja
window-1
window-2
1
4
2
1.8
0.6
0.6
11.2
10.65
0.15
1.2
1
2
1.8
0.6
1.4
1.4
0.3
0.3
0.3
0.3
0.3
0.6
0.3
0.1
0.1
0.1
0.1
0.1
0.15
0.15
total
slab
lintal
D1
D2
w1
w2
V1
step-1
step-2
1
5
1
4
3
total
0.036
0.15
0.06
0.216
0.054
0.126
0.063
0.705
12
a
b
D.P.C
long wall-1
long wall-2
short wall-1
short wall-2
short wall-3
short wall-4
3
1
3
2
2
1
11.2
5.6
4
5.8
2.65
3.65
0.3
0.3
0.3
0.3
0.3
0.3
10.08
1.68
3.6
3.48
1.59
1.095
21.525
total
13
door/window/ventilator
D1
D2
w1
w2
V1
1
5
1
4
3
1.2
1
2
1.8
0.6
0.3
0.3
0.3
0.3
0.3
2.2
2.2
1.4
1.4
0.45
Volume
0.792
3.3
0.84
3.024
0.243
8.199
0.6
0.6
0.6
0.6
0.6
0.6
0.6
total
9.4875
7.2
7.3125
7.8
9
3.7125
3.0375
47.55
total
14
earth work
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2
5.75
4
3.25
4
4
2.25
2.25
2.75
3
3.75
3.25
3.75
2.75
2.25
area
2.64
11
2.8
10.08
0.81
27.33
15
Flooring
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2
5.75
4
3.25
4
4
2.25
2.25
area
15.8125
12
12.1875
13
15
6.1875
5.0625
79.25
2.75
3
3.75
3.25
3.75
2.75
2.25
total
16
A
17
A
White Wash
Inner Side
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2
Outter Side
Long wall
short wall
Oil Paint
Inner Side
drawing room
bed room-1
bed room-2
dinning area
kitchen
w/c-1
w/c-2
2
2
11.25
14
14
7.25
11.5
10
9
3.75
3.75
3.75
3.75
3.75
3.75
3.75
42.1875
52.5
52.5
27.1875
43.125
37.5
33.75
11.2
10.65
3.75
3.75
total
84
79.875
452.625
11.25
14
14
7.25
11.5
10
9
3.75
3.75
3.75
3.75
3.75
3.75
3.75
42.1875
52.5
52.5
27.1875
43.125
37.5
33.75
Outter Side
Long wall
short wall
2
2
11.2
10.65
3.75
3.75
total
Sr. No.
Type
Quantities
1
Excavation(m3)
56.17
2
PCC in Foundation(m3)
9.36
3
Brick Masonary in Foundation(m3)
37.43
4
Sand Filling(m3)
47.55
5 Brick Masonary in Super Structure(m3)
65.55
6
12 mm Plastering(m2)
425.30
7
RCC for Slab(m3)
17.89
8
RCC for Chajja(m3)
0.55
9
RCC for Lintals(m3)
0.71
10
White Washing(m2)
425.30
11
Oil Paint(m2)
425.30
12
Wooden Part(m2)
8.20
13
Flooring(m2)Ceramic Tiles
79.25
14
D.P.C.(m2)
21.525
Rate
95.00
1985.00
2140.00
305.00
2125.00
95.00
3025.00
3025.00
3025.00
10.00
100.00
500.00
655.00
50.00
Total Cost
Cost
5336.48
18584.07
80097.53
14502.75
139300.13
40403.03
54123.30
1669.80
2132.63
4252.95
42529.50
4099.50
51908.75
1076.25
460016.65
Total Cost
36801.33
36801.33
533619.31
Abstract of Quantities:-
84
79.875
452.625