ABSTRACT OF COST

PROJECT : Kirnetar Health Center Maintenance Location:Kirnetar,Dolkha Sn 1.0 2.00 3.00 4.00 5.00 6.00 5.00 Description Dismentalling of existing concrete block wall Removing Doors and Windows for OT and X ray room Dismentalling of existing counter slab Concrete block wall made in 1:6 C/S mortar in superstructure in perfect line level finish all complete. (size of block=16"x6"x8") PCC (1:1.5:3) for RCC Reinforcement for RCC works Internal wall Plaster 12.5mm thick cement sand plaster in (1:4) ratio on INTERNAL WALLS of in perfect line & level including racking the joints, wetting of surface & curing the work all complete. Floor finish work Providing and laying non slippery glazed ceramic tile on floor including with 20mm cement sand mortar (1:3) and joints of tiles finished with white cement as approved patterns as per drawing and specification. 125 mm high tile skrting Ply wood fixing on wall of x- ray for lead sheet Granite on the counter slab of Dark Room Painting Works Applying two or more coats of enamel paints of approved quality over a coat of primers on doors, false ceiling and roofing exposed wooden members. Applying two coats of Emulsion painting of approved quality over a coat of primer on internal surfaces. Unit Sqm. L.S L.S Sqm. Cum. Kg Quantity 33.640 1.000 1.000 118.400 0.970 100.000 Rate 121.00 2000.00 4000.00 959.00 11293.00 112.84 Amount 4070.440 2000.000 4000.000 113545.600 10954.210 11284.000 Reks

Sqm.

187.580

230.31

43201.540

6.0

6.1

Sqm.

94.800

1553.84

147304.030

6.2 6.3 6.4 7.00 7.1

Rm Sqm. Sqm.

84.850 54.020 2.175

194.23 401.35 5000.00

16480.410 21680.920 10875.000

Sqm.

168.440

192.95

32500.490

7.2 8.0

Sqm.

187.580

193.13

36227.320

Sal wood door frames


Providing, making and fixing seasoned dressed salwood door frames including two coats of Cum. bitumen painting over faces in contact with partition walls as per drawing and specification.

0.587

174234.20

102275.470

Door shutter
Providing, making and fixing 4cm. thick paneled of teak wood door shutter with approved type of aluminium tower bolts, aluminium handles, iron Sqm. hinges, mortice lock and door stoppers etc. as per drawing and specification.

13.680

5756.16

78744.260

10 11 12 13 14 15

Lead glass fixing work with all necessary component Lead sheet fixing in the Doors of X ray room (1mm thick) all complete. Lead sheet fixing in the walls of X ray room (1mm thick) all complete Sanitary accessories including pipes for Surgical sinks and dark room Making necessary arrangement for suspending OT light in the roof truss. Laboratry Sink for Dark Room

Sqm. Sqm. Sqm. LS LS no.

1.080 5.040 54.020 1.000 1.000

150710.00 9150.00 9150.00 15000.00 25000.00

162766.800 46116.000 494283.000 15000.000 25000.000 8000.000 1378309.490 1557489.724

1.000 8000.00 TOTAL without VAT TOTAL including 13% VAT

Note: Rate of all Items has been taken from the district rate of Kavre District.